Intelligent monitoring method and system for water conservancy project data based on digital twin
Using digital twin technology to conduct multi-channel safety dynamics and statics analysis of water conservancy projects and generate monitoring models, it solves the problem of insufficient monitoring effectiveness in traditional technologies, achieves accurate monitoring and early warning of water conservancy projects, and ensures long-term safety and stability run.
Patent Information
- Application Number
- CN202410867178.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-01
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2044-07-01
AI Technical Summary
Traditional water conservancy project monitoring technology is difficult to comprehensively consider multiple major aspects and specific conditions, resulting in insufficient monitoring effectiveness.
A method based on digital twins is used to obtain the structural status data, environmental status data and panoramic image data of the water conservancy project, conduct multi-channel safety dynamics and statics analysis, and generate a water conservancy project monitoring model for real-time monitoring and safety prediction.
Through detailed dynamic and static analysis, we can fully grasp the real-time situation of the project, improve the effectiveness of monitoring and early warning capabilities, ensure the long-term safe and stable operation of the project in complex environments, and improve the scientificity and efficiency of management.
Smart Images

Figure CN118410653B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of computer technology, and in particular to a method and system for intelligent monitoring of water conservancy project data based on digital twins. Background Art
[0002] With the development of computer technology, water conservancy project monitoring technology has emerged. This technology uses rain gauges, flow meters, water level gauges, total stations, stress gauges, piezometers and other equipment, combined with emerging technologies such as drones, satellite remote sensing and artificial intelligence, to achieve real-time data collection and transmission. By analyzing and processing data, the safety and stable operation of water conservancy projects can be ensured, and remote monitoring and early warning can be carried out to deal with potential hazards in a timely manner.
[0003] In traditional technology, the collected data is analyzed and processed using a special model developed for the current water conservancy project, or is processed using a universal water conservancy project analysis model. Since the monitoring of water conservancy projects needs to be considered from many aspects, the traditional technology uses special models or general models for analysis and processing, which makes it difficult to fully consider the multiple major aspects and specific conditions that affect water conservancy projects, resulting in insufficient effectiveness of water conservancy project monitoring. Summary of the invention
[0004] Based on this, it is necessary to provide a digital twin-based intelligent monitoring method, system, device, computer equipment, computer-readable storage medium and computer program product for water conservancy project data, which can improve the effectiveness of water conservancy project monitoring, in response to the above-mentioned technical problems.
[0005] In the first aspect, the present application provides a method for intelligent monitoring of water conservancy project data based on digital twins, which is applied to the digital twin layer corresponding to the water conservancy project, including:
[0006] Acquiring structural status data, environmental status data and panoramic image data of the water conservancy project;
[0007] Performing a multi-channel safety dynamics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain water conservancy project dynamics analysis data;
[0008] When the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety statics analysis is performed on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data;
[0009] The water conservancy project dynamics analysis data and the water conservancy project statics analysis data are mapped to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0010] In a second aspect, the present application also provides a water conservancy project data intelligent monitoring system based on digital twins, including: a sensor and a server;
[0011] The sensor is used to obtain structural status data, environmental status data and panoramic image data of the water conservancy project;
[0012] The server is used to perform a multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain water conservancy project dynamic analysis data;
[0013] The server is further configured to perform a multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data when the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger;
[0014] The server is also used to map the water conservancy project dynamic analysis data and the water conservancy project static analysis data to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0015] In a third aspect, the present application also provides an intelligent monitoring device for water conservancy project data based on digital twins, including:
[0016] A data acquisition module, used to acquire structural status data, environmental status data and panoramic image data of the water conservancy project;
[0017] A dynamic analysis module, used for performing a multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data, to obtain dynamic analysis data of the water conservancy project;
[0018] A statics analysis module, for performing a multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain statics analysis data of the water conservancy project when the dynamics analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger;
[0019] The project monitoring module is used to map the water conservancy project dynamic analysis data and the water conservancy project static analysis data to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0020] In a fourth aspect, the present application further provides a computer device, comprising a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the following steps are implemented:
[0021] Acquiring structural status data, environmental status data and panoramic image data of the water conservancy project;
[0022] Performing a multi-channel safety dynamics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain water conservancy project dynamics analysis data;
[0023] When the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety statics analysis is performed on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data;
[0024] The water conservancy project dynamics analysis data and the water conservancy project statics analysis data are mapped to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0025] In a fifth aspect, the present application further provides a computer-readable storage medium having a computer program stored thereon, wherein when the computer program is executed by a processor, the following steps are implemented:
[0026] Acquiring structural status data, environmental status data and panoramic image data of the water conservancy project;
[0027] Performing a multi-channel safety dynamics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain water conservancy project dynamics analysis data;
[0028] When the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety statics analysis is performed on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data;
[0029] The water conservancy project dynamics analysis data and the water conservancy project statics analysis data are mapped to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0030] In a sixth aspect, the present application further provides a computer program product, including a computer program, which implements the following steps when executed by a processor:
[0031] Acquiring structural status data, environmental status data and panoramic image data of the water conservancy project;
[0032] Performing a multi-channel safety dynamics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain water conservancy project dynamics analysis data;
[0033] When the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety statics analysis is performed on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data;
[0034] The water conservancy project dynamics analysis data and the water conservancy project statics analysis data are mapped to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0035] The above-mentioned intelligent monitoring method, system, device, computer equipment, storage medium and computer program product for water conservancy project data based on digital twin obtains the structural status data, environmental status data and panoramic image data of the water conservancy project; performs multi-channel safety dynamic analysis on the water conservancy project according to the structural status data, environmental status data and panoramic image data to obtain the dynamic analysis data of the water conservancy project; when the dynamic analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger, performs multi-channel safety static analysis on the water conservancy project according to the structural status data, environmental status data and panoramic image data to obtain the static analysis data of the water conservancy project; maps the dynamic analysis data and the static analysis data of the water conservancy project to the water conservancy building information model of the water conservancy project to obtain the water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0036] By acquiring the structural status data, environmental status data and panoramic image data of the water conservancy project, the real-time situation of the project can be fully grasped. Multi-channel safety dynamic analysis is further used to evaluate the stress and deformation of the project in a dynamic environment, and detailed dynamic analysis data is obtained; on the premise of ensuring that the dynamic analysis is safe, multi-channel safety static analysis is performed at the same time to evaluate the stability and bearing capacity of the project in a static environment, and static analysis data is obtained. These detailed analysis data are mapped to the water conservancy building information model to generate an accurate water conservancy project monitoring model. This monitoring model can not only monitor the structural and environmental changes of the project in real time, but also make safety predictions based on comprehensive data and identify potential risks in advance. Through this systematic method, the effectiveness of water conservancy project monitoring can be improved, the real-time monitoring and early warning capabilities of water conservancy projects can be effectively improved, the long-term safe and stable operation of the project under complex environmental conditions can be ensured, and the scientificity and efficiency of management can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0038] Figure 1 This is an application environment diagram of a method for intelligent monitoring of water conservancy project data based on digital twins in one embodiment;
[0039] Figure 2 A schematic diagram of a process of an intelligent monitoring method for water conservancy project data based on digital twins in one embodiment;
[0040] Figure 3 A schematic diagram of a flow chart of a method for obtaining water conservancy project dynamics analysis data in one embodiment;
[0041] Figure 4 A schematic flow chart of a method for obtaining water conservancy project dynamics analysis data in another embodiment;
[0042] Figure 5 A schematic diagram of a flow chart of a method for obtaining static analysis data of a water conservancy project in one embodiment;
[0043] Figure 6 A schematic flow chart of a method for obtaining water conservancy project statics analysis data in another embodiment;
[0044] Figure 7 A schematic diagram of a flow chart of a method for obtaining a water conservancy project monitoring model in one embodiment;
[0045] Figure 8 It is a structural block diagram of an intelligent monitoring device for water conservancy project data based on digital twin in one embodiment;
[0046] Fig. 9 FIG. 4 is a diagram showing the internal structure of a computer device in one embodiment. DETAILED DESCRIPTION
[0047] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0048] The embodiment of the present application provides a method for intelligent monitoring of water conservancy project data based on digital twins, which can be applied to Figure 1 In the application environment shown. Among them, the terminal 102 communicates with the server 104 through the network. The data storage system can store the data that the server 104 needs to process. The data storage system can be integrated on the server 104, or it can be placed on the cloud or other network servers. The server 104 obtains the structural status data, environmental status data and panoramic image data of the water conservancy project from the terminal 102; according to the structural status data, environmental status data and panoramic image data, a multi-channel safety dynamic analysis is performed on the water conservancy project to obtain the dynamic analysis data of the water conservancy project; when the dynamic analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger, according to the structural status data, environmental status data and panoramic image data, a multi-channel safety static analysis is performed on the water conservancy project to obtain the static analysis data of the water conservancy project; the dynamic analysis data of the water conservancy project and the static analysis data of the water conservancy project are mapped to the water conservancy building information model of the water conservancy project to obtain the monitoring model of the water conservancy project; the monitoring model of the water conservancy project is used to generate safety monitoring data and safety prediction data for the water conservancy project. The terminal 102 may be, but is not limited to, various personal computers, laptops, smart phones, tablet computers, IoT devices, and portable wearable devices. The IoT devices may be smart speakers, smart TVs, smart air conditioners, smart car-mounted devices, etc. The portable wearable devices may be smart watches, smart bracelets, head-mounted devices, etc. The server 104 may be implemented as an independent server or a server cluster consisting of multiple servers.
[0049] In an exemplary embodiment, Figure 2 As shown in the figure, a method for intelligent monitoring of water conservancy project data based on digital twins is provided. Figure 1 The server in the example is used to illustrate, including the following steps 202 to 208. Among them:
[0050] Step 202, obtaining structural status data, environmental status data and panoramic image data of the water conservancy project.
[0051] Among them, the structural state data can be various data describing the physical state and operation status of water conservancy engineering structures (such as dams, dikes, gates, etc.). These data usually include parameters such as deformation, stress, strain, seepage, displacement, temperature, etc.
[0052] Among them, environmental status data can be various data reflecting the environmental conditions and changes around water conservancy projects. These data include hydrological (such as rainfall, runoff, water level), meteorological (such as temperature, humidity, wind speed), geological (such as soil moisture, seismic activity), ecological (such as water quality, aquatic organisms) and other parameters.
[0053] Among them, panoramic image data can be image data obtained by panoramic photography or other imaging technologies, which can fully display the water conservancy project and its surrounding environment. These data provide an overall perspective of the water conservancy project, helping managers and engineers to intuitively observe and evaluate the current status of the project and its surrounding environment.
[0054] Specifically, by deploying sensors and monitoring equipment at key locations of water conservancy projects, real-time structural status data, such as stress, strain, and displacement, can be obtained. Similarly, environmental sensors can be used to monitor surrounding environmental status data, including meteorological, hydrological, and geological information. High-resolution cameras or drones can be installed to capture panoramic image data to comprehensively record the appearance of the project and the surrounding environment. The above data can be integrated and transmitted to the central control system through the data acquisition system for subsequent analysis and processing.
[0055] Step 204, performing a multi-channel safety dynamics analysis on the water conservancy project based on the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project dynamics analysis data.
[0056] Among them, multi-channel safety dynamics analysis can be a method of using a variety of different dynamics analysis models to evaluate the impact of multiple factors in a complex system on system safety. By simulating and analyzing the dynamic behavior of the system under different conditions through a variety of different dynamics analysis models, potential risk points and vulnerable links can be identified, so as to formulate corresponding preventive measures to ensure that the system can remain stable and safe under various possible operating environments.
[0057] Among them, the water conservancy project dynamic analysis data can be the analysis data obtained when using a variety of different dynamic analysis models to study the response and behavior of the water conservancy project structure under various dynamic loads (such as water flow, wind, earthquake, etc.).
[0058] Specifically, the acquired structural state data, environmental state data and panoramic image data are input into professional analysis software. Multiphase flow simulation models, hydrodynamic simulation models, discrete element analysis models and sediment transport models are used to analyze the stress and deformation of water conservancy projects under different dynamic environments, and calculate the corresponding dynamic analysis data, such as dynamic parameters such as stress, displacement and vibration of key parts. Then, multiple simulations are performed for different working conditions and environments to evaluate the response of the project under various dynamic loads and environmental changes. Finally, the comprehensive analysis of different simulation results obtains detailed dynamic analysis data of water conservancy projects, which provides a basis for subsequent static analysis and engineering safety assessment.
[0059] Step 206, when the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety statics analysis of the water conservancy project is performed based on the structural state data, environmental state data and panoramic image data to obtain the water conservancy project statics analysis data.
[0060] Among them, multi-path safety statics analysis can be a method of using a variety of different static analysis models to evaluate the stability and safety of complex systems under multiple paths or multiple static loads (such as gravity, hydrostatic pressure, foundation settlement, etc.); it is also an analysis method to evaluate changes in the state of water conservancy projects due to third-party reasons (non-mechanical reasons). By analyzing the stress distribution, deformation and internal mechanical behavior of the system under different static conditions, this method can identify potential weaknesses and risks and ensure that the system maintains structural integrity and normal function under various possible static conditions.
[0061] Among them, the static analysis data of water conservancy projects can be the data obtained when studying the mechanical behaviors of water conservancy project structures such as stress, strain, and deformation under static loads (such as gravity, hydrostatic pressure, and earth pressure), or the analysis results of changes in the state of water conservancy projects due to third-party reasons (non-mechanical reasons). These data include parameters such as the stress, displacement, and deformation of various parts of the structure.
[0062] Specifically, when the dynamic analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger, the hydrological simulation model, climate simulation model, river water quality simulation model, and groundwater simulation model are used to analyze the stress and deformation of the water conservancy project under static load, focusing on evaluating the stability and bearing capacity of the structure. The analysis results are further fed back to the hydrological simulation model, climate simulation model, river water quality simulation model, and groundwater simulation model to analyze the stress distribution, deformation, and safety margin of each key part to obtain the analysis results of the model. Multiple simulations are performed on the water conservancy project under different static conditions to ensure a comprehensive evaluation of the project's performance under various static conditions. Finally, all analysis results are combined to obtain detailed static analysis data for the water conservancy project.
[0063] Step 208, mapping the water conservancy project dynamics analysis data and the water conservancy project statics analysis data to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model.
[0064] Among them, the water conservancy building information model can be a BIM (Building Information Modeling) model of water conservancy projects. It is a digital technology used to create and manage a three-dimensional information model of the entire life cycle of a water conservancy project. The model integrates various data such as the project's geometric information, physical properties, construction process, operation and maintenance, and can provide a comprehensive view of the project and accurate information support.
[0065] Among them, the water conservancy project monitoring model can be used to generate safety monitoring data and safety prediction data for water conservancy projects.
[0066] Specifically, the dynamic analysis data of the hydraulic engineering and the static analysis data of the hydraulic engineering are integrated and input into the hydraulic building information model (BIM). The hydraulic building information model technology is used to establish a three-dimensional digital model containing structural, environmental and panoramic image data. Through the data mapping and association of the hydraulic engineering dynamic analysis data and the hydraulic engineering static analysis data with the hydraulic building information model, the hydraulic engineering dynamic analysis data and the hydraulic engineering static analysis data are respectively connected with each structural unit in the model to form a dynamically updated hydraulic engineering monitoring model. Among them, the hydraulic engineering monitoring model can reflect the stress, deformation and environmental changes of the project in real time. Furthermore, through data analysis and prediction algorithms, early warnings are issued for possible structural safety issues in the future, and detailed safety monitoring data and safety prediction data are generated.
[0067] In the above-mentioned intelligent monitoring method of water conservancy project data based on digital twin, the structural status data, environmental status data and panoramic image data of the water conservancy project are obtained; based on the structural status data, environmental status data and panoramic image data, a multi-channel safety dynamic analysis is performed on the water conservancy project to obtain the dynamic analysis data of the water conservancy project; when the dynamic analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety static analysis is performed on the water conservancy project based on the structural status data, environmental status data and panoramic image data to obtain the static analysis data of the water conservancy project; the dynamic analysis data and the static analysis data of the water conservancy project are mapped to the water conservancy building information model of the water conservancy project to obtain the water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0068] By acquiring the structural status data, environmental status data and panoramic image data of the water conservancy project, the real-time situation of the project can be fully grasped. Multi-channel safety dynamic analysis is further used to evaluate the stress and deformation of the project in a dynamic environment, and detailed dynamic analysis data is obtained; on the premise of ensuring that the dynamic analysis is safe, multi-channel safety static analysis is performed at the same time to evaluate the stability and bearing capacity of the project in a static environment, and static analysis data is obtained. These detailed analysis data are mapped to the water conservancy building information model to generate an accurate water conservancy project monitoring model. This monitoring model can not only monitor the structural and environmental changes of the project in real time, but also make safety predictions based on comprehensive data and identify potential risks in advance. Through this systematic method, the effectiveness of water conservancy project monitoring can be improved, the real-time monitoring and early warning capabilities of water conservancy projects can be effectively improved, the long-term safe and stable operation of the project under complex environmental conditions can be ensured, and the scientificity and efficiency of management can be improved.
[0069] In an exemplary embodiment, Figure 3 As shown, based on the structural state data, environmental state data and panoramic image data, a multi-channel safety dynamics analysis is performed on the water conservancy project to obtain the water conservancy project dynamics analysis data, including steps 302 to 306. Among them:
[0070] Step 302 , extracting feature information of the structural state data, the environmental state data and the panoramic image data respectively, to obtain structural feature data, environmental feature data and panoramic feature data.
[0071] The structural feature data, the environmental feature data and the panoramic feature data are feature data obtained by extracting features from the structural state data, the environmental state data and the panoramic image data using a neural network, respectively.
[0072] Specifically, the structural state data is input into the structural data feature extraction model, and the structural feature data is obtained by extracting structural feature information such as stress, strain, and displacement; similarly, the environmental state data is input into the environmental data feature extraction model, and environmental feature information such as meteorology, hydrology, and geology is extracted to obtain environmental feature data; similarly, the panoramic feature data is input into the water conservancy project image feature extraction model, and key features such as cracks, deformations, and appearance changes are identified and extracted to obtain panoramic feature data.
[0073] Step 304, determining a multi-path safety dynamics analysis sequence for the water conservancy project based on the structural feature data, the environmental feature data, and the panoramic feature data.
[0074] The multi-path safety dynamics analysis sequence may be the execution sequence of multiple safety dynamics analysis models.
[0075] Specifically, the extracted structural feature data, environmental feature data, and panoramic feature data are comprehensively analyzed to identify the key safety influencing factors reflected in each data; then, based on the key safety influencing factors, the dynamic analysis steps that meet the current situation of the water conservancy project are determined, or the dynamic analysis steps that meet the current situation of the water conservancy project can be determined based on the proportion of each feature data. According to the dynamic analysis steps of the current situation of the water conservancy project, the priority order of the analysis composed of multiple dynamic analysis models is established, and the above priority order is re-verified through weight analysis and sorting algorithms. If the verification is passed, the multi-path safety dynamic analysis order of the water conservancy project is determined.
[0076] Step 306, according to the multi-channel safety dynamics analysis sequence, the dynamics analysis models corresponding to several water conservancy projects are retrieved, and safety dynamics analysis is performed on the water conservancy projects in sequence to obtain the water conservancy project dynamics analysis data.
[0077] The dynamic analysis model may be a model used for safety dynamic analysis of water conservancy projects, including a multiphase flow simulation model, a hydrodynamic simulation model, a discrete element analysis model, and a sediment transport model.
[0078] Specifically, according to the determined multi-channel safety dynamic analysis sequence, multiple dynamic analysis models of the corresponding water conservancy project are retrieved in sequence. First, the structural parts and environmental areas with the highest priority are analyzed in sequence by executing multiple dynamic analysis models in the multi-channel safety dynamic analysis sequence to obtain the first structural part analysis data and the first environmental analysis data; then, the structural parts and environmental areas with the second highest priority are analyzed in sequence by executing multiple dynamic analysis models in the multi-channel safety dynamic analysis sequence to obtain the second structural part analysis data and the second environmental analysis data; and so on, the remaining structural parts and areas are analyzed in the same way to ensure that all key areas are fully covered. The results of each analysis are saved and summarized, and finally the data of each analysis are integrated to obtain complete dynamic analysis data of the water conservancy project.
[0079] In this embodiment, by extracting the characteristic information of the structural state data, environmental state data and panoramic image data, the structural characteristic data, environmental characteristic data and panoramic characteristic data are obtained respectively, and the multi-channel safety dynamic analysis sequence of the water conservancy project is determined accordingly. Then, the corresponding dynamic analysis models are called up in sequence, and the safety dynamic analysis is performed to obtain detailed dynamic analysis data. This method can systematically and accurately evaluate the stress and deformation of water conservancy projects in various dynamic environments, effectively identify potential risks, optimize safety monitoring and early warning mechanisms, and improve the overall safety and management efficiency of water conservancy projects.
[0080] In an exemplary embodiment, Figure 4 As shown, according to the multi-channel safety dynamics analysis sequence, the dynamics analysis models corresponding to several water conservancy projects are retrieved, and the safety dynamics analysis of the water conservancy projects is performed in sequence to obtain the dynamics analysis data of the water conservancy projects, including steps 402 to 410. Among them:
[0081] Step 402 , according to the multi-path safety dynamics analysis sequence, the structural feature data, the environmental feature data and the panoramic feature data are input into the multiphase flow simulation model to obtain the multiphase flow simulation data.
[0082] Specifically, when the multi-path safety dynamic analysis sequence specifies that the analysis order of each dynamic analysis model is multiphase flow simulation model, hydrodynamic simulation model, discrete element analysis model and sediment transport model, the structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the multiphase flow simulation model. The interaction between water flow, sediment and other multiphase fluids is considered in combination with the multiphase flow simulation model. The structural characteristic data is used to define the boundary conditions and initial conditions of the multiphase flow simulation model. The environmental characteristic data is used to simulate the changes in the physical properties of the fluid caused by external environmental factors. The panoramic characteristic data is used to calibrate and verify the characteristics of the multiphase flow simulation model. The multiphase flow simulation model is solved to comprehensively analyze the flow and force conditions of the water conservancy project in the multiphase flow environment, analyze the pressure, flow velocity and flow distribution of each key part, and obtain detailed multiphase flow simulation data.
[0083] Step 404 , according to the multi-path safety dynamics analysis sequence, the multiphase flow simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrodynamic simulation model to obtain the hydrodynamic simulation data.
[0084] Specifically, when the multi-path safety dynamic analysis sequence specifies that the analysis order of each dynamic analysis model is multiphase flow simulation model, hydrodynamic simulation model, discrete element analysis model and sediment transport model, the multiphase flow simulation data, structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the hydrodynamic simulation model, and the fluid boundary conditions and initial state are defined in combination with the multiphase flow simulation data. The structural characteristic data is used for structural response simulation of the model, the environmental characteristic data is used to reflect the changes in the physical properties of the fluid caused by external influencing factors, and the panoramic characteristic data is used for model calibration and accuracy verification. The hydrodynamic simulation model is solved to analyze the behavior of the water conservancy project under complex hydrodynamic conditions, such as the flow, force and stability of each key part, and the hydrodynamic simulation data is comprehensively calculated and output.
[0085] Step 406, according to the multi-path safety dynamics analysis sequence, the hydrodynamics simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the discrete element analysis model to obtain discrete element analysis data.
[0086] Specifically, when the multi-channel safety dynamic analysis sequence specifies that the analysis order of each dynamic analysis model is multiphase flow simulation model, hydrodynamic simulation model, discrete element analysis model and sediment transport model, the hydrodynamic simulation data, structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the discrete element analysis model. Combined with the interaction between particles and structural units, the hydrodynamic simulation data is used to simulate the force of fluid on particles and structures, the structural characteristic data is used to determine the mechanical properties of each structural unit in the model, the environmental characteristic data is used to consider the changes in the physical properties of the fluid caused by external environmental factors, and the panoramic characteristic data is used to calibrate the model and verify the accuracy. The discrete element analysis model is solved to analyze the particle movement and interaction of water conservancy projects under complex hydrodynamic conditions and external environments, and the discrete element analysis data is comprehensively calculated and output.
[0087] Step 408, according to the multi-path safety dynamics analysis sequence, the discrete element analysis data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the sediment transport model to obtain the sediment transport data.
[0088] Specifically, when the multi-channel safety dynamic analysis sequence specifies that the analysis order of each dynamic analysis model is multiphase flow simulation model, hydrodynamic simulation model, discrete element analysis model and sediment transport model, the discrete element analysis data, structural feature data, environmental feature data and panoramic feature data are input into the sediment transport model. The particle characteristics and movement laws are defined in combination with the discrete element analysis data, the structural feature data is used to simulate the interaction between sediments and water conservancy project structures, the environmental feature data is used to reflect the influence of external environmental conditions, and the panoramic feature data is used for model calibration and accuracy verification. The sediment transport model is solved to analyze the transport, deposition and resuspension process of sediments in the fluid, analyze the sediment distribution and movement trajectory of each key area, and comprehensively calculate and output the sediment transport data.
[0089] Step 410, integrating the multiphase flow simulation data, the hydrodynamics simulation data, the discrete element analysis data and the sediment transport data to obtain the hydraulic engineering dynamics analysis data.
[0090] Specifically, the multiphase flow simulation data, hydrodynamic simulation data, discrete element analysis data, and sediment transport data are preprocessed and normalized to ensure that the data formats are consistent and compatible with each other. Then, data fusion technology is used to integrate these data into a unified analysis platform. By establishing a comprehensive dynamic model, the overall dynamic behavior of the water conservancy project under complex environmental conditions is analyzed globally, such as the force, deformation, flow, and sediment distribution of each key part, and detailed dynamic analysis data of the water conservancy project is comprehensively calculated and output.
[0091] In one embodiment, the simulation function of the hydrodynamic simulation model is:
[0092]
[0093] in, , represents the fluid velocity vector; is the fluid density; is the fluid pressure; is the fluid dynamic viscosity; is the volume force; For time; is temperature; is the specific heat capacity; is the thermal conductivity coefficient; is the viscous dissipation function; is the divergence operator; is the gradient operator; is the Laplace operator.
[0094] In one embodiment, the simulation function of the discrete element analysis model is:
[0095]
[0096] in, To act on particles The total force on For particles quality; For particles The position vector of To act on particles The total moment on For particles The moment of inertia; For particles Angular velocity; For particles and particles The positive force between For particles and particles The tangential force between For particles and particles The damping force between For particles and particles The friction torque between For particles and particles The damping torque between To act on particles External forces on is the positive contact stiffness; is the tangential contact stiffness; is the forward damping coefficient; is the tangential damping coefficient; is the total damping coefficient; is the rotation damping coefficient; is the positive displacement; is the tangential displacement; is the positive unit vector; is the tangent unit vector; is the positive relative velocity; Tangential relative velocity; For particles and particles The relative speed between Displacement vector from the contact point to the center of mass; For particles and particles The relative angular velocity between .
[0097] In this embodiment, by sequentially inputting structural feature data, environmental feature data and panoramic feature data into a multiphase flow simulation model, a hydrodynamic simulation model, a discrete element analysis model and a sediment transport model, respective simulation data are gradually obtained. Then, the multiphase flow simulation data, the hydrodynamic simulation data, the discrete element analysis data and the sediment transport data are integrated to form comprehensive water conservancy project dynamic analysis data. This method can simulate and analyze various behaviors and interactions of water conservancy projects in complex dynamic environments in a detailed and accurate manner, provide detailed dynamic evaluations, significantly improve the accuracy and reliability of project safety monitoring, and provide a scientific basis for project safety management and optimal design.
[0098] In an exemplary embodiment, Figure 5 As shown, according to the structural state data, environmental state data and panoramic image data, a multi-channel safety statics analysis is performed on the water conservancy project to obtain the statics analysis data of the water conservancy project, including steps 502 to 504. Among them:
[0099] Step 502, determining a multi-path safety statics analysis sequence for the water conservancy project based on the structural feature data, the environmental feature data and the panoramic feature data.
[0100] The multi-path safety statics analysis sequence may be the execution sequence of multiple safety statics analysis models.
[0101] Specifically, the extracted structural feature data, environmental feature data, and panoramic feature data are comprehensively analyzed to identify the key safety influencing factors or third-party reasons (non-mechanical reasons) reflected in each data; then, based on the key safety influencing factors or third-party reasons (non-mechanical reasons), the static analysis steps that meet the current situation of the water conservancy project are determined, or the static analysis steps that meet the current situation of the water conservancy project can be determined based on the proportion of each feature data. According to the static analysis steps of the current situation of the water conservancy project, the priority order of the analysis composed of multiple static analysis models is established, and the above priority order is re-verified through weight analysis and sorting algorithms. If the verification is passed, the multi-path safety static analysis order of the water conservancy project is determined.
[0102] Step 504, according to the multi-channel safety statics analysis sequence, retrieve the statics analysis models corresponding to several water conservancy projects, perform safety statics analysis on the water conservancy projects in turn, and obtain the statics analysis data of the water conservancy projects.
[0103] Specifically, according to the determined multi-channel safety statics analysis order, multiple statics analysis models of the corresponding water conservancy project are retrieved in sequence. First, the structural parts and environmental areas with the highest priority are analyzed in sequence according to the multi-channel safety statics analysis order using multiple statics analysis models to obtain the third structural part analysis data and the third environmental analysis data; then, the structural parts and environmental areas with the second highest priority are analyzed in sequence according to the multi-channel safety statics analysis order using multiple statics analysis models to obtain the fourth structural part analysis data and the fourth environmental analysis data; and so on, the remaining structural parts and areas are analyzed in the same way to ensure that all key areas are fully covered. The results of each analysis are saved and summarized, and finally the data of each analysis are integrated to obtain complete statics analysis data of the water conservancy project.
[0104] In this embodiment, the multi-channel safety statics analysis sequence of the water conservancy project is determined by analyzing the structural feature data, environmental feature data and panoramic feature data. Then, the corresponding statics analysis models are called up in sequence to perform detailed safety statics analysis to obtain comprehensive statics analysis data. This method can systematically and accurately evaluate the stress and deformation of water conservancy projects under static loads, identify potential structural risks and weak links, optimize safety monitoring and maintenance strategies, improve the long-term stability and safety of water conservancy projects, and provide strong support for scientific management and decision-making.
[0105] In an exemplary embodiment, Figure 6 As shown, according to the multi-channel safety statics analysis sequence, the statics analysis models corresponding to several water conservancy projects are retrieved, and the safety statics analysis of the water conservancy projects is performed in sequence to obtain the statics analysis data of the water conservancy projects, including steps 602 to 610. Among them:
[0106] Step 602, according to the multi-channel safety statics analysis sequence, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrological simulation model to obtain the hydrological simulation data.
[0107] Specifically, when the multi-channel safety static analysis sequence specifies that the analysis order of each static analysis model is hydrological simulation model, climate simulation model, river water quality simulation model and groundwater simulation model, the structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the hydrological simulation model. Combined with the boundary conditions and initial state of the defined hydrological process, the structural characteristic data are used to simulate the impact of the engineering structure on the hydrological process, the environmental characteristic data are used to reflect external conditions such as meteorology, hydrology and geology, and the panoramic characteristic data are used to calibrate and verify the accuracy of the model. Solve the hydrological simulation model to analyze water conservancy projects such as flow, flow velocity and water level changes under different hydrological conditions, as well as analyze the hydrological response of each key area, and comprehensively calculate and output the hydrological simulation data.
[0108] Step 604, according to the multi-channel safety statics analysis sequence, the hydrological simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the climate simulation model to obtain the climate simulation data.
[0109] Specifically, when the multi-channel safety static analysis sequence specifies that the analysis order of each static analysis model is hydrological simulation model, climate simulation model, river water quality simulation model and groundwater simulation model, the hydrological simulation data, structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the climate simulation model. Combined with the boundary conditions and initial state of the defined climate simulation, the hydrological simulation data is used to reflect the impact of the hydrological process on the climate, the structural characteristic data is used to consider the regulatory effect of the engineering structure on the local climate conditions, the environmental characteristic data is used to simulate the external influence of meteorological and geological conditions, and the panoramic characteristic data is used for model calibration and accuracy verification. Solve the climate simulation model to analyze the changes in climate parameters such as temperature, precipitation, wind speed, etc. of the water conservancy project under different climate conditions, and analyze the climate response of key areas, and comprehensively calculate and output the climate simulation data.
[0110] Step 606, according to the multi-channel safety statics analysis sequence, the climate simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the river water quality simulation model to obtain the river water quality analysis data.
[0111] Specifically, when the multi-channel safety static analysis sequence specifies that the analysis order of each static analysis model is hydrological simulation model, climate simulation model, river water quality simulation model and groundwater simulation model, the climate simulation data, structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the river water quality simulation model. Combined with the boundary conditions and initial parameters of the water quality simulation, the climate simulation data is used to reflect the impact of climate change on river water quality, the structural characteristic data is used to consider the impact of the water conservancy project structure on river water quality, the environmental characteristic data is used to simulate the changes in external environmental conditions, and the panoramic characteristic data is used to calibrate and verify the accuracy of the model. The river water quality simulation model is solved to analyze the changes in river water quality under different environmental and climatic conditions, analyze water quality parameters such as dissolved oxygen, pollutant concentration and nutrient content in key areas, and comprehensively calculate and output river water quality analysis data.
[0112] Step 608, according to the multi-channel safety statics analysis sequence, the river water quality analysis data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the groundwater simulation model to obtain the groundwater simulation data.
[0113] Specifically, when the multi-channel safety static analysis sequence specifies that the analysis order of each static analysis model is hydrological simulation model, climate simulation model, river water quality simulation model and groundwater simulation model, the river water quality analysis data, structural characteristic data, environmental characteristic data and panoramic characteristic data are input into the groundwater simulation model. Combined with the boundary conditions and initial parameters for defining groundwater flow and mass transfer, the river water quality analysis data is used to reflect the interaction between surface water and groundwater, the structural characteristic data is used to consider the impact of the water conservancy project structure on the groundwater flow, the environmental characteristic data is used to simulate changes in external environmental conditions, and the panoramic characteristic data is used to calibrate and verify the model accuracy. The groundwater simulation model is solved to analyze the flow, recharge, discharge and water quality changes of groundwater under different environmental and structural conditions, analyze the groundwater level, flow velocity and pollutant diffusion in key areas, and comprehensively calculate and output the groundwater simulation data.
[0114] Step 610, integrating the hydrological simulation data, climate simulation data, river water quality analysis data and groundwater simulation to obtain the static analysis data of the water conservancy project.
[0115] Specifically, the hydrological simulation data, climate simulation data, river water quality analysis data and groundwater simulation data are preprocessed and uniformly formatted to ensure data consistency and compatibility. Then, using data fusion technology, these data are input into the static analysis model. Through the analysis of the static analysis model, the stress and deformation of the water conservancy project under static load can be fully simulated, considering the comprehensive influence of hydrology, climate, surface water and groundwater on the structure, running the comprehensive statics model, conducting global statics analysis, calculating and outputting the stress, deformation and safety margin of each key part, and integrating all analysis results to obtain complete static analysis data of the water conservancy project.
[0116] In one embodiment, the hydrological simulation model has multiple simulation functions, including a mechanical simulation function and a hydrological simulation function, wherein the simulation function in the hydrological simulation model is:
[0117]
[0118] in, is the total water demand in the basin; is the rainfall; is the evapotranspiration; is the total runoff; is the infiltration volume; is the outflow of groundwater in the basin; is the groundwater inflow into the basin; is the surface runoff; is the base flow; is the surface runoff coefficient; is the field water capacity; is the nonlinear coefficient of surface runoff; is the base flow coefficient; is the groundwater flow; is the groundwater flow threshold; is the nonlinear coefficient of the base flow; is the soil permeability coefficient; is the maximum soil water content; is the nonlinear coefficient of infiltration; is the maximum groundwater flow; for groundwater storage; is the maximum groundwater storage capacity; is the nonlinear coefficient of groundwater flow; is the potential evapotranspiration; is the nonlinear coefficient of evapotranspiration;
[0119] In one embodiment, the hydrological simulation model has multiple simulation functions, including a mechanical simulation function and a river water quality simulation function, wherein the simulation function of the river water quality simulation model for river water quality is:
[0120]
[0121] in, For pollutants concentration; For time; is the fluid velocity vector; is the molecular diffusion coefficient matrix, which represents the diffusion coefficient in each direction; is the reaction term, representing the pollutant The rate at which it is generated or consumed; For pollutants The source term of For pollutants The sedimentation rate; For pollutants Gradients of concentration; For pollutants The diffusion term of the concentration.
[0122] In this embodiment, by sequentially inputting structural feature data, environmental feature data and panoramic feature data into the hydrological simulation model, the climate simulation model, the river water quality simulation model and the groundwater simulation model, respective simulation data are gradually obtained. Then, the hydrological simulation data, the climate simulation data, the river water quality analysis data and the groundwater simulation data are integrated to form comprehensive static analysis data of water conservancy projects. This method can simulate and analyze the behavior and changes of water conservancy projects in complex static environments in a detailed and accurate manner, provide detailed static evaluation, significantly improve the accuracy and reliability of static safety monitoring of projects, and provide a scientific basis for long-term safety management and optimal design of projects.
[0123] In an exemplary embodiment, Figure 7 As shown, the water conservancy project dynamics analysis data and the water conservancy project statics analysis data are mapped to the water conservancy building information model of the water conservancy project to obtain the water conservancy project monitoring model, including steps 702 to 704. Among them:
[0124] Step 702, based on the historical state data of the water conservancy project, the dynamics analysis data of the water conservancy project and the statics analysis data of the water conservancy project, spatial analysis is performed on the state change of the water conservancy project to obtain the state change spatial analysis data.
[0125] Among them, historical status data can be various data on the operation status and structural status of water conservancy projects at different time points since their completion. These data include the construction records of the project, previous maintenance and reinforcement conditions, operation parameters (such as water level, flow), environmental changes (such as meteorological and geological conditions), accidents and abnormal event records, etc.
[0126] Among them, the state change spatial analysis data can be various data used to study and evaluate the state changes of the system or structure of the water conservancy project at different spatial locations and times. These data include displacement, deformation, stress, strain, temperature and other parameters. By analyzing the spatial distribution and time evolution of these data, the behavior patterns of the system or structure under dynamic and static conditions can be revealed and potential risk areas can be identified.
[0127] Specifically, the historical state data is integrated with the current dynamic analysis data and static analysis data of the water conservancy project, and the data is imported into a unified spatial analysis platform using the geographic information system (GIS) and spatial analysis software. Through time series analysis and spatial interpolation technology, a three-dimensional spatiotemporal model of the water conservancy project is established to simulate the state changes at different time points and spatial locations. The spatiotemporal correlation between the historical state data, the current dynamic analysis data of the water conservancy project, and the static analysis data is analyzed to identify the changing trends of the structural stress, deformation, and environmental factors, and the spatial analysis data of the state changes is comprehensively calculated and output.
[0128] Step 704, mapping the state change spatial analysis data to the water conservancy building information model to obtain a water conservancy project monitoring model.
[0129] Specifically, the state change spatial analysis data is formatted and preprocessed to ensure its compatibility with the BIM platform. BIM technology is used to map the state change spatial analysis data to the corresponding positions and structural units in the three-dimensional digital model, and the various parameters of the model are updated. Through this mapping process, a dynamically updated water conservancy project monitoring model is established.
[0130] In this embodiment, by comprehensively utilizing the historical state data, dynamic analysis data and static analysis data of the water conservancy project, the state change of the project is spatially analyzed to obtain detailed state change spatial analysis data. Then, these data are mapped into the water conservancy building information model (BIM) to form a dynamically updated water conservancy project monitoring model. This method can accurately reflect the changes in time and space of the project, provide real-time monitoring and early warning information, significantly improve the accuracy and efficiency of project management, provide strong support for scientific decision-making and maintenance, and ensure the long-term safe and stable operation of the water conservancy project.
[0131] It should be understood that, although the steps in the flowcharts involved in the above embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above embodiments may include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.
[0132] Based on the same inventive concept, the embodiment of the present application also provides a device for intelligent monitoring of water conservancy project data based on digital twins for realizing the above-mentioned method for intelligent monitoring of water conservancy project data based on digital twins. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in the embodiments of one or more devices for intelligent monitoring of water conservancy project data based on digital twins provided below can be referred to the limitations of the method for intelligent monitoring of water conservancy project data based on digital twins above, and will not be repeated here.
[0133] In an exemplary embodiment, Figure 8 As shown, a water conservancy project data intelligent monitoring device based on digital twin is provided, including: a data acquisition module 802, a dynamic analysis module 804, a static analysis module 806 and an engineering monitoring module 808, wherein:
[0134] The data acquisition module 802 is used to acquire the structural status data, environmental status data and panoramic image data of the water conservancy project;
[0135] The dynamic analysis module 804 is used to perform multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the dynamic analysis data of the water conservancy project;
[0136] The statics analysis module 806 is used to perform a multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data, and obtain the statics analysis data of the water conservancy project when the dynamics analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger;
[0137] The project monitoring module 808 is used to map the dynamic analysis data and static analysis data of the water conservancy project to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0138] In one embodiment, the dynamic analysis module 804 is also used to extract feature information of structural status data, environmental status data and panoramic image data respectively to obtain structural feature data, environmental feature data and panoramic feature data; determine the multi-channel safety dynamic analysis sequence for the water conservancy project based on the structural feature data, environmental feature data and panoramic feature data; according to the multi-channel safety dynamic analysis sequence, call up the dynamic analysis models corresponding to several water conservancy projects, perform safety dynamic analysis on the water conservancy projects in turn, and obtain the water conservancy project dynamic analysis data.
[0139] In one embodiment, the dynamic analysis module 804 is also used to input the structural feature data, environmental feature data and panoramic feature data into the multiphase flow simulation model according to the multi-channel safety dynamic analysis sequence to obtain multiphase flow simulation data; input the multiphase flow simulation data, structural feature data, environmental feature data and panoramic feature data into the hydrodynamic simulation model according to the multi-channel safety dynamic analysis sequence to obtain hydrodynamic simulation data; input the hydrodynamic simulation data, structural feature data, environmental feature data and panoramic feature data into the discrete element analysis model according to the multi-channel safety dynamic analysis sequence to obtain discrete element analysis data; input the discrete element analysis data, structural feature data, environmental feature data and panoramic feature data into the sediment transport model according to the multi-channel safety dynamic analysis sequence to obtain sediment transport data; and fuse the multiphase flow simulation data, hydrodynamic simulation data, discrete element analysis data and sediment transport data to obtain water conservancy project dynamic analysis data.
[0140] In one embodiment, the statics analysis module 806 is also used to determine the multi-channel safety statics analysis sequence for the water conservancy project based on the structural feature data, environmental feature data and panoramic feature data; according to the multi-channel safety statics analysis sequence, the statics analysis models corresponding to several water conservancy projects are retrieved, and safety statics analysis is performed on the water conservancy projects in turn to obtain the statics analysis data of the water conservancy projects.
[0141] In one embodiment, the statics analysis module 806 is also used to input the structural characteristic data, environmental characteristic data and panoramic characteristic data into a hydrological simulation model according to a multi-channel safety statics analysis sequence to obtain hydrological simulation data; input the hydrological simulation data, structural characteristic data, environmental characteristic data and panoramic characteristic data into a climate simulation model according to a multi-channel safety statics analysis sequence to obtain climate simulation data; input the climate simulation data, structural characteristic data, environmental characteristic data and panoramic characteristic data into a river water quality simulation model according to a multi-channel safety statics analysis sequence to obtain river water quality analysis data; input the river water quality analysis data, structural characteristic data, environmental characteristic data and panoramic characteristic data into a groundwater simulation model according to a multi-channel safety statics analysis sequence to obtain groundwater simulation data; and integrate the hydrological simulation data, climate simulation data, river water quality analysis data and groundwater simulation to obtain water conservancy engineering statics analysis data.
[0142] In one embodiment, the project monitoring module 808 is also used to perform spatial analysis on the state changes of the water conservancy project based on the historical state data of the water conservancy project, the dynamic analysis data of the water conservancy project, and the static analysis data of the water conservancy project to obtain the state change spatial analysis data; and map the state change spatial analysis data to the water conservancy building information model to obtain the water conservancy project monitoring model.
[0143] Each module in the above-mentioned intelligent monitoring device for water conservancy project data based on digital twin can be implemented in whole or in part by software, hardware and their combination. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0144] In an exemplary embodiment, a water conservancy project data intelligent monitoring system based on digital twin is provided, the system comprising: a sensor and a server;
[0145] Sensors, used to obtain structural status data, environmental status data and panoramic image data of water conservancy projects;
[0146] The server is used to perform multi-channel safety dynamics analysis on the water conservancy project based on the structural state data, environmental state data and panoramic image data to obtain the dynamics analysis data of the water conservancy project;
[0147] The server is also used to perform multi-channel safety statics analysis on the water conservancy project according to the structural state data, environmental state data and panoramic image data to obtain the statics analysis data of the water conservancy project when the dynamics analysis data of the water conservancy project indicates that the dynamics structure of the water conservancy project is not in danger;
[0148] The server is also used to map the dynamic analysis data and static analysis data of the water conservancy project to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
[0149] In an exemplary embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as shown in FIG. Fig. 9 As shown. The computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store server data. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a method for intelligent monitoring of water conservancy project data based on digital twins is realized.
[0150] Those skilled in the art will understand that Fig. 9 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.
[0151] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.
[0152] In one embodiment, a computer-readable storage medium is provided, storing a computer program, which implements the steps in the above method embodiments when executed by a processor.
[0153] In one embodiment, a computer program product or computer program is provided, the computer program product or computer program includes computer instructions, the computer instructions are stored in a computer-readable storage medium. A processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device performs the steps in the above-mentioned method embodiments.
[0154] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.
[0155] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in this application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.
[0156] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.
[0157] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.
Claims
1. A method for intelligent monitoring of water conservancy project data based on digital twins, characterized in that: Applied to the digital twin layer corresponding to the water conservancy project, the method includes: Acquiring structural status data, environmental status data and panoramic image data of the water conservancy project; According to the structural state data, the environmental state data and the panoramic image data, a multi-channel safety dynamics analysis is performed on the water conservancy project to obtain the water conservancy project dynamics analysis data; wherein, according to the structural state data, the environmental state data and the panoramic image data, a multi-channel safety dynamics analysis is performed on the water conservancy project to obtain the water conservancy project dynamics analysis data, including: Extracting feature information of the structural state data, the environmental state data and the panoramic image data respectively to obtain structural feature data, environmental feature data and panoramic feature data; Determining a multi-path safety dynamics analysis sequence for the water conservancy project according to the structural feature data, the environmental feature data and the panoramic feature data; According to the multi-channel safety dynamics analysis sequence, the dynamics analysis models corresponding to the water conservancy projects are retrieved, and the safety dynamics analysis of the water conservancy projects is performed in sequence to obtain the dynamics analysis data of the water conservancy projects; The dynamic analysis model includes a multiphase flow simulation model, a hydrodynamic simulation model, a discrete element analysis model and a sediment transport model; according to the multi-path safety dynamic analysis sequence, the dynamic analysis models corresponding to several water conservancy projects are retrieved, and the safety dynamic analysis of the water conservancy projects is performed in sequence to obtain the dynamic analysis data of the water conservancy projects, including: According to the multi-path safety dynamics analysis sequence, the structural feature data, the environmental feature data and the panoramic feature data are input into the multiphase flow simulation model to obtain multiphase flow simulation data; According to the multi-path safety dynamics analysis sequence, the multiphase flow simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrodynamic simulation model to obtain hydrodynamic simulation data; According to the multi-path safety dynamics analysis sequence, the hydrodynamics simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the discrete element analysis model to obtain discrete element analysis data; According to the multi-path safety dynamics analysis sequence, the discrete element analysis data, the structural feature data, the environmental feature data and the panoramic feature data are input into the sediment transport model to obtain sediment transport data; Fusion of the multiphase flow simulation data, the hydrodynamics simulation data, the discrete element analysis data and the sediment transport data to obtain the water conservancy engineering dynamics analysis data; In the case where the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger, a multi-channel safety statics analysis is performed on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data; wherein, the multi-channel safety statics analysis is performed on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project statics analysis data, including: Determining a multi-path safety statics analysis sequence for the water conservancy project according to the structural feature data, the environmental feature data and the panoramic feature data; According to the multi-channel safety statics analysis sequence, a number of statics analysis models corresponding to the water conservancy projects are retrieved, and safety statics analysis is performed on the water conservancy projects in sequence to obtain statics analysis data of the water conservancy projects; The static analysis model includes a hydrological simulation model, a climate simulation model, a river water quality simulation model and a groundwater simulation model; according to the multi-channel safety static analysis sequence, the static analysis models corresponding to the water conservancy projects are retrieved, and the safety static analysis of the water conservancy projects is performed in turn to obtain the static analysis data of the water conservancy projects, including: According to the multi-channel safety statics analysis sequence, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrological simulation model to obtain hydrological simulation data; According to the multi-channel safety statics analysis sequence, the hydrological simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the climate simulation model to obtain climate simulation data; According to the multi-channel safety statics analysis sequence, the climate simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the river water quality simulation model to obtain river water quality analysis data; According to the multi-channel safety statics analysis sequence, the river water quality analysis data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the groundwater simulation model to obtain groundwater simulation data; The hydrological simulation data, the climate simulation data, the river water quality analysis data and the groundwater simulation are integrated to obtain the water conservancy project statics analysis data; The water conservancy project dynamics analysis data and the water conservancy project statics analysis data are mapped to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
2. The method according to claim 1, characterized in that The simulation function of the hydrodynamic simulation model is: Among them, the , represents the fluid velocity vector; is the fluid density; is the fluid pressure; is the fluid dynamic viscosity; is the body force; for time; is the temperature; is the specific heat capacity; is the thermal conductivity coefficient; is the viscous dissipation function; is a divergence operator; is the gradient operator; is the Laplace operator; The simulation function of the discrete element analysis model is: Among them, the To act on particles The total force on For particles the quality of For particles The position vector of To act on particles The total moment on For particles The moment of inertia of For particles The angular velocity of For particles and particles The positive force between For particles and particles The tangential force between For particles and particles The damping force between For particles and particles The friction torque between For particles and particles The damping torque between To act on particles external force on is the positive contact stiffness; is the tangential contact stiffness; is the forward damping coefficient; is the tangential damping coefficient; is the total damping coefficient; is the rotation damping coefficient; is the positive displacement; is the tangential displacement; is the positive unit vector; is the tangent unit vector; is the positive relative speed; Tangential relative speed; For particles and particles The relative speed between The displacement vector from the contact point to the center of mass; For particles and particles The relative angular velocity between .
3. The method according to claim 1, characterized in that The simulation function of the hydrological simulation model is: Among them, the is the total water demand in the basin; is the rainfall; is the evaporation and transpiration; is the total runoff; is the infiltration amount; is the outflow of groundwater in the basin; is the groundwater inflow into the basin; is the surface runoff; is the base flow; is the surface runoff coefficient; is the field capacity; is the nonlinear coefficient of surface runoff; is the base flow coefficient; is the groundwater flow; is the groundwater flow threshold; is the nonlinear coefficient of the base flow; is the soil permeability coefficient; is the maximum soil moisture content; is the nonlinear coefficient of infiltration; is the maximum groundwater flow; is the groundwater storage capacity; is the maximum groundwater storage capacity; is the nonlinear coefficient of groundwater flow; is the potential evapotranspiration; is the nonlinear coefficient of evapotranspiration; The simulation function of the river water quality simulation model is: Among them, the For pollutants The concentration of for time; is the fluid velocity vector; is the molecular diffusion coefficient matrix, which represents the diffusion coefficient in each direction; is the reaction term, representing the pollutant The generation or consumption rate of For pollutants The source term of For pollutants The sedimentation rate of For pollutants concentration gradient; For pollutants The diffusion term of the concentration.
4. The method according to claim 1, characterized in that: The step of mapping the water conservancy project dynamics analysis data and the water conservancy project statics analysis data to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model includes: Performing spatial analysis on the state change of the water conservancy project according to the historical state data of the water conservancy project, the dynamics analysis data of the water conservancy project and the statics analysis data of the water conservancy project to obtain the state change spatial analysis data; The state change spatial analysis data is mapped to the water conservancy building information model to obtain the water conservancy project monitoring model.
5. An intelligent monitoring system for water conservancy project data based on digital twins, characterized in that: The system comprises: a sensor and a server; The sensor is used to obtain structural status data, environmental status data and panoramic image data of the water conservancy project; The server is used to perform a multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project dynamic analysis data; wherein, the multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the water conservancy project dynamic analysis data includes: Extracting feature information of the structural state data, the environmental state data and the panoramic image data respectively to obtain structural feature data, environmental feature data and panoramic feature data; Determining a multi-path safety dynamics analysis sequence for the water conservancy project according to the structural feature data, the environmental feature data and the panoramic feature data; According to the multi-channel safety dynamics analysis sequence, the dynamics analysis models corresponding to the water conservancy projects are retrieved, and the safety dynamics analysis of the water conservancy projects is performed in sequence to obtain the dynamics analysis data of the water conservancy projects; The dynamic analysis model includes a multiphase flow simulation model, a hydrodynamic simulation model, a discrete element analysis model and a sediment transport model; according to the multi-path safety dynamic analysis sequence, the dynamic analysis models corresponding to several water conservancy projects are retrieved, and the safety dynamic analysis of the water conservancy projects is performed in sequence to obtain the dynamic analysis data of the water conservancy projects, including: According to the multi-path safety dynamics analysis sequence, the structural feature data, the environmental feature data and the panoramic feature data are input into the multiphase flow simulation model to obtain multiphase flow simulation data; According to the multi-path safety dynamics analysis sequence, the multiphase flow simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrodynamic simulation model to obtain hydrodynamic simulation data; According to the multi-path safety dynamics analysis sequence, the hydrodynamics simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the discrete element analysis model to obtain discrete element analysis data; According to the multi-path safety dynamics analysis sequence, the discrete element analysis data, the structural feature data, the environmental feature data and the panoramic feature data are input into the sediment transport model to obtain sediment transport data; Fusion of the multiphase flow simulation data, the hydrodynamics simulation data, the discrete element analysis data and the sediment transport data to obtain the water conservancy engineering dynamics analysis data; The server is further configured to perform a multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data, and the panoramic image data to obtain the water conservancy project statics analysis data when the water conservancy project dynamics analysis data indicates that the dynamic structure of the water conservancy project is not in danger; wherein the multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data, and the panoramic image data to obtain the water conservancy project statics analysis data includes: Determining a multi-path safety statics analysis sequence for the water conservancy project according to the structural feature data, the environmental feature data and the panoramic feature data; According to the multi-channel safety statics analysis sequence, a number of statics analysis models corresponding to the water conservancy projects are retrieved, and safety statics analysis is performed on the water conservancy projects in sequence to obtain statics analysis data of the water conservancy projects; The static analysis model includes a hydrological simulation model, a climate simulation model, a river water quality simulation model and a groundwater simulation model; according to the multi-channel safety static analysis sequence, the static analysis models corresponding to the water conservancy projects are retrieved, and the safety static analysis of the water conservancy projects is performed in turn to obtain the static analysis data of the water conservancy projects, including: According to the multi-channel safety statics analysis sequence, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrological simulation model to obtain hydrological simulation data; According to the multi-channel safety statics analysis sequence, the hydrological simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the climate simulation model to obtain climate simulation data; According to the multi-channel safety statics analysis sequence, the climate simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the river water quality simulation model to obtain river water quality analysis data; According to the multi-channel safety statics analysis sequence, the river water quality analysis data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the groundwater simulation model to obtain groundwater simulation data; The hydrological simulation data, the climate simulation data, the river water quality analysis data and the groundwater simulation are integrated to obtain the water conservancy project statics analysis data; The server is also used to map the water conservancy project dynamic analysis data and the water conservancy project static analysis data to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.
6. An intelligent monitoring device for water conservancy project data based on digital twins, characterized in that: The device comprises: A data acquisition module, used to acquire structural status data, environmental status data and panoramic image data of the water conservancy project; A dynamic analysis module is used to perform a multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the dynamic analysis data of the water conservancy project; wherein, the multi-channel safety dynamic analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the dynamic analysis data of the water conservancy project includes: Extracting feature information of the structural state data, the environmental state data and the panoramic image data respectively to obtain structural feature data, environmental feature data and panoramic feature data; Determining a multi-path safety dynamics analysis sequence for the water conservancy project according to the structural feature data, the environmental feature data and the panoramic feature data; According to the multi-channel safety dynamics analysis sequence, the dynamics analysis models corresponding to the water conservancy projects are retrieved, and the safety dynamics analysis of the water conservancy projects is performed in sequence to obtain the dynamics analysis data of the water conservancy projects; The dynamic analysis model includes a multiphase flow simulation model, a hydrodynamic simulation model, a discrete element analysis model and a sediment transport model; according to the multi-path safety dynamic analysis sequence, the dynamic analysis models corresponding to several water conservancy projects are retrieved, and the safety dynamic analysis of the water conservancy projects is performed in sequence to obtain the dynamic analysis data of the water conservancy projects, including: According to the multi-path safety dynamics analysis sequence, the structural feature data, the environmental feature data and the panoramic feature data are input into the multiphase flow simulation model to obtain multiphase flow simulation data; According to the multi-path safety dynamics analysis sequence, the multiphase flow simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrodynamic simulation model to obtain hydrodynamic simulation data; According to the multi-path safety dynamics analysis sequence, the hydrodynamics simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the discrete element analysis model to obtain discrete element analysis data; According to the multi-path safety dynamics analysis sequence, the discrete element analysis data, the structural feature data, the environmental feature data and the panoramic feature data are input into the sediment transport model to obtain sediment transport data; Fusion of the multiphase flow simulation data, the hydrodynamics simulation data, the discrete element analysis data and the sediment transport data to obtain the water conservancy engineering dynamics analysis data; The statics analysis module is used to perform a multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the statics analysis data of the water conservancy project when the dynamics analysis data of the water conservancy project indicates that the dynamic structure of the water conservancy project is not in danger; wherein the multi-channel safety statics analysis on the water conservancy project according to the structural state data, the environmental state data and the panoramic image data to obtain the statics analysis data of the water conservancy project includes: Determining a multi-path safety statics analysis sequence for the water conservancy project according to the structural feature data, the environmental feature data and the panoramic feature data; According to the multi-channel safety statics analysis sequence, a number of statics analysis models corresponding to the water conservancy projects are retrieved, and safety statics analysis is performed on the water conservancy projects in sequence to obtain statics analysis data of the water conservancy projects; The static analysis model includes a hydrological simulation model, a climate simulation model, a river water quality simulation model and a groundwater simulation model; according to the multi-channel safety static analysis sequence, the static analysis models corresponding to the water conservancy projects are retrieved, and the safety static analysis of the water conservancy projects is performed in turn to obtain the static analysis data of the water conservancy projects, including: According to the multi-channel safety statics analysis sequence, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the hydrological simulation model to obtain hydrological simulation data; According to the multi-channel safety statics analysis sequence, the hydrological simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the climate simulation model to obtain climate simulation data; According to the multi-channel safety statics analysis sequence, the climate simulation data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the river water quality simulation model to obtain river water quality analysis data; According to the multi-channel safety statics analysis sequence, the river water quality analysis data, the structural characteristic data, the environmental characteristic data and the panoramic characteristic data are input into the groundwater simulation model to obtain groundwater simulation data; The hydrological simulation data, the climate simulation data, the river water quality analysis data and the groundwater simulation are integrated to obtain the water conservancy project statics analysis data; The project monitoring module is used to map the water conservancy project dynamic analysis data and the water conservancy project static analysis data to the water conservancy building information model of the water conservancy project to obtain a water conservancy project monitoring model; the water conservancy project monitoring model is used to generate safety monitoring data and safety prediction data for the water conservancy project.