Impact risk assessment method and system of small and medium-sized reservoirs on downstream cross-buildings

By combining the risk assessment method with the distribution pattern and relative position of the reservoir group, it solves the problem of rapid assessment of the impact risk of small and medium-sized reservoir groups on downstream infrastructure, identifies weak links and provides flood control support, and improves the accuracy and efficiency of dam failure risk assessment. .

CN118261090BActive Publication Date: 2024-10-18NANJING HYDRAULIC RES INST
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410677418.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-29
Publication Date
2024-10-18
Estimated Expiration
2044-05-29

AI Technical Summary

Technical Problem

Existing technology cannot effectively evaluate the impact risks of small and medium-sized reservoir groups on important downstream infrastructure, especially linear projects such as water diversion projects, subways, and highways, and lacks rapid evaluation methods.

Method used

This paper proposes a risk assessment method for the impact of small and medium-sized reservoir groups on downstream cross-buildings. Combined with the distribution pattern and relative position of the reservoir group, the impact of dam failure floods is estimated through empirical formulas, and the probability of dam failure is determined through hidden danger investigation. Single reservoir and Reservoir group impact risk assessment method to calculate the risk value R.

Benefits of technology

Quickly identify controlled reservoirs, weak reservoirs and general reservoirs in the reservoir group, provide technical support for river basin flood control, solve the problem of difficulty in rapid evaluation of the dynamic complexity of reservoir group risks, and improve the understanding and assessment capabilities of the characteristics of dam failure risk transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118261090B_ABST
    Figure CN118261090B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for assessing the impact risk of a group of small and medium-sized reservoirs on downstream intersecting buildings. The method aims to assess the impact risk of floods on important infrastructure located downstream of the reservoir, comprehensively considers the influence of multiple factors such as reservoir scale, engineering safety and distribution pattern, and quickly and effectively conducts risk assessment on reservoirs (groups) in the upstream river basin. First, the basic information of the reservoirs in the upstream river basin is checked to clarify the number and distribution pattern of reservoirs within the impact range, and a risk assessment is conducted from three aspects: the possibility of dam failure, the severity of the consequences, and the degree of impact on downstream buildings. If there are multiple reservoirs upstream, it is necessary to divide the risk assessment units and rank the reservoir group risks before the risk assessment, and select the risk assessment method according to the different distribution patterns of the reservoir group. The present invention realizes the rapid assessment of the impact risk of small and medium-sized reservoirs (groups) from the perspective of ensuring the safety of important infrastructure projects such as downstream intersecting buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of risk analysis of reservoir dam projects, and in particular relates to a method for evaluating the impact risk of small and medium-sized reservoirs (groups) on downstream cross-buildings. Background Art

[0002] As of now, there are more than 90,000 reservoirs of various types in my country, of which small and medium-sized reservoirs account for more than 99%. However, affected by global climate change, my country's climate situation is complex and changeable, and the suddenness, abnormality and uncertainty of floods and droughts are prominent. The trend of frequent and repeated occurrences has intensified, seriously threatening the safe operation of reservoirs and dams. The risks of small and medium-sized reservoirs have led to prominent risks to major downstream infrastructure.

[0003] Current research on reservoir risk assessment is focused on the risk of a single reservoir or the risk of a cascade of reservoirs collapsing. The impact risk of a reservoir (group) in a river basin on a specific infrastructure has not been considered. This is especially true for linear projects such as water diversion projects, subways, and highways. Since their lines are long and there may be many reservoirs along the lines, there is still a lack of a method that can quickly assess the impact risk of reservoirs. Summary of the invention

[0004] The technical problem to be solved by the present invention is as follows: a method for evaluating the impact risk of small and medium-sized reservoirs (groups) on downstream intersecting buildings is proposed, which comprehensively considers the relative positions of small and medium-sized reservoirs (groups) and downstream intersecting buildings and the distribution pattern of reservoir groups, uses empirical formulas to estimate the impact of dam break floods, and determines the probability of dam break through hidden danger inspections, providing theoretical and technical support for the impact risk assessment of reservoirs on downstream important infrastructure.

[0005] The present invention adopts the following technical solutions to solve the above technical problems:

[0006] Investigate the upstream river basins of the crossing structures, and preliminarily determine the river basins and the number of small and medium-sized reservoirs in the river basins that will have an impact on the downstream crossing structures; collect basic information on river basins and reservoirs, and determine different risk assessment methods based on the conditions of reservoirs in the same river basin; the basic information on river basins and reservoirs includes hydrological and meteorological data and engineering characteristic data; the hydrological and meteorological data include: heavy rains in the upstream river basin, flood characteristics, reservoir design floods and their processes; the engineering characteristic data include: geographical location of the reservoir, engineering grade, flood control standards, characteristic water level and storage capacity, and basic conditions of hydraulic structures.

[0007] If there is only one small or medium-sized reservoir in the upstream basin, the single reservoir impact risk assessment LSD method is used to calculate the impact risk of single reservoir collapse on downstream cross-buildings; if there are two or more small and medium-sized reservoirs in the upstream basin at the same time, the risk superposition effect of continuous reservoir collapse is further considered on the basis of the single reservoir impact risk assessment LSD method, and the reservoir group impact risk assessment method is adopted.

[0008] The specific technical solutions are as follows:

[0009] S1. If there is only one small or medium-sized reservoir in the upstream basin, the single reservoir impact risk assessment LSD method is used to calculate the impact risk of single reservoir failure on downstream cross-buildings. The calculation formula is:

[0010] (1)

[0011] In the formula: R represents the risk value; L represents the dam break possibility coefficient; S represents the dam break consequence severity coefficient; D represents the impact coefficient, which is related to the distance, river section, gradient, and roughness factors;

[0012] S2. If there are two or more small and medium-sized reservoirs in the upstream basin, the reservoir group impact risk assessment method is adopted; it includes the following sub-steps:

[0013] S201. Divide and clarify the reservoir distribution pattern: treat all reservoirs within the basin including key cross-buildings as a risk assessment unit; divide the reservoir group into three distribution patterns: series reservoir group, parallel reservoir group, and mixed reservoir group according to the relative position relationship of the reservoirs within the basin;

[0014] S202, dividing the controlled reservoirs, weak reservoirs and general reservoirs according to different risk characteristics, and calculating the unit risk R value through the risk characteristic value of the controlled reservoir;

[0015] According to the LSD method for single reservoir impact risk assessment, the L and S values ​​of each single reservoir risk in the unit are calculated respectively; the reservoir with the largest L value, that is, the single reservoir with the highest probability of dam failure, is the weak reservoir; the reservoir with the largest S value is the control reservoir, and the reservoir with a larger S value has a stronger ability to cut off risk transmission in the unit;

[0016] S203. Calculate the risk value R by determining the dam-break possibility coefficient L, dam-break consequence severity coefficient S and impact coefficient D of the reservoir group as a whole under different distribution modes; the details are as follows:

[0017] For a series of reservoirs, the L value is the probability of dam failure of the controlling reservoir when considering the superposition of upstream dam failure risks, the S value is the superposition value of the severity of the consequences of dam failure, and the D value is the impact coefficient of the reservoirs adjacent to the cross-buildings in the reservoir group on the downstream after the superposition of floods;

[0018] For a group of parallel reservoirs, the risk value R when the parallel reservoirs burst at the same time should be calculated first, where L is the probability of the parallel reservoirs bursting at the same time, S is the superposition value of the severity of the consequences of the bursting reservoirs, and D is the impact coefficient of the combined flood on the downstream when the parallel reservoirs burst at the same time. Then, the risk value of the dam burst of a single reservoir is calculated separately. By comparing the risk values ​​of the simultaneous dam burst of multiple parallel reservoirs with the dam burst of a single reservoir, the larger value is taken to represent the risk value of the reservoir group.

[0019] For a mixed library group, which is composed of multiple series and parallel structures, its risk value R is calculated by combining series and parallel risk assessment methods.

[0020] Furthermore, the present invention also proposes a computer system, comprising a memory, a processor and a computer program stored in the memory, wherein the processor executes the computer program to implement the steps of the method proposed above in the present invention.

[0021] Furthermore, the present invention also proposes a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the steps of the method proposed above in the present invention are implemented.

[0022] Finally, the present invention also proposes a computer program product, including a computer program or instructions, characterized in that the steps of the method proposed in the present invention are implemented when the computer program or instructions are executed by a processor.

[0023] The present invention adopts the above technical solution, and compared with the prior art, its significant technical effects are as follows:

[0024] (1) The method of the present invention fully considers the importance of reservoir group distribution pattern in dam risk assessment. By stipulating the dam break probability estimation and dam break consequence calculation methods corresponding to different series, parallel and mixed modes, it can quickly identify the control reservoirs, weak reservoirs and general reservoirs in the reservoir group, providing technical support for quickly anchoring the weak links of basin flood control.

[0025] (2) The present invention comprehensively considers the relative positions of small and medium-sized reservoirs (groups) and downstream cross-structures and the importance of the distribution pattern of reservoir groups in the risk assessment of river basin reservoirs. It explains that the hydraulic connection between the upstream and downstream reservoirs causes the characteristics of dam break risk transmission between reservoir groups, and solves the problem that the risk dynamics of reservoir groups in the same river basin are complex and difficult to quickly evaluate. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a flow chart of the overall steps of the present invention.

[0027] Figure 2 It is a schematic diagram of a reservoir group with different reservoir distribution patterns of the present invention.

[0028] Figure 3 It is a schematic diagram of the geographical location of three reservoirs and the downstream inverted siphon A project according to an embodiment of the present invention. DETAILED DESCRIPTION

[0029] The technical solution of the present invention will be clearly and completely described below in conjunction with the drawings and specific implementation methods of the specification. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field belong to the scope of protection of the present invention.

[0030] The present invention proposes a method for assessing the impact risk of small and medium-sized reservoirs (groups) on downstream cross-buildings, comprising:

[0031] Investigate the upstream basins of the cross-structures and preliminarily determine the basins and the number of small and medium-sized reservoirs in the basins that may have an impact on the downstream cross-structures. Comprehensively collect basic data on basins and reservoirs, including but not limited to: hydrological and meteorological data such as rainstorms and flood characteristics in the upstream basins, reservoir design floods and their processes, and engineering characteristic data such as the geographical location of the reservoir, engineering grade, flood control standards, characteristic water level and storage capacity, and basic conditions of hydraulic structures.

[0032] Determine different risk assessment methods based on the reservoir conditions in the same basin:

[0033] S1. If there is only one small or medium-sized reservoir in the upstream basin, the impact risk of a single reservoir breach on downstream cross-buildings is considered, and the single reservoir impact risk assessment LSD method is adopted;

[0034] S2. If there are two or more small and medium-sized reservoirs in the upstream basin, the risk superposition effect of consecutive reservoir failures is further considered on the basis of the LSD method for single reservoir impact risk assessment, and the reservoir group impact risk assessment method is adopted.

[0035] The impact risk assessment method of small and medium-sized reservoirs (groups) on downstream cross-buildings proposed in the present invention, in the specific step of step S1, the single reservoir impact risk assessment LSD method refers to comprehensively considering the possibility of a single reservoir dam break, the severity of the consequences and the impact degree on downstream buildings to determine the size of the risk value R, which can be calculated according to formula (1):

[0036] (1)

[0037] In the formula: R represents the risk value; L represents the dam break possibility coefficient; S represents the dam break consequence severity coefficient; D represents the impact coefficient, which is related to distance, river section, gradient and roughness factors.

[0038] For a single reservoir, the L value can be used to qualitatively determine the possibility of dam failure and assign a value by investigating the risk level of the reservoir. The risk investigation mainly includes two aspects: engineering risk and management risk. According to the severity of the risk, it can be divided into three levels: general, serious and severe. The specific values ​​are as follows:

[0039]

[0040] The S value is mainly determined based on the reservoir dam height and storage capacity information. Based on the safety level classification formula of the structural system reliability theory, the S value can be calculated according to formula (2):

[0041] (2)

[0042] Where: H represents the maximum dam height, in meters; V represents the reservoir capacity, in 10,000 m 3 .

[0043] In order to quickly evaluate the impact risk of the reservoir on the downstream cross-buildings, the impact coefficient D is used to qualitatively describe the maximum flow Q when the dam-break flood evolves to the cross-building section. xm The relative relationship between the cross-building verification standard flow Q verification and the design standard flow Q design: If Q xm ≥Q check, then D is 1; if Q check>Q xm ≥Q design, then D is 0.8; if Q xm <Q design, then D is taken as 0.6.

[0044] Dam breach flood xm The calculation can be done using the formula recommended in the Manual of Flood Calculation for Water Conservancy and Hydropower Engineering Design. The specific formula is shown in formula (3). Taking the gradual collapse process of an earth-rock dam as an example, the maximum flow at the dam site Q m The Saint-Venant formula is used for estimation. The specific formula is shown in formula (4).

[0045] (3)

[0046] Where: Q xm It represents the maximum dam-break flow at the upstream dam site X, in m 3 / s;Q m Indicates the maximum discharge of the upstream dam site at the dam break. For reservoirs with spillways, the maximum discharge of the spillway should be added. The unit is m 3 / s; W represents the total amount of water discharged, the unit is m 3 ; X represents the distance between the downstream section and the upstream dam site, in meters; K represents the coefficient that comprehensively reflects the river section, gradient, and roughness factors.

[0047] Maximum flow at dam site Q m The Saint-Venant formula is used for estimation, namely:

[0048] (4)

[0049] Where: b is the length of the collapsed dam (m); B is the average width of the cross section at the dam site (m); h0 is the water depth in front of the dam when the dam breaks (m); g is the acceleration of gravity (m / s 2 ).

[0050] The method for assessing the impact risk of small and medium-sized reservoirs (groups) on downstream intersecting buildings proposed in the present invention comprises the following sub-steps in the specific steps of step S2:

[0051] S201. Assessment unit division and clear reservoir distribution pattern: including key cross-buildings and all reservoirs within the basin they cross as a risk assessment unit. According to the relative position of reservoirs in the basin, reservoir groups can be divided into three basic types: "series", "parallel" and "mixed". See the schematic diagram Figure 2 .

[0052] S202. Clarify the controlled reservoirs, weak reservoirs and general reservoirs within the evaluation unit: To ensure that the evaluation method is easy to operate, the evaluation process is appropriately simplified from a conservative perspective, and the controlled reservoirs, weak reservoirs and general reservoirs are divided according to different risk characteristics. The unit risk R value is calculated using the risk characteristic value of the controlled reservoir.

[0053] According to the single reservoir impact risk assessment method (LSD method), the L and S values ​​of each single reservoir risk in the unit are calculated respectively. The weak reservoir has the largest L value, that is, the single reservoir has the highest probability of dam failure; the control reservoir has the largest S value. Since the dam height and reservoir capacity are considered comprehensively when calculating the S value, generally speaking, the larger the S value, the stronger the ability to cut off risk transmission in the unit.

[0054] S203. According to different distribution patterns, it is divided into series library group risk assessment, parallel library group risk assessment, and mixed library group risk assessment.

[0055] The method for assessing the impact risk of small and medium-sized reservoirs (groups) on downstream cross-buildings proposed by the present invention, in the specific steps of step S203, the risk assessment of the series reservoir group mainly refers to:

[0056] If the two reservoirs A and B are determined to be in series ( Figure 2 The unit risk can be calculated using formula (5). The probability of dam failure of reservoir B when the risks of upstream reservoirs are superimposed is It can be calculated using formula (6):

[0057] (5)

[0058] Where: B is the control reservoir, S A , S B It indicates the severity of the damage caused by the dam breach of reservoirs A and B to the downstream. D indicates the impact coefficient of the dam breach flood of the adjacent reservoir upstream of the cross-building on the downstream after the flood is superimposed. Here, the floods of multiple reservoirs need to be superimposed. The probability of dam failure of reservoir B when the risks of upstream reservoirs are superimposed is calculated using the following formula:

[0059] (6)

[0060] Where: L A , L B Respectively represent the probability of dam failure of the two reservoirs, where L AB It represents the probability of dam breach in reservoir B when reservoir A breaches. This conditional probability is obtained by comparing the reservoir capacity difference and the upstream and downstream inflow and outflow. Assuming that there are no early warning and emergency response measures, when the total storage capacity of the upper reservoir A is less than the flood control storage capacity of the lower reservoir B, it is believed that the lower reservoir can accommodate the flood caused by the dam breach in the upper reservoir. Therefore, L AB =0; when the total storage capacity of the upper reservoir A ≥ the flood control storage capacity of the lower reservoir B, if the maximum flood discharge of the lower reservoir ≥ the maximum combined discharge when the dam breaks in the upper reservoir, it is considered that the lower reservoir can reduce the risk of dam break in the upper reservoir to a certain extent, and L is taken. AB =0.5; if the maximum flood discharge of the lower reservoir is less than the maximum combined discharge when the upper reservoir reaches the dam breach, it is believed that the flood of the upper reservoir will continue to flow into the lower reservoir and eventually cause the dam to overflow, so L AB =1.

[0061] When three reservoirs A, B, and C (C is the control reservoir) are connected in series, the probability of dam failure is , and so on.

[0062] The method for assessing the impact risk of small and medium-sized reservoirs (groups) on downstream cross-buildings proposed by the present invention, in the specific steps of step S203, the risk assessment of the parallel reservoir group mainly refers to:

[0063] Since there is no direct impact between the parallel reservoirs, A and B ( Figure 2 The risk of parallel reservoirs in (b) can be calculated according to formula (7).

[0064] (7)

[0065] Where: R is the risk value of the unit; L A , L B Respectively represent the probability of dam failure of the two reservoirs; S A , S B They represent the severity of the damage caused by the dam breach of the two reservoirs; D represents the impact coefficient of the combined flood on the downstream when the two adjacent reservoirs upstream breach at the same time;

[0066] It should be noted that since the probability of simultaneous dam failure of two reservoirs is much smaller than the probability of a single reservoir failure, the risk value of dam failure of each reservoir should be calculated separately for the parallel reservoir group. A , R B , compare R and R A , R B After the risk value is calculated, the maximum value represents the risk level of the unit.

[0067] The method for assessing the impact risk of small and medium-sized reservoirs (groups) on downstream intersecting buildings proposed by the present invention, in the specific steps of step S203, the risk assessment of the hybrid reservoir group mainly refers to:

[0068] The hybrid reservoir group can be regarded as a combination of multiple series and parallel structures. For the simplest hybrid distribution mode of three reservoirs A, B, and C ( Figure 2 In (c) above, the control reservoir C can represent the overall risk level of the unit after considering the risk superposition effect, R C It can be calculated according to (8). It represents the probability of dam failure of reservoir C when the dam failure risks of reservoirs A and B are superimposed. It can be calculated using formula (9). Other situations can be deduced by this method.

[0069] (8)

[0070] Where: S A , S B , S C It indicates the severity of the damage caused by the dam breach of reservoirs A, B, and C. D indicates the impact coefficient of the dam breach flood of the adjacent reservoir upstream of the cross-building on the downstream after the flood is superimposed. The probability of dam failure of reservoir C is expressed when the dam failure risks of reservoirs A and B are superimposed, and is calculated using the following formula:

[0071] (9)

[0072] Where: L A , L B , L C Represents the probability of dam failure of the three reservoirs, L AC , L BC , L AB,C They represent the probability of dam failure of the downstream reservoir C when the A and B reservoirs fail separately and simultaneously.

[0073] One embodiment of the present invention is to conduct risk assessment analysis on three reservoirs in Handan, Hebei and an inverted siphon project downstream.

[0074] The ZZ Reservoir is a small (2) type, homogeneous earth dam with a total storage capacity of 871,400 m 3 The maximum dam height is 10.9m, and the flood standard is designed for a 10-year flood and verified for a 50-year flood. The SQ reservoir is a small (2) type reservoir with a total storage capacity of 384,200 m 3 The dam is a homogeneous earth dam with a maximum dam height of 10.11m and a dam crest length of 136m. The reservoir flood control standard is designed for a 10-year flood and verified for a 50-year flood, with a maximum discharge of 42.8 m³ / s. The LJH reservoir is connected in parallel with the SQ reservoir and is a small (2) type reservoir with a total storage capacity of 687,000 m 3The dam is a homogeneous earth dam with a maximum dam height of 12.6m. The flood standard is designed for a flood that returns once in 20 years and verified for a flood that returns once in 200 years.

[0075] 2.19km downstream of ZZ Reservoir is a drainage inverted siphon A project, with a flood standard of 50-year flood design and a design flow of 319.6m 3 / s, 200-year flood verification, verification flow is 490.9m 3 / s. The schematic diagram of the location of the three reservoirs and the inverted siphon project is shown in Figure 3 The basic engineering information of the three reservoirs is shown in the following table, where the water depth before breach is an assumed value and the average breach width is based on (For reservoirs with a capacity of less than 1 million m 3 , K2 is determined according to the quality of dam construction and management, and is taken as 9.1 here).

[0076]

[0077] Due to the lack of information on on-site hidden danger inspections, it is assumed here that the inspection results of engineering hidden dangers and management hidden dangers of the three reservoirs are all average, and the specific values ​​are as follows:

[0078]

[0079] According to the dam-break flood estimation results, the D value can be determined by comparing with the design and verification flow of the downstream inverted siphon project. Since the maximum flow of the dam-break floods of the three reservoirs to the inverted siphon A project exceeds the verification flow of the project by 490.9m 3 / s, so the D value is taken as 1.0. The risk R value and L, S, and D values ​​of the three reservoirs' dam breaches on the downstream inverted siphon project are shown in the following table, where ZZ is the control reservoir. Since the L value is assumed to be 0.2, there is no relatively weak reservoir. From the single reservoir impact risk assessment results, it can be seen that the ZZ reservoir has a relatively large impact risk on the downstream, followed by the SQ reservoir, and finally the ZZ reservoir.

[0080]

[0081] Further considering the impact risk of the relationship between the three reservoirs on the downstream inverted siphon A project, the following conclusions can be drawn using equations (5) to (9):

[0082] 1) Assuming that the SQ and LJH reservoirs fail in series, the risk value R is 0.17;

[0083] 2) Assuming that the LJH reservoir breach causes the downstream ZZ reservoir to breach, the risk value R is 1.84;

[0084] 3) Assuming that the SQ reservoir breach causes the downstream ZZ reservoir to breach, the risk value R is 1.29;

[0085] 4) Assuming that the LJH and SQ reservoirs fail at the same time, causing the downstream ZZ reservoir to fail, the risk value is 1.584.

[0086] Combining the above single reservoir dam break and reservoir group dam break risk assessment results, it can be seen that when the LJH reservoir breaks and causes the ZZ reservoir to break, the impact risk on the downstream inverted siphon A project is the greatest and should be taken seriously.

[0087] It should be noted that the description of the system of the embodiment of the present application is similar to the description of the above-mentioned method embodiment, and has similar beneficial effects as the method embodiment, so it will not be repeated.

[0088] As another embodiment of the present invention, the present invention further proposes a computer system, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the method of the present invention when executing the computer program.

[0089] Finally, the present invention provides a computer-readable storage medium having a computer program stored thereon, wherein the computer program implements the steps of the method of the present invention when executed by a processor.

[0090] Various implementations of the systems and techniques described above herein can be implemented in digital electronic circuit systems, integrated circuit systems, field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), load programmable logic devices (CPLDs), computer hardware, firmware, software, and / or combinations thereof. These various implementations can include: being implemented in one or more computer programs that can be executed and / or interpreted on a programmable system including at least one programmable processor, which can be a special purpose or general purpose programmable processor that can receive data and instructions from a storage system, at least one input device, and at least one output device, and transmit data and instructions to the storage system, the at least one input device, and the at least one output device.

[0091] The program code for implementing the method of the present application can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, implements the functions / operations specified in the flow chart and / or block diagram. The program code can be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0092] In the context of the present application, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or device, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0093] The above descriptions are only some embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for assessing the impact risk of a group of small and medium-sized reservoirs on downstream intersecting buildings, characterized in that: include: S1. If there is only one small or medium-sized reservoir in the upstream basin, the single reservoir impact risk assessment LSD method is used to calculate the impact risk of single reservoir failure on downstream cross-buildings. The calculation formula is: (1) Where: R represents the risk value; L represents the dam break possibility coefficient; S represents the dam break consequence severity coefficient; D represents the impact coefficient, which is related to distance, river section, gradient, and roughness factors; S2. If there are two or more small and medium-sized reservoirs in the upstream basin, the reservoir group impact risk assessment method shall be adopted; It includes the following sub-steps: S201. Divide and clarify the reservoir distribution pattern: treat all reservoirs within the basin including key cross-buildings as a risk assessment unit; divide the reservoir group into three distribution patterns: series reservoir group, parallel reservoir group, and mixed reservoir group according to the relative position relationship of the reservoirs within the basin; S202, dividing the controlled reservoirs, weak reservoirs and general reservoirs according to different risk characteristics, and calculating the unit risk R value through the risk characteristic value of the controlled reservoir; According to the LSD method for single reservoir impact risk assessment, the L and S values ​​of each single reservoir risk in the unit are calculated respectively; the reservoir with the largest L value, that is, the single reservoir with the highest probability of dam failure, is the weak reservoir; the reservoir with the largest S value is the control reservoir, and the reservoir with a larger S value has a stronger ability to cut off risk transmission in the unit; S203. Calculate the risk value R by determining the dam-break possibility coefficient L, dam-break consequence severity coefficient S and impact coefficient D of the reservoir group as a whole under different distribution modes, as follows: The impact coefficient D is used to qualitatively describe the maximum flow Q when the dam-break flood evolves to the cross-building section. xm Verify standard flow Q with cross-buildings 校核 , Design standard flow Q 设计 The relative relationship between: If Q xm ≥Q 校核 , then D is 1; if Q 校核 >Q xm ≥Q 设计 , then D is 0.8; if Q xm <Q 设计 , then D is 0.6; (3) Where: Q xm It represents the maximum dam-break flow at the upstream dam site X, in m 3 / s;Q m Indicates the maximum discharge of the upstream dam site at the dam break. For reservoirs with spillways, the maximum discharge of the spillway should be added. The unit is m 3 / s; W represents the total amount of water discharged, the unit is m 3 ; X represents the distance between the downstream section and the upstream dam site, in meters; K represents the coefficient that comprehensively reflects the river section, gradient, and roughness factors; For a series of reservoirs, the L value is the probability of dam failure of the controlled reservoir when the upstream dam failure risk is superimposed, the S value is the superposition value of the severity of the consequences of the dam failure, and the D value is the impact coefficient of the reservoirs near the cross-buildings in the reservoir group on the downstream after the flood is superimposed. The risk assessment of the series of reservoirs refers to: If reservoirs A and B are determined to be connected in series, the unit risk is calculated using the following formula: (5) Where: B is the control reservoir, S A , S B It indicates the severity of the damage caused by the dam breach of reservoirs A and B to the downstream. D indicates the impact coefficient of the dam breach flood of the adjacent reservoir upstream of the cross-building on the downstream after the flood is superimposed. Here, the floods of multiple reservoirs need to be superimposed. The probability of dam failure of reservoir B when the risks of upstream reservoirs are superimposed is calculated using the following formula: (6) Where: L A , L B Represent the probability of dam failure of the two reservoirs, L AB It represents the probability of dam breach in reservoir B when reservoir A breaches. This conditional probability is obtained by comparing the reservoir capacity difference and the upstream and downstream inflow and outflow: Assuming that there are no early warning and emergency response measures, when the total storage capacity of the upper reservoir A is less than the flood control storage capacity of the lower reservoir B, it is believed that the lower reservoir can accommodate the dam-break flood of the upper reservoir, so L AB =0; when the total storage capacity of the upper reservoir A ≥ the flood control storage capacity of the lower reservoir B, if the maximum flood discharge of the lower reservoir ≥ the maximum combined discharge when the dam breaks in the upper reservoir, it is considered that the lower reservoir can reduce the risk of dam break in the upper reservoir to a certain extent, and L is taken. AB =0.5; if the maximum flood discharge of the lower reservoir is less than the maximum combined discharge when the upper reservoir reaches the dam breach, it is believed that the flood of the upper reservoir will continue to flow into the lower reservoir and eventually cause the dam to overflow, so L AB =1; Assume C is the control reservoir. When the three reservoirs A, B, and C are connected in series, the probability of dam failure is , and so on; For parallel reservoir groups, the risk value R when the parallel reservoirs burst at the same time should be calculated first, where L is the probability of the parallel reservoirs bursting at the same time, S is the superposition value of the severity of the consequences of the burst reservoirs, and D is the impact coefficient of the combined flood on the downstream when the parallel reservoirs burst at the same time. Then, the risk value of the dam burst of a single reservoir is calculated separately. By comparing the risk values ​​of the simultaneous dam burst of multiple parallel reservoirs and the dam burst of a single reservoir, the larger value is taken to represent the risk value of the reservoir group. The method is as follows: For the risk assessment of parallel reservoirs, the risk value of the simultaneous dam failure of the two parallel reservoirs A and B is first calculated as follows: (7) Where: R is the risk value of the unit; L A , L B Respectively represent the probability of dam failure of the two reservoirs; S A , S B They represent the severity of the damage caused by the dam breach of the two reservoirs; D represents the impact coefficient of the combined flood on the downstream when the two adjacent reservoirs upstream breach at the same time; Secondly, calculate the risk value R of a single reservoir dam break A , R B , compare R and R A , R B After the risk value is calculated, the maximum value represents the risk level of the unit; For a hybrid warehouse group, which is composed of multiple series and parallel structures, its risk value R is calculated by combining the series and parallel risk assessment methods. The risk assessment of the hybrid warehouse group refers to: The hybrid reservoir group is regarded as a combination of multiple series and parallel structures. For the hybrid distribution mode of three reservoirs A, B, and C, the control reservoir C represents the overall risk level of the unit after considering the risk superposition effect. C Calculate as follows: (8) Where: S A , S B , S C It indicates the severity of the damage caused by the dam breach of reservoirs A, B, and C. D indicates the impact coefficient of the dam breach flood of the adjacent reservoir upstream of the cross-building on the downstream after the flood is superimposed. The probability of dam failure of reservoir C is expressed when the dam failure risks of reservoirs A and B are superimposed, and is calculated using the following formula: (9) Where: L A , L B , L C Represents the probability of dam failure of the three reservoirs, L AC , L BC , L AB,C They represent the probability of dam failure of the downstream reservoir C when the A and B reservoirs fail separately and simultaneously.

2. The method according to claim 1, characterized in that For a single reservoir, the L value is determined by qualitatively determining the possibility of dam failure and assigning a value through hidden danger inspection of the reservoir's dangerousness; hidden danger inspection includes engineering hidden dangers and management hidden dangers, which are divided into three levels according to the severity of the hidden dangers, and assigned values ​​of 0.1, 0.3, and 0.5 from low to high respectively.

3. The method according to claim 1, characterized in that The S value is determined based on the reservoir dam height and storage capacity information, and the safety level classification formula based on the structural system reliability theory. The S value is determined according to the following formula: (2) Where: H represents the maximum dam height, in meters; V represents the reservoir capacity, in 10,000 m 3 .

4. A computer system comprising a memory, a processor and a computer program stored in the memory, characterized in that: The processor executes the computer program to implement the steps of any one of claims 1-3.

5. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 3 are implemented.

6. A computer program product comprising a computer program or instructions, characterized in that When the computer program or instruction is executed by a processor, the steps of any method described in claims 1-3 are implemented.

Citation Information

Patent Citations

  • Experimental device for simulating impact of upstream dam break on downstream dam

    CN107044105A

  • Waater resource risk assessment method for multiple risk sources of cascade reservoir group

    CN111260213A