Truss sliding control method, device, equipment and computer readable storage medium

By acquiring mechanical parameter data during the truss sliding process, constructing and correcting a point cloud model, and combining it with finite element analysis, the problems of low construction accuracy and efficiency in traditional steel truss sliding technology are solved, achieving precise control and quality assurance of the construction process.

CN117494253BActive Publication Date: 2024-11-15CHINA RAILWAY CONSTRUCTION ENGINEERING GROUP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311262554.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-09-27
Publication Date
2024-11-15
Estimated Expiration
2043-09-27

AI Technical Summary

Technical Problem

Traditional steel truss sliding technology has a low level of informatization, and the construction accuracy and efficiency are difficult to meet the requirements, resulting in high construction difficulty and difficulty in guaranteeing quality.

Method used

By acquiring mechanical parameter data during the truss sliding process, a point cloud model is constructed and corrected. Combined with finite element analysis, the construction process can be simulated and precisely monitored and controlled, and the sliding operation status can be adjusted.

Benefits of technology

It improves the construction efficiency and quality of steel truss sliding, ensures the accuracy and efficiency of the construction process, and reduces errors and waste of resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117494253B_ABST
    Figure CN117494253B_ABST
Patent Text Reader

Abstract

The embodiments of the present application provide a truss sliding control method, device, equipment and computer-readable storage medium. The method includes obtaining mechanical parameter data during the current truss sliding process; comparing the mechanical parameter data with simulated mechanical parameter data; and adjusting the sliding operation state of the current truss according to the comparison result. In this way, the construction simulation of the steel truss sliding and the precise monitoring and control of the construction process are realized, which improves the construction efficiency and ensures the quality of the truss sliding.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] Embodiments of the present application relate to the field of data processing, and in particular, to a truss sliding control method, device, equipment, and computer-readable storage medium. Background Art

[0002] With the progress of urbanization and the development of the construction industry, more and more large buildings have been built, among which large-span steel structures account for the majority. The construction of steel structures requires extremely high lifting and sliding technology, and steel trusses are usually spliced ​​before lifting to avoid cross-construction, which makes the lifting and sliding requirements more stringent due to their large size and high weight.

[0003] The traditional steel truss sliding technology has a relatively low level of informatization, and its construction accuracy and efficiency are difficult to meet the requirements, which leads to the difficulty of steel truss construction and difficulty in ensuring construction quality. Summary of the invention

[0004] According to an embodiment of the present application, a truss sliding control solution is provided, which realizes the construction simulation of truss sliding and accurate construction process monitoring and control, improves the construction efficiency and ensures the quality of sliding.

[0005] In a first aspect of the present application, a truss sliding control method is provided. The method comprises:

[0006] Obtain the mechanical parameter data of the current truss during sliding;

[0007] Comparing the mechanical parameter data with simulated mechanical parameter data;

[0008] According to the comparison results, adjust the sliding operation state of the current truss;

[0009] The simulated mechanical parameter data is obtained in the following manner:

[0010] Obtain 3D point cloud data of the truss;

[0011] Constructing a point cloud model based on the three-dimensional point cloud data;

[0012] Modifying the constructed truss model through the point cloud model;

[0013] The mechanical performance analysis of the sliding process is carried out through the modified truss model to obtain the simulated mechanical parameter data.

[0014] Furthermore, the mechanical parameter data includes stress change data and stress condition data.

[0015] Furthermore, constructing a point cloud model based on the three-dimensional point cloud data includes:

[0016] De-noising, aligning and correcting the three-dimensional point cloud data to obtain optimized three-dimensional point cloud data;

[0017] Construct a point cloud model from optimized 3D point cloud data.

[0018] Furthermore, the denoising, aligning and correcting the three-dimensional point cloud data to obtain optimized three-dimensional point cloud data includes:

[0019] Wherein, aligning the three-dimensional point cloud data includes:

[0020] Based on the constructed BIM model, reference feature points are obtained; the reference feature points include structural corner points and connection positions;

[0021] Using the reference feature points as the reference coordinate system of the BIM model, matching the three-dimensional point cloud data with the reference feature points in the BIM model based on the ICP algorithm, obtaining the position of the point cloud data in the BIM model coordinate system, and completing the alignment of the three-dimensional point cloud data;

[0022] Denoising the three-dimensional point cloud data includes:

[0023] De-noising the three-dimensional point cloud data by using a Voxel Grid filtering algorithm;

[0024] Correcting the three-dimensional point cloud data includes:

[0025] Initialize the registration change matrix;

[0026] The point cloud data and the constructed BIM model are roughly registered by using the registration change matrix to obtain a preliminary registration result;

[0027] Extracting feature points of the point cloud data and the BIM model; the feature points include SIFT feature points and FPFH feature points;

[0028] The preliminary alignment result is optimized through the feature points to complete the optimization of the three-dimensional point cloud data.

[0029] Furthermore, the truss model includes:

[0030] The truss model including truss geometry, connection method and material characteristics information is established through Tekla.

[0031] Furthermore, the mechanical performance analysis of the sliding process is performed using the modified truss model to obtain simulated mechanical parameter data including:

[0032] The modified truss model was imported into Ansys, and external force was applied to simulate the traction device and sliding track during the sliding process. Finite element analysis was performed to obtain the simulated mechanical parameter data.

[0033] Furthermore, the comparing the mechanical parameter data with the simulated mechanical parameter data comprises:

[0034] Comparing the stress data in the mechanical parameter data with the stress data in the simulated mechanical parameter data, and calculating the error of the stress data;

[0035] The stress condition data in the mechanical parameter data and the stress condition data in the simulated mechanical parameter data are compared to calculate the error of the strain data.

[0036] In one possible implementation,

[0037] In a second aspect of the present application, a truss sliding control device is provided. The device comprises:

[0038] An acquisition module is used to obtain mechanical parameter data during the current truss sliding process;

[0039] A comparison module, used for comparing the mechanical parameter data with simulated mechanical parameter data;

[0040] An adjustment module is used to adjust the sliding operation state of the current truss according to the comparison result;

[0041] The simulated mechanical parameter data is obtained in the following manner:

[0042] Obtain 3D point cloud data of the truss;

[0043] Constructing a point cloud model based on the three-dimensional point cloud data;

[0044] Modifying the constructed truss model through the point cloud model;

[0045] The mechanical performance analysis of the sliding process is carried out through the modified truss model to obtain the simulated mechanical parameter data.

[0046] In a third aspect of the present application, an electronic device is provided, which includes a memory and a processor, wherein a computer program is stored in the memory, and when the processor executes the program, the method described above is implemented.

[0047] In a fourth aspect of the present application, a computer-readable storage medium is provided, on which a computer program is stored, and when the program is executed by a processor, the method according to the first aspect of the present application is implemented.

[0048] The truss sliding control method provided in the embodiment of the present application obtains the mechanical parameter data of the current truss sliding process; compares the mechanical parameter data with the simulated mechanical parameter data; and adjusts the sliding operation state of the current truss according to the comparison result, thereby realizing the construction simulation of the steel truss sliding and the precise monitoring and control of the construction process, improving the construction efficiency and ensuring the sliding quality.

[0049] It should be understood that the contents described in the Summary of the Invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] The above and other features, advantages and aspects of the embodiments of the present application will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, wherein:

[0051] Figure 1 is a flow chart of a truss sliding control method according to an embodiment of the present application;

[0052] Figure 2 is a block diagram of a truss sliding control device according to an embodiment of the present application;

[0053] Figure 3 It is a schematic diagram of the structure of a terminal device or a server suitable for implementing the embodiments of the present application. DETAILED DESCRIPTION

[0054] In order to make the purpose, technical solution and advantages of the embodiments of the present disclosure clearer, the technical solution in the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings in the embodiments of the present disclosure. Obviously, the described embodiments are part of the embodiments of the present disclosure, not all of the embodiments. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present disclosure.

[0055] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0056] Figure 1 A flow chart of a truss sliding control method according to an embodiment of the present disclosure is shown. The method comprises:

[0057] S110, obtaining mechanical parameter data of the current truss during sliding.

[0058] Among them, the mechanical parameter data include stress change data and stress condition data.

[0059] In some embodiments, the truss mechanical parameter data during the current construction process (truss sliding process) can be obtained through stress and strain sensors pre-arranged on the truss.

[0060] S120, comparing the mechanical parameter data with simulated mechanical parameter data.

[0061] The simulated mechanical parameter data is obtained in the following manner:

[0062] Obtain 3D point cloud data of the truss;

[0063] Constructing a point cloud model based on the three-dimensional point cloud data;

[0064] Modifying the constructed truss model through the point cloud model;

[0065] The mechanical performance analysis of the sliding process is carried out through the modified truss model to obtain the simulated mechanical parameter data.

[0066] Specifically, the truss can be scanned by a three-dimensional scanner to obtain three-dimensional point cloud data of the truss;

[0067] De-noising, aligning and correcting the three-dimensional point cloud data to obtain optimized three-dimensional point cloud data:

[0068] Wherein, aligning the three-dimensional point cloud data includes:

[0069] Based on the constructed BIM model (constructed by existing construction drawings, etc.), reference feature points are obtained; the reference feature points include structural corner points and connection positions, etc.;

[0070] The reference feature points are used as the reference coordinate system of the BIM model, and the scanned point cloud data is registered with the reference feature points in the BIM model using the ICP algorithm to obtain the position of the point cloud data in the BIM model coordinate system, thereby completing the alignment of the three-dimensional point cloud data;

[0071] Denoising the three-dimensional point cloud data includes:

[0072] De-noising the three-dimensional point cloud data through the Voxel Grid filtering algorithm. Discretize the point cloud data into 3D grids and set the appropriate grid size (Voxel Size). Sampling the point cloud in each grid, usually using the centroid or average value of the point cloud in the grid as the representative point. Downsampling the point cloud data is achieved through Voxel Grid filtering to reduce the point cloud density and thus remove some noise;

[0073] Correcting the three-dimensional point cloud data includes:

[0074] Initialize the registration transformation matrix using ICP or its variant algorithm, perform rough registration of the point cloud data and the constructed BIM model, and obtain preliminary alignment results; extract feature points of the point cloud data and BIM model, such as SIFT feature points, FPFH feature points, etc.; optimize the preliminary registration through the extracted feature points, iteratively optimize the minimum distance between matching point clouds, and continuously update the registration transformation matrix until convergence; perform error correction for registration errors;

[0075] Furthermore, in order to achieve better correction effects, methods such as the least squares method can be used to further improve the matching results between the point cloud data and the BIM model.

[0076] According to the optimized point cloud data, a reverse modeling algorithm or software is used to perform 3D reconstruction to obtain the corrected geometry and details of the steel truss; the result of the 3D reconstruction is integrated with the original BIM model to obtain the final corrected BIM model, i.e., the point cloud model.

[0077] A truss model including truss geometry, connection mode and material feature information is established through Tekla. The truss model is compared through the point cloud model, the processing error is corrected, a high-precision model is established, and the correction of the truss model is completed.

[0078] The modified truss model was imported into Ansys for mechanical performance analysis. That is, external force was applied to simulate the traction device and sliding track during the sliding process, and finite element analysis was performed to obtain the stress changes and strain conditions (simulated mechanical parameter data) of various parts of the steel truss during the sliding process.

[0079] In some embodiments, actual construction mechanical parameter data and finite element simulation results (simulated mechanical parameter data) are compared to calculate the error between the two.

[0080] Error calculation of stress data: Error = |actual construction stress - finite element simulation stress|;

[0081] Error calculation of strain data: Error = |actual construction strain - finite element simulation strain|.

[0082] That is, the stress data in the mechanical parameter data is compared with the stress data in the simulated mechanical parameter data, and the error of the stress data is calculated;

[0083] The stress condition data in the mechanical parameter data and the stress condition data in the simulated mechanical parameter data are compared to calculate the error of the strain data.

[0084] S130: Adjust the sliding operation state of the current truss according to the comparison result.

[0085] In some embodiments, the sliding operation state of the current truss is adjusted according to the calculated error in step S120.

[0086] Specifically, error determination is to set a maximum allowable error threshold according to engineering specifications or project requirements, and compare the calculated error with the set error threshold;

[0087] If the error is less than or equal to the set error threshold, it is considered that the actual construction mechanical parameter data is consistent with the finite element simulation results, meets the requirements of the specification, and the construction quality is good;

[0088] If the error is greater than the set error threshold, it is considered that there is a difference between the actual construction mechanics parameter data and the finite element simulation results, and there may be construction quality problems, which require further analysis of the cause.

[0089] Error result processing: If the error is within the permitted range of the specification, the error calculation results and judgment results can be recorded in the database for subsequent query and analysis, and visualized so that engineers and supervisors can intuitively understand the construction quality;

[0090] If the error exceeds the allowable range of the specification, it is necessary to further analyze the cause of the error. For example, it may be caused by errors in the construction process or inaccurate finite element simulation. Depending on the specific situation, the construction plan should be adjusted and optimized, or the finite element simulation method should be improved to improve the construction quality and simulation accuracy.

[0091] That is, if the difference between the data collected in real time at the construction site and the results of the simulation is within the specification requirements, the construction process will continue; if the error is too large, the construction process will be stopped for debugging.

[0092] Among them, the range requirement (the range permitted by the specification) and the error threshold can be pre-set according to the actual application scenario requirements and / or manual experience.

[0093] According to the embodiments of the present disclosure, the following technical effects are achieved:

[0094] Through the method disclosed in the present invention, an accurate real-time model is created, and the actual construction process is compared with the model to achieve simulation and optimization of the construction process, which helps to discover potential problems in advance and take corresponding measures, thereby reducing errors and risks.

[0095] It can monitor various parameters and indicators in the construction process in real time and provide timely feedback, which helps to ensure the accuracy and efficiency of the construction process and can respond quickly to any problems to avoid potential quality problems.

[0096] It can provide intelligent decision support for the construction team. By comparing and analyzing the actual data with the model, it can obtain suggestions on optimizing the construction process, improving efficiency and reducing resource waste.

[0097] In summary, the method disclosed herein can improve the efficiency of the construction process and reduce costs. By simulating and optimizing the construction process, waste and duplication of work are reduced, resource utilization is improved, and construction time and costs are reduced.

[0098] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0099] The above is an introduction to the method embodiment. The following is a further explanation of the scheme described in this application through an apparatus embodiment.

[0100] Figure 2 A truss sliding control device 200 according to an embodiment of the present application is shown. Figure 2 Shown include:

[0101] An acquisition module 210 is used to acquire mechanical parameter data during the current truss sliding process;

[0102] A comparison module 220, for comparing the mechanical parameter data with simulated mechanical parameter data;

[0103] An adjustment module 230, used to adjust the sliding operation state of the current truss according to the comparison result;

[0104] The simulated mechanical parameter data is obtained in the following manner:

[0105] Obtain 3D point cloud data of the truss;

[0106] Constructing a point cloud model based on the three-dimensional point cloud data;

[0107] Modifying the constructed truss model through the point cloud model;

[0108] The mechanical performance analysis of the sliding process is carried out through the modified truss model to obtain the simulated mechanical parameter data.

[0109] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described module can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0110] Figure 3 A schematic diagram of the structure of a terminal device or a server suitable for implementing an embodiment of the present application is shown.

[0111] like Figure 3 As shown, the terminal device or server includes a central processing unit (CPU) 301, which can perform various appropriate actions and processes according to the program stored in the read-only memory (ROM) 302 or the program loaded from the storage part 308 into the random access memory (RAM) 303. In RAM303, various programs and data required for the operation of the terminal device or server are also stored. CPU 301, ROM 302 and RAM303 are connected to each other through bus 304. Input / output (I / O) interface 305 is also connected to bus 704.

[0112] The following components are connected to the I / O interface 305: an input section 306 including a keyboard, a mouse, etc.; an output section 307 including a cathode ray tube (CRT), a liquid crystal display (LCD), etc., and a speaker, etc.; a storage section 308 including a hard disk, etc.; and a communication section 309 including a network interface card such as a LAN card, a modem, etc. The communication section 309 performs communication processing via a network such as the Internet. A drive 310 is also connected to the I / O interface 305 as needed. A removable medium 311, such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, etc., is installed on the drive 310 as needed, so that a computer program read therefrom is installed into the storage section 308 as needed.

[0113] In particular, according to an embodiment of the present application, the above method flow steps can be implemented as a computer software program. For example, an embodiment of the present application includes a computer program product, which includes a computer program carried on a machine-readable medium, and the computer program includes a program code for executing the method shown in the flow chart. In such an embodiment, the computer program can be downloaded and installed from the network through the communication part 309, and / or installed from the removable medium 311. When the computer program is executed by the central processing unit (CPU) 301, the above-mentioned functions defined in the system of the present application are executed.

[0114] It should be noted that the computer-readable medium shown in the present application may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present application, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In the present application, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Computer-readable signal media may also be any computer-readable medium other than computer-readable storage media, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wireless, wire, optical cable, RF, etc., or any suitable combination of the above.

[0115] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each box in the flow chart or block diagram can represent a module, a program segment or a part of the code, and the aforementioned module, program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flow chart, and the combination of the boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs the specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0116] The units or modules involved in the embodiments described in the present application may be implemented by software or hardware. The units or modules described may also be arranged in a processor. The names of these units or modules do not, in some cases, constitute limitations on the units or modules themselves.

[0117] As another aspect, the present application further provides a computer-readable storage medium, which may be included in the electronic device described in the above embodiment; or may exist independently without being assembled into the electronic device. The above computer-readable storage medium stores one or more programs, and when the above programs are used by one or more processors to execute the method described in the present application.

[0118] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.

Claims

1. A truss sliding control method, It is characterized in that include: Obtain the mechanical parameter data of the current truss during sliding; Comparing the mechanical parameter data with simulated mechanical parameter data; According to the comparison results, adjust the sliding operation state of the current truss; The simulated mechanical parameter data is obtained in the following manner: Obtain 3D point cloud data of the truss; Constructing a point cloud model based on the three-dimensional point cloud data includes: De-noising, aligning and correcting the three-dimensional point cloud data to obtain optimized three-dimensional point cloud data; Wherein, aligning the three-dimensional point cloud data includes: Based on the constructed BIM model, reference feature points are obtained; the reference feature points include structural corner points and connection positions; Using the reference feature points as the reference coordinate system of the BIM model, matching the three-dimensional point cloud data with the reference feature points in the BIM model based on the ICP algorithm, obtaining the position of the point cloud data in the BIM model coordinate system, and completing the alignment of the three-dimensional point cloud data; Denoising the three-dimensional point cloud data includes: De-noising the three-dimensional point cloud data by using a Voxel Grid filtering algorithm; Correcting the three-dimensional point cloud data includes: Initialize the registration change matrix; The point cloud data and the constructed BIM model are roughly registered by using the registration change matrix to obtain a preliminary registration result; Extracting feature points of the point cloud data and the BIM model; the feature points include SIFT feature points and FPFH feature points; Optimizing the preliminary alignment result by using the feature points to complete the optimization of the three-dimensional point cloud data; Build a point cloud model through optimized 3D point cloud data; Modifying the constructed truss model through the point cloud model; The mechanical performance analysis of the sliding process is carried out through the modified truss model to obtain the simulated mechanical parameter data.

2. The method according to claim 1, It is characterized in that The mechanical parameter data include stress change data and stress condition data.

3. The method according to claim 2, It is characterized in that The truss model includes: The truss model including truss geometry, connection method and material characteristics information is established through Tekla.

4. The method according to claim 3, It is characterized in that The mechanical performance analysis of the sliding process is performed using the modified truss model to obtain simulated mechanical parameter data including: The modified truss model was imported into Ansys, and external force was applied to simulate the traction device and sliding track during the sliding process. Finite element analysis was performed to obtain the simulated mechanical parameter data.

5. The method according to claim 4, It is characterized in that The comparing the mechanical parameter data with the simulated mechanical parameter data comprises: Comparing the stress data in the mechanical parameter data with the stress data in the simulated mechanical parameter data, and calculating the error of the stress data; The stress condition data in the mechanical parameter data and the stress condition data in the simulated mechanical parameter data are compared to calculate the error of the strain data.

6. A truss sliding control device, It is characterized in that include: An acquisition module is used to obtain mechanical parameter data during the current truss sliding process; A comparison module, used for comparing the mechanical parameter data with simulated mechanical parameter data; An adjustment module is used to adjust the sliding operation state of the current truss according to the comparison result; The simulated mechanical parameter data is obtained in the following manner: Obtain 3D point cloud data of the truss; Constructing a point cloud model based on the three-dimensional point cloud data includes: De-noising, aligning and correcting the three-dimensional point cloud data to obtain optimized three-dimensional point cloud data; Wherein, aligning the three-dimensional point cloud data includes: Based on the constructed BIM model, reference feature points are obtained; the reference feature points include structural corner points and connection positions; Using the reference feature points as the reference coordinate system of the BIM model, matching the three-dimensional point cloud data with the reference feature points in the BIM model based on the ICP algorithm, obtaining the position of the point cloud data in the BIM model coordinate system, and completing the alignment of the three-dimensional point cloud data; Denoising the three-dimensional point cloud data includes: De-noising the three-dimensional point cloud data by using a Voxel Grid filtering algorithm; Correcting the three-dimensional point cloud data includes: Initialize the registration change matrix; The point cloud data and the constructed BIM model are roughly registered by using the registration change matrix to obtain a preliminary registration result; Extracting feature points of the point cloud data and the BIM model; the feature points include SIFT feature points and FPFH feature points; Optimizing the preliminary alignment result by using the feature points to complete the optimization of the three-dimensional point cloud data; Build a point cloud model through optimized 3D point cloud data; Modifying the constructed truss model through the point cloud model; The mechanical performance analysis of the sliding process is carried out through the modified truss model to obtain the simulated mechanical parameter data.

7. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory. It is characterized in that When the processor executes the computer program, the method according to any one of claims 1 to 5 is implemented.

8. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method according to any one of claims 1 to 5 is implemented.