Advanced geological prediction results interpretation method and system for extra-long tunnels
By processing and analyzing the geological maps and reports of extra-long tunnels, a digital geological model is formed, the areas are divided and the geological hazard levels are judged, which solves the problem that the geological hazard levels are not considered in the existing technology and realizes the geological hazard assessment in the tunnel construction area. Hidden hazard assessment and early warning reduce construction risks and costs.
Patent Information
- Application Number
- CN202410389833.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-01
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2044-04-01
AI Technical Summary
Existing advanced geological forecasting methods fail to effectively consider the level of geological hazards, resulting in a waste of geological resources in areas with lower geological hazard levels, and making it difficult to accurately warn and avoid high-risk areas.
By obtaining geological maps and geological reports of the areas involved in the extra-long tunnel, processing and analysis are performed to form a digital geological model, and the areas are divided to obtain rock continuity risk indicators, fracture locations and degrees, porosity and groundwater trends, and arcGIS is used for visual display and real-time updates. Set geological disaster thresholds and early warning levels, determine geological safety status and risk areas, and avoid high-risk areas.
It realizes the assessment and early warning of geological disaster hazards in the construction area of extra-long tunnels, reduces construction risks, improves project quality and safety, and avoids construction delays and cost increases caused by geological disasters.
Smart Images

Figure CN118297378B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of geological results identification, specifically to a method and system for interpreting advanced geological prediction results for extra-long tunnels. Background Art
[0002] Tunnel construction is a complex project that requires a full understanding of underground geological conditions to ensure the safety and stability of the tunnel. Advanced geological prediction is an important prediction method that can provide timely and accurate geological information for tunnel construction, helping to reduce construction risks and improve project quality. Therefore, it is of great significance to study the interpretation methods and systems of advanced geological prediction results.
[0003] Large and extra-long tunnels are mostly located in mountainous areas with complex geological conditions and a large number of geological disaster risks, such as unstable strata, fault zones, and groundwater springs. Understanding the geological conditions of tunnels directly affects the construction quality and safety of tunnels. Extra-long tunnels are difficult to construct, with long construction periods and high construction risks. Advanced geological forecasting can timely discover geological disaster risks and provide important information and reference for tunnel construction. Research on the interpretation methods and systems of advanced geological forecasting results will help improve the safety and quality of tunnel projects and reduce construction costs and risks. This is of great strategic significance for accelerating national infrastructure construction and improving regional economic development levels.
[0004] For example, the existing Chinese patent with publication number CN106772618A discloses a TRT test result interpretation method based on GOCAD, including the steps of: obtaining TRT test data of the test section; excavating the test section, obtaining and cataloging geological conditions; importing the TRT test data of the test section and the cataloged geological conditions into GOCAD to establish a model, generating a three-dimensional geological information model of the test section; obtaining a cross-sectional view of the three-dimensional geological information model of the test section, and obtaining the interpretation criteria of the result image from the cross-sectional view; importing the coordinates of the tunnel and its TRT test data into GOCAD to create a model, and establishing a three-dimensional geological information model of the tunnel; based on the interpretation criteria of the result image, predicting the disaster body existing in the tunnel stratum, and at the same time, predicting the development position and scale of the disaster body in the tunnel according to the development position and color of the disaster body relative to the tunnel in the above-mentioned result image. However, this design does not take into account the problem of geological disaster level, and is prone to waste geological resources in areas with lower geological disaster levels. For this reason, the present invention provides an advanced geological prediction result interpretation method and system for extra-long tunnels. Summary of the invention
[0005] The purpose of the present invention is to provide a method and system for interpreting advanced geological prediction results for extra-long tunnels, so as to solve the existing problems raised in the above-mentioned background technology.
[0006] To achieve the above object, the present invention provides the following technical solution: a method for interpreting the results of advanced geological prediction for extra-long tunnels, comprising the following steps:
[0007] S1. Obtain geological maps and geological reports of the areas involved in the extra-long tunnel;
[0008] S2. Processing and analyzing the geological maps and geological reports collected on site to form a digital geological model;
[0009] S3. Based on the digital geological model, early warning of geological disasters that will be encountered during tunnel excavation is provided.
[0010] The present invention is further improved in that the specific step S2 comprises:
[0011] S21, dividing the geological map into k regions according to the preset construction start time;
[0012] S22, obtaining the rock continuity hazard index of each area in the geological map;
[0013] S23, obtaining the fracture position and extent of each area through the geological map;
[0014] S24. Obtaining the rock porosity and groundwater direction of each area through the geological map;
[0015] S25. The above steps are managed uniformly through arcGIS and visualized and updated in real time.
[0016] The present invention is further improved in that the specific step of S22 comprises:
[0017] S221, divide the x-th regional geological map into pixels, x∈{1, 2, ..., k}, extract the pixel value of each pixel point in the x-th region, and form a pixel value data set in, represents the pixel value of the nth pixel, n represents the total number of pixels in the geological map, and the pixel value difference of each pixel point in the pixel value data set is calculated to form a pixel difference sequence in, represents the pixel difference value between the i+1th pixel and the ith pixel, i∈(1, 2, …, n-1);
[0018] S222, setting a pixel difference threshold Tpvd, extracting corresponding pixels in the pixel difference sequence that are greater than the pixel difference threshold, and forming a rock boundary pre-selected pixel sequence in, represents the εmth pixel value, εm represents the total number of pre-selected pixels, and the sequence number of the rock boundary pre-selected pixel sequence is {ε1, ε2, ..., εm}∈{1, 2, ..., n};
[0019] S223, setting a threshold value for the number of boundary pixels, extracting rock boundary pre-selected pixels whose continuous sequence numbers are greater than the threshold value for the number of boundary pixels from the sequence number sequence of the rock boundary pre-selected pixel sequence, forming a rock boundary pixel sequence, and marking each group of rock boundary pixels corresponding to the continuous sequence numbers as a rock boundary;
[0020] S224. On the marked rock boundary, draw a straight line perpendicular to the stratum on the geological map every 5 cm, measure the pixels occupied by the straight line to obtain the stratum measurement thickness data, and include the stratum measurement thickness data in the different rock layer thickness data sets. in represents the measured thickness of the i-th stratum of the j-th rock layer, p represents the number of rock layers, and assuming that the number of measured thickness of the j-th rock layer is qj, then q1 represents the stratigraphic thickness of the first rock layer;
[0021] S225. Calculation of rock continuity hazard index The function exmax() represents maximum value extraction.
[0022] A further improvement of the present invention is that the fracture position and degree are obtained through a fracture detection algorithm. First, the geological map is converted into a grayscale image, the gradient of the grayscale image is calculated using the Sobel operator, and a gradient threshold is set. When the gradient of the grayscale image is greater than the gradient threshold, it is recorded as a fracture point and included in a fracture point data set. Then, the rock boundary pixel sequence in the fracture point data set is eliminated, the fracture point data set is updated, and the direction and fracture strength brs are recorded. The fracture strength is represented by the gradient of the grayscale image.
[0023] A further improvement of the present invention is that the porosity of the rock is obtained by establishing a porosity prediction model, by collecting historical geological maps with historical porosity data, and obtaining the average pixel value, average brightness value and texture characteristics of different rock layers in the historical geological maps, combining the historical porosity data as training data of the porosity prediction model, training the porosity prediction model, and then obtaining the different rock layer data of the xth region from S21, x∈{1, 2, ..., k}, calculating the average pixel value data set, average brightness value data set and texture feature data set in the different rock layer data as inputs of the porosity prediction model, and obtaining the porosity data set of different rock layers. in, Represents the porosity of the pth rock layer; calculates the porosity stress value Where spor represents the set maximum porosity.
[0024] The present invention is further improved in that the specific step of S25 comprises:
[0025] S251. Calculate the total value of geological stress in the xth region:
[0026]
[0027] Among them, α1 represents the weight of rock continuity hazard index, and α2 represents the weight of porosity stress value;
[0028] S252. Calculate the total geological stress value of all regions to obtain the total geological stress value sequence tgs χ ={tgs1, tgs2, ..., tgs k};
[0029] S253, linearly map the total geological stress value sequence to a red range, linearly map the fracture intensity brs to a green range, and linearly map the groundwater direction to a blue range, perform visual display, and establish a digital geological model.
[0030] The present invention is further improved in that the specific step S3 comprises:
[0031] S31. Set geological hazard thresholds Ttgs1 and Ttgs2, as well as warning levels, including geological safety status, first-level geological hazard risk, second-level geological hazard risk, rock fracture risk, and groundwater flow areas;
[0032] S32, assuming that the presence of groundwater in the xth region is wat=1, and the absence of groundwater is wat=0, and setting a rock fracture risk threshold Tbrs;
[0033] S33, geological safety status judgment formula is: Fgs = {(tgs χ <Ttgs1)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fgs holds, tme is output, and the advanced geological prediction results interpretation system determines that the area is a safe area;
[0034] The first-level early warning judgment formula for geological disasters is: Fghw1={(Ttgs1≤tgs χ <Ttgs2)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fghw1 holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a first-level risk area;
[0035] The second-level early warning judgment formula for geological disasters is: Fghw2 = {(tgs χ≥Ttgs2)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fghw2 holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a secondary risk area;
[0036] The rock fracture risk judgment formula is: If the judgment formula Frfr holds true, true is output, and the advanced geological prediction results interpretation system determines that the area is a rock fracture risk area, and the system will avoid the area;
[0037] The groundwater flow determination formula is: If the judgment formula Fwa holds true, the output is true, and the advanced geological prediction results interpretation system determines that the area is an area where groundwater flows, and the system will avoid the area.
[0038] On the other hand, the present invention provides an advanced geological prediction result interpretation system for extra-long tunnels, comprising:
[0039] The geological data collection module is used to obtain geological maps and geological reports of the areas involved in the extra-long tunnels;
[0040] A geological model generation module is used to process and analyze the geological maps and geological reports collected on site to form a digital geological model;
[0041] The geological disaster early warning module is used to warn of geological disasters that will be encountered during tunnel excavation based on the digital geological model.
[0042] Compared with the prior art, the present invention has the following beneficial effects:
[0043] 1. The present invention first forms a digital geological model by processing and analyzing geological maps and geological reports, which can evaluate the geological conditions of the tunnel area, identify geological disaster risks, and warn of geological disasters that may be encountered during tunnel construction in advance, which helps to reduce construction risks; the digital geological model can intuitively display the geological structure, stratum distribution, fault zone location and other information of the tunnel area, which helps to scientifically determine the construction process and plan, avoid taking inappropriate construction measures for geological disaster risks, and improve the quality of the project;
[0044] 2. The geological disaster early warning module can warn of geological disasters that may be encountered during tunnel excavation, and corresponding preventive measures can be taken to reduce the impact on construction, avoid construction delays and project changes caused by geological disasters, and thus control construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] Figure 1 This is a flow chart of the method for interpreting the advanced geological prediction results for extra-long tunnels according to the present invention;
[0046] Figure 2 It is a schematic diagram of the method for interpreting the advanced geological prediction results for extra-long tunnels according to the present invention;
[0047] Figure 3 This is a framework diagram of the advanced geological prediction results interpretation system for extra-long tunnels according to the present invention. DETAILED DESCRIPTION
[0048] The technical solution of the present invention is described in detail below through the accompanying drawings and specific embodiments. It should be understood that the embodiments of the present invention and the specific features in the embodiments are detailed descriptions of the technical solution of the present invention, rather than limitations on the technical solution of the present invention. The embodiments of the present invention and the technical features in the embodiments may be combined with each other unless there is a conflict.
[0049] The term "and / or" is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " generally indicates that the associated objects before and after are in an "or" relationship.
[0050] Example 1
[0051] Figure 1 The flowchart of the method for interpreting the advanced geological prediction results for extra-long tunnels disclosed in this embodiment is shown. Figure 2 A schematic diagram of the method for interpreting the advanced geological prediction results for extra-long tunnels disclosed in this embodiment is shown, and the steps of the method are as follows:
[0052] S1. Obtain geological maps and geological reports of the areas involved in the extra-long tunnel;
[0053] S2. Processing and analyzing the geological map and geological report collected on site to form a digital geological model. The specific steps include:
[0054] S21, dividing the geological map into k regions according to the preset construction start time;
[0055] S22, obtaining the rock continuity hazard index of each area in the geological map, the specific steps comprising:
[0056] S221, divide the x-th regional geological map into pixels, x∈{1, 2, ..., k}, extract the pixel value of each pixel point in the x-th region, and form a pixel value data set in, represents the pixel value of the nth pixel, n represents the total number of pixels in the geological map, and the pixel value difference of each pixel point in the pixel value data set is calculated to form a pixel difference sequence in, represents the pixel difference value between the i+1th pixel and the ith pixel, i∈(1, 2, …, n-1);
[0057] S222, setting a pixel difference threshold Tpvd, extracting corresponding pixels in the pixel difference sequence that are greater than the pixel difference threshold, and forming a rock boundary pre-selected pixel sequence in, represents the εmth pixel value, εm represents the total number of pre-selected pixels, and the sequence number of the rock boundary pre-selected pixel sequence is {ε1, ε2, ..., εm}∈{1, 2, ..., n};
[0058] S223, setting a threshold value for the number of boundary pixels, extracting rock boundary pre-selected pixels whose continuous sequence numbers are greater than the threshold value for the number of boundary pixels from the sequence number sequence of the rock boundary pre-selected pixel sequence, forming a rock boundary pixel sequence, and marking each group of rock boundary pixels corresponding to the continuous sequence numbers as a rock boundary;
[0059] S224. On the marked rock boundary, draw a straight line perpendicular to the stratum on the geological map every 5 cm, measure the pixels occupied by the straight line to obtain the stratum measurement thickness data, and include the stratum measurement thickness data in the different rock layer thickness data sets. in represents the measured thickness of the i-th stratum of the j-th rock layer, p represents the number of rock layers, and assuming that the number of measured thickness of the j-th rock layer is qj, then q1 represents the stratigraphic thickness of the first rock layer;
[0060] S225. Calculation of rock continuity hazard index The function exmax() represents maximum value extraction.
[0061] S23. The fracture position and degree of each area are obtained through the geological map. The fracture position and degree are obtained through a fracture detection algorithm. First, the geological map is converted into a grayscale image. The gradient of the grayscale image is calculated using the Sobel operator. A gradient threshold is set. When the gradient of the grayscale image is greater than the gradient threshold, it is recorded as a fracture point and included in a fracture point data set. Then, the rock boundary pixel sequence in the fracture point data set is removed, the fracture point data set is updated, and the direction and fracture strength brs are recorded. The fracture strength is represented by the gradient of the grayscale image.
[0062] S24. Obtain the rock porosity and groundwater direction of each area through the geological map; the rock porosity is obtained by establishing a porosity prediction model, by collecting historical geological maps with historical porosity data, and obtaining the average pixel value, average brightness value and texture characteristics of different rock layers in the historical geological map, combining the historical porosity data as training data of the porosity prediction model, training the porosity prediction model, and then obtaining the different rock layer data of the xth area from S21, x∈{1, 2, ..., k}, calculating the average pixel value data set, average brightness value data set and texture feature data set in the different rock layer data as input of the porosity prediction model, and obtaining the porosity data set of different rock layers. in, Represents the porosity of the pth rock layer; calculates the porosity stress value Where spor represents the set maximum porosity.
[0063] S25. The above steps are managed uniformly through ArcGIS and visualized and updated in real time. The specific steps include:
[0064] S251. Calculate the total value of geological stress in the xth region:
[0065]
[0066] Among them, α1 represents the weight of rock continuity hazard index, and α2 represents the weight of porosity stress value;
[0067] S252. Calculate the total geological stress value of all regions to obtain the total geological stress value sequence tgs χ ={tgs1, tgs2, ..., tgs k};
[0068] S253, linearly map the total geological stress value sequence to a red range, linearly map the fracture intensity brs to a green range, and linearly map the groundwater direction to a blue range, perform visual display, and establish a digital geological model.
[0069] S3. Early warning of geological disasters that will be encountered during tunnel excavation based on the digital geological model. The specific steps include:
[0070] S31. Set geological hazard thresholds Ttgs1 and Ttgs2, as well as warning levels, including geological safety status, first-level geological hazard risk, second-level geological hazard risk, rock fracture risk, and groundwater flow areas;
[0071] S32, assuming that the presence of groundwater in the xth region is wat=1, and the absence of groundwater is wat=0, and setting a rock fracture risk threshold Tbrs;
[0072] S33, geological safety status judgment formula is: Fgs = {(tgs χ <Ttgs1)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fgs holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a safe area;
[0073] The first-level early warning judgment formula for geological disasters is: Fghw1={(Ttgs1≤tgs χ <Ttgs2)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fghw1 holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a first-level risk area;
[0074] The second-level early warning judgment formula for geological disasters is: Fghw2 = {(tgs χ ≥Ttgs2)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fghw2 holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a secondary risk area;
[0075] The rock fracture risk judgment formula is: If the judgment formula Frfr holds true, true is output, and the advanced geological prediction results interpretation system determines that the area is a rock fracture risk area, and the system will avoid the area;
[0076] The groundwater flow determination formula is: If the judgment formula Fwa holds true, the output is true, and the advanced geological prediction results interpretation system determines that the area is an area where groundwater flows, and the system will avoid the area.
[0077] The threshold and weight are set by professionals according to specific needs.
[0078] Example 2
[0079] Figure 3 The framework diagram of the advanced geological prediction results interpretation system for extra-long tunnels disclosed in this embodiment is shown, including:
[0080] The geological data collection module is used to obtain geological maps and geological reports of the areas involved in the extra-long tunnels;
[0081] A geological model generation module is used to process and analyze the geological maps and geological reports collected on site to form a digital geological model;
[0082] The geological disaster early warning module is used to warn of geological disasters that will be encountered during tunnel excavation based on the digital geological model.
[0083] It should be understood that in the various embodiments of the present application, the size of the serial numbers of the above-mentioned processes does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0084] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0085] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0086] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0087] The embodiments of the present invention are described above in conjunction with the accompanying drawings, but the present invention is not limited to the above-mentioned specific implementation methods. The above-mentioned specific implementation methods are merely illustrative and not restrictive. Under the enlightenment of the present invention, ordinary technicians in this field can also make many forms without departing from the scope of protection of the purpose of the present invention and the claims, which all fall within the protection of the present invention.
Claims
1. A method for interpreting advanced geological prediction results for extra-long tunnels, characterized by: The following steps are involved: S1. Obtain geological maps and geological reports of the areas involved in the extra-long tunnel; S2. Processing and analyzing the geological maps and geological reports collected on site to form a digital geological model; S3. Predicting geological disasters that may occur during tunnel excavation based on the digital geological model; The specific steps of S2 include: S21, dividing the geological map into k regions according to the preset construction start time; S22, obtaining the rock continuity hazard index of each area in the geological map; S23, obtaining the fracture position and extent of each area through the geological map; S24. Obtaining the rock porosity and groundwater direction of each area through the geological map; S25. The above steps are managed uniformly through arcGIS and visualized and updated in real time; The specific steps of S22 include: S221, divide the x-th regional geological map into pixels, x∈{1,2,…,k}, extract the pixel value of each pixel point in the x-th region, and form a pixel value data set in, represents the pixel value of the nth pixel, n represents the total number of pixels in the geological map, and the pixel value difference of each pixel point in the pixel value data set is calculated to form a pixel difference sequence in, Represents the pixel difference value between the i+1th pixel and the ith pixel, i∈(1,2,…,n-1); S222, setting a pixel difference threshold Tpvd, extracting corresponding pixels in the pixel difference sequence that are greater than the pixel difference threshold, and forming a rock boundary pre-selected pixel sequence in, represents the εmth pixel value, εm represents the total number of pre-selected pixels, and the sequence number of the rock boundary pre-selected pixel sequence is {ε1,ε2,…,εm}∈{1,2,…,n}; S223, setting a threshold value for the number of boundary pixels, extracting rock boundary pre-selected pixels whose continuous sequence numbers are greater than the threshold value for the number of boundary pixels from the sequence number sequence of the rock boundary pre-selected pixel sequence, forming a rock boundary pixel sequence, and marking each group of rock boundary pixels corresponding to the continuous sequence numbers as a rock boundary; S224. On the marked rock boundary, draw a straight line perpendicular to the stratum on the geological map every 5 cm, measure the pixels occupied by the straight line to obtain the stratum measurement thickness data, and include the stratum measurement thickness data in the different rock layer thickness data sets. in represents the measured thickness of the i-th stratum of the j-th rock layer, p represents the number of rock layers, and assuming that the number of measured thickness of the j-th rock layer is qj, then q1 represents the stratigraphic thickness of the first rock layer; S225. Calculation of rock continuity hazard index The function exmax() represents maximum value extraction.
2. The method for interpreting the advanced geological prediction results for extra-long tunnels according to claim 1 is characterized in that: The fracture position and degree are obtained through the fracture detection algorithm. First, the geological map is converted into a grayscale image, the gradient of the grayscale image is calculated using the Sobel operator, and a gradient threshold is set. When the gradient of the grayscale image is greater than the gradient threshold, it is recorded as a fracture point and included in the fracture point data set. Then, the rock boundary pixel sequence in the fracture point data set is eliminated, the fracture point data set is updated, and the direction and fracture strength brs are recorded. The fracture strength is represented by the gradient of the grayscale image.
3. The method for interpreting the advanced geological prediction results for extra-long tunnels according to claim 2 is characterized in that: The porosity of the rock is obtained by establishing a porosity prediction model, by collecting historical geological maps with existing historical porosity data, and obtaining the average pixel value, average brightness value and texture characteristics of different rock layers in the historical geological maps, combining the historical porosity data as training data of the porosity prediction model, training the porosity prediction model, and then obtaining the different rock layer data of the xth region from S21, x∈{1,2,…,k}, and calculating the average pixel value data set, average brightness value data set and texture feature data set in the different rock layer data as inputs of the porosity prediction model to obtain the porosity data sets of different rock layers. in, Represents the porosity of the pth rock layer; calculates the porosity stress value Where spor represents the set maximum porosity.
4. The method for interpreting the advanced geological prediction results for extra-long tunnels according to claim 3 is characterized in that: The specific steps of S25 include: S251. Calculate the total value of geological stress in the xth region: Among them, α1 represents the weight of rock continuity hazard index, and α2 represents the weight of porosity stress value; S252. Calculate the total geological stress value of all regions to obtain the total geological stress value sequence tgs χ ={tgs1,tgs2,…,tgs k }; S253, linearly map the total geological stress value sequence to a red range, linearly map the fracture intensity brs to a green range, and linearly map the groundwater direction to a blue range, perform visual display, and establish a digital geological model.
5. The method for interpreting the advanced geological prediction results for extra-long tunnels according to claim 4 is characterized in that: The specific steps of S3 include: S31. Set geological hazard thresholds Ttgs1 and Ttgs2, as well as warning levels, including geological safety status, first-level geological hazard risk, second-level geological hazard risk, rock fracture risk, and groundwater flow areas; S32, assuming that the presence of groundwater in the xth region is wat=1, and the absence of groundwater is wat=0, and setting a rock fracture risk threshold Tbrs; S33. The formula for judging geological safety status is: Fgs = {(tgs χ <Ttgs1)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fgs holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a safe area; The judgment formula for the first-level geological disaster warning is: Fghw1={(Ttgs1≤tgs χ <Ttgs2)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fghw1 holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a first-level risk area; The judgment formula for the second-level early warning of geological disasters is: Fghw2={(tgs χ ≥Ttgs2)∩(brs<Tbrs)∩(wat=0)}, if the judgment formula Fghw2 holds, true is output, and the advanced geological prediction results interpretation system determines that the area is a secondary risk area; The rock fracture risk judgment formula is: If the judgment formula Frfr holds true, true is output, and the advanced geological prediction results interpretation system determines that the area is a rock fracture risk area, and the system will avoid the area; The groundwater flow determination formula is: If the judgment formula Fwa holds true, the output is true, and the advanced geological prediction results interpretation system determines that the area is an area where groundwater flows, and the system will avoid the area.
6. A system for interpreting the results of advanced geological prediction for extra-long tunnels, used for executing the method for interpreting the results of advanced geological prediction for extra-long tunnels as claimed in any one of claims 1 to 5, characterized in that: include: The geological data collection module is used to obtain geological maps and geological reports of the areas involved in the extra-long tunnels; A geological model generation module is used to process and analyze the geological maps and geological reports collected on site to form a digital geological model; The geological disaster early warning module is used to warn of geological disasters that will be encountered during tunnel excavation based on the digital geological model.