Hydropower efficiency monitoring method, device, computer equipment, readable storage medium and program product

By collecting water area information and comprehensively analyzing hydropower operation data, the problem of insufficient comprehensive monitoring of hydropower efficiency in the existing technology has been solved, and the monitoring accuracy and operation optimization capabilities of hydropower efficiency have been improved.

CN118229157BActive Publication Date: 2024-10-08CSG POWER GENERATION (GUANGDONG) ENERGY STORAGE TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410645752.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-23
Publication Date
2024-10-08
Estimated Expiration
2044-05-23

AI Technical Summary

Technical Problem

Existing hydropower efficiency monitoring methods are not comprehensive enough and usually only analyze from a single perspective, resulting in low accuracy of results and affecting the accuracy of hydropower efficiency analysis and management.

Method used

By collecting water area information, the hydropower efficiency monitoring threshold is determined, and hydropower operation assessment information, abandoned water assessment information, and drainage water area assessment information are obtained to comprehensively analyze the comprehensive hydropower efficiency of the hydropower plant and generate alarm information and analysis reports.

Benefits of technology

It improves the monitoring accuracy of hydropower efficiency, provides multi-faceted and multi-angle reflections on the operation of hydropower plants, and helps operators understand the causes of low efficiency and take measures to optimize operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118229157B_ABST
    Figure CN118229157B_ABST
Patent Text Reader

Abstract

The present application relates to a method, device, computer equipment, readable storage medium and program product for monitoring hydropower efficiency. The method includes: in response to an efficiency monitoring request for a hydropower plant to be monitored, collecting current water area information of the water area corresponding to the hydropower plant to be monitored; determining the corresponding hydropower efficiency monitoring threshold value based on the current water area information; obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information; generating alarm information and analysis reports for the hydropower plant to be monitored when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold value. The use of this method can improve the accuracy of hydropower efficiency monitoring.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of hydropower technology, and in particular to a hydropower efficiency monitoring method, device, computer equipment, computer-readable storage medium and computer program product. Background Art

[0002] Hydropower is the second largest power resource after coal and a major clean energy source. It is crucial to saving coal resources, reducing greenhouse gas and pollutant emissions, and plays a significant role in low-carbon sustainable development. In the power trading market, the flexibility and stability of hydropower make it a key component of renewable energy. By monitoring and analyzing hydropower efficiency, it can not only achieve energy conservation and emission reduction, flood prevention and disaster reduction, but also more effectively adjust the supply and demand balance in the power market and improve market response speed. In view of the maturity of hydropower technology and its stability as a renewable energy source, the analysis of the comprehensive efficiency of hydropower plants can optimize their performance in the power trading market, enhance their competitiveness, and improve resource utilization, thereby promoting the optimization of energy structure.

[0003] However, the current monitoring methods for hydropower efficiency are not comprehensive enough, and often only monitor and analyze hydropower efficiency from a single perspective. Monitoring and analysis from a single perspective will result in low accuracy of the results, further affecting the accuracy of hydropower efficiency analysis and management. Summary of the invention

[0004] Based on this, it is necessary to provide a hydropower efficiency monitoring method, device, computer equipment, computer-readable storage medium and computer program product that can improve the accuracy of hydropower efficiency monitoring in response to the above technical problems.

[0005] In a first aspect, the present application provides a method for monitoring hydropower efficiency, comprising:

[0006] In response to an efficiency monitoring request for a hydropower plant to be monitored, collecting current water area information of a water area corresponding to the hydropower plant to be monitored;

[0007] Determine a corresponding hydropower efficiency monitoring threshold value according to the current water area information;

[0008] Obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information;

[0009] When the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, an alarm message and an analysis report for the hydropower plant to be monitored are generated.

[0010] In one embodiment, the current water area information includes water level information and water flow information;

[0011] The determining, according to the current water area information, a corresponding hydropower efficiency monitoring threshold value includes:

[0012] Determine water flow assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow information;

[0013] Determine the water condition assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow assessment information and the water level information;

[0014] According to the preset mapping relationship, the hydropower efficiency monitoring threshold corresponding to the water situation assessment information is determined.

[0015] In one embodiment, determining the water flow assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow information includes:

[0016] Determine, based on the water flow information, a water flow variation curve of the water area corresponding to the hydropower plant to be monitored;

[0017] Determining the overlap length between the water flow change curve and a preset water flow change reference curve;

[0018] The water flow assessment information is determined according to the overlap length, the water flow information and preset water flow reference information.

[0019] In one embodiment, the obtaining of the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored includes:

[0020] Obtaining power generation information of the hydropower plant to be monitored within multiple preset time periods;

[0021] Determining power generation stability assessment information of the hydropower plant to be monitored based on the power generation information;

[0022] The accumulated usage time and startup time of the equipment of the hydropower plant to be monitored are obtained, and the hydropower operation evaluation information of the hydropower plant to be monitored is determined based on the accumulated usage time of the equipment, the startup time, the power generation stability evaluation information and the preset power generation reference information.

[0023] In one embodiment, the obtaining of the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored includes:

[0024] Obtaining water inflow information of the upstream water area of ​​the water area corresponding to the hydropower plant to be monitored, and obtaining actual water consumption information of the hydropower plant to be monitored;

[0025] The hydropower abandonment assessment information of the hydropower plant to be monitored is determined according to the inflow water information, the actual water consumption information and a preset abandonment reference ratio.

[0026] In one embodiment, the obtaining of the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored includes:

[0027] Obtaining dissolved oxygen information, temperature information, pH information and sediment information of the downstream water area corresponding to the water area of ​​the hydropower plant to be monitored;

[0028] The drainage water area assessment information of the hydropower plant to be monitored is determined based on the dissolved oxygen information, the temperature information, the pH information, the sediment information and the corresponding preset reference information.

[0029] In a second aspect, the present application also provides a hydropower efficiency monitoring device, comprising:

[0030] A water area information collection module, used to collect current water area information of the water area corresponding to the hydropower plant to be monitored in response to an efficiency monitoring request for the hydropower plant to be monitored;

[0031] A monitoring threshold determination module, used to determine a corresponding hydropower efficiency monitoring threshold according to the current water area information;

[0032] A hydropower efficiency determination module, used to obtain the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information of the hydropower plant to be monitored, and determine the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information;

[0033] The information report generating module is used to generate alarm information and analysis report for the hydropower plant to be monitored when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold.

[0034] In a third aspect, the present application further provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:

[0035] In response to an efficiency monitoring request for a hydropower plant to be monitored, collecting current water area information of a water area corresponding to the hydropower plant to be monitored;

[0036] Determine a corresponding hydropower efficiency monitoring threshold value according to the current water area information;

[0037] Obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information;

[0038] When the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, an alarm message and an analysis report for the hydropower plant to be monitored are generated.

[0039] In a fourth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:

[0040] In response to an efficiency monitoring request for a hydropower plant to be monitored, collecting current water area information of a water area corresponding to the hydropower plant to be monitored;

[0041] Determine a corresponding hydropower efficiency monitoring threshold value according to the current water area information;

[0042] Obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information;

[0043] When the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, an alarm message and an analysis report for the hydropower plant to be monitored are generated.

[0044] In a fifth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:

[0045] In response to an efficiency monitoring request for a hydropower plant to be monitored, collecting current water area information of a water area corresponding to the hydropower plant to be monitored;

[0046] Determine a corresponding hydropower efficiency monitoring threshold value according to the current water area information;

[0047] Obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information;

[0048] When the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, an alarm message and an analysis report for the hydropower plant to be monitored are generated.

[0049] The hydropower efficiency monitoring method, device, computer equipment, computer-readable storage medium and computer program product described above firstly respond to the efficiency monitoring request for the hydropower plant to be monitored, collect the current water area information of the water area corresponding to the hydropower plant to be monitored, and obtain the water level, water flow velocity, water quality and other information of the water area, so as to provide basic data for subsequent efficiency monitoring; then, determine the corresponding hydropower efficiency monitoring threshold value according to the current water area information, and determine the reasonable monitoring threshold value of the hydropower efficiency according to the current water area information, combined with the characteristics and environmental conditions of the hydropower plant, so as to facilitate subsequent evaluation and comparison; then, obtain the hydropower operation of the hydropower plant to be monitored. The operation assessment information, hydropower abandonment assessment information and drainage water area assessment information are collected, and the comprehensive hydropower efficiency of the hydropower plant to be monitored is determined based on the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information, and the comprehensive hydropower efficiency of the hydropower plant to be monitored is analyzed and predicted from multiple aspects and angles to more comprehensively reflect the operation of the hydropower plant; finally, when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, an alarm information and analysis report for the hydropower plant to be monitored is generated to promptly remind the operator to pay attention and take corresponding measures, and help the operator to deeply understand the reasons for the low efficiency of the hydropower plant, and provide decision support for optimizing operations. In the above method, through the comprehensive analysis of multi-faceted data, the water area information, hydropower plant operation data and the impact on the surrounding environment are comprehensively considered, the comprehensive monitoring capability of hydropower efficiency is improved, the accuracy of the assessment of hydropower efficiency is improved, and the errors caused by single-angle analysis are avoided. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] In order to more clearly illustrate the technical solutions in the embodiments of the present application or related technologies, the drawings required for use in the embodiments of the present application or related technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0051] Figure 1 A schematic diagram of a flow chart of a method for monitoring hydropower efficiency in one embodiment;

[0052] Figure 2 A schematic flow chart of a step of determining a threshold value for monitoring hydropower efficiency in one embodiment;

[0053] Figure 3 A schematic diagram of a flow chart of a method for monitoring hydropower efficiency in another embodiment;

[0054] Figure 4 is a structural block diagram of a hydropower efficiency monitoring device in one embodiment;

[0055] Figure 5 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION

[0056] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.

[0057] In one embodiment, Figure 1 As shown, a method for monitoring water and electricity efficiency is provided. This embodiment uses the method applied to a terminal as an example for illustration. It is understandable that the method can also be applied to a server, and can also be applied to a system including a terminal and a server, and is implemented through the interaction between the terminal and the server. Among them, the terminal can be, but is not limited to, various personal computers, laptops, smart phones, and tablet computers. The server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. In this embodiment, the method includes the following steps:

[0058] Step S101 , in response to an efficiency monitoring request for a hydropower plant to be monitored, current water area information of a water area corresponding to the hydropower plant to be monitored is collected.

[0059] For example, the terminal can collect water area information in real time through various sensor devices or monitoring stations, such as water level, flow rate, water temperature, water quality, etc. The collected water area information is recorded in detail, such as the measurement point of the water level, the monitoring range of the water flow rate, the parameters of water quality monitoring, etc.

[0060] In a specific example, the user can pre-set several monitoring time points, and according to the water level monitoring points in the water area of ​​the hydropower plant to be monitored, the terminal collects the water level and water flow at each water level monitoring point in the water area of ​​the hydropower plant to be monitored at each monitoring time point. For example, the water level is determined by measuring the position of the buoy floating on the water surface, the water flow rate is measured by using a rotating turbine, and the flow rate is calculated by counting the rotation of the turbine.

[0061] The water level data at the water level monitoring point is an important indicator of water level changes in the water area. By monitoring and analyzing water level changes, it can help hydropower plants predict the water storage capacity of the water area and reasonably arrange water area scheduling, which helps to ensure that the turbine can maintain the best operating state at different water levels and improve power generation efficiency. Secondly, the water flow data of each monitoring point will directly affect the fluidity and transport characteristics of the water body in the water area. The hydropower plant can adjust the start, operation and stop strategies of the turbine according to the combination of different water levels and water flows, maximize the use of water flow resources, and improve power generation efficiency. Through the analysis of comprehensive water level and water flow data, the hydropower plant can better manage the water level and flow of the water area, adjust the power generation strategy, and optimize the power generation efficiency, which helps to reduce the operating costs of the hydropower plant, improve the utilization efficiency of water energy resources, and ensure the long-term stable operation of the hydropower plant.

[0062] Step S102: determining a corresponding hydropower efficiency monitoring threshold value according to current water area information.

[0063] Exemplarily, the terminal conducts an in-depth analysis of the collected water area information, including data such as water level, water flow velocity, and water quality, and considers the factors affecting the operation of the hydropower plant. Based on the preset method, the correlation and mutual influence between different water area information can be specifically analyzed to more fully understand the potential impact of water area conditions on hydropower efficiency. Analyze historical data and hydropower plant operation experience to summarize the changing laws and trends of hydropower efficiency under different water conditions. Based on the analysis results of historical data, predetermine the reasonable range of hydropower efficiency monitoring thresholds in each case, and adjust them in consideration of special circumstances in different water areas.

[0064] Step S103, obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information.

[0065] Exemplarily, the terminal obtains the operating data of the hydropower plant, including information such as power generation, installed capacity, and load curve, to evaluate the actual power generation efficiency and operating stability of the hydropower plant. In addition, the water abandonment data of the hydropower plant is obtained, including information such as the amount of abandoned water, the reason for abandonment, and the period of abandonment, in order to evaluate the resource utilization efficiency and environmental impact of the hydropower plant. The assessment of the water abandonment situation can be analyzed by analyzing the amount of abandoned water recorded by the hydropower plant and the monitored water conditions, and verified by combining field investigations and data statistics. The impact assessment data of the hydropower plant on the surrounding waters is also obtained, including information such as water quality, water quantity, and ecological environment of the water area, in order to evaluate the degree of impact of the hydropower plant on the surrounding environment. Relevant information can be obtained through channels such as water area monitoring stations and environmental monitoring data, and on-site investigations and expert evaluations can also be carried out.

[0066] In a specific example, the comprehensive hydropower efficiency of the hydropower plant to be monitored can be calculated based on the following formula:

[0067]

[0068] in, represents the comprehensive hydropower efficiency characterization value of the hydropower plant to be monitored, , as well as They respectively represent the hydropower operation assessment information of the hydropower plant to be monitored, the hydropower abandonment assessment information of the hydropower plant to be monitored, and the drainage water area assessment information of the hydropower plant to be monitored. , and They respectively represent the weight factors corresponding to the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information.

[0069] The comprehensive hydropower efficiency characterization value of the hydropower plant was evaluated, which can provide a comprehensive evaluation of the overall performance of the hydropower plant, help to formulate targeted improvement and optimization strategies, improve the overall efficiency of the hydropower plant, and reduce resource waste.

[0070] Step S104: when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, generate alarm information and analysis report for the hydropower plant to be monitored.

[0071] Exemplarily, after the terminal obtains the comprehensive hydropower efficiency of the hydropower plant to be monitored, the comprehensive hydropower efficiency is compared with the hydropower efficiency monitoring threshold, and when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, the terminal will automatically generate an alarm message to notify the relevant responsible person or manager. The alarm information may include the specific reasons for the low hydropower efficiency, the degree of impact, the response measures, etc., so that necessary actions can be taken in time. The terminal can send alarm notifications to relevant personnel in a variety of ways, such as email, SMS, App push, etc., to ensure timely response and processing. At the same time, the terminal also generates an analysis report on the low hydropower efficiency, detailing the cause of the problem, possible impact and response measures. The report may include a detailed analysis of the hydropower operation assessment, abandoned water assessment and drainage water assessment to help managers gain an in-depth understanding of the root cause of the problem. Targeted suggestions and improvement measures are provided in the analysis report, including temporary solutions to the problem and long-term improvement measures. The suggestions may involve aspects such as hydropower plant equipment maintenance, operation optimization, and environmental protection to improve hydropower efficiency and operational safety.

[0072] When the comprehensive efficiency of a hydropower plant is lower than the comprehensive efficiency characterization threshold, this report analysis will have a far-reaching impact. It provides a comprehensive assessment of the operating status and environmental impact of the hydropower plant. This comparative analysis shows that the operation of the hydropower plant may have adverse effects on the aquatic environment, such as water pollution, sediment accumulation or water quality degradation, which helps to understand the actual impact of the production activities of the hydropower plant on the environment and provides the necessary basis for the formulation of improvement plans. By quantitatively studying hydropower efficiency, it is not only possible to achieve energy conservation and emission reduction, flood prevention and disaster reduction, but also to more effectively adjust the supply and demand balance in the power market and improve the market response speed. The analysis of the comprehensive efficiency of hydropower plants can also optimize their performance in the power trading market, enhance the competitiveness of hydropower plants, and improve resource utilization, thereby promoting the optimization of energy structure.

[0073] In the above-mentioned hydropower efficiency monitoring method, first, in response to the efficiency monitoring request for the hydropower plant to be monitored, the current water area information of the water area corresponding to the hydropower plant to be monitored is collected, and the water level, water flow velocity, water quality and other information of the water area can be obtained to provide basic data for subsequent efficiency monitoring; then, according to the current water area information, the corresponding hydropower efficiency monitoring threshold is determined, and according to the current water area information, combined with the characteristics and environmental conditions of the hydropower plant, the reasonable monitoring threshold of the hydropower efficiency is determined for subsequent evaluation and comparison; then, the hydropower operation evaluation information and the hydropower abandonment evaluation information of the hydropower plant to be monitored are obtained. The method can be used to collect water information and drainage water area assessment information, and determine the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, hydropower abandoned water assessment information and drainage water area assessment information, and conduct comprehensive hydropower efficiency analysis and prediction of the hydropower plant from multiple aspects and angles to more comprehensively reflect the operation of the hydropower plant; finally, when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, generate alarm information and analysis reports for the hydropower plant to be monitored, and promptly remind the operator to pay attention and take corresponding measures, and help the operator to deeply understand the reasons for the low efficiency of the hydropower plant, and provide decision support for optimizing operations. In the above method, through the comprehensive analysis of multi-faceted data, the water area information, hydropower plant operation data and the impact on the surrounding environment are comprehensively considered, which improves the comprehensive monitoring capability of hydropower efficiency, improves the accuracy of hydropower efficiency assessment, and avoids the errors caused by single-angle analysis.

[0074] In an exemplary embodiment, the current water area information includes water level information and water flow information; Figure 2 As shown, the above step S102 determines the corresponding hydropower efficiency monitoring threshold according to the current water area information, and can also be implemented by the following steps:

[0075] Step S201, determining water flow assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow information;

[0076] Step S202, determining the water situation assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow assessment information and the water level information;

[0077] Step S203: determining a hydropower efficiency monitoring threshold corresponding to the water situation assessment information according to a preset mapping relationship.

[0078] Exemplarily, the terminal collects water flow data in real time through a water flow monitoring station or sensor equipment, including information such as water flow velocity and flow change. According to the collected water flow data, select a suitable evaluation method, such as direct evaluation based on flow velocity measurement or indirect evaluation based on the relationship between water level and flow. According to the selected evaluation method, the water flow evaluation information of the corresponding water area of ​​the hydropower plant to be monitored is generated, which may be data such as average flow velocity, maximum flow velocity, and flow change trend. Then, the terminal combines the water flow evaluation information with the water level information, comprehensively considers the flow and water level changes in the water area, and determines the water conditions of the water area. According to the comprehensive evaluation, water condition evaluation information is generated, which may be data such as the water volume, water level change trend, and flow-water level relationship of the water area. Based on historical data and experimental analysis in advance, an association mapping relationship model between water condition evaluation indicators and hydropower efficiency is established. Finally, the terminal substitutes the water condition evaluation information into the mapping relationship model to calculate the hydropower efficiency monitoring threshold corresponding to the water condition.

[0079] In a specific example, first, the terminal can calculate the water situation assessment information of the hydropower plant to be monitored based on the current water area information:

[0080]

[0081] in, Indicates the water situation assessment information of the hydropower plant to be monitored. represents the water level of the water area of ​​the hydropower plant to be monitored at the jth water level monitoring point at the i-th monitoring time point, W represents the water flow assessment information of the water area of ​​the hydropower plant to be monitored, Indicates the preset reference water level of the water area of ​​the hydropower plant to be monitored. and They represent the compensation factors corresponding to the set water level and water flow assessment values, respectively; i represents the number of each monitoring time point, , n is the number of monitoring time points, j is the number of each water level monitoring point, , m is the number of water level monitoring points. The compensation factors corresponding to the water level and water flow assessment values ​​can be predetermined based on the design characteristics of the hydropower plant, the hydraulic performance of the hydropower station, environmental factors, and actual operation data.

[0082] Then, the terminal matches the water situation assessment information of the hydropower plant to be monitored with the hydropower efficiency monitoring thresholds corresponding to each water situation assessment information interval stored in the cloud database to obtain the hydropower efficiency monitoring thresholds of the hydropower plant to be monitored.

[0083] In this embodiment, by comprehensively considering the water level and water flow information, the situation of the water area where the hydropower plant is located is more comprehensively evaluated, and the accuracy of the monitoring threshold is improved. The water flow and water level data collected in real time can update the water situation assessment information and monitoring threshold in real time, enhance the real-time and accuracy of monitoring, and help the hydropower plant accurately predict the water storage capacity of the water area, reasonably arrange the water area scheduling, and help ensure that the turbine can maintain the best operating state under different water levels and improve the power generation efficiency. Secondly, the water flow data of each monitoring point will directly affect the fluidity and transportation characteristics of the water body in the water area according to the combination of different water levels and water flows. The hydropower plant can adjust the start, operation and stop strategies of the turbine according to the combination of different water levels and water flows, maximize the use of water flow resources, and improve the power generation efficiency. By analyzing the comprehensive water level and water flow data, the hydropower plant can better manage the water level and water flow in the water area, adjust the power generation strategy, and optimize the power generation efficiency, which helps to reduce the operating cost of the hydropower plant, improve the utilization efficiency of water resources, and ensure the long-term stable operation of the hydropower plant.

[0084] In an exemplary embodiment, the above-mentioned step S201 determines the water flow assessment information of the water area corresponding to the hydropower plant to be monitored based on the water flow information, and also includes: determining the water flow change curve of the water area corresponding to the hydropower plant to be monitored based on the water flow information; determining the overlap length between the water flow change curve and the preset water flow change reference curve; and determining the water flow assessment information based on the overlap length, the water flow information and the preset water flow reference information.

[0085] Exemplarily, based on the collected water flow information, the terminal draws a water flow change curve for the water area corresponding to the hydropower plant to be monitored, reflecting the change trend of water flow over time. Then, the water flow change curve is compared with the preset water flow change reference curve to determine the overlap length between the two, that is, the length of the overlapping part of the curve. The length of the overlapping part can be accurately calculated by integral calculation, fitting curve comparison and other methods. Finally, the water flow assessment information is determined by combining the overlap length, water flow information and preset water flow reference information, including the average value of the water flow, fluctuation, deviation from the reference curve and other data.

[0086] In a specific example, the terminal can calculate the water flow assessment information in the following manner:

[0087] First, at each monitoring time point, the water flow of the water area of ​​the hydropower plant to be monitored at each water level monitoring point is counted, and the water flow change curve of the water area of ​​the hydropower plant to be monitored at each water level monitoring point is constructed, and the overlap check is performed with the water flow change reference curve stored in the cloud database. In this way, the length of the line that overlaps the water flow change curve of the water area of ​​the hydropower plant to be monitored at each water level monitoring point at each monitoring time point is extracted and recorded as .

[0088] Then, the water flow assessment information W of the water area to which the hydropower plant to be monitored belongs is calculated:

[0089]

[0090] Among them, W is the water flow assessment information of the water area of ​​the hydropower plant to be monitored, It represents the water flow rate of the water area of ​​the hydropower plant to be monitored at the jth water level monitoring point at the i-th monitoring time point, Indicates the set reference water flow rate, Indicates the line length of the preset water flow change reference curve, and Indicates the correction factor corresponding to the line length and water flow in the water area stored in the cloud database (which can be predetermined by many factors such as the geographical morphology of the water area, river flow characteristics, design parameters of the hydropower station, etc.), It represents the compensation factor corresponding to the water flow assessment information of the set water area, and e represents a natural constant.

[0091] In this embodiment, the water flow rate of the water area is one of the important parameters affecting the power generation of the turbine, which can further affect the rotation speed and output power of the turbine. By understanding the change of water flow rate under different water levels, it can help the hydropower plant to reasonably adjust the working state of the turbine to maximize its operating efficiency under different water flow conditions. High water flow may increase hydraulic loss and turbine wear, while low water flow may lead to a decrease in power generation. By comprehensively analyzing the average water flow data under different water levels, the hydropower plant can optimize the water area scheduling plan to achieve more stable and efficient power generation operation. Therefore, a comprehensive analysis of the water flow evaluation value of the water area helps the hydropower plant to more effectively manage water resources, optimize power generation efficiency, and help maintain the ecological balance of the water area, providing a decision-making basis for the hydropower plant, so that the hydropower plant can operate more flexibly under different water levels and water flow conditions, maximize the use of water resources, and improve power generation efficiency. By comparing the water flow change curve and the preset reference curve, the water flow situation of the water area can be more accurately evaluated. By calculating the overlap length, the trend of water flow change can be effectively judged, abnormal conditions can be discovered in time, and corresponding measures can be taken.

[0092] In an exemplary embodiment, the above-mentioned step S103 obtains the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and also includes: obtaining the power generation information of the hydropower plant to be monitored within multiple preset time periods; determining the power generation stability assessment information of the hydropower plant to be monitored based on the power generation information; obtaining the cumulative use time and start time of the equipment of the hydropower plant to be monitored, and determining the hydropower operation assessment information of the hydropower plant to be monitored based on the cumulative use time of the equipment, the start time, the power generation stability assessment information and the preset power generation reference information.

[0093] Exemplarily, the terminal obtains the power generation information of the hydropower plant in a preset time period through the monitoring system or historical records of the hydropower plant, including hourly, daily or monthly power generation data. The acquired power generation information is analyzed to evaluate the power generation stability of the hydropower plant in each time period, including the fluctuation of power generation, stability indicators, etc. And the accumulated equipment usage time information and start-up time information of the hydropower plant are obtained. Finally, the terminal determines the hydropower operation evaluation information of the hydropower plant, including the power generation compliance, power generation stability, etc., based on the accumulated equipment usage time, start-up time, power generation stability evaluation information and preset power generation reference information.

[0094] In a specific example, the user can set a monitoring period, during which the terminal counts the cumulative time the power generation equipment of the hydropower plant to be monitored is put into use, the power generation, and the start-up time of the power generation equipment. Then, the terminal calculates the hydropower operation evaluation information of the hydropower plant to be monitored. Among them, the terminal counts the power generation of the power generation equipment of the hydropower plant to be monitored at each monitoring time point, and records the time period between two adjacent monitoring time points as the monitoring time period, thereby counting the power generation of the power generation equipment of the hydropower plant to be monitored in each monitoring time period, and calculating the power generation stability evaluation information of the target hydropower plant. The details are as follows:

[0095]

[0096]

[0097] in, represents the hydropower operation evaluation information of the hydropower plant to be monitored, T represents the cumulative time the power generation equipment of the hydropower plant to be monitored has been put into use (i.e. the cumulative time the equipment has been used), Indicates the start-up time of the power generation equipment of the hydropower plant to be monitored, as well as They represent the evaluation factors corresponding to the equipment unit commissioning time and unit startup time stored in the cloud database (which can be predetermined by factors such as the equipment type of the hydropower plant, the service life specified by the manufacturer, the technical characteristics of the equipment, the operating environment and maintenance management), K represents the power generation of the power generation equipment of the hydropower plant to be monitored, It represents the reference period defined power generation of the hydropower plant to be monitored. represents the correction factor corresponding to the power generation of the hydropower plant to be monitored and stored in the cloud database, It represents the evaluation factor corresponding to the set power generation stability evaluation information (which can be predetermined by factors such as the technical performance, maintenance status, operation stability, and design parameters of the generator set of the equipment). Y represents the power generation stability evaluation information of the hydropower plant to be monitored. represents the power generation of the target hydropower plant's power generation equipment in the bth monitoring period, It indicates the correction factor corresponding to the power generation of the set power generation equipment, b indicates the number of each monitoring time period, , t is the number of monitoring time periods.

[0098] Among them, the start-up time of power generation equipment refers to the time required for the power generation equipment to reach full load state from a completely shut down state. The start-up time of power generation equipment is a key parameter affecting the hydropower plant's participation in the standby market and provision of auxiliary services. A shorter start-up time can improve the competitiveness of the hydropower plant in the standby market and auxiliary service market.

[0099] By monitoring the cumulative time of equipment in use, hydropower plants can conduct real-time assessments of the health of equipment. Long-term operation may lead to wear and aging of equipment, so analysis of time in use helps predict the life of equipment, identify potential failure risks in advance, and provide timely maintenance and care to reduce equipment failure rates, ensure stable operation of hydropower plants, and thus improve overall efficiency.

[0100] In this embodiment, by analyzing the power generation of the hydropower plant's power generation equipment, its operating conditions in different time periods can be understood, which helps to identify fluctuations in power generation efficiency and peak power generation capacity, and provides a basis for optimizing the operation plan. A higher power generation stability index usually means that the equipment is more robust and can maintain a relatively stable power generation level under various environments. By analyzing the power generation of the power generation equipment and calculating the power generation stability index, the hydropower plant can fully understand the equipment performance, and on this basis, formulate an optimized operation strategy to improve the overall efficiency of the hydropower plant. By obtaining various operating data and evaluation indicators, the operation of the hydropower plant is comprehensively evaluated, including power generation, operating stability, etc. By evaluating power generation stability and operating time, it is possible to promptly discover operating anomalies and take corresponding measures to improve the operating efficiency and stability of the hydropower plant. According to the hydropower operation evaluation information, a scientific basis and guidance are provided for the operation management of the hydropower plant, supporting operational decision-making and optimization adjustments.

[0101] In an exemplary embodiment, the above-mentioned step S103 obtains the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and also includes: obtaining the inflow water volume information of the upstream water area corresponding to the water area of ​​the hydropower plant to be monitored, and obtaining the actual water consumption information of the hydropower plant to be monitored; determining the hydropower abandonment assessment information of the hydropower plant to be monitored based on the inflow water volume information, the actual water consumption information and the preset abandonment reference ratio.

[0102] Exemplarily, the terminal can obtain the inflow water volume information of the upstream water area in real time through a hydrological station, a hydrological model or a hydrological forecasting system, including data such as water flow and precipitation. Hydrological sensors and remote sensing technology can also be used to obtain the flow and water level data of the upstream water area to achieve real-time monitoring of the upstream water area. Hydropower plants are usually equipped with metering equipment such as water meters and flow meters, which can monitor the actual water consumption of the hydropower plant in real time. Through the monitoring system or metering equipment of the hydropower plant, the terminal can collect information such as the water inflow and water outflow of the hydropower plant in real time to calculate the actual water consumption. The terminal compares the actual water consumption with the inflow water volume of the upstream water area and calculates the water abandonment ratio. According to the preset water abandonment reference ratio, the water abandonment situation of the hydropower plant is judged, and the water abandonment assessment information, such as the amount of water abandoned and the proportion of water abandoned, is determined.

[0103] In a specific example, the terminal monitors and counts the total amount of water flowing into the upstream of the water area of ​​the hydropower plant to be monitored and the actual amount of water consumed by the turbine for power generation during the monitoring period, and calculates the hydropower abandonment assessment information of the hydropower plant to be monitored:

[0104]

[0105] in, Indicates the hydropower abandonment assessment information of the hydropower plant to be monitored, It indicates the total amount of water flowing into the upstream of the water area of ​​the hydropower plant to be monitored. It indicates the actual water consumption of the turbine power generation in the hydropower plant to be monitored. It represents the reference ratio of abandoned water of the hydropower plant to be monitored stored in the cloud database. It represents the correction factor corresponding to the water abandonment ratio of the monitored hydropower plant stored in the cloud database.

[0106] In this embodiment, the total amount of water flowing into the upstream of the water area and the amount of water used for turbine power generation are analyzed, and the evaluation value of the water abandonment rate of the monitored hydropower plant is calculated, which helps to understand the full utilization of water resources by the hydropower plant. If the hydropower plant has a high water abandonment rate, it means that a large amount of water flow is not fully utilized, and there may be problems of inefficiency or improper water resource management. By monitoring and reducing the water abandonment rate, the hydropower plant can improve the effective utilization of water resources and improve the overall efficiency. Secondly, the analysis of the water abandonment rate helps to formulate a more scientific water area scheduling strategy. By understanding which part of the total amount of water flowing into the upstream of the water area is used for power generation and which part is not used and abandoned, the hydropower plant can optimize the water storage and release strategy of the water area to ensure that the abandonment can be minimized under different water levels and water flow conditions, and improve the power generation efficiency of the hydropower plant. By obtaining the amount of water flowing into the upstream water area and the actual water consumption of the hydropower plant, the water abandonment situation of the hydropower plant is comprehensively evaluated, including the amount of abandoned water and the proportion of abandoned water. According to the water abandonment evaluation information, the hydropower plant can adjust the operation strategy, effectively control the amount of abandoned water, and improve the efficiency of water resource utilization. By monitoring and evaluating the water abandonment of hydropower plants, the negative impacts on the water environment and ecosystem can be reduced and sustainable development can be achieved.

[0107] In an exemplary embodiment, the above-mentioned step S103 obtains the hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and also includes: obtaining the dissolved oxygen information, temperature information, pH information and sediment information of the downstream water area corresponding to the water area of ​​the hydropower plant to be monitored; and determining the drainage water area assessment information of the hydropower plant to be monitored based on the dissolved oxygen information, temperature information, pH information, sediment information and respective corresponding preset reference information.

[0108] Exemplarily, the terminal collects water quality information of the downstream water area in real time through water quality monitoring stations or sensor equipment, including data such as dissolved oxygen, temperature, pH, and sediment. The water quality of the drainage water area is evaluated by combining the acquired water quality information with preset reference information, including the health status of the water body, the degree of pollution, etc. The terminal determines whether the water quality of the drainage water area meets the preset standards based on the changes in indicators such as dissolved oxygen, temperature, pH, and sediment, and determines the evaluation information.

[0109] In a specific example, the terminal monitors and counts the dissolved oxygen, temperature and pH value in the water body downstream of the water area of ​​the hydropower plant to be monitored (for example, a multi-parameter water quality monitor can simultaneously measure multiple water quality parameters, including dissolved oxygen, temperature, pH value, etc.), and then deploys several sediment monitoring points in the downstream area of ​​the water area of ​​the hydropower plant to be monitored, and monitors the sediment information such as the sediment height of the water body and sample data at each sediment monitoring point, where the sample data includes the volume of the collected water sample and the volume of the sediment filtered in the water sample, and then calculates the sediment impact assessment value in the water body downstream of the water area of ​​the target hydropower plant, and finally calculates the drainage water area assessment information of the target hydropower plant:

[0110]

[0111]

[0112] in, Indicates the assessment information of the drainage water area of ​​the hydropower plant to be monitored. represents the dissolved oxygen in the water body downstream of the water area of ​​the hydropower plant to be monitored, T represents the temperature in the water body downstream of the water area of ​​the hydropower plant to be monitored, , as well as They represent the reference dissolved oxygen, reference temperature and reference pH value stored in the cloud database respectively. , and They represent the correction factors corresponding to dissolved oxygen, temperature and pH value stored in the cloud database, respectively. Z represents the compensation factor corresponding to the sediment impact assessment value in the water body downstream of the water area to be monitored. and represents the volume of the water sample at the cth sediment monitoring point and the volume of sediment after filtration in the water sample, It indicates the volume percentage of sediment in water bodies of water environment standards stored in the cloud database. and They represent the correction factors corresponding to the sediment volume percentage and the sediment height in the water body, represents the height of water sediment at the cth sediment monitoring point, represents the reference height of water sediment stored in the cloud database, c represents the number of each sediment monitoring point, , k is the number of sediment monitoring points.

[0113] Dissolved oxygen is one of the key factors required for the survival of organisms in water bodies. The right amount of dissolved oxygen is essential to the ecosystem of fish and other aquatic organisms. The level of dissolved oxygen in the water discharged by hydropower plants is directly related to the health of the underwater ecological environment. Therefore, by monitoring and maintaining appropriate dissolved oxygen levels, hydropower plants can reduce the adverse effects on the aquatic ecosystem, maintain the ecological balance of the water body, and benefit environmental protection. Secondly, water temperature has a significant impact on the power generation efficiency of hydropower plants. Increased water temperature may lead to a decrease in dissolved oxygen in the water, thereby affecting the performance of power generation equipment. High temperature may also cause equipment to overheat and slow down the power generation process. Therefore, monitoring water temperature and taking measures to control temperature is essential to maintaining the normal operation of hydropower plants and improving power generation efficiency.

[0114] The pH value of the water is another key factor. Too high or too low pH values ​​may have adverse effects on aquatic organisms and equipment. Maintaining the proper pH level can reduce the dissolution of metal ions in the water, reduce corrosion to equipment, help extend the life of equipment, and improve the reliability of hydropower plants.

[0115] The sediment content in the water affects the performance of the hydraulic equipment of the hydropower plant. A large amount of sediment may cause the blockage of the water flow channel, reduce the efficiency of the water flow, and affect the operating efficiency of the turbine power generation equipment. Monitoring of sediment can also help the hydropower plant take timely dredging measures to maintain smooth water flow and improve the efficiency of water-to-electricity conversion. Secondly, the sediment may contain harmful substances, such as heavy metals, which have an adverse effect on water quality. The accumulation of these substances may cause poisoning and death of organisms in the aquatic ecosystem, directly affecting the ecological balance of the water area. By evaluating the impact of sediment, the hydropower plant can take measures to reduce the discharge of harmful substances, protect aquatic organisms and maintain the ecological health of the water area. In addition, the accumulation of sediment may also cause siltation in the water body and affect the water storage capacity of the water area. By monitoring and controlling the sediment content in the water, the hydropower plant can reduce equipment loss and improve the operating efficiency of the hydraulic system.

[0116] In this embodiment, by monitoring and maintaining the dissolved oxygen, temperature, pH value and sediment content of the water body downstream of the water area, the impact of the hydropower plant discharge on the water quality of the water area is comprehensively evaluated, which helps the hydropower plant to achieve environmental protection, improve power generation efficiency and extend the life of equipment. By real-time monitoring of water quality parameters, abnormal changes in water quality in the water area can be discovered in time, providing an important basis for environmental protection and governance, and effectively monitoring the health of the ecological environment of the water area to ensure the stability and sustainable development of the ecosystem.

[0117] In another exemplary embodiment, Figure 3 As shown, the present application provides a method for monitoring hydropower efficiency, the method comprising the following steps:

[0118] Step S301 , in response to an efficiency monitoring request for a hydropower plant to be monitored, current water area information of a water area corresponding to the hydropower plant to be monitored is collected.

[0119] Among them, the current water area information includes water level information and water flow information.

[0120] Step S302, determining the water flow variation curve of the water area corresponding to the hydropower plant to be monitored according to the water flow information, and determining the overlap length between the water flow variation curve and a preset water flow variation reference curve.

[0121] Step S303, determining water flow assessment information according to the overlap length, water flow information and preset water flow reference information.

[0122] Step S304, determining the water condition assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow assessment information and the water level information, and determining the hydropower efficiency monitoring threshold corresponding to the water condition assessment information according to a preset mapping relationship.

[0123] Step S305, obtaining power generation information of the hydropower plant to be monitored within a plurality of preset time periods, and determining power generation stability assessment information of the hydropower plant to be monitored based on the power generation information.

[0124] Step S306, obtaining the cumulative usage time and startup time of the equipment of the hydropower plant to be monitored, and determining the hydropower operation evaluation information of the hydropower plant to be monitored based on the cumulative usage time, startup time, power generation stability evaluation information and preset power generation reference information.

[0125] Step S307, obtaining the inflow water volume information of the upstream water area corresponding to the water area of ​​the hydropower plant to be monitored, and obtaining the actual water consumption information of the hydropower plant to be monitored.

[0126] Step S308, determining the hydropower abandonment assessment information of the hydropower plant to be monitored according to the inflow water information, the actual water consumption information and the preset abandonment reference ratio.

[0127] Step S309, obtaining dissolved oxygen information, temperature information, pH information and sediment information of the downstream water area corresponding to the water area of ​​the hydropower plant to be monitored.

[0128] Step S310, determining the drainage water area assessment information of the hydropower plant to be monitored based on the dissolved oxygen information, temperature information, pH information, sediment information and respective corresponding preset reference information.

[0129] Step S311, determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandoned water assessment information and the drainage water area assessment information.

[0130] Step S312: when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, generate alarm information and analysis report for the hydropower plant to be monitored.

[0131] In this embodiment, ① by evaluating the water environment assessment index of the target hydropower plant, the water flow rate of the water area is evaluated at the same time. The water level usually affects the process of converting water energy into electrical energy, and the change of water flow rate will affect the performance of the turbine. Therefore, accurate calculation of water flow rate is helpful to predict and optimize power generation. In addition, water level analysis is also conducive to maintaining ecological balance. By controlling the water level and water flow rate, the ecosystem of the downstream river can be protected, and the power generation efficiency is improved, thereby reducing the power generation cost, optimizing the performance of the hydropower plant in the power trading market, enhancing the competitiveness of the hydropower plant, and improving resource utilization, thereby promoting the optimization of the energy structure. ②By monitoring and analyzing the cumulative time of use of power generation equipment, power generation and water abandonment rate, the hydropower plant can evaluate its capacity utilization, optimize power generation strategy and improve power generation efficiency. The water abandonment rate is an important environmental and economic indicator in the operation of hydropower plants. By reasonably controlling the water abandonment rate, it is helpful to reduce the waste of water resources, understand its operation status more comprehensively and deeply, improve the resource utilization efficiency of hydropower plants, reduce resource waste, and enable hydropower plants to more effectively adjust the supply and demand balance in the power market and improve market response speed. ③By monitoring and analyzing the total amount of water flowing into the upstream of the water area and the water consumption used for turbine power generation, the hydropower plant can more accurately evaluate the supply of water resources. By understanding the ratio of the actual amount of water used to the total amount of water, the hydropower plant can determine the benefits of its water resource utilization, which helps to optimize the operation strategy of the turbine, improve power generation efficiency, reduce unit energy consumption, and thus reduce power generation costs. In addition, it also helps the hydropower plant to reasonably adjust the water storage and discharge plans of the water area. The hydropower plant can minimize the water abandonment rate and improve the comprehensive utilization benefits of water resources. ④ By monitoring and analyzing the dissolved oxygen, temperature, pH value and sediment in the water body downstream of the water area, and by monitoring the changes in dissolved oxygen and pH value, the hydropower plant can evaluate the oxygen content and acid-base balance of the water body, which helps to ensure the health of the water ecological environment. Water temperature is an important factor affecting the water ecosystem and turbine performance. The rise and fall of water temperature directly affects the water quality and the power generation efficiency of the turbine. The analysis of sediments is crucial to the management of the water area and the operation of the hydropower plant. The accumulation of sediments will affect the volume of the water area and the performance of the turbine, and even cause siltation problems. Therefore, analyzing sediments helps to ensure the normal operation of the turbine and extend the life of the equipment.

[0132] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0133] Based on the same inventive concept, the embodiment of the present application also provides a hydropower efficiency monitoring device for implementing the hydropower efficiency monitoring method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more hydropower efficiency monitoring device embodiments provided below can refer to the limitations of the hydropower efficiency monitoring method above, and will not be repeated here.

[0134] In an exemplary embodiment, Figure 4 As shown, a hydropower efficiency monitoring device is provided, including: a water area information collection module 401, a monitoring threshold determination module 402, a hydropower efficiency determination module 403 and an information report generation module 404, wherein:

[0135] The water area information collection module 401 is used to collect the current water area information of the water area corresponding to the hydropower plant to be monitored in response to the efficiency monitoring request for the hydropower plant to be monitored;

[0136] A monitoring threshold determination module 402 is used to determine a corresponding hydropower efficiency monitoring threshold according to current water area information;

[0137] The hydropower efficiency determination module 403 is used to obtain the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information of the hydropower plant to be monitored, and determine the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information;

[0138] The information report generating module 404 is used to generate alarm information and analysis reports for the hydropower plant to be monitored when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold.

[0139] In one of the embodiments, the current water area information includes water level information and water flow information; the above-mentioned monitoring threshold determination module 402 is also used to determine the water flow assessment information of the water area corresponding to the hydropower plant to be monitored based on the water flow information; determine the water condition assessment information of the water area corresponding to the hydropower plant to be monitored based on the water flow assessment information and the water level information; and determine the hydropower efficiency monitoring threshold corresponding to the water condition assessment information based on a preset mapping relationship.

[0140] In one of the embodiments, the monitoring threshold determination module 402 is also used to determine the water flow change curve of the water area corresponding to the hydropower plant to be monitored based on the water flow information; determine the overlap length between the water flow change curve and the preset water flow change reference curve; and determine the water flow evaluation information based on the overlap length, the water flow information and the preset water flow reference information.

[0141] In one of the embodiments, the hydropower efficiency determination module 403 is further used to obtain the power generation information of the hydropower plant to be monitored within multiple preset time periods; determine the power generation stability assessment information of the hydropower plant to be monitored based on the power generation information; obtain the cumulative usage time and start-up time of the equipment of the hydropower plant to be monitored, and determine the hydropower operation assessment information of the hydropower plant to be monitored based on the cumulative usage time of the equipment, the start-up time, the power generation stability assessment information and the preset power generation reference information.

[0142] In one of the embodiments, the hydropower efficiency determination module 403 is also used to obtain the inflow water volume information of the upstream water area corresponding to the water area of ​​the hydropower plant to be monitored, and to obtain the actual water consumption information of the hydropower plant to be monitored; based on the inflow water volume information, the actual water consumption information and the preset water abandonment reference ratio, the hydropower abandonment assessment information of the hydropower plant to be monitored is determined.

[0143] In one of the embodiments, the hydropower efficiency determination module 403 is also used to obtain dissolved oxygen information, temperature information, pH information and sediment information of the downstream water area corresponding to the water area of ​​the hydropower plant to be monitored; and determine the drainage water area assessment information of the hydropower plant to be monitored based on the dissolved oxygen information, temperature information, pH information, sediment information and their respective corresponding preset reference information.

[0144] Each module in the above-mentioned hydropower efficiency monitoring device can be implemented in whole or in part by software, hardware, or a combination thereof. Each of the above-mentioned modules can be embedded in or independent of a processor in a computer device in the form of hardware, or can be stored in a memory in a computer device in the form of software, so that the processor can call and execute operations corresponding to each of the above modules.

[0145] In an exemplary embodiment, a computer device is provided. The computer device may be a terminal, and its internal structure diagram may be as shown in FIG. Figure 5As shown. The computer device includes a processor, a memory, an input / output interface, a communication interface, a display unit and an input device. The processor, the memory and the input / output interface are connected through a system bus, and the communication interface, the display unit and the input device are connected to the system bus through the input / output interface. The processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal in a wired or wireless manner, and the wireless manner can be implemented through WIFI, a mobile cellular network, near field communication (NFC) or other technologies. When the computer program is executed by the processor, a method for monitoring water and electricity efficiency is implemented. The display unit of the computer device is used to form a visually visible picture, which can be a display screen, a projection device or a virtual reality imaging device. The display screen can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the computer device shell, or an external keyboard, touchpad or mouse.

[0146] Those skilled in the art will understand that Figure 5 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0147] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.

[0148] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0149] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0150] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0151] A person of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment method can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetic random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., but are not limited to this.

[0152] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this application.

[0153] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A method for monitoring hydropower efficiency, characterized in that: The method comprises: In response to an efficiency monitoring request for a hydropower plant to be monitored, collecting current water area information of a water area corresponding to the hydropower plant to be monitored; Determine a corresponding hydropower efficiency monitoring threshold value according to the current water area information; Obtaining hydropower operation assessment information, hydropower abandonment assessment information and drainage water area assessment information of the hydropower plant to be monitored, and determining the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information; When the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold, generating alarm information and analysis report for the hydropower plant to be monitored; Wherein, the current water area information includes water level information and water flow information; The determining, according to the current water area information, a corresponding hydropower efficiency monitoring threshold value includes: Determine, based on the water flow information, a water flow variation curve of the water area corresponding to the hydropower plant to be monitored; Determining the overlap length between the water flow change curve and a preset water flow change reference curve; Determining water flow assessment information according to the overlap length, the water flow information and preset water flow reference information; Determine the water condition assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow assessment information and the water level information; Determining a hydropower efficiency monitoring threshold corresponding to the water situation assessment information according to a preset mapping relationship; The water situation assessment information is calculated based on the following formula: in, Indicates the water situation assessment information of the hydropower plant to be monitored. represents the water level of the water area of ​​the hydropower plant to be monitored at the jth water level monitoring point at the i-th monitoring time point, W represents the water flow assessment information of the water area of ​​the hydropower plant to be monitored, Indicates the preset reference water level of the water area of ​​the hydropower plant to be monitored. and They represent the compensation factors corresponding to the set water level and water flow assessment values, respectively; i represents the number of each monitoring time point, , n is the number of monitoring time points, j is the number of each water level monitoring point, , m is the number of water level monitoring points; The water flow assessment information is calculated based on the following formula: Among them, W is the water flow assessment information of the water area of ​​the hydropower plant to be monitored, It represents the water flow rate of the water area of ​​the hydropower plant to be monitored at the jth water level monitoring point at the i-th monitoring time point, Indicates the set reference water flow rate, Indicates the line length of the preset water flow change reference curve, and Indicates the correction factor corresponding to the line length and water flow in the water area stored in the cloud database, It represents the compensation factor corresponding to the water flow assessment information of the set water area, and e represents a natural constant; Indicates the overlap length between the water flow change curve and a preset water flow change reference curve; The comprehensive hydropower efficiency of the hydropower plant to be monitored is calculated based on the following formula: in, represents the comprehensive hydropower efficiency characterization value of the hydropower plant to be monitored, , as well as They respectively represent the hydropower operation assessment information of the hydropower plant to be monitored, the hydropower abandonment assessment information of the hydropower plant to be monitored, and the drainage water area assessment information of the hydropower plant to be monitored. , and Respectively represent the weight factors corresponding to the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information; The drainage watershed assessment information is determined based on the following steps: Obtaining dissolved oxygen information, temperature information, pH information and sediment information of the downstream water area corresponding to the water area of ​​the hydropower plant to be monitored; Determine the drainage water area assessment information of the hydropower plant to be monitored according to the dissolved oxygen information, the temperature information, the pH information, the sediment information and the corresponding preset reference information The drainage water area assessment information is calculated based on the following formula: ; in, Indicates the assessment information of the drainage water area of ​​the hydropower plant to be monitored. It represents the dissolved oxygen in the water body downstream of the water area of ​​the hydropower plant to be monitored, T represents the temperature in the water body downstream of the water area of ​​the hydropower plant to be monitored, and PH represents the acidity and alkalinity of the water body downstream of the water area of ​​the hydropower plant to be monitored. , as well as They represent the reference dissolved oxygen, reference temperature and reference pH stored in the cloud database respectively. , and They represent the correction factors corresponding to dissolved oxygen, temperature and pH stored in the cloud database, respectively. represents the compensation factor corresponding to the sediment impact assessment value in the water body downstream of the water area to be monitored by the hydropower plant, Z represents the sediment impact assessment value in the water body downstream of the water area to be monitored by the hydropower plant, and represents the volume of the water sample at the cth sediment monitoring point and the volume of sediment after filtration in the water sample, It indicates the volume percentage of sediment in water bodies of water environment standards stored in the cloud database. and They represent the correction factors corresponding to the sediment volume percentage and the sediment height in the water body, represents the height of water sediment at the cth sediment monitoring point, represents the reference height of water sediment stored in the cloud database, c represents the number of each sediment monitoring point, , k is the number of sediment monitoring points.

2. The method according to claim 1, characterized in that The obtaining of the hydropower operation assessment information, hydropower abandoned water assessment information and drainage water area assessment information of the hydropower plant to be monitored includes: Obtaining power generation information of the hydropower plant to be monitored within multiple preset time periods; Determining power generation stability assessment information of the hydropower plant to be monitored based on the power generation information; The accumulated usage time and startup time of the equipment of the hydropower plant to be monitored are obtained, and the hydropower operation evaluation information of the hydropower plant to be monitored is determined based on the accumulated usage time of the equipment, the startup time, the power generation stability evaluation information and the preset power generation reference information.

3. The method according to claim 2, characterized in that The hydropower operation evaluation information is calculated based on the following formula: ; in, represents the hydropower operation evaluation information of the hydropower plant to be monitored, T represents the cumulative time the power generation equipment of the hydropower plant to be monitored has been put into use, Indicates the start-up time of the power generation equipment of the hydropower plant to be monitored, as well as They represent the evaluation factors corresponding to the equipment unit commissioning time and unit startup time stored in the cloud database, respectively; K represents the power generation of the power generation equipment of the hydropower plant to be monitored, It represents the reference period defined power generation of the hydropower plant to be monitored. represents the correction factor corresponding to the power generation of the hydropower plant to be monitored and stored in the cloud database, represents the evaluation factor corresponding to the set power generation stability evaluation information, Y represents the power generation stability evaluation information of the hydropower plant to be monitored, represents the power generation of the target hydropower plant's power generation equipment in the bth monitoring period, It indicates the correction factor corresponding to the power generation of the set power generation equipment, b indicates the number of each monitoring time period, , t is the number of monitoring time periods.

4. The method according to claim 1, characterized in that The obtaining of the hydropower operation assessment information, hydropower abandoned water assessment information and drainage water area assessment information of the hydropower plant to be monitored includes: Obtaining water inflow information of the upstream water area of ​​the water area corresponding to the hydropower plant to be monitored, and obtaining actual water consumption information of the hydropower plant to be monitored; The hydropower abandonment assessment information of the hydropower plant to be monitored is determined according to the inflow water information, the actual water consumption information and a preset abandonment reference ratio.

5. The method according to claim 4, characterized in that The hydropower abandonment assessment information is calculated based on the following formula: in, Indicates the hydropower abandonment assessment information of the hydropower plant to be monitored, It indicates the total amount of water flowing into the upstream of the water area of ​​the hydropower plant to be monitored. It indicates the actual water consumption of the turbine power generation in the hydropower plant to be monitored. It represents the reference ratio of abandoned water of the hydropower plant to be monitored stored in the cloud database. It represents the correction factor corresponding to the water abandonment ratio of the monitored hydropower plant stored in the cloud database.

6. A hydropower efficiency monitoring device, characterized in that: The device comprises: A water area information collection module, used to collect current water area information of the water area corresponding to the hydropower plant to be monitored in response to an efficiency monitoring request for the hydropower plant to be monitored; A monitoring threshold determination module, used to determine a corresponding hydropower efficiency monitoring threshold according to the current water area information; A hydropower efficiency determination module, used to obtain the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information of the hydropower plant to be monitored, and determine the comprehensive hydropower efficiency of the hydropower plant to be monitored based on the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information; An information report generating module, used for generating alarm information and analysis report for the hydropower plant to be monitored when the comprehensive hydropower efficiency is less than the hydropower efficiency monitoring threshold; Wherein, the current water area information includes water level information and water flow information; The monitoring threshold determination module is further used for: Determine, based on the water flow information, a water flow variation curve of the water area corresponding to the hydropower plant to be monitored; Determining the overlap length between the water flow change curve and a preset water flow change reference curve; Determining water flow assessment information according to the overlap length, the water flow information and preset water flow reference information; Determine the water condition assessment information of the water area corresponding to the hydropower plant to be monitored according to the water flow assessment information and the water level information; Determining a hydropower efficiency monitoring threshold corresponding to the water situation assessment information according to a preset mapping relationship; The water situation assessment information is calculated based on the following formula: in, Indicates the water situation assessment information of the hydropower plant to be monitored. represents the water level of the water area of ​​the hydropower plant to be monitored at the jth water level monitoring point at the i-th monitoring time point, W represents the water flow assessment information of the water area of ​​the hydropower plant to be monitored, Indicates the preset reference water level of the water area of ​​the hydropower plant to be monitored. and They represent the compensation factors corresponding to the set water level and water flow assessment values, respectively; i represents the number of each monitoring time point, , n is the number of monitoring time points, j is the number of each water level monitoring point, , m is the number of water level monitoring points; The water flow assessment information is calculated based on the following formula: Among them, W is the water flow assessment information of the water area of ​​the hydropower plant to be monitored, It represents the water flow rate of the water area of ​​the hydropower plant to be monitored at the jth water level monitoring point at the i-th monitoring time point, Indicates the set reference water flow rate, Indicates the line length of the preset water flow change reference curve, and Indicates the correction factor corresponding to the line length and water flow in the water area stored in the cloud database, It represents the compensation factor corresponding to the water flow assessment information of the set water area, and e represents a natural constant; Indicates the overlap length between the water flow change curve and a preset water flow change reference curve; The comprehensive hydropower efficiency of the hydropower plant to be monitored is calculated based on the following formula: in, represents the comprehensive hydropower efficiency characterization value of the hydropower plant to be monitored, , as well as They respectively represent the hydropower operation assessment information of the hydropower plant to be monitored, the hydropower abandonment assessment information of the hydropower plant to be monitored, and the drainage water area assessment information of the hydropower plant to be monitored. , and Respectively represent the weight factors corresponding to the hydropower operation assessment information, the hydropower abandonment assessment information and the drainage water area assessment information; The hydropower efficiency determination module is further used for: Obtaining dissolved oxygen information, temperature information, pH information and sediment information of the downstream water area corresponding to the water area of ​​the hydropower plant to be monitored; Determine the drainage water area assessment information of the hydropower plant to be monitored according to the dissolved oxygen information, the temperature information, the pH information, the sediment information and the corresponding preset reference information The drainage water area assessment information is calculated based on the following formula: ; in, Indicates the assessment information of the drainage water area of ​​the hydropower plant to be monitored. It represents the dissolved oxygen in the water body downstream of the water area of ​​the hydropower plant to be monitored, T represents the temperature in the water body downstream of the water area of ​​the hydropower plant to be monitored, and PH represents the acidity and alkalinity of the water body downstream of the water area of ​​the hydropower plant to be monitored. , as well as They represent the reference dissolved oxygen, reference temperature and reference pH stored in the cloud database respectively. , and They represent the correction factors corresponding to dissolved oxygen, temperature and pH stored in the cloud database, respectively. represents the compensation factor corresponding to the sediment impact assessment value in the water body downstream of the water area to be monitored by the hydropower plant, Z represents the sediment impact assessment value in the water body downstream of the water area to be monitored by the hydropower plant, and represents the volume of the water sample at the cth sediment monitoring point and the volume of sediment after filtration in the water sample, It indicates the volume percentage of sediment in water bodies of water environment standards stored in the cloud database. and They represent the correction factors corresponding to the sediment volume percentage and the sediment height in the water body, represents the height of water sediment at the cth sediment monitoring point, represents the reference height of water sediment stored in the cloud database, c represents the number of each sediment monitoring point, , k is the number of sediment monitoring points.

7. The device according to claim 6, characterized in that The hydropower efficiency determination module is also used to obtain the power generation information of the hydropower plant to be monitored within multiple preset time periods; determine the power generation stability assessment information of the hydropower plant to be monitored based on the power generation information; obtain the cumulative use time and start time of the equipment of the hydropower plant to be monitored, and determine the hydropower operation assessment information of the hydropower plant to be monitored based on the cumulative use time of the equipment, the start time, the power generation stability assessment information and preset power generation reference information.

8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 5 are implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 5 are implemented.