A dark excavation station entrance and exit passage structure and construction method thereof

By setting up a drainage system with water guiding, water diversion and drainage layers in the tunnel-excavated station, and by using specific construction methods, the construction problem of the intersection of the multi-level entrance and exit of the tunnel-excavated station was solved, achieving efficient and safe construction and convenient transfer of entrance and exit channels.

CN117967367BActive Publication Date: 2024-11-22CHINA RAILWAY FIFTH BUREAU GRP SOUTH CHINA ENG CO LTD +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410068424.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-17
Publication Date
2024-11-22
Estimated Expiration
2044-01-17

AI Technical Summary

Technical Problem

In the existing technology, there is a lack of safe and simple construction methods for the cross-section of the multi-level entrance and exit stations of the underground railway station, and the excavation volume is large and the construction efficiency is low.

Method used

The main passageway of the station hall is divided into upper and lower levels, with a drainage system consisting of a water guiding layer, a water diversion layer, and a water drainage layer. Combined with the tunnel support structure and secondary lining structure, construction is carried out through specific excavation and blasting techniques. Escalators and staircases are used to separate and facilitate convenient transfer between the entrance and exit passageways.

Benefits of technology

This reduced the amount of excavation required for the access channels, improved construction efficiency and safety, enabled convenient switching between access channels and efficient drainage, and lowered investment costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117967367B_ABST
    Figure CN117967367B_ABST
Patent Text Reader

Abstract

A structure for an in-and-out passage of a dark-cut station and a construction method thereof, comprising: a main passage of a station hall, the main passage of the station hall is divided into two layers, the upper layer of the main passage of the station hall is connected to an upper layer of a sloped section branch passage, and the lower layer of the main passage of the station hall is connected to a lower layer of a sloped section branch passage; the main passage of the station hall is connected to a train platform layer through an upper layer of a sloped section branch passage, forming an exit passage; the main passage of the station hall is connected to a train platform layer through a lower layer of a sloped section branch passage, forming an entry passage; a supporting structure is provided between the upper and lower layers of the main passage of the station hall, for reinforcing the support of the upper layer of the passage and maintaining the top of the lower layer of the passage. The structure described in the present invention can greatly reduce crowding of people and realize the separation of in-and-out passages, facilitate the conversion of in-and-out passages for people, and at the same time reduce the excavation volume of dark-cut passages, reduce mutual influence between tunnels, reduce investment, and has the advantages of high safety and high construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of tunnels and underground engineering, and in particular to a dark-excavated station entrance and exit passage structure and a construction method thereof. Background Art

[0002] At present, in order to facilitate the transportation of tourists, tourist scenic spots generally separate the entrance and exit channels to reduce crowding. At the same time, in order to facilitate the transfer of people from the entrance and exit channels to the stairs, stacked entrance and exit channels are generally used, that is, the upper level is for exit and the lower level is for entrance, or the upper level is for entrance and the lower level is for exit. In underground tunnel stations, three-dimensional cross-stacked channels are realized, so it is inevitable to form a three-dimensional intersection with the main channel. The entrance and exit channels lead to the ground station with steep slopes. The intersection of the sub-channels and the main channel are stacked, and the upper and lower layers of the sub-channels are small. The construction is a small-spacing blasting construction.

[0003] However, there is currently no safe and simple construction method for the intersection of stacked entrances and exits of underground excavation stations in China, and the excavation volume is high and the construction efficiency is low.

[0004] Application Contents

[0005] The purpose of the present application is to provide a dark-cut station entrance and exit passage structure and a construction method thereof to solve the technical problems described in the background technology.

[0006] The technical solutions adopted in this application are as follows:

[0007] A structure for entering and exiting a station through a concealed excavation, comprising: a main passage at a station hall level, the main passage at the station hall level being divided into an upper and lower level, the upper level of the main passage at the station hall level being connected to an upper level slope section branch passage, and the lower level of the main passage at the station hall level being connected to a lower level slope section branch passage; the main passage at the station hall level being connected to a train platform level through an upper level slope section branch passage to form an exit passage; the main passage at the station hall level being connected to a train platform level through a lower level slope section branch passage to form an entry passage;

[0008] An upper and lower support structure is arranged between the upper and lower layers of the main passage of the station hall, including: a water-guiding layer is arranged at the bottom of the upper passage, and a water-guiding hole is arranged in the water-guiding layer; a water-inducing layer is arranged below the water-guiding layer, and a hydrophobic layer is arranged below the water-inducing layer; the top of the heating evaporation part is connected to the bottom of the water-spreading pipe, the bottom of the heating evaporation part is connected to the top of the drainage pipe, the heating evaporation part is connected to the hydrophobic layer, and the introduced water flow and water droplets are evaporated and heated, and the heated water vapor is discharged through the water-spreading pipe, and the excess accumulated water is discharged through the drainage pipe; the reinforcement layer supports the hydrophobic layer and is arranged at the top of the lower passage;

[0009] The tunnel entrance and exit passage structure of the underground excavation station includes: tunnel support structure and tunnel secondary lining structure; the tunnel support structure includes: steel mesh and shotcrete; the tunnel secondary lining structure includes: arch wall lining, C35 cast-in-place reinforced concrete, geotextile + waterproof board + annular blind pipe waterproof structure;

[0010] The tunnel support structure includes: hollow anchor rods are used in the arch part, and mortar anchor rods are used in the side walls; hollow anchor rods are used in the main passage of the station hall and the arch parts on both sides, and prestressed anchor rods are used in the side walls.

[0011] Preferably, the secondary lining structure of the tunnel includes: a base plate, which is made of C35 cast-in-place reinforced concrete, and a prefabricated reinforced concrete pipe + concrete-filled drainage structure is buried under the base plate on one side.

[0012] Preferably, escalators and staircases are provided at the entrance and exit passages to meet the needs of passengers going up and down.

[0013] Preferably, the construction method comprises the following steps:

[0014] Enter the main passage of the station hall through the auxiliary passage, and select the matching excavation method according to the surrounding rock conditions. For Grade V surrounding rock, the reserved core soil method or CD method is used, for Grade IV, the step method is used, and for Grades II and III, the full section method is used. Digital electronic detonators are used for controlled blasting, and the blasting vibration speed of the upper and lower caverns and adjacent caverns is controlled within 5 cm / s.

[0015] Step S10: excavating the upper layer of the main passage of the station hall;

[0016] Step S11: excavating the connecting section between the main passage of the station hall layer and the horizontal branch passage of the upper slope section;

[0017] Step S12: excavating the upper slope section into horizontal channels;

[0018] Step S13: excavating the lower layer of the main passage of the station hall;

[0019] Step S14: excavating the connection section between the main passage of the station hall layer and the branch passage of the lower slope section;

[0020] Step S15: excavating the lower slope section branch channel from bottom to top;

[0021] Step S16: constructing the upper slope section branch channel from bottom to top;

[0022] S11, S12, S14~S16 are blasted at staggered times at the same locations on both sides, and adjacent construction can only be carried out after blasting inspection and ventilation are completed; after excavation of steps S10~S14 is completed, slag is discharged from the main channel of the station hall layer; S15 and S16 discharge slag from the connection between the entrance and exit channels and the platform layer of the railway station, and at the same time, the excavation ventilation of S10~S14 adopts a pressure-in ventilation mode for the main channel of the station hall layer, three ventilation ducts are set at the intersection, and jet fans are set up on the ground; S15 and S16 adopt a pressure-in ventilation mode from the entrance and exit channels at the bottom of the slope, and jet fans are set up on the ground at the entrance and exit channels to realize local exhaust; the slope of S15 and S16 channels is large during reverse excavation, and a simple drilling platform is set up with a quick-disassembly scaffold, and three rows of diagonal braces are used at the tail.

[0023] Preferably, the construction method for the secondary lining structure of the tunnel comprises the following steps:

[0024] Step S20: The lining is first constructed from bottom to top to form the lower slope section channel;

[0025] Step S21: constructing the upper slope section branch channel from bottom to top;

[0026] Step S22: constructing the upper slope section horizontal channel from the middle to the side;

[0027] Step S23: construct the connection section between the main passage of the station hall layer and the branch passage of the lower slope section;

[0028] Step S24: constructing the connecting section between the main passage of the station hall layer and the horizontal branch passage of the upper slope section branch passage;

[0029] Step S25: construct the lower level of the main passage of the station hall;

[0030] Step S26: construct the upper level of the main passage of the station hall.

[0031] Preferably, steps S20 to S24 are constructed using a combination of full-height brackets + steel sections + small steel formwork, S25 and S26 are constructed using a lining trolley, and the upper lining of S24 and S26 can only be constructed after the strength of the lower layer of concrete reaches the design strength.

[0032] Compared with the prior art, the advantages and positive effects of the present invention are: the structure described in the present invention can greatly reduce the congestion of people and realize the separation of entry and exit channels, facilitate the conversion of entry and exit channels for people, and at the same time reduce the excavation volume of dark tunnels, reduce the mutual influence between tunnels, reduce investment, and have the advantages of high safety and high construction efficiency; the upper and lower support structures of the main channel of the station hall are used to drain the accumulated water in the upper channel and strengthen the top support of the lower channel, thereby improving the drainage and stability performance of the main channel of the entire station hall. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The above and / or other aspects and advantages of the present invention will become clearer and easier to understand through the detailed description made in conjunction with the following drawings, which are only exemplary and do not limit the present invention, wherein:

[0034] Figure 1 The present invention is a schematic diagram of an embodiment of a structure of an entrance and exit passage of a dark-cut station.

[0035] Figure 2 The present invention is a schematic diagram of the main passage structure of the station hall layer in one embodiment of a concealed excavation station entrance and exit passage structure.

[0036] Figure 3 The present invention is a schematic diagram of the support structure of an embodiment of a dark excavation station entrance and exit passage structure.

[0037] Figure 4 The present invention is a schematic diagram of the tunnel structure of an embodiment of a dark excavation station entrance and exit passage structure.

[0038] Figure 5 The present invention is a schematic diagram of an elevator structure for a concealed excavation station entrance and exit passage structure.

[0039] Figure 6 The present invention is a construction schematic diagram of an embodiment of a method for constructing a dark excavation station entrance and exit passage structure.

[0040] Figure 7 The present invention is a flow chart of an excavation construction method for an embodiment of a construction method for a dark excavation station entrance and exit passage structure.

[0041] Figure 8 The present invention is a flow chart of a lining construction method for an embodiment of a construction method for a dark excavation station entrance and exit passage structure. DETAILED DESCRIPTION

[0042] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0043] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0044] As the instruction manual Figure 1-4As shown: a structure of an entrance and exit passage of a dark-cut station, including: a main passage 230 of the station hall level, the main passage 230 of the station hall level is divided into an upper and lower layer, the upper layer of the main passage 230 of the station hall level is connected to the upper layer slope section branch passage 200, and the lower layer of the main passage 230 of the station hall level is connected to the lower layer slope section branch passage 210.

[0045] The main passage 230 of the station hall level is connected to the platform level 220 of the train station through the upper slope section branch passage 200, forming an exit passage; the main passage 230 of the station hall level is connected to the platform level 220 of the train station through the lower slope section branch passage 210, forming an entry passage.

[0046] An upper and lower supporting structure 400 is arranged between the upper and lower layers of the main passage 230 of the station hall level, which is used to improve the drainage effect of the upper passage and strengthen the top support of the lower passage.

[0047] In this embodiment, passengers pass through the main passage of the station hall through the waiting hall, and reach the entrance of the platform level through the elevator / stairs of the downslope section. The exit level is above the entrance level, forming an upper and lower stacked channel at the intersection.

[0048] In one embodiment, the upper and lower supporting structures 400 include: a water-conducting layer 410 is arranged at the bottom of the upper channel, and a water-conducting hole 401 is arranged in the water-conducting layer 410; a water-inducing layer 420 is arranged under the water-conducting layer 410, and a hydrophobic layer 430 is arranged under the water-inducing layer 420; the top of the heating evaporation part 450 is connected to the bottom of the water diffusion pipe 451, and the bottom of the heating evaporation part 450 is connected to the top of the drainage pipe 452; the reinforcement layer 440 supports the hydrophobic layer 430 and is arranged at the top of the lower channel.

[0049] After the accumulated water in the upper channel is discharged into the water guide hole 401 of the water guide layer 410, it is merged into the hydrophobic layer 430 through the water guide layer 420; the heating evaporation part 450 is connected to the hydrophobic layer 430, and the introduced water flow and water droplets are evaporated and heated. The heated water vapor is discharged through the water diffusion pipe 451, and the excess accumulated water is discharged through the drainage pipe 452; the reinforcement layer 440 is arranged at the bottom of the upper and lower supporting structures 400 to support the drainage structure of the entire upper and lower supporting structures 400, and at the same time reinforce the top of the lower channel.

[0050] In this embodiment, the upper and lower supporting structures are used to drain the accumulated water in the upper channel and at the same time strengthen the top support of the lower channel, thereby improving the drainage and stability performance of the main channel of the entire station hall.

[0051] In one embodiment, the tunnel support structure comprises: The steel mesh is 350, with a grid spacing of 25cm×25cm and shotcrete of 8 to 12cm. The secondary lining structure of the tunnel includes: arch wall lining 360, C35 cast-in-place reinforced concrete, and geotextile + waterproof board + annular blind pipe waterproof structure 370.

[0052] In one embodiment, the tunnel support structure includes: hollow anchor rods 320 are used in the arch, mortar anchor rods 330 are used in the side walls, the anchor rods are 3.5 meters long and the spacing is 1.2*1.2; hollow anchor rods are used in the arches on both sides, and φ25 prestressed anchor rods 340 are used in the side walls, which are 4.5 meters long and the spacing is 1.2*1.2.

[0053] In one embodiment, the secondary lining structure of the tunnel includes: a bottom plate 380, which is made of C35 cast-in-place reinforced concrete, and a prefabricated reinforced concrete pipe + concrete-filled drainage structure 390 is buried under the bottom plate on one side.

[0054] As the instruction manual Figure 5 As shown: In one embodiment, a structure for an entrance and exit passage of a dark-cut station includes: an escalator and a staircase 310 are arranged in the entrance and exit passage to meet the needs of passengers going up and down.

[0055] As the instruction manual Figure 6-8 As shown: A construction method for a dark excavation station entrance and exit passage structure, the excavation construction method includes:

[0056] Step S10: excavating the upper layer of the main channel of the intersection;

[0057] Step S11: excavating branch channels on both sides of the upper layer of the main channel of the intersection;

[0058] Step S12: excavating the upper horizontal branch channel of the slope section;

[0059] Step S13: excavating the lower layer of the main channel of the intersection;

[0060] Step S14: excavating branch channels on both sides of the lower layer of the main channel of the intersection;

[0061] Step S15: excavating the lower slope section branch channel from bottom to top;

[0062] Step S16: construct the upper slope section branch channel from bottom to top.

[0063] Enter the main channel of the intersection through the auxiliary channel. The channel selects a matching excavation method based on the surrounding rock conditions. For grade V surrounding rock, the reserved core soil method or CD method is used, for grade IV surrounding rock, the step method is used, and for grades II and III, the full section method is used.

[0064] Digital electronic detonators are used for controlled blasting, and the blasting vibration speed of the upper and lower caverns and adjacent caverns is controlled within 5cm / s.

[0065] The intersection is divided into a branch channel and a main channel, and three locking steel arch frames are constructed continuously with I18 steel at a spacing of 0.6m.

[0066] The blasting construction in the same parts on both sides of S11, S12, S14~S16 shall be staggered at different times, and adjacent construction shall be carried out only after the blasting inspection and ventilation are completed.

[0067] After the excavation of steps S10 to S14 is completed, the slag is discharged from the main channel; S15 and S16 discharge the slag from the entrance and exit channel at the bottom of the slope. At the same time, the excavation ventilation of S10 to S14 is pressure-in ventilation of the main channel, three ventilation ducts are set at the intersection, and jet fans are set up on the ground; S15 and S16 use pressure-in ventilation from the entrance and exit channel at the bottom of the slope, and jet fans are set up on the ground at the entrance and exit to achieve local extraction.

[0068] The slope of S15 and S16 channels is large during reverse excavation construction, and a simple drilling platform is set up using a quick-dismantle scaffold, with three rows of diagonal braces at the tail.

[0069] As the instruction manual Figure 6-8 As shown: In one embodiment, a method for constructing a dark excavation station entrance and exit passage structure, the lining construction method comprises the following steps:

[0070] Step S20: The lining is first constructed from bottom to top to form the lower slope section channel;

[0071] Step S21: constructing the upper slope section branch channel from bottom to top;

[0072] Step S22: constructing the upper horizontal branch channel of the slope section from the middle to the side;

[0073] Step S23: constructing sub-channels on both sides of the lower level of the main channel of the intersection;

[0074] Step S24: constructing sub-channels on both sides of the upper level of the main channel of the intersection;

[0075] Step S25: construct the lower layer of the main channel of the intersection;

[0076] Step S26: construct the upper level of the main channel of the intersection.

[0077] Steps S20 to S14 are constructed using a combination of full-floor support + steel + small steel formwork, S25 and S26 are constructed using a lining trolley, and S24 and S26 require that the upper lining be constructed only after the lower layer concrete strength reaches the design strength.

[0078] It should be understood that the above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.

Claims

1. A dark excavation station entrance and exit passage structure, comprising: The main passage (230) of the station hall layer is divided into two layers, the upper layer of the main passage (230) of the station hall layer is connected to the upper layer slope section branch passage (200), and the lower layer of the main passage (230) of the station hall layer is connected to the lower layer slope section branch passage (210); the main passage (230) of the station hall layer is connected to the train platform layer (220) through the upper layer slope section branch passage (200) to form an exit passage; the main passage (230) of the station hall layer is connected to the train platform layer (220) through the lower layer slope section branch passage (210) to form an entry passage; An upper and lower support structure (400) is arranged between the upper and lower layers of the main passage (230) at the station hall level, comprising: a water guide layer (410) arranged at the bottom of the upper passage, and a water guide hole (401) is arranged in the water guide layer (410); a water diversion layer (420) is arranged below the water guide layer (410), and a hydrophobic layer (430) is arranged below the water diversion layer (420); the top of the heating evaporation part (450) is connected to the bottom of the water dispersion pipe (451), the bottom of the heating evaporation part (450) is connected to the top of the drainage pipe (452), the heating evaporation part (450) is connected to the hydrophobic layer (430), and the introduced water flow and water droplets are evaporated and heated, and the heated water vapor is discharged through the water dispersion pipe (451), and the excessive accumulated water is discharged through the drainage pipe (452); the reinforcement layer (440) supports the hydrophobic layer (430) and is arranged at the top of the lower passage; The tunnel entrance and exit passage structure of the underground excavation station includes: tunnel support structure and tunnel secondary lining structure; the tunnel support structure includes: steel mesh and shotcrete; the tunnel secondary lining structure includes: arch wall lining, C35 cast-in-place reinforced concrete, geotextile + waterproof board + annular blind pipe waterproof structure; The tunnel support structure comprises: hollow anchor rods (320) for the arch part and mortar anchor rods (330) for the side wall; hollow anchor rods for the main passage (230) of the station hall layer and the arch parts on both sides, and prestressed anchor rods (340) for the side wall.

2. The dark excavation station entrance and exit passage structure according to claim 1 is characterized in that: The secondary lining structure of the tunnel includes: a bottom plate (380) made of C35 cast-in-place reinforced concrete, and a prefabricated reinforced concrete pipe + concrete-filled drainage structure (390) buried under the bottom plate on one side.

3. The dark excavation station entrance and exit passage structure as claimed in claim 2 is characterized in that: Escalators and staircases (310) are provided at the entrance and exit passages to meet the needs of passengers going up and down.

4. The construction method of the dark excavation station entrance and exit passage structure according to any one of claims 2 or 3, characterized in that: The construction method comprises the following steps: Enter the main passage (230) of the station hall through the auxiliary passage, and select the matching excavation method according to the surrounding rock conditions. For grade V surrounding rock, the reserved core soil method or CD method is used, for grade IV, the step method is used, and for grades II and III, the full section method is used; digital electronic detonators are used for controlled blasting, and the blasting vibration speed of the upper and lower caverns and adjacent caverns is controlled within 5 cm / s; Step S10: excavating the upper layer of the main passage (230) at the station hall level; Step S11: excavating a connecting section between the main passage (230) of the station hall layer and the horizontal branch passage of the upper slope section branch passage (200); Step S12: excavating the upper slope section branch channel (200) and the horizontal branch channel; Step S13: excavating the lower layer of the main passage (230) at the station hall level; Step S14: excavating the connection section between the main passage (230) of the station hall layer and the branch passage (210) of the lower slope section; Step S15: excavating the lower slope section branch channel from bottom to top (210); Step S16: constructing the upper slope section branch channel (200) from bottom to top; S11, S12, S14-S16 are blasted at staggered times at the same locations on both sides, and adjacent construction can only be carried out after blasting inspection and ventilation are completed; after the excavation of steps S10-S14 is completed, slag is discharged from the main channel (230) of the station hall layer; S15 and S16 discharge slag from the connection between the entrance and exit channels and the railway platform layer (220), and at the same time, the excavation ventilation of S10-S14 is a pressure-in ventilation mode for the main channel (230) of the station hall layer, three ventilation ducts are set at the intersection, and jet fans are set up on the ground; S15 and S16 are ventilated from the entrance and exit channels at the bottom of the slope, and jet fans are set up on the ground at the entrance and exit channels to achieve local exhaust; when the S15 and S16 channels are reversed, the slope is large, and a simple drilling platform is set up using a quick-disassembly scaffold, and three rows of diagonal braces are used at the tail.

5. The construction method of the dark excavation station entrance and exit passage structure as claimed in claim 4 is characterized in that: The construction method of the secondary lining structure of the tunnel includes the following steps: Step S20: Lining is first constructed from bottom to top on the lower slope section branch channel (210); Step S21: constructing the upper slope section branch channel (200) from bottom to top; Step S22: constructing the upper slope section branch channel (200) horizontal branch channel from the middle to the side; Step S23: constructing the connection section between the main passage (230) of the station hall layer and the branch passage (210) of the lower slope section; Step S24: constructing the connection section between the main passage (230) of the station hall layer and the horizontal branch passage of the upper slope section branch passage (200); Step S25: construct the lower level of the main passage (230) at the station hall level; Step S26: construct the upper level of the main passage (230) at the station hall level.

6. The construction method of the dark excavation station entrance and exit passage structure as claimed in claim 5, characterized in that: Steps S20 to S24 are constructed using a combination of full-floor support + steel + small steel formwork, S25 and S26 are constructed using a lining trolley, and S24 and S26 require that the upper lining be constructed only after the lower concrete strength reaches the design strength.