A railway coal intelligent management system based on cloud computing
Through an intelligent management system based on cloud computing, comprehensive risk assessment and management optimization are carried out for railway coal storage areas, solving the problems of railway coal storage safety and low management efficiency, and achieving more efficient safety supervision and risk warning.
Patent Information
- Application Number
- CN202410352332.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-26
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2044-03-26
AI Technical Summary
The existing technology cannot effectively supervise the railway coal storage area, resulting in low coal safety and management efficiency, and it is easy to cause combustion and safety problems due to excessive temperature.
An intelligent management system based on cloud computing is used to supervise and analyze the safety of railway coal storage from point to surface. It conducts risk assessment based on the two dimensions of storage environment and information screen, and generates feedback instructions to optimize management strategies and improve management qualification efficiency. .
It improves the safety and rationality of railway coal storage and management, avoids the risk of untimely information collection and coal theft, provides timely early warning management, reduces the risk of coal combustion and safety accidents, and improves the effectiveness of management strategies.
Smart Images

Figure CN118261418B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of railway coal management, and in particular to a railway coal intelligent management system based on cloud computing. Background Art
[0002] Coal is widely used as one of the important sources of energy in our lives. Most of the existing coal storage is open-air storage. The stored coal is exposed to the sun and rain. High-quality coal is easy to deteriorate and lose its high combustion value. Moreover, after being dried, the coal is easy to weather and blown everywhere with strong winds, polluting the environment. At the same time, due to the flammable nature of coal, if the coal is not stored and stacked correctly, the temperature inside the coal is easy to be too high, resulting in economic losses and even safety problems caused by coal combustion;
[0003] In the process of coal production and transportation, coal needs to be transferred through storage and other links. However, in the existing technology, it is impossible to conduct safety supervision on the coal storage area, which is not conducive to the safe storage of coal. It is impossible to conduct safety supervision on coal storage from multiple points, and thus it is impossible to manage coal storage reasonably and targetedly, thereby reducing the management efficiency of coal storage, and it is impossible to reasonably adjust the management strategy according to the overall situation of coal storage, thereby reducing the qualified rate of coal storage management;
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a railway coal intelligent management system based on cloud computing to solve the technical defects mentioned above. The present invention supervises and analyzes the railway coal storage safety in a point-to-surface manner to improve the railway coal storage safety and management rationality, that is, analyzes from the two points of railway coal storage area supervision and self-supervision, and analyzes from the two dimensions of storage environment and information screen in the railway coal storage area supervision to improve the comprehensiveness of the analysis data, analyzes from the railway coal self-supervision, that is, conducts self-risk supervision feedback analysis on the status risk data, and analyzes through information feedback and information fusion to determine whether the railway coal safety in the storage area is qualified, so as to carry out targeted management according to the information feedback situation, and on the premise of qualification, combines historical information to carry out data fluctuation analysis, so as to optimize the railway coal storage management plan in the storage area according to the feedback text, and plan and adjust the management strategy to improve the railway coal storage safety in the storage area, and at the same time improve the management qualification efficiency of the railway coal storage management plan.
[0006] The object of the present invention can be achieved by the following technical solutions: A railway coal intelligent management system based on cloud computing, including a safety management platform, a data retrieval unit, an internal surface supervision unit, a coal area assessment unit, a supervision risk unit, a fusion safety unit, a response management unit and a coal management unit;
[0007] When the safety management platform generates an operation management instruction, the operation management instruction is sent to the data retrieval unit and the internal surface supervision unit. After receiving the operation management instruction, the data retrieval unit immediately retrieves the storage risk data and monitoring interference data of the railway coal from the internal part. The storage risk data includes the moisture risk value and the environmental impact value. The monitoring interference data includes the actual maximum monitoring rotation angle and the average value of the screen delay time. The storage risk data and the monitoring interference data are sent to the coal area assessment unit and the supervision risk unit respectively. After receiving the storage risk data, the coal area assessment unit immediately conducts a coal damage risk assessment and analysis on the storage risk data, and sends the obtained risk signal to the response management unit;
[0008] After receiving the monitoring interference data, the supervision risk unit immediately performs a picture information loss risk supervision operation on the monitoring interference data, and sends the obtained abnormal signal to the response management unit;
[0009] After receiving the transport management instruction, the internal surface supervision unit immediately collects the state risk data of the railway coal in the storage area, including the average oxidation rate and the actual temperature value, and performs its own risk supervision feedback analysis on the state risk data, sends the obtained state risk assessment coefficient Q to the fusion safety unit, and sends the obtained alarm signal to the coal management unit;
[0010] After receiving the status risk assessment coefficient Q, the fusion safety unit immediately integrates and refines the storage information and sends the obtained control signal to the coal management unit.
[0011] Preferably, the coal damage risk assessment and analysis process of the coal area assessment unit is as follows:
[0012] S1: Set a monitoring period and set it as a time threshold, divide the time threshold into i sub-time periods, i is a natural number greater than zero, divide the area of the railway coal storage area into g sub-region blocks, g is a natural number greater than zero, obtain the moisture risk value of each sub-region block in each sub-time period, the moisture risk value represents the product of the part of the maximum ground humidity that exceeds the preset ground humidity value threshold and the duration after data normalization, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the moisture risk value as the Y-axis, draw the moisture risk value curve of each sub-region block by drawing points, obtain the rising trend value of each moisture risk value curve, and set it as the moisture interference value, compare and analyze the moisture interference value with the stored preset moisture interference value threshold, and set the ratio of the number of sub-region blocks corresponding to the moisture interference value greater than the preset moisture interference value threshold to the total number of sub-regions as the damage risk coefficient;
[0013] S2: Obtain the environmental impact value of the railway coal storage area in each sub-time period. The environmental impact value represents the product of the portion of the maximum ambient temperature that deviates from the set temperature value and the duration after data normalization, and then the product of the ventilation risk value after data normalization. The ventilation risk value represents the portion of the actual ventilation volume in the sub-time period that deviates from the set ventilation volume, and then obtain the average of the environmental impact values within the time threshold, and set it as the environmental assessment coefficient.
[0014] Preferably, the damage risk factor and the environmental assessment factor are compared and analyzed with the preset damage risk factor threshold and the preset environmental assessment factor threshold that are stored and recorded internally:
[0015] If the damage risk factor is less than the preset damage risk factor threshold, and the environmental assessment factor is less than the preset environmental assessment factor threshold, no signal is generated;
[0016] If the damage risk factor is greater than or equal to the preset damage risk factor threshold, or the environmental assessment coefficient is greater than or equal to the preset environmental assessment coefficient threshold, a risk signal is generated.
[0017] Preferably, the screen information loss risk supervision operation process of the supervision risk unit is as follows:
[0018] T1: Obtain the actual maximum monitoring rotation angle of the monitoring equipment in the railway coal storage area in each sub-time period, and then obtain the part of the actual maximum monitoring rotation angle that is lower than the set threshold, and set it as the missing screen value, compare and analyze the missing screen value with the stored preset missing screen value threshold, and set the number of sub-time periods corresponding to the missing screen value greater than the preset missing screen value threshold as the missing ratio value;
[0019] T2: Obtain the average image delay duration of each monitoring device in the railway coal storage area in each sub-time period, compare and analyze the average image delay duration with the stored preset image delay duration average threshold, set the ratio of the number of sub-time periods corresponding to the average image delay duration greater than the preset image delay duration average threshold to the total number of sub-time periods as the image loss ratio, compare and analyze the image loss ratio with the stored preset image loss ratio threshold, and set the number of monitoring devices corresponding to the image loss ratio greater than the preset image loss ratio threshold as the information delay value;
[0020] T3: Compare and analyze the missing ratio value and information delay value with the preset missing ratio value threshold and preset information delay value threshold that are stored internally:
[0021] If the missing multiplier value is less than the preset missing multiplier value threshold, and the information delay value is less than the preset information delay value threshold, no signal is generated;
[0022] If the missing ratio value is greater than or equal to the preset missing ratio value threshold, or the information delay value is greater than or equal to the preset information delay value threshold, an abnormal signal is generated.
[0023] Preferably, the risk supervision feedback analysis process of the internal surface supervision unit itself is as follows:
[0024] SS1: Obtain the average oxidation rate of the outer surface of the railway coal in the railway coal storage area in each sub-time period, compare and analyze the average oxidation rate with the stored preset oxidation rate average threshold, calculate the ratio of the number of sub-time periods corresponding to the average oxidation rate greater than the preset oxidation rate average threshold to the total number of sub-time periods, and set it as the oxidation risk value;
[0025] SS2: Divide the railway coal in the storage area into m sub-region blocks, where m is a natural number greater than zero, obtain the actual temperature value of the railway coal in each sub-region block within the time threshold, and then obtain the maximum actual temperature value of the railway coal in the storage area within the time threshold, and set it as the temperature potential value, compare and analyze the temperature potential value with the preset temperature potential value threshold, set the part of the temperature potential value greater than the preset temperature potential value threshold as the potential risk value, and label the oxidation risk value and the potential risk value as YF and QF respectively;
[0026] SS3: According to the formula The state risk assessment coefficient is obtained, where a1 and a2 are preset proportional factor coefficients of oxidation risk value and potential risk value respectively, a1 and a2 are both greater than zero, a3 is the preset correction factor coefficient, and its value is 2.181, and Q is the state risk assessment coefficient. The state risk assessment coefficient Q is compared and analyzed with the preset state risk assessment coefficient threshold value stored in the internal input:
[0027] If the ratio between the state risk assessment coefficient Q and the preset state risk assessment coefficient threshold is less than 1, no signal is generated;
[0028] If the ratio between the state risk assessment coefficient Q and the preset state risk assessment coefficient threshold is greater than 1, an alarm signal is generated.
[0029] Preferably, the storage information integration and refinement analysis process of the fusion security unit is as follows:
[0030] The damage risk coefficient and environmental assessment coefficient within the time threshold are retrieved from the coal regional assessment unit, and the missing ratio value and information delay value within the time threshold are retrieved from the regulatory risk unit, and the damage risk coefficient, environmental assessment coefficient, missing ratio value and information delay value are labeled as SS, HP, QB and XW respectively;
[0031] According to the formula The storage safety assessment coefficient is obtained, where f1, f2, f3, f4 and f5 are respectively the preset weight factor coefficients of the damage risk coefficient, the environmental assessment coefficient, the missing multiple value, the information delay value and the state risk assessment coefficient. f1, f2, f3, f4 and f5 are all greater than zero. f6 is the preset fault tolerance factor coefficient, which is 2.882. R is the storage safety assessment coefficient. The storage safety assessment coefficient R is compared and analyzed with the preset storage safety assessment coefficient threshold value stored in the internal storage:
[0032] If the ratio between the storage safety assessment coefficient R and the preset storage safety assessment coefficient threshold is less than 1, a feedback instruction is generated;
[0033] If the ratio between the storage safety assessment coefficient R and the preset storage safety assessment coefficient threshold is greater than or equal to 1, a control signal is generated.
[0034] Preferably, when the fusion safety unit generates a feedback instruction:
[0035] The stored safety assessment coefficient R corresponding to the feedback instruction is obtained, and the part of the stored safety assessment coefficient R corresponding to the feedback instruction that is less than the preset stored safety assessment coefficient threshold is set as the safety assessment value. The safety assessment values corresponding to the feedback instruction within the historical n time thresholds are obtained, where n is a natural number greater than zero, and a set A of safety assessment values is constructed. The discrete coefficient of set A is obtained and set as the safety floating value, and the safety floating value is compared and analyzed with the preset safety floating value threshold stored internally:
[0036] If the safety float value is less than the preset safety float value threshold, a stable signal is generated;
[0037] If the safety floating value is greater than or equal to the preset safety floating value threshold, a floating signal is generated, and the stable signal and the floating signal are sent to the coal management unit. After receiving the stable signal and the floating signal, the coal management unit immediately displays the preset warning text corresponding to the stable signal and the floating signal.
[0038] The beneficial effects of the present invention are as follows:
[0039] (1) The present invention conducts supervision and analysis on railway coal storage safety in a point-to-surface manner to improve the safety and management rationality of railway coal storage, that is, the analysis is conducted from two points of railway coal storage area supervision and self-supervision, and the analysis is conducted from two dimensions of storage environment and information screen in railway coal storage area supervision to improve the comprehensiveness of analysis data, that is, the coal damage risk assessment analysis is conducted on storage risk data to determine whether the storage risk of railway coal storage area is too large, so as to conduct early warning management in a timely manner to ensure the safety of railway coal storage, and the screen information loss risk supervision operation is conducted on monitoring interference data to avoid the risk of untimely information collection and railway coal theft;
[0040] (2) The present invention analyzes the railway coal's own supervision, that is, conducts risk supervision feedback analysis on the status risk data, so as to carry out rational management according to the information feedback, and analyzes through information feedback and information fusion to determine whether the railway coal safety in the storage area is qualified, so as to carry out targeted management according to the information feedback. On the premise of qualification, data fluctuation analysis is carried out in combination with historical information, so as to optimize the railway coal storage management plan in the storage area according to the feedback text, plan and adjust the management strategy, so as to improve the management efficiency of the railway coal storage management plan. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The present invention will be further described below in conjunction with the accompanying drawings;
[0042] Figure 1 It is a flowchart of the system of the present invention;
[0043] Figure 2 This is a local reference analysis diagram of Example 1 of the present invention. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] Embodiment 1:
[0046] See also Figure 1 to Figure 2 As shown, the present invention is a railway coal intelligent management system based on cloud computing, including a safety management platform, a data retrieval unit, an internal surface supervision unit, a coal area assessment unit, a supervision risk unit, a fusion safety unit, a response management unit and a coal management unit, the safety management platform is connected to the data retrieval unit and the internal surface supervision unit in a one-way communication, the data retrieval unit is connected to the coal area assessment unit and the supervision risk unit in a one-way communication, the coal area assessment unit and the supervision risk unit are connected to the response management unit in a one-way communication, the internal surface supervision unit, the coal area assessment unit and the supervision risk unit are connected to the fusion safety unit in a one-way communication, and the internal surface supervision unit and the fusion safety unit are connected to the coal management unit in a one-way communication;
[0047] When the safety management platform generates a transportation management instruction, the transportation management instruction is sent to the data retrieval unit and the internal surface supervision unit. After receiving the transportation management instruction, the data retrieval unit immediately retrieves the storage risk data and monitoring interference data of the railway coal from the internal. The storage risk data includes the moisture risk value and the environmental impact value. The monitoring interference data includes the actual maximum monitoring rotation angle and the average value of the screen delay time. The storage risk data and the monitoring interference data are sent to the coal area assessment unit and the supervision risk unit respectively. After receiving the storage risk data, the coal area assessment unit immediately conducts a coal damage risk assessment and analysis on the storage risk data to determine whether the storage risk of the railway coal storage area is too large, so as to carry out early warning management in a timely manner to ensure the safety of railway coal storage and effectively avoid railway coal damage. The specific coal damage risk assessment and analysis process is as follows:
[0048] A monitoring period is set and set as a time threshold. The time threshold is divided into i sub-time periods, where i is a natural number greater than zero. The area of the railway coal storage area is divided into g sub-region blocks, where g is a natural number greater than zero. The moisture risk value of each sub-region block in each sub-time period is obtained. The moisture risk value represents the product of the part of the maximum ground humidity that exceeds the preset ground humidity value threshold and the duration after data normalization. A rectangular coordinate system is established with the number of sub-time periods as the X-axis and the moisture risk value as the Y-axis. The moisture risk value curve of each sub-region block is drawn by plotting points. The rising trend value of each moisture risk value curve is obtained and set as the moisture interference value. The moisture interference value is compared and analyzed with the stored preset moisture interference value threshold. The ratio of the number of sub-region blocks corresponding to the moisture interference value greater than the preset moisture interference value threshold to the total number of sub-regions is set as the damage risk coefficient. It should be noted that the larger the value of the damage risk coefficient, the greater the railway coal storage risk.
[0049] The environmental impact value of the railway coal storage area in each sub-time period is obtained. The environmental impact value represents the product of the part of the maximum ambient temperature that deviates from the set temperature value and the duration after data normalization, and then the product of the ventilation risk value after data normalization. The ventilation risk value represents the part of the actual ventilation volume in the sub-time period that deviates from the set ventilation volume, and then the average value of the environmental impact value within the time threshold is obtained and set as the environmental assessment coefficient. It should be noted that the larger the value of the environmental assessment coefficient, the greater the risk of railway coal storage;
[0050] Compare and analyze the damage risk factor and environmental assessment factor with the preset damage risk factor threshold and preset environmental assessment factor threshold that are stored internally:
[0051] If the damage risk factor is less than the preset damage risk factor threshold, and the environmental assessment factor is less than the preset environmental assessment factor threshold, no signal is generated;
[0052] If the damage risk factor is greater than or equal to the preset damage risk factor threshold, or the environmental assessment factor is greater than or equal to the preset environmental assessment factor threshold, a risk signal is generated and sent to the response management unit. After receiving the risk signal, the response management unit immediately performs the preset early warning operation corresponding to the risk signal, so as to timely and rationally manage the railway coal storage area to improve the safety of railway coal storage;
[0053] After receiving the monitoring interference data, the supervision risk unit immediately performs the screen information loss risk supervision operation on the monitoring interference data to determine whether the monitoring of the railway coal storage area is safe, avoid the risk of untimely information collection and railway coal theft, and improve the safety of railway coal storage. The specific screen information loss risk supervision operation process is as follows:
[0054] The actual maximum monitoring rotation angle of the monitoring equipment in the railway coal storage area in each sub-time period is obtained, and then the part of the actual maximum monitoring rotation angle that is lower than the set threshold is obtained, and it is set as the missing screen value, and the missing screen value is compared and analyzed with the stored preset missing screen value threshold, and the number of sub-time periods corresponding to the missing screen value greater than the preset missing screen value threshold is set as the missing multiplier value. It should be noted that the larger the value of the missing multiplier value, the greater the safety risk of the railway coal storage area;
[0055] The average value of the image delay duration of each monitoring device in the railway coal storage area in each sub-time period is obtained, and the average image delay duration is compared and analyzed with the stored preset image delay duration average threshold value, and the ratio of the number of sub-time periods corresponding to the average image delay duration greater than the preset image delay duration average threshold value to the total number of sub-time periods is set as the image missing ratio, and the image missing ratio is compared and analyzed with the stored preset image missing ratio threshold value, and the number of monitoring devices corresponding to the image missing ratio greater than the preset image missing ratio threshold value is set as the information delay value. It should be noted that the larger the value of the information delay value, the greater the safety risk of the railway coal storage area;
[0056] Compare and analyze the missing ratio value and information delay value with the preset missing ratio value threshold and preset information delay value threshold that are stored internally:
[0057] If the missing multiplier value is less than the preset missing multiplier value threshold, and the information delay value is less than the preset information delay value threshold, no signal is generated;
[0058] If the missing ratio value is greater than or equal to the preset missing ratio value threshold, or the information delay value is greater than or equal to the preset information delay value threshold, an abnormal signal is generated and sent to the response management unit. After receiving the abnormal signal, the response management unit immediately performs the preset early warning operation corresponding to the abnormal signal, so as to timely and rationally monitor and manage the railway coal storage area to improve the efficiency of railway coal supervision.
[0059] Embodiment 2:
[0060] After receiving the transport management instruction, the internal surface supervision unit immediately collects the status risk data of the railway coal in the storage area. The status risk data includes the average oxidation rate and the actual temperature value, and conducts its own risk supervision feedback analysis on the status risk data to determine whether the railway coal storage risk itself is too high, so as to conduct rational management according to the information feedback. The specific self-risk supervision feedback analysis process is as follows:
[0061] Obtain the average oxidation rate of the outer surface of the railway coal in the railway coal storage area in each sub-time period, compare and analyze the average oxidation rate with the stored preset oxidation rate average threshold, calculate the ratio of the number of sub-time periods corresponding to the average oxidation rate greater than the preset oxidation rate average threshold to the total number of sub-time periods, and set it as the oxidation risk value. It should be noted that the larger the value of the oxidation risk value, the greater the risk of the railway coal itself in the storage area. If the coal is oxidized and the air is not smooth, the heat generated during oxidation is easy to accumulate inside the coal pile, causing the temperature to rise rapidly, causing the coal to spontaneously combust;
[0062] The railway coal in the storage area is divided into m sub-area blocks, where m is a natural number greater than zero, and the actual temperature value of the railway coal in each sub-area block within the time threshold is obtained, and then the maximum actual temperature value of the railway coal in the storage area within the time threshold is obtained, and it is set as the temperature potential value, and the temperature potential value is compared and analyzed with the preset temperature potential value threshold, and the part of the temperature potential value greater than the preset temperature potential value threshold is set as the potential risk value. It should be noted that the larger the value of the potential risk value is, the greater the risk of the railway coal itself in the storage area is, and the oxidation risk value and the potential risk value are marked as YF and QF respectively;
[0063] According to the formula The state risk assessment coefficient is obtained, where a1 and a2 are preset proportional factor coefficients of the oxidation risk value and the potential risk value, respectively. The proportional factor coefficient is used to correct the deviation of various parameters in the formula calculation process, so as to make the calculation result more accurate. Both a1 and a2 are greater than zero. A3 is the preset correction factor coefficient, which is 2.181. Q is the state risk assessment coefficient. The state risk assessment coefficient Q is sent to the fusion safety unit, and the state risk assessment coefficient Q is compared and analyzed with the preset state risk assessment coefficient threshold value stored in the internal input:
[0064] If the ratio between the state risk assessment coefficient Q and the preset state risk assessment coefficient threshold is less than 1, no signal is generated;
[0065] If the ratio between the state risk assessment coefficient Q and the preset state risk assessment coefficient threshold is greater than 1, an alarm signal is generated and sent to the coal management unit. After receiving the alarm signal, the coal management unit immediately performs the preset early warning operation corresponding to the alarm signal, so as to timely and reasonably manage the railway coal in the storage area to reduce the risk of the railway coal itself;
[0066] After receiving the status risk assessment coefficient Q, the fusion safety unit immediately conducts storage information integration and refinement analysis to determine whether the railway coal safety in the storage area is qualified, so as to carry out targeted management according to the information feedback. The specific storage information integration and refinement analysis process is as follows:
[0067] The damage risk coefficient and environmental assessment coefficient within the time threshold are retrieved from the coal regional assessment unit, and the missing ratio value and information delay value within the time threshold are retrieved from the regulatory risk unit, and the damage risk coefficient, environmental assessment coefficient, missing ratio value and information delay value are labeled as SS, HP, QB and XW respectively;
[0068] According to the formula The storage safety assessment coefficient is obtained, where f1, f2, f3, f4 and f5 are respectively the preset weight factor coefficients of the damage risk coefficient, the environmental assessment coefficient, the missing multiple value, the information delay value and the state risk assessment coefficient. f1, f2, f3, f4 and f5 are all greater than zero. f6 is the preset fault tolerance factor coefficient, which is 2.882. R is the storage safety assessment coefficient. The storage safety assessment coefficient R is compared and analyzed with the preset storage safety assessment coefficient threshold value stored in the internal storage:
[0069] If the ratio between the storage safety assessment coefficient R and the preset storage safety assessment coefficient threshold is less than 1, a feedback instruction is generated;
[0070] If the ratio between the storage safety assessment coefficient R and the preset storage safety assessment coefficient threshold is greater than or equal to 1, a control signal is generated and sent to the coal management unit. After receiving the control signal, the coal management unit immediately displays the preset warning text corresponding to the control signal, so as to perform reasonable safety management according to the feedback text, so as to improve the safety of railway coal storage in the storage area;
[0071] When a feedback instruction is generated, the stored safety assessment coefficient R corresponding to the feedback instruction is obtained, and the part of the stored safety assessment coefficient R corresponding to the feedback instruction that is less than the preset stored safety assessment coefficient threshold is set as the safety assessment value, and the safety assessment values corresponding to the feedback instruction within the historical n time thresholds are obtained, where n is a natural number greater than zero, so as to construct a set A of safety assessment values, obtain the discrete coefficient of set A, and set it as the safety floating value, and compare and analyze the safety floating value with the preset safety floating value threshold stored internally:
[0072] If the safety float value is less than the preset safety float value threshold, a stable signal is generated;
[0073] If the safety floating value is greater than or equal to the preset safety floating value threshold, a floating signal is generated, and the stable signal and the floating signal are sent to the coal management unit. After receiving the stable signal and the floating signal, the coal management unit immediately displays the preset warning text corresponding to the stable signal and the floating signal, so as to optimize the railway coal storage management plan in the storage area according to the feedback text, so as to reasonably plan and adjust the management strategy, so as to improve the safety of railway coal storage in the storage area, and at the same time improve the management efficiency of the railway coal storage management plan;
[0074] In summary, the present invention conducts supervision and analysis on railway coal storage safety in a point-to-surface manner to improve the safety and management rationality of railway coal storage, that is, it analyzes from two points of railway coal storage area supervision and self-supervision, and analyzes from two dimensions of storage environment and information screen in railway coal storage area supervision to improve the comprehensiveness of analysis data, that is, it conducts coal damage risk assessment analysis on storage risk data to determine whether the storage risk of railway coal storage areas is too large, so as to carry out early warning management in a timely manner to ensure the safety of railway coal storage, and at the same time effectively avoid railway coal damage, and performs screen information loss risk supervision operation on monitoring interference data to determine whether the monitoring of railway coal storage areas is safe, so as to avoid information collection in time. In addition, the risk of railway coal theft is taken into consideration, and analysis is conducted from the perspective of railway coal's own supervision, that is, feedback analysis of the status risk data is conducted on its own risk supervision to determine whether the railway coal's own storage risk is too high, so that rational management can be carried out according to the information feedback. Analysis is conducted through information feedback and information fusion to determine whether the railway coal safety in the storage area is qualified, so that targeted management can be carried out according to the information feedback. On the premise of qualification, data fluctuation analysis is conducted in combination with historical information, so that the railway coal storage management plan in the storage area can be optimized according to the feedback text, and the management strategy can be planned and adjusted to improve the railway coal storage safety in the storage area, while improving the management efficiency of the railway coal storage management plan.
[0075] The threshold is set to facilitate comparison. The size of the threshold depends on the amount of sample data and the number of bases set by technicians in this field for each group of sample data; as long as it does not affect the proportional relationship between the parameter and the quantized value.
[0076] The above formulas are obtained by collecting a large amount of data for software simulation and selecting a formula that is close to the actual value. The coefficients in the formula are set by technical personnel in this field according to actual conditions. The above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited to this. Any technical personnel familiar with the technical field within the technical scope disclosed by the present invention, according to the technical solution and the inventive concept of the present invention, make equivalent replacement or change, which should be covered within the protection scope of the present invention.
Claims
1. A railway coal intelligent management system based on cloud computing, characterized in that: It includes the safety management platform, data retrieval unit, internal surface supervision unit, coal area assessment unit, supervision risk unit, integrated safety unit, response management unit and coal management unit; When the safety management platform generates an operation management instruction, the operation management instruction is sent to the data retrieval unit and the internal surface supervision unit. After receiving the operation management instruction, the data retrieval unit immediately retrieves the storage risk data and monitoring interference data of the railway coal from the internal part. The storage risk data includes the moisture risk value and the environmental impact value. The monitoring interference data includes the actual maximum monitoring rotation angle and the average value of the screen delay time. The storage risk data and the monitoring interference data are sent to the coal area assessment unit and the supervision risk unit respectively. After receiving the storage risk data, the coal area assessment unit immediately conducts a coal damage risk assessment and analysis on the storage risk data, and sends the obtained risk signal to the response management unit; After receiving the monitoring interference data, the supervision risk unit immediately performs a picture information loss risk supervision operation on the monitoring interference data, and sends the obtained abnormal signal to the response management unit; After receiving the transport management instruction, the internal surface supervision unit immediately collects the state risk data of the railway coal in the storage area, including the average oxidation rate and the actual temperature value, and performs its own risk supervision feedback analysis on the state risk data, sends the obtained state risk assessment coefficient Q to the fusion safety unit, and sends the obtained alarm signal to the coal management unit; After receiving the status risk assessment coefficient Q, the fusion safety unit immediately integrates and refines the storage information and sends the obtained control signal to the coal management unit; The coal damage risk assessment and analysis process of the coal regional assessment unit is as follows: S1: Set a monitoring period and set it as a time threshold, divide the time threshold into i sub-time periods, i is a natural number greater than zero, divide the area of the railway coal storage area into g sub-region blocks, g is a natural number greater than zero, obtain the moisture risk value of each sub-region block in each sub-time period, the moisture risk value represents the product of the part of the maximum ground humidity that exceeds the preset ground humidity value threshold and the duration after data normalization, establish a rectangular coordinate system with the number of sub-time periods as the X-axis and the moisture risk value as the Y-axis, draw the moisture risk value curve of each sub-region block by drawing points, obtain the rising trend value of each moisture risk value curve, and set it as the moisture interference value, compare and analyze the moisture interference value with the stored preset moisture interference value threshold, and set the ratio of the number of sub-region blocks corresponding to the moisture interference value greater than the preset moisture interference value threshold to the total number of sub-regions as the damage risk coefficient; S2: Obtain the environmental impact value of the railway coal storage area in each sub-time period. The environmental impact value represents the product of the portion of the maximum ambient temperature that deviates from the set temperature value and the duration after data normalization, and then the product of the ventilation risk value after data normalization. The ventilation risk value represents the portion of the actual ventilation volume that deviates from the set ventilation volume in the sub-time period, and then obtain the average of the environmental impact values within the time threshold, and set it as the environmental assessment coefficient; Compare and analyze the damage risk factor and environmental assessment factor with the preset damage risk factor threshold and preset environmental assessment factor threshold that are stored internally: If the damage risk factor is less than the preset damage risk factor threshold, and the environmental assessment factor is less than the preset environmental assessment factor threshold, no signal is generated; If the damage risk factor is greater than or equal to the preset damage risk factor threshold, or the environmental assessment factor is greater than or equal to the preset environmental assessment factor threshold, a risk signal is generated; The screen information loss risk supervision operation process of the supervision risk unit is as follows: T1: Obtain the actual maximum monitoring rotation angle of the monitoring equipment in the railway coal storage area in each sub-time period, and then obtain the part of the actual maximum monitoring rotation angle that is lower than the set threshold, and set it as the missing screen value, compare and analyze the missing screen value with the stored preset missing screen value threshold, and set the number of sub-time periods corresponding to the missing screen value greater than the preset missing screen value threshold as the missing ratio value; T2: Obtain the average image delay duration of each monitoring device in the railway coal storage area in each sub-time period, compare and analyze the average image delay duration with the stored preset image delay duration average threshold, set the ratio of the number of sub-time periods corresponding to the average image delay duration greater than the preset image delay duration average threshold to the total number of sub-time periods as the image loss ratio, compare and analyze the image loss ratio with the stored preset image loss ratio threshold, and set the number of monitoring devices corresponding to the image loss ratio greater than the preset image loss ratio threshold as the information delay value; T3: Compare and analyze the missing ratio value and information delay value with the preset missing ratio value threshold and preset information delay value threshold that are stored internally: If the missing multiplier value is less than the preset missing multiplier value threshold, and the information delay value is less than the preset information delay value threshold, no signal is generated; If the missing ratio value is greater than or equal to the preset missing ratio value threshold, or the information delay value is greater than or equal to the preset information delay value threshold, an abnormal signal is generated; The self-risk supervision feedback analysis process of the internal surface supervision unit is as follows: SS1: Obtain the average oxidation rate of the outer surface of the railway coal in the railway coal storage area in each sub-time period, compare and analyze the average oxidation rate with the stored preset oxidation rate average threshold, calculate the ratio of the number of sub-time periods corresponding to the average oxidation rate greater than the preset oxidation rate average threshold to the total number of sub-time periods, and set it as the oxidation risk value; SS2: Divide the railway coal in the storage area into m sub-region blocks, where m is a natural number greater than zero, obtain the actual temperature value of the railway coal in each sub-region block within the time threshold, and then obtain the maximum actual temperature value of the railway coal in the storage area within the time threshold, and set it as the temperature potential value, compare and analyze the temperature potential value with the preset temperature potential value threshold, set the part of the temperature potential value greater than the preset temperature potential value threshold as the potential risk value, and label the oxidation risk value and the potential risk value as YF and QF respectively; SS3: According to the formula The state risk assessment coefficient is obtained, where a1 and a2 are preset proportional factor coefficients of oxidation risk value and potential risk value respectively, a1 and a2 are both greater than zero, a3 is the preset correction factor coefficient, and its value is 2.181, and Q is the state risk assessment coefficient. The state risk assessment coefficient Q is compared and analyzed with the preset state risk assessment coefficient threshold value stored in the internal input: If the ratio between the state risk assessment coefficient Q and the preset state risk assessment coefficient threshold is less than 1, no signal is generated; If the ratio between the state risk assessment coefficient Q and the preset state risk assessment coefficient threshold is greater than 1, an alarm signal is generated; The storage information integration and refinement analysis process of the fusion security unit is as follows: The damage risk coefficient and environmental assessment coefficient within the time threshold are retrieved from the coal regional assessment unit, and the missing ratio value and information delay value within the time threshold are retrieved from the regulatory risk unit, and the damage risk coefficient, environmental assessment coefficient, missing ratio value and information delay value are labeled as SS, HP, QB and XW respectively; According to the formula The storage safety assessment coefficient is obtained, where f1, f2, f3, f4 and f5 are respectively the preset weight factor coefficients of the damage risk coefficient, the environmental assessment coefficient, the missing multiple value, the information delay value and the state risk assessment coefficient. f1, f2, f3, f4 and f5 are all greater than zero. f6 is the preset fault tolerance factor coefficient, which is 2.
882. R is the storage safety assessment coefficient. The storage safety assessment coefficient R is compared and analyzed with the preset storage safety assessment coefficient threshold value stored in the internal storage: If the ratio between the storage safety assessment coefficient R and the preset storage safety assessment coefficient threshold is less than 1, a feedback instruction is generated; If the ratio between the storage safety assessment coefficient R and the preset storage safety assessment coefficient threshold is greater than or equal to 1, a control signal is generated; When the fusion safety unit generates a feedback instruction: The stored safety assessment coefficient R corresponding to the feedback instruction is obtained, and the part of the stored safety assessment coefficient R corresponding to the feedback instruction that is less than the preset stored safety assessment coefficient threshold is set as the safety assessment value. The safety assessment values corresponding to the feedback instruction within the historical n time thresholds are obtained, where n is a natural number greater than zero, and a set A of safety assessment values is constructed. The discrete coefficient of set A is obtained and set as the safety floating value, and the safety floating value is compared and analyzed with the preset safety floating value threshold stored internally: If the safety float value is less than the preset safety float value threshold, a stable signal is generated; If the safety floating value is greater than or equal to the preset safety floating value threshold, a floating signal is generated, and the stable signal and the floating signal are sent to the coal management unit. After receiving the stable signal and the floating signal, the coal management unit immediately displays the preset warning text corresponding to the stable signal and the floating signal.