Method for determining the clear distance of double-hole tunnels in soft rock strata with high ground stress

Through the combination of numerical simulation and on-site measurement, a ground stress inversion model was established to determine the reasonable clear distance of the double-hole tunnel in the high-level stress soft rock formation, which solved the problem that the existing design specifications were difficult to apply and improved construction efficiency and safety reduces engineering costs.

CN118036122BActive Publication Date: 2024-11-26BEIJING JIAOTONG UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410022951.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-08
Publication Date
2024-11-26
Estimated Expiration
2044-01-08

AI Technical Summary

Technical Problem

The existing tunnel design specifications are difficult to effectively determine the minimum clearance of double-hole tunnels under high-level stress soft rock formation conditions, resulting in low construction efficiency and heavy engineering economic burden.

Method used

Using a method of combining numerical simulation with on-site measurement, a geostress inversion model was established, geological factors were determined, and geostress inversion calculation and simulation were carried out. Through multivariate linear regression equations and orthogonal experiment calculations, it was concluded that the double-hole tunnel was buried in different places. Recommended value for reasonable net distance under deep and surrounding rock characteristics.

Benefits of technology

It improves the efficiency of tunnel construction, reduces the economic burden of the project, provides a high-safe method for determining tunnel clearance, fills the gaps in the existing design specifications, and provides new solutions for the construction of highland stress soft rock formation tunnels.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118036122B_ABST
    Figure CN118036122B_ABST
Patent Text Reader

Abstract

The invention provides a method for determining the clear distance of a double-hole tunnel in a high-ground stress soft rock formation, belongs to the technical field of tunnel engineering construction, and fills the gap in the existing tunnel design specifications under high-ground stress; the method comprises: establishing a ground stress inversion model of a tunnel site area and setting an initial ground stress field, and carrying out regression inversion calculation; calculating the expression of the initial ground stress field by a single stress field condition simulation method, and then performing a combined calculation of all stress field condition simulations to obtain the ground stress distribution, and then determining the distribution of lateral pressure coefficients at different sections of the tunnel line; determining all calculation conditions of tunnel excavation simulation by tunnel stability influencing indicators, establishing a corresponding tunnel excavation model, performing numerical simulation statistics, and finally determining the reasonable clear distance of the double-hole tunnel under various tunnel stability influencing indicators; the invention is based on numerical simulation and on-site measurement, and can obtain a reasonable recommended value of the minimum clear distance of the double-hole tunnel that improves construction efficiency and reduces the economic burden of the project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of tunnel engineering construction, and is applied to the design process of the line spacing between two parallel tunnels, and is specifically a method for determining the net distance of a double-hole tunnel in a high-ground stress soft rock formation. Background Art

[0002] With the continuous and vigorous development of tunnel construction, the transportation operation network is constantly improving; however, as the center of tunnel construction gradually shifts to the southwest, many new problems have emerged. The southwest region is full of high mountains and the geological conditions are extremely complex. Dangerous rock falls, debris flows, karst, soft rock deformation caused by high ground temperature and high ground stress, harmful gases and special rock and soil are all difficult problems in the tunnel construction process. For the selection of tunnel clearance, tunnel line layout and tunnel form in tunnel construction, how to meet the construction of the southwest region while improving construction efficiency and reducing the economic burden of the project has always been the focus of the industry.

[0003] At present, according to the distance between the tunnel lines of double-hole tunnels, they can be divided into ordinary separated tunnels, small clearance tunnels and continuous arch tunnels. The advantage of ordinary separated tunnels is that the surrounding rock pressures of the left and right lines do not affect each other during the tunnel construction process, and the surrounding rock disturbance on one side will not be transmitted to the other line; but the disadvantage is that the distance between the two lines is too large, and in the narrow areas of mountainous areas, the contradiction between the highway line and the connection outside the tunnel is prominent. The advantage of continuous arch tunnels is that the distance between the left and right lines is extremely small, which is convenient for tunnel line selection; but the disadvantage is that artificial middle partition walls are used instead of natural rock pillars. The small distance between the left and right lines also greatly increases the requirements for construction technology, the process is cumbersome, the surrounding rock disturbance is frequent, and the connection parts are prone to water leakage and cracking of the middle partition wall.

[0004] The advantage of a small clearance tunnel is that it combines the characteristics of an ordinary separated tunnel and a continuous arch tunnel, reducing the distance between the two lines. However, it still uses natural rock pillars as the separation area between the two lines, taking advantage of the large bearing capacity of natural rock pillars and supplemented by grouting reinforcement, it ensures the stability of the surrounding rock between the two lines and avoids water leakage to a great extent.

[0005] However, the existing railway and highway tunnel design specifications for separated tunnels and small clearance tunnels are based on tunnels of general burial depth, and are no longer fully applicable to soft rock tunnels with large burial depth and high ground stress. Studies have shown that under the compression of high ground stress, the disturbance range of tunnel excavation on the surrounding rock can reach more than 5 times the tunnel diameter, which has exceeded the minimum clearance range of separated tunnels specified in the existing tunnel design specifications. In summary, this field urgently needs a high-standard and high-safety tunnel clearance determination method to cope with the tunnel construction process in high ground stress soft rock formations. Summary of the invention

[0006] The purpose of the present invention is to efficiently and safely determine the tunnel clearance by combining numerical simulation with field measurement under the condition of tunnel construction in high geostress soft rock formations, and to obtain a reasonable recommended value for the minimum clearance of a double-hole tunnel that can improve construction efficiency and reduce the economic burden of the project.

[0007] The present invention adopts the following technical solutions to achieve the purpose:

[0008] A method for determining the clear distance of a double-hole tunnel in a high-in-situ stress soft rock formation comprises the following steps:

[0009] S1. Establish a geostress inversion model for the tunnel site area and set the initial geostress field for the tunnel site area;

[0010] S2. Determine the geological factors that affect the initial geostress field in the tunnel site;

[0011] S3. According to the determined geological factors, the corresponding geological boundary conditions are selected, and the regression inversion calculation of the initial geostress field of the tunnel site is performed in the geostress inversion model;

[0012] S4. Calculate the expression of the initial geostress field in the tunnel site area by simulating a single stress field condition; then perform a combined calculation of all stress field condition simulations to obtain the geostress distribution in the entire geostress inversion model;

[0013] S5. According to the distribution of ground stress, the distribution of lateral pressure coefficients at different sections of the tunnel line is calculated, and then all calculation conditions of tunnel excavation simulation are determined through the tunnel stability influencing index;

[0014] S6. Establish a tunnel excavation model under various calculation conditions, calculate and statistically analyze the time and space effects of tunnel stability, and obtain numerical simulation statistical results; based on the numerical simulation statistical results, determine the reasonable clear distance of the tunnel under various tunnel stability influencing indicators.

[0015] Furthermore, in step S5, the geostress distribution is calculated, including the calculation results of stress components of different stress states in the geostress inversion model; the calculation results of the stress components are combined with the multivariate linear regression equation, and the geostress cloud map of different depths in the longitudinal section of the tunnel is superimposed and calculated, so as to determine the geostress distribution law of the tunnel site area, determine the horizontal lateral pressure coefficient in different directions, and then obtain the distribution of lateral pressure coefficient at different sections of the tunnel.

[0016] The influencing indexes of tunnel stability are determined by combining the on-site geological survey data of the tunnel site and the tunnel line design data. The orthogonal test calculation table is selected through the experimental values ​​of the influencing indexes of tunnel stability to determine all the calculation conditions of the tunnel excavation simulation.

[0017] Based on the statistical results of numerical simulation of various working conditions and the orthogonal test calculation table of the influencing indicators of each tunnel stability, the recommended value range of the reasonable spacing between double-hole tunnels under different surrounding rock characteristics in various burial depths is analyzed, and reasonable suggestions for the minimum clear distance of double-hole tunnels are put forward.

[0018] In summary, due to the adoption of this technical solution, the beneficial effects of the present invention are as follows:

[0019] In the method of the present invention, the initial geostress of the tunnel site is inverted, and the factors affecting the stability of tunnel excavation are studied through the distribution law; this process gives full play to the advantages of computer numerical simulation, and after integrating the statistical results of numerical simulation of various working conditions and the orthogonal test analysis of various influencing factors, the reasonable clear distance recommended values ​​of double-hole tunnels under different surrounding rock characteristics in each burial depth range are obtained; combined with on-site actual measurement, the reasonable value of the minimum clear distance of the tunnel can be obtained efficiently and accurately, filling the gap in the existing design specifications under high geostress and providing a new solution for the development of tunnel engineering technology. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall process of the method for determining the clear distance of a double-hole tunnel of the present invention;

[0021] Figure 2 This is a screenshot of the geostress inversion model in the numerical calculation software;

[0022] Figure 3 It is the vertical principal stress cloud diagram at different depths of the longitudinal section where the tunnel line is located;

[0023] Figure 4 It is the maximum horizontal principal stress cloud diagram at different depths of the longitudinal section where the tunnel line is located;

[0024] Figure 5 It is the minimum horizontal principal stress cloud diagram at different depths of the longitudinal section where the tunnel line is located;

[0025] Figure 6 To express the intention for the design of working conditions based on orthogonal tests;

[0026] Figure 7 This is a screenshot of the tunnel excavation model in the numerical calculation software;

[0027] Figure 8 A schematic diagram of the three-dimensional screenshot of the tunnel excavation model in the numerical calculation software. DETAILED DESCRIPTION

[0028] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0029] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] Example

[0031] A method for determining the clear distance of a double-hole tunnel in a soft rock formation with high ground stress. The overall process of this method can be found in Figure 1 This embodiment will introduce the details and preferred methods of each step in detail according to the specific step sequence of the method.

[0032] In this embodiment, an actual double-hole tunnel project is used as a specific example to introduce the application of the method.

[0033] The overall direction of a proposed tunnel is east-west, with a total length of about 18km. It is designed as two single-hole single-slope tunnels, i.e. double-hole tunnels. The entire tunnel is planned to be constructed using the drilling and blasting method. The entrance and exit elevations are 3272m and 3700m respectively. The tunnel structure is buried at a depth of 500-1100m, with a general burial depth of 500-800m. The entrance and exit sections are relatively small, with a minimum burial depth of about 11m. The traffic conditions at the entrance of the tunnel are acceptable, but the exit section has a high and narrow slope and no roads, making traffic extremely difficult.

[0034] The tunnel section is a horseshoe-shaped "five-center circle + inverted arch", with a height of 10.87m and a width of 9.43m. It is excavated using the "three-step + inverted arch" method, with the upper step height of about 2.6m, the middle step height of about 3.3m, the lower step height of about 2.6m, and the inverted arch height of about 2.5m. The total length of the tunnel is 17803.3m, of which the Grade III surrounding rock section is 50m in total, accounting for 0.28% of the entire line, with a total of 1 section; the Grade IV surrounding rock section is 15143.3m in total, accounting for 85.06% of the entire line, with a total of 12 sections; the Grade V surrounding rock section is 2610m in total, accounting for 14.66% of the entire line, with a total of 12 sections. The data of the proposed tunnel is a typical soft rock tunnel with a large burial depth and high ground stress state. The following is the specific content of the method of this embodiment.

[0035] 1. Establishment of geostress inversion model

[0036] Select and determine the appropriate scope of geostress inversion calculation to be used in the model. The scope considerations include the conventional contents of model establishment, such as the grid division of the calculation area, the boundary conditions to be used, the load conditions and the initial stress range; use MIDAS / GTS NX or FLAC 3D numerical calculation software to extract the three-dimensional contour data of the tunnel site area and establish a geostress inversion model that is as close to the actual site as possible.

[0037] In this embodiment, two principles can be followed for the selection and determination of the inverse calculation range of geostress: first, the calculation range of the model should include the entire main area of ​​the tunnel project; second, the boundary of the model should be clear and definite, and it can be selected as far as possible at the ridge or valley.

[0038] The inverse model of geostress is as follows Figure 2 As shown in the figure, for the model itself, the upper surface of the model is a curved surface that is the same as the actual topography of the tunnel site, the rest of the model surface is a plane, and the horizontal cross-section of the model is a rectangular cross-section at different stratum depths. After the model is established, the initial geostress field of the tunnel site is set corresponding to the limited measured geostress area of ​​the tunnel site for the start of subsequent numerical calculations.

[0039] 2. Determine geological factors

[0040] Combined with the engineering geological conditions of the area through which the proposed tunnel will pass, the geological factors that affect the initial geostress field in the tunnel site are determined; the geological factors include: deadweight of the surrounding rock, physical and mechanical properties of the surrounding rock, geological tectonic action, topography, groundwater action and crustal temperature.

[0041] 3. Prepare the regression inversion calculation of the initial geostress field in the tunnel site area

[0042] Based on the determined geological factors, corresponding geological boundary conditions are selected; in this embodiment, these geological boundary conditions specifically include multiple aspects such as surface conditions, rock mass boundaries, structural boundaries, hydrological boundaries and the influence of other external factors. The boundary conditions that have a greater impact on the initial geostress field can be selected according to the actual project; various boundary conditions can be strictly divided into types: self-weight stress, horizontal extrusion, vertical shear and annular shear in the horizontal plane;.

[0043] After the geological boundary conditions are selected, the regression inversion calculation of the initial geostress field in the tunnel site area can be carried out; when performing the regression inversion calculation, the displacement boundary condition method and the stress boundary condition method are used, and the two methods work together to control the calculation process.

[0044] 4. Calculation of geostress distribution in geostress inversion model

[0045] Firstly, the target geostress under each type of single stress field condition is simulated respectively. Then, the expression of the initial geostress field of the tunnel site is calculated by regression analysis, neural network method or genetic algorithm based on the measured geostress results of the limited measured geostress area in the tunnel site.

[0046] Subsequently, based on the expression of the initial geostress field in the tunnel site area, the expansion multiples of the displacement boundary conditions or stress boundary conditions under each type of single stress field condition are obtained; then, MIDAS / GTS NX or FLAC 3D numerical calculation software is used to calculate the geostress distribution in the entire geostress inversion model based on the expansion multiples of the displacement boundary conditions or stress boundary conditions.

[0047] 5. Determination of all calculation conditions during tunnel excavation simulation

[0048] The calculated distribution of geostress includes the calculation results of stress components of different stress states in the geostress inversion model; the results are combined with the multivariate linear regression equation to calculate the geostress cloud maps at different depths of the longitudinal section where the tunnel is located. These cloud maps can be found in Figure 3 The vertical principal stress, Figure 4 The maximum horizontal principal stress and Figure 5 The minimum horizontal principal stress.

[0049] Based on the calculated geostress cloud map, the geostress distribution law of the tunnel site area can be determined, which is common knowledge or standard analysis and induction technology in this field, and then the horizontal lateral pressure coefficients in different directions can be determined, and the lateral pressure coefficient distribution at different sections of the tunnel line can be obtained. This lateral pressure coefficient distribution will be used in the subsequent calculation of numerical values ​​in the tunnel excavation simulation process and the application of tunnel stability influencing indicators.

[0050] Next, by combining the on-site geological survey data of the tunnel site and the tunnel line design data, that is, the specific tunnel parameters in the example of this embodiment, the main factors affecting the stability of tunnel excavation, that is, the tunnel stability influencing index, can be determined; each influencing index needs to determine a specific and different test value for use in the numerical simulation process. By selecting the orthogonal test calculation table, all calculation conditions of the tunnel excavation simulation can be determined.

[0051] In this embodiment, the influencing indicators of tunnel stability include: the clear distance of the double-hole tunnel, the tunnel burial depth, the tunnel area lateral pressure coefficient and the surrounding rock strength; wherein, the tunnel area lateral pressure coefficient is obtained from the calculated distribution of lateral pressure coefficients at different sections of the tunnel line. For the specific tunnel of this embodiment, the different test values ​​determined for each influencing indicator are: the clear distance factor of the double-hole tunnel is divided into three levels of 30m, 50m and 70m; the tunnel burial depth factor is divided into three levels of 500m, 800m and 1100m; the tunnel area lateral pressure coefficient is divided into three levels of 1.0, 1.5 and 2.0; the surrounding rock strength factor can be divided into three levels of strong, medium and weak according to its inherent characteristics. The test values ​​of these factors can be selected with reference to the actual situation or relevant research data, and the selection of their maximum and minimum boundary values ​​must meet the actual situation and specification requirements.

[0052] Based on the above test values, the selected orthogonal test calculation table can be found in Figure 4 In the figure, the letters A, B, C, and D respectively represent the clear distance of the double-hole tunnel, the tunnel burial depth, the tunnel area lateral pressure coefficient and the surrounding rock strength. The 1, 2, and 3 below the letters represent the test values ​​of the three levels respectively. Based on this table and the actual situation, it is determined that a total of 9 numerical simulation calculation tests under different working conditions are carried out.

[0053] 6. Establish a tunnel excavation model, conduct numerical simulation and statistics, and determine the reasonable clearance

[0054] Using MIDAS / GTS NX or FLAC 3D numerical calculation software, based on the inverse model of ground stress, combined with the distribution of lateral pressure coefficients at different sections of the tunnel line and 9 calculation conditions of tunnel excavation simulation, the tunnel excavation model under 9 conditions is established. The tunnel excavation model is based on the tunnel line design data, which is presented in the numerical calculation software as follows Figure 6 The front cross-sectional view shown also has a multi-level structure, such as Figure 7 With the tunnel excavation model, the simulation calculation of the tunnel excavation process can be carried out on the basis of the ground stress inversion model.

[0055] In the simulation calculation, the displacement deformation data, surrounding rock stress data and surrounding rock deformation data of the tunnel characteristic points in the tunnel excavation model are continuously counted, so as to analyze the time and space effects of tunnel stability as the statistical analysis results; on the basis of the statistical analysis results, combined with the orthogonal test calculation table selected by the tunnel stability influencing index, the reasonable clearance of the double-hole tunnel corresponding to different tunnel stability influencing indicators is determined. For example, the levels of the other three indicators other than the double-hole tunnel clearance are determined. After numerical simulation, it can be statistically determined which level of double-hole tunnel clearance at this time best meets the efficiency and safety requirements of the actual project, so that it can be determined as the clearance used in the actual construction of the double-hole tunnel project.

Claims

1. A method for determining the clear distance of a double-hole tunnel in a high-in-situ stress soft rock formation, characterized in that: The method comprises the following steps: S1. Establish a geostress inversion model for the tunnel site area and set the initial geostress field for the tunnel site area; S2. Determine the geological factors that affect the initial geostress field in the tunnel site; S3. According to the determined geological factors, the corresponding geological boundary conditions are selected, and the regression inversion calculation of the initial geostress field of the tunnel site is performed in the geostress inversion model; S4. Calculate the expression of the initial geostress field in the tunnel site area by simulating a single stress field condition; then perform a combined calculation of all stress field condition simulations to obtain the geostress distribution in the entire geostress inversion model; S5. According to the distribution of ground stress, the distribution of lateral pressure coefficients at different sections of the tunnel line is calculated, and then all calculation conditions of tunnel excavation simulation are determined through the tunnel stability influencing index; S6. Establish a tunnel excavation model under various calculation conditions, calculate and statistically analyze the time and space effects of tunnel stability, and obtain numerical simulation statistical results; Based on the statistical results of numerical simulation, the reasonable clearance of tunnels under various tunnel stability influencing indicators is determined; In step S1, the inverse calculation range of the inverse stress model is determined, and the three-dimensional contour data of the tunnel site area is extracted by numerical calculation software to establish the inverse stress model; in the inverse stress model, the setting of the initial inverse stress field of the tunnel site area corresponds to the limited measured inverse stress area of ​​the tunnel site area; In step S2, the geological factors affecting the initial geostress field in the tunnel site are determined in combination with the engineering geological conditions of the area through which the proposed tunnel passes; the geological factors include: deadweight of surrounding rock, physical and mechanical properties of surrounding rock, geological tectonic action, topography, groundwater action and crustal temperature; In step S3, the selected geological boundary conditions include: self-weight stress, horizontal compression, vertical shear and annular shear in the horizontal plane; when performing regression inversion calculation, the displacement boundary condition method and the stress boundary condition method are used, and the two methods work together to control the calculation process; in the ground stress inversion model, the upper surface part of the model is a curved surface with the same actual topography and landform as the tunnel site, and the rest of the surface of the model is a plane, and the horizontal cross-section of the model is a rectangular with equal cross-section at different stratum depths; In step S4, when performing the calculation process of regression inversion calculation, for the initial geostress field of the tunnel site, firstly, the target geostress under each type of single stress field condition is simulated respectively, and then the expression of the initial geostress field of the tunnel site is calculated by regression analysis method, neural network method or genetic algorithm through the measured geostress results of the limited measured geostress area of ​​the tunnel site; In step S5, the calculated geostress distribution includes the calculation results of stress components of different stress states in the geostress inversion model; the calculation results of stress components are combined with the multivariate linear regression equation to calculate the geostress cloud map at different depths of the longitudinal section where the tunnel is located, so as to determine the geostress distribution law of the tunnel site area, determine the horizontal lateral pressure coefficient in different directions, and then obtain the distribution of lateral pressure coefficients at different sections of the tunnel; In step S6, numerical calculation software is used to establish a tunnel excavation model under each calculation condition based on the ground stress inversion model, combined with the distribution of lateral pressure coefficients at different sections of the tunnel line and all calculation conditions of the tunnel excavation simulation, and perform simulation calculations of the tunnel excavation process; in the simulation calculation, the displacement deformation data, surrounding rock stress data and surrounding rock deformation data of the tunnel characteristic points in the tunnel excavation model are continuously counted, so as to analyze the time and space effects of the tunnel stability as the statistical analysis results; on the basis of the statistical analysis results, combined with the orthogonal test calculation table selected by the tunnel stability influencing index, the reasonable clear distance corresponding to the double-hole tunnel under different tunnel stability influencing indicators is determined.

2. The method for determining the clear distance of a double-hole tunnel in a high-in-situ stress soft rock formation according to claim 1 is characterized by: Based on the expression of the initial geostress field in the tunnel site area, the expansion multiples of the displacement boundary conditions or stress boundary conditions under each type of single stress field condition are obtained; then, numerical calculation software is used to calculate the geostress distribution in the entire geostress inversion model based on the expansion multiples of the displacement boundary conditions or stress boundary conditions.

3. The method for determining the clear distance of a double-hole tunnel in a high-in-situ stress soft rock formation according to claim 1, characterized in that: The influencing indexes of tunnel stability are determined by combining the on-site geological survey data of the tunnel site and the tunnel line design data. The orthogonal test calculation table is selected through the experimental values ​​of the influencing indexes of tunnel stability to determine all the calculation conditions of the tunnel excavation simulation.

4. The method for determining the clear distance of a double-hole tunnel in a high-in-situ stress soft rock formation according to claim 3 is characterized by: The influencing indicators of tunnel stability include: the clear distance between double-hole tunnels, tunnel burial depth, tunnel area lateral pressure coefficient and surrounding rock strength; among them, the tunnel area lateral pressure coefficient is obtained from the calculated lateral pressure coefficient distribution at different sections of the tunnel line.