Device information management method, device, electronic equipment, storage medium and product

In the electronic design process, the device encoding is obtained from the product life cycle management system and compared with the preset library, and new device requests are generated, which solves the problem of inefficient device information management and realizes device information and schematic symbols and printing The relationship between circuit board packaging improves the automatic synchronization capability between design and production and improves management efficiency.

CN118446630BActive Publication Date: 2024-12-06MIDEA SMART TECHNOLOGY CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202410904294.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-12-06
Estimated Expiration
2044-07-08

AI Technical Summary

Technical Problem

In the electronic design process, device information is independent of the schematic symbols used in the design and printed circuit board packaging files, resulting in inefficient device information management and prone to lag and errors.

Method used

By obtaining the pending device encoding from the product life cycle management system, comparing it with the encoding in the preset device library, generating new device requests, forming new device work orders, and performing device library processing to ensure device information and schematic symbols The relationship between the printed circuit board packaging is synchronized to reduce manual matching errors.

Benefits of technology

It improves the efficiency of device information management, ensures the accuracy of bill of materials information in the design drawings, realizes automatic synchronization of design and production, reduces manual operations, and improves the level of digital and intelligent management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118446630B_ABST
    Figure CN118446630B_ABST
Patent Text Reader

Abstract

The present application relates to the field of automation technology, and provides a device information management method, apparatus, electronic device, storage medium and product, the method comprising: obtaining the device code to be processed from the product lifecycle management system; if the device code to be processed is different from all device codes in the preset device library, then generating a device addition request based on the device code to be processed; receiving a device addition work order generated based on the device addition request, and performing device entry processing based on the device addition work order; the device addition work order includes the association relationship between the device code to be processed and the schematic symbol and the printed circuit board package. The user of the present application can design electronic drawings according to the device corresponding to the device code associated with the schematic symbol and the printed circuit board package, so that the device information in the bill of materials table obtained according to the design drawing will not be delayed, wrong or missing relative to the product lifecycle management system, and the efficiency of device information management can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of automation technology, and in particular to a device information management method, apparatus, electronic equipment, storage medium and product. Background Art

[0002] At present, when various enterprises and units carry out electronic design work, the device information and the schematic symbols and printed circuit board (PCB) package files used in the design are basically independent of each other. The device information is managed through the production system, such as product lifecycle management (PLM). The design uses the schematic symbols and PCB packages to draw electronic drawings through electronic design automation tools. Only after the electronic drawing design is completed, the device information such as coding information is manually matched and uploaded to the production system to form the production bill of materials (BOM) table, and then enter the production stage. This method has the disadvantages of non-standard and non-uniform library files such as schematic symbols and PCB packages, and the device information in the BOM table is prone to lags, errors and omissions. As a result, the current efficiency in device information management is low. Summary of the invention

[0003] The present application aims to solve at least one of the technical problems existing in the related art. To this end, the present application proposes a device information management method, which can improve the efficiency of device information management.

[0004] The present application also proposes a device information management apparatus, an electronic device, a storage medium and a computer program product.

[0005] According to the first aspect of the present application, the device information management method includes:

[0006] Obtain the device code to be processed from the product life cycle management system;

[0007] If the device code to be processed is different from all device codes in the preset device library, generating a device adding request based on the device code to be processed;

[0008] A device addition work order generated based on the device addition request is received, and device warehousing processing is performed based on the device addition work order; the device addition work order includes the association relationship between the device code to be processed and the schematic symbol and printed circuit board package.

[0009] According to the device information management method of the embodiment of the present application, after obtaining the device code to be processed from the product lifecycle management system, by comparing the device code to be processed with the device code in the preset device library, when the device code to be processed is different from all the device codes in the preset device library, a device addition request can be generated based on the device code to be processed, so as to associate the schematic symbol with the printed circuit board package based on the device code to be processed in the device addition request and form a device addition work order, and then the device warehousing processing can be performed based on the formed device addition work order. Therefore, when designing electronic drawings, the user can draw drawings according to the devices corresponding to the device codes associated with the schematic symbols and the printed circuit board packages, so that the device information in the bill of materials table obtained according to the design drawings will not be delayed, wrong or missing relative to the product lifecycle management system, thereby improving the efficiency of device information management.

[0010] According to an embodiment of the present application, the device warehousing process is performed based on the device newly added work order, including:

[0011] Conducting approval mark detection on new work orders for the device;

[0012] If it is determined that the device new work order has a target approval mark, the association relationship between the device code to be processed and the schematic symbol and printed circuit board package in the device new work order is put into storage; the target approval mark indicates that the work order has been approved.

[0013] According to an embodiment of the present application, after determining that the device newly added work order has a target approval identifier, the method further includes:

[0014] If the device new work order contains an associated symbol new work order and / or an associated package new work order, and when the associated symbol new work order exists, the associated symbol new work order has a target approval mark, and when the associated package new work order exists, the associated package new work order has a target approval mark, and when the associated symbol new work order and the associated package new work order exist, both the associated symbol new work order and the associated package new work order have target approval marks, then the device warehousing processing is performed based on the device new work order, the associated symbol new work order and / or the associated package new work order.

[0015] According to an embodiment of the present application, the device warehousing processing based on the device new work order, the associated symbol new work order and / or the associated package new work order includes any of the following:

[0016] If the associated symbol new work order exists in the device new work order, the association relationship between the device code to be processed in the device new work order and the printed circuit board package, and the association relationship between the device code to be processed in the device new work order and the new schematic symbol in the associated symbol new work order are put into storage;

[0017] If the associated package new work order exists in the device new work order, the association relationship between the device code to be processed and the schematic symbol in the device new work order, and the association relationship between the device code to be processed in the device new work order and the new printed circuit board package in the associated package new work order are put into storage;

[0018] If the newly added work order for the device contains the newly added work order for the associated symbol and the newly added work order for the associated package, the association relationship between the code of the device to be processed in the newly added work order for the device and the newly added schematic symbol in the newly added work order for the associated symbol, and the association relationship between the code of the device to be processed in the newly added work order for the device and the newly added printed circuit board package in the newly added work order for the associated package are put into storage.

[0019] According to an embodiment of the present application, after the association relationship between the to-be-processed device code and the schematic diagram symbol and the printed circuit board package in the device new work order is put into storage, the method further includes:

[0020] The status of the printed circuit board package corresponding to the to-be-processed device code is set to be associated with reference, and the to-be-processed device code and its corresponding association relationship and the set status information are synchronized to an electronic design automation tool.

[0021] According to one embodiment of the present application, it also includes:

[0022] Receive device-related change work orders;

[0023] If the device association change work order is a device symbol association change work order, the association relationship between the device code to be changed corresponding to the device symbol association change work order in the preset device library and the current schematic symbol is adjusted to the association relationship between the device code to be changed and the target schematic symbol in the device symbol association change work order;

[0024] If the device-associated change work order is a device package-associated change work order, the association relationship between the device code to be changed corresponding to the device package-associated change work order in the preset device library and the current printed circuit board package is adjusted to the association relationship between the device code to be changed and the target printed circuit board package in the device package-associated change work order.

[0025] According to the second aspect of the present application, a device information management apparatus includes:

[0026] An acquisition module, used for acquiring a device code to be processed from a product life cycle management system;

[0027] A generating module, configured to generate a device adding request based on the device code to be processed if the device code to be processed is different from all device codes in a preset device library;

[0028] A warehousing module, configured to receive a device addition work order generated based on the device addition request, and perform device warehousing processing based on the device addition work order; the device addition work order includes an association relationship between the device code to be processed and the schematic symbol and the printed circuit board package;

[0029] The warehousing module is also used to detect the approval mark of the new device work order; if it is determined that the new device work order has a target approval mark, the association relationship between the to-be-processed device code and the schematic symbol and printed circuit board package in the new device work order is processed for warehousing; the target approval mark indicates that the work order has been approved.

[0030] According to an electronic device of an embodiment of the third aspect of the present application, the electronic device includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the device information management method described in any one of the above methods is implemented.

[0031] According to the storage medium of the fourth aspect of the present application, the storage medium is a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, it implements any of the device information management methods described above.

[0032] A computer program product according to an embodiment of the fifth aspect of the present application includes a computer program, which, when executed by a processor, implements any of the device information management methods described above.

[0033] The above one or more technical solutions in the embodiments of the present application have at least the following technical effects:

[0034] After obtaining the code of the device to be processed from the product lifecycle management system, by comparing the code of the device to be processed with the device code in the preset device library, when the code of the device to be processed is different from all the device codes in the preset device library, a device addition request can be generated based on the code of the device to be processed, so as to associate the schematic symbol with the printed circuit board package based on the code of the device to be processed in the device addition request and form a device addition work order, and then the device warehousing processing can be carried out based on the formed device addition work order. Therefore, when designing electronic drawings, users can draw drawings according to the devices corresponding to the device codes associated with the schematic symbols and the printed circuit board packages, so that the device information in the bill of materials obtained according to the design drawings will not be delayed, wrong or missing relative to the product lifecycle management system, thereby improving the efficiency of device information management.

[0035] Additional aspects and advantages of the present application will be given in part in the description below, and in part will become apparent from the description below, or will be learned through the practice of the present application. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related technologies, the drawings required for use in the embodiments or the related technical descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0037] Figure 1 It is a flow chart of the device information management method provided in the embodiment of the present application.

[0038] Figure 2 It is a structural diagram of a device information management apparatus provided in an embodiment of the present application.

[0039] Figure 3 It is a structural schematic diagram of the electronic device provided by this application. DETAILED DESCRIPTION

[0040] The following is a further detailed description of the implementation of the present application in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present application but cannot be used to limit the scope of the present application.

[0041] In the description of the embodiments of the present application, it should be noted that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the embodiments of the present application. In addition, the terms "first", "second", and "third" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.

[0042] In the description of the embodiments of the present application, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected or indirectly connected through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present application can be understood according to specific circumstances.

[0043] In the embodiments of the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0044] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the embodiments of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0045] See also Figure 1 , Figure 1 is a flow chart of a device information management method provided in an embodiment of the present application, such as Figure 1 As shown, the device information management method includes:

[0046] Step 110: Obtain the code of the device to be processed from the product lifecycle management system.

[0047] It should be noted that the executor of the device information management method provided in the embodiment of the present application can be a server, a computer device, such as a mobile phone, a tablet computer, a laptop computer, a PDA, a vehicle-mounted electronic device, a wearable device, an ultra-mobile personal computer (UMPC), a netbook or a personal digital assistant (PDA), etc.

[0048] The execution subject of the present application can be connected to a device information management device, or can communicate with the device information management device, so the device information management method of the present application can be implemented by controlling the device information management device. The device information management device in the present application can specifically adopt an electronic data management system (EDM).

[0049] The electronic data management system of the present application is pre-set with a database as a device library, and the devices in the preset device library exist as objects with codes, that is, the electronic data management system stores device code information. In addition, the library files such as schematic symbols and PCB packages in the preset device library exist as objects with specific standard names, and are put into storage after approval and confirmation through the process engine.

[0050] The present application can target device codes in an electronic data management system and associate a device code with a schematic symbol and one or more PCB packages in the electronic data management system, thereby forming an association relationship between the device code, the schematic symbol, and the PCB package.

[0051] It should be noted that the electronic data management system in the present application can synchronize the device code from the PLM system daily through a specific data interface within a fixed time period, and determine each acquired device code as a device code to be processed.

[0052] Step 120 : If the device code to be processed is different from all device codes in the preset device library, a device adding request is generated based on the device code to be processed.

[0053] Furthermore, after obtaining the code of the device to be processed, the present application can compare the code of the device to be processed with each device code stored in the preset device library.

[0054] If it is determined through comparison that the code of the device to be processed is consistent with any device code in the preset device library, it is determined that the code of the device to be processed has been put into the library.

[0055] Furthermore, if it is determined through comparison that the device code to be processed is different from all device codes in the preset device library, it is determined that the device code to be processed has not been included in the library, and the device code to be processed is not associated with any schematic symbol or PCB package. Therefore, in this application, a device addition request can be generated based on the device code to be processed and sent to the corresponding user's workbench.

[0056] Users can automatically create a device addition work order by clicking on the device addition request on the workbench, and can associate the existing schematic symbols and PCB packages in the electronic data management system (that is, the reusable schematic symbols and PCB packages in the preset device library) in the device addition work order. After completing the association, the device addition work order can be submitted.

[0057] After submission, the new work order for the device can be submitted to the process engine for approval by the corresponding user. If approved, the new work order for the device will have a target approval mark indicating that the work order has been approved. It should be noted that the specific form or information of the target approval mark is not limited in this application, and can be set and adjusted according to actual needs.

[0058] Step 130, receiving a component addition work order generated based on a component addition request, and performing component warehousing processing based on the component addition work order; the component addition work order includes an association relationship between the component code to be processed and the schematic symbol and the printed circuit board package.

[0059] The electronic data management system of the present application can receive a device addition work order generated based on the device addition request. Therefore, after receiving the device addition work order generated based on the device addition request, if it is determined that the device addition work order has passed the approval, the device code to be processed and its associated relationship in the device addition work order can be put into storage.

[0060] According to the device information management method of the embodiment of the present application, after obtaining the device code to be processed from the product lifecycle management system, by comparing the device code to be processed with the device code in the preset device library, when the device code to be processed is different from all the device codes in the preset device library, a device addition request can be generated based on the device code to be processed, so as to associate the schematic symbol with the printed circuit board package based on the device code to be processed in the device addition request and form a device addition work order, and then the device warehousing processing can be performed based on the formed device addition work order. Therefore, when designing electronic drawings, the user can draw drawings according to the devices corresponding to the device codes associated with the schematic symbols and the printed circuit board packages, so that the device information in the bill of materials table obtained according to the design drawings will not be delayed, wrong or missing relative to the product lifecycle management system, thereby realizing automatic synchronization between drawings and production, and improving the level of digital and intelligent management, so as to improve the efficiency of device information management.

[0061] In addition, the present application associates the code of the device to be processed with the schematic symbol and the printed circuit board package and forms a new work order for the device and then puts it into the warehouse. After the design of the electronic drawing is completed, due to the association between the device code and the schematic symbol and the printed circuit board package, the BOM can be automatically output according to the design drawing, thereby realizing digital and intelligent management of the entire process of design and production, reducing manual operations, and thus achieving fully intelligent management of the entire design and manufacturing ends.

[0062] Based on the above embodiment, the device warehousing process is performed based on the device newly added work order, including:

[0063] Step 131, performing approval mark detection on the newly added work order of the device;

[0064] Step 132, if it is determined that the device new work order has a target approval mark, the association relationship between the device code to be processed and the schematic symbol and printed circuit board package in the device new work order is put into storage; the target approval mark indicates that the work order has been approved.

[0065] When processing device warehousing based on a device new work order, the present application can detect the approval mark of the device new work order, and specifically can detect whether there is a target approval mark in the device new work order.

[0066] Furthermore, if it is determined through testing that the newly added device work order does not have the target approval mark, then it is determined that the newly added device work order has not been approved. In order to ensure the validity and security of the data in the electronic data management system, the pending device codes and their associated relationships in the newly added device work order will not be entered into the warehouse.

[0067] If it is determined that the device new work order has a target approval mark, it is determined that the device new work order has been approved, so the association relationship between the device code to be processed and the schematic symbol and printed circuit board package in the device new work order can be put into storage. Specifically, the device code to be processed can be put into storage, the association relationship between the device code to be processed and the specified schematic symbol can be put into storage, and the association relationship between the device code to be processed and the specified PCB package can be put into storage.

[0068] This application processes the association between the pending device code and the schematic symbol and printed circuit board package in the new device work order only after determining that the new device work order has a target approval mark, thereby avoiding the arbitrary entry of device codes corresponding to unapproved work orders, ensuring the validity and security of data in the electronic data management system, and allowing users to draw drawings based on devices corresponding to device codes associated with schematic symbols and printed circuit board packages when designing electronic drawings. At the same time, the device information in the bill of materials table obtained based on the design drawings will not be delayed, wrong, or missed relative to the product life cycle management system, thereby improving the efficiency of device information management.

[0069] Based on the above embodiment, after determining that the device new work order has a target approval identifier, the method further includes:

[0070] Step A, if there are associated symbol new work orders and / or associated package new work orders in the device new work order, and when there is an associated symbol new work order, the associated symbol new work order has a target approval mark, when there is an associated package new work order, the associated package new work order has a target approval mark, and when there are associated symbol new work orders and associated package new work orders, both the associated symbol new work order and the associated package new work order have target approval marks, then the device warehousing processing is performed based on the device new work order, the associated symbol new work order and / or the associated package new work order.

[0071] Specifically, the device warehousing process is performed based on the device new work order, the associated symbol new work order and / or the associated package new work order, including any of the following:

[0072] Step A1, if there is an associated symbol added work order in the device added work order, then the association relationship between the device code to be processed in the device added work order and the printed circuit board package, and the association relationship between the device code to be processed in the device added work order and the newly added schematic symbol in the associated symbol added work order are put into storage;

[0073] Step A2: if there is an associated package addition work order in the device addition work order, the association relationship between the device code to be processed and the schematic symbol in the device addition work order, and the association relationship between the device code to be processed in the device addition work order and the new printed circuit board package in the associated package addition work order are put into storage;

[0074] Step A3, if there are associated symbol new work orders and associated package new work orders in the device new work order, the association relationship between the device code to be processed in the device new work order and the new schematic symbol in the associated symbol new work order, as well as the association relationship between the device code to be processed in the device new work order and the new printed circuit board package in the associated package new work order are put into storage.

[0075] It should be noted that the user of this application can also actively create a new work order for a device according to demand. At this time, the user needs to enter the device code of the device that needs to be put into storage.

[0076] In addition, users can also create symbol addition work orders for adding schematic symbols and package addition work orders for adding PCB packages according to actual needs, so as to add files such as schematic symbols and PCB packages.

[0077] Users can also create symbol change work orders for changing schematic symbols and package change work orders for changing PCB packages according to actual needs, so as to realize changes to files such as schematic symbols and PCB packages.

[0078] It is understandable that, after the symbol change work order and the package change work order are approved and stored in the library, the original schematic symbol in the preset device library will be changed to the adjusted schematic symbol, and correspondingly, the original PCB package in the preset device library will be changed to the adjusted PCB package. In addition, the association relationship associated with the corresponding schematic symbol or PCB package in the preset device library, the schematic symbol and the PCB package will also be adjusted accordingly.

[0079] It can be understood that in the present application, a device work order (such as a device addition work order or a device change work order) can be associated with a package addition work order or a symbol addition work order in the editing state before the process is started, and the two types of work orders can be simultaneously approved by the process.

[0080] Therefore, when creating a new work order for a device, the user can select the new work order for the created schematic symbol as the new work order for the associated symbol in the new work order for the device; the user can also select the new work order for the created PCB package as the new work order for the associated package; the user can also select the new work order for the created schematic symbol as the new work order for the associated symbol and select the new work order for the created PCB package as the new work order for the associated package.

[0081] Therefore, after receiving a device addition work order generated based on a device addition request and determining that the device addition work order has a target approval identifier, the present application can detect whether there are associated symbol addition work orders and associated package addition work orders in the device addition work order.

[0082] Furthermore, if it is determined that there is an associated symbol added work order in the device added work order, it can be determined whether the associated symbol added work order has a target approval mark, and if the associated symbol added work order has a target approval mark, the device warehousing process is performed based on the device added work order and the associated symbol added work order. Specifically, the warehousing process can be performed on the association relationship between the to-be-processed device code and the printed circuit board package in the device added work order, and the association relationship between the to-be-processed device code in the device added work order and the newly added schematic symbol in the associated symbol added work order.

[0083] If it is determined that there is an associated package new work order in the device new work order, it can be determined whether the associated package new work order has a target approval mark. If the associated package new work order has a target approval mark, the device warehousing process is performed based on the device new work order and the associated package new work order. Specifically, the warehousing process can be performed on the association between the to-be-processed device code and the schematic symbol in the device new work order, and the association between the to-be-processed device code in the device new work order and the newly added printed circuit board package in the associated package new work order.

[0084] If it is determined that there are associated symbol new work orders and associated package new work orders in the device new work order, it can be determined whether the associated symbol new work order has a target approval mark, and whether the associated package new work order has a target approval mark. If the associated symbol new work order has a target approval mark and the associated package new work order has a target approval mark, the device warehousing process is performed based on the device new work order, the associated symbol new work order and the associated package new work order. Specifically, the association relationship between the to-be-processed device code in the device new work order and the newly added schematic symbol in the associated symbol new work order, as well as the association relationship between the to-be-processed device code in the device new work order and the newly added printed circuit board package in the associated package new work order can be processed for warehousing.

[0085] The present application can associate and store the newly added device work order with the associated newly added package work order and the associated newly added symbol work order, so as to meet the user's operational requirements of simultaneously completing the addition of symbols and packages and associating new symbols and packages with device codes in one process. When designing electronic drawings, users can draw drawings based on devices corresponding to device codes that are associated with schematic symbols and printed circuit board packages, so that the device information in the bill of materials obtained according to the design drawings will not be delayed, wrong, or missed relative to the product lifecycle management system, thereby improving the efficiency of device information management.

[0086] Based on the above embodiment, after the association relationship between the to-be-processed device code and the schematic diagram symbol and the printed circuit board package in the device new work order is put into storage, the following is further included:

[0087] Step 133 , setting a state of associating and referencing the printed circuit board package corresponding to the device code to be processed, and synchronizing the device code to be processed and its corresponding associative relationship with the set state information to an electronic design automation tool.

[0088] The present application performs version management and status management on the package library files formed after the device codes, schematic symbols, PCB packages, the association between device codes and schematic symbols, and the association between devices and PCB packages in the preset device library are stored. Specifically, the information of each version can be recorded and stored in the electronic data management system by version classification.

[0089] Furthermore, in the present application, the status of the package library file corresponding to the PCB package referenced by the device in the preset device library, that is, the package library file corresponding to the PCB package referenced by the device code association, can be set. The specific status information set in the present application is not specifically limited. In one embodiment, the settable status can be "mass production" and "pending reference".

[0090] In this application, the status of the package library file corresponding to the PCB package referenced by the device in the preset device library, that is, the package library file with the device code associated reference can be set to "mass production". The package library files with the status information of "mass production" are merged into the package library package and synchronized to the user's local through the synchronization tool.

[0091] At the same time, the status of the package library files that are not referenced by the device association is set to "pending reference" and are only stored in the electronic data management system and will not be merged into the package library package.

[0092] Therefore, after the application processes the association between the device code to be processed and the schematic symbol and printed circuit board package in the device new work order, the status of the printed circuit board package corresponding to the device code to be processed can be set to "mass production", and the package library file formed by the device code to be processed and its corresponding association and the set status information can be merged into the package library package, and the package library package can be synchronized to the electronic design automation tool (for example, Altium Designer) through the synchronization tool. Among them, Altium Designer is a design software suitable for various electronic design projects, including simple to complex multi-layer designs.

[0093] This application can set the status of the package library files and synchronize them to the user's local computer, ensuring that the package library files in the user's local library package are all in the "mass production" state, avoiding excessive complexity of the library package files, and improving the efficiency of drawing design.

[0094] Based on the above embodiment, it also includes:

[0095] Step B1, receiving a device association change work order;

[0096] Step B2, if the device association change work order is a device symbol association change work order, the association relationship between the device code to be changed corresponding to the device symbol association change work order in the preset device library and the current schematic symbol is adjusted to the association relationship between the device code to be changed and the target schematic symbol in the device symbol association change work order;

[0097] Step B3, if the device association change work order is a device package association change work order, the association relationship between the device code to be changed corresponding to the device package association change work order in the preset device library and the current printed circuit board package is adjusted to the association relationship between the device code to be changed and the target printed circuit board package in the device package association change work order.

[0098] If this application determines that the device code to be processed already exists in the preset device library, or the user has the intention to adjust the association relationship corresponding to any device code in the preset device library, then a device association change work order can be created and submitted for the device code to be changed that needs to be adjusted and its association relationship with the schematic symbol or PCB package.

[0099] Therefore, the present application can receive a device association change work order and determine whether the device association change work order has a target approval identifier. If the target approval identifier is determined, the type of the device association change work order is further determined. If it is determined that the device association change work order is a device symbol association change work order, the association relationship between the device code to be changed corresponding to the device symbol association change work order in the preset device library and the current schematic symbol is adjusted to the association relationship between the device code to be changed and the target schematic symbol in the device symbol association change work order.

[0100] If it is determined that the device association change work order is a device package association change work order, the association relationship between the device code to be changed corresponding to the device package association change work order in the preset device library and the current printed circuit board package is adjusted to the association relationship between the device code to be changed and the target printed circuit board package in the device package association change work order.

[0101] This application adjusts the corresponding association relationship in the preset device library according to the device association change work order. Therefore, when the user is designing electronic drawings, he can draw drawings according to the devices corresponding to the device codes associated with the schematic symbols and printed circuit board packages, so that the device information in the bill of materials table obtained according to the design drawings will not be delayed, wrong or missed relative to the product life cycle management system, thereby improving the efficiency of device information management.

[0102] This application aims to solve the problem of delayed or missing device and package information and lack of lifecycle management of package library files when the electronic design stage of an enterprise transitions to the production stage. These problems generally lead to delayed updates of enterprise R&D and design information, increased possibility of production errors, increased production costs and prolonged product development cycles, which is not conducive to enterprise standardization management and cost reduction and efficiency improvement.

[0103] This application can ensure that the design-side device library information and the production-side information are automatically updated synchronously, realizing digital and intelligent management. At the same time, it can realize the life cycle management of the package library file, reduce the manual information proofreading operation from the design end to the production end, improve product development efficiency, iterative updates and reduce production error costs.

[0104] Figure 2 is a schematic diagram of the structure of the device information management device provided in the embodiment of the present application, such as Figure 2 As shown, the device information management device comprises:

[0105] An acquisition module 210 is used to acquire a code of a device to be processed from a product lifecycle management system;

[0106] A generating module 220, configured to generate a device adding request based on the device code to be processed if the device code to be processed is different from all device codes in a preset device library;

[0107] The warehousing module 230 is used to receive a device addition work order generated based on the device addition request, and perform device warehousing processing based on the device addition work order; the device addition work order includes the association relationship between the device code to be processed and the schematic symbol and printed circuit board package.

[0108] According to the device information management apparatus of the embodiment of the present application, after obtaining the device code to be processed from the product lifecycle management system, by comparing the device code to be processed with the device code in the preset device library, when the device code to be processed is different from all the device codes in the preset device library, a device addition request can be generated based on the device code to be processed, so as to associate the schematic symbol with the printed circuit board package based on the device code to be processed in the device addition request and form a device addition work order, and then the device warehousing processing can be performed based on the formed device addition work order. Therefore, when designing electronic drawings, the user can draw drawings according to the devices corresponding to the device codes associated with the schematic symbols and the printed circuit board packages, so that the device information in the bill of materials table obtained according to the design drawings will not be delayed, wrong or missing relative to the product lifecycle management system, thereby improving the efficiency of device information management.

[0109] Based on any of the above embodiments, the warehousing module 230 is specifically used for:

[0110] Conducting approval mark detection on new work orders for the device;

[0111] If it is determined that the device new work order has a target approval mark, the association relationship between the device code to be processed and the schematic symbol and printed circuit board package in the device new work order is put into storage; the target approval mark indicates that the work order has been approved.

[0112] Based on any of the above embodiments, the storage module 230 includes a first storage unit, and the first storage unit is used to:

[0113] If the device new work order contains an associated symbol new work order and / or an associated package new work order, and when the associated symbol new work order exists, the associated symbol new work order has a target approval mark, and when the associated package new work order exists, the associated package new work order has a target approval mark, and when the associated symbol new work order and the associated package new work order exist, both the associated symbol new work order and the associated package new work order have target approval marks, then the device warehousing processing is performed based on the device new work order, the associated symbol new work order and / or the associated package new work order.

[0114] Based on any of the above embodiments, the storage module 230 further includes a second storage unit, and the second storage unit is used to:

[0115] If the associated symbol new work order exists in the device new work order, the association relationship between the device code to be processed in the device new work order and the printed circuit board package, and the association relationship between the device code to be processed in the device new work order and the new schematic symbol in the associated symbol new work order are put into storage;

[0116] If the associated package new work order exists in the device new work order, the association relationship between the device code to be processed and the schematic symbol in the device new work order, and the association relationship between the device code to be processed in the device new work order and the new printed circuit board package in the associated package new work order are put into storage;

[0117] If the newly added work order for the device contains the newly added work order for the associated symbol and the newly added work order for the associated package, the association relationship between the code of the device to be processed in the newly added work order for the device and the newly added schematic symbol in the newly added work order for the associated symbol, and the association relationship between the code of the device to be processed in the newly added work order for the device and the newly added printed circuit board package in the newly added work order for the associated package are put into storage.

[0118] Based on any of the above embodiments, the warehousing module 230 further includes a synchronization unit, and the synchronization unit is used to:

[0119] The status of the printed circuit board package corresponding to the to-be-processed device code is set to be associated with reference, and the to-be-processed device code and its corresponding association relationship and the set status information are synchronized to an electronic design automation tool.

[0120] Based on any of the above embodiments, the device information management apparatus further includes:

[0121] A receiving module, used for receiving a device-related change work order;

[0122] A first adjustment module is used for adjusting the association relationship between the device code to be changed corresponding to the device symbol association change work order in the preset device library and the current schematic symbol to the association relationship between the device code to be changed and the target schematic symbol in the device symbol association change work order if the device association change work order is a device symbol association change work order;

[0123] The second adjustment module is used to adjust the association relationship between the device code to be changed corresponding to the device package associated change work order in the preset device library and the current printed circuit board package to the association relationship between the device code to be changed and the target printed circuit board package in the device package associated change work order if the device associated change work order is a device package associated change work order.

[0124] Based on the same idea as the method in the above-mentioned embodiment, the device information management apparatus provided in the present application can implement the method in the above-mentioned embodiment. For the convenience of explanation, the structural diagram of the device embodiment only shows the parts related to the embodiment of the present application. Those skilled in the art can understand that the illustrated structure does not constitute a limitation on the device, and may include more or fewer components than shown in the figure, or a combination of certain components, or a different arrangement of components.

[0125] Figure 3 An example of a physical structure diagram of an electronic device is shown in FIG. Figure 3 As shown, the electronic device may include: a processor 310, a communication interface 320, a memory 330 and a communication bus 340, wherein the processor 310, the communication interface 320 and the memory 330 communicate with each other through the communication bus 340. The processor 310 may call the logic instructions in the memory 330 to execute the following method: obtaining the code of the device to be processed from the product life cycle management system;

[0126] If the device code to be processed is different from all device codes in the preset device library, generating a device adding request based on the device code to be processed;

[0127] A device addition work order generated based on the device addition request is received, and device warehousing processing is performed based on the device addition work order; the device addition work order includes the association relationship between the device code to be processed and the schematic symbol and printed circuit board package.

[0128] In addition, the logic instructions in the above-mentioned memory 330 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the relevant technology. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0129] In another aspect, an embodiment of the present application further provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method provided in each of the above embodiments is implemented, for example, including: obtaining a code of a device to be processed from a product lifecycle management system;

[0130] If the device code to be processed is different from all device codes in the preset device library, generating a device adding request based on the device code to be processed;

[0131] A device addition work order generated based on the device addition request is received, and device warehousing processing is performed based on the device addition work order; the device addition work order includes the association relationship between the device code to be processed and the schematic symbol and printed circuit board package.

[0132] In another aspect, an embodiment of the present application further provides a computer program product having a computer program stored thereon, and when the computer program is executed by a processor, the method provided by the above embodiments is implemented, for example, including: obtaining a code of a device to be processed from a product lifecycle management system;

[0133] If the device code to be processed is different from all device codes in the preset device library, generating a device adding request based on the device code to be processed;

[0134] A device addition work order generated based on the device addition request is received, and device warehousing processing is performed based on the device addition work order; the device addition work order includes the association relationship between the device code to be processed and the schematic symbol and printed circuit board package.

[0135] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0136] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the relevant technology can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiment.

[0137] Finally, it should be noted that the above implementation modes are only used to illustrate the present application, rather than to limit the present application. Although the present application is described in detail with reference to the embodiments, a person skilled in the art should understand that various combinations, modifications or equivalent substitutions of the technical solutions of the present application do not depart from the spirit and scope of the technical solutions of the present application, and should be included in the scope of the claims of the present application.

Claims

1. A device information management method, characterized in that: include: Obtain the device code to be processed from the product life cycle management system; If the device code to be processed is different from all device codes in the preset device library, generating a device adding request based on the device code to be processed; receiving a component adding work order generated based on the component adding request, and performing component warehousing processing based on the component adding work order; The device newly added work order includes the association relationship between the device code to be processed and the schematic symbol and printed circuit board package; The device warehousing process based on the device newly added work order includes: Conducting approval mark detection on new work orders for the device; If it is determined that the device new work order has a target approval mark, the association relationship between the device code to be processed and the schematic symbol and printed circuit board package in the device new work order is put into storage; the target approval mark indicates that the work order has been approved; After determining that the device newly added work order has a target approval identifier, the method further includes: If the device new work order contains an associated symbol new work order and / or an associated package new work order, and when the associated symbol new work order exists, the associated symbol new work order has a target approval mark, and when the associated package new work order exists, the associated package new work order has a target approval mark, and when the associated symbol new work order and the associated package new work order exist, both the associated symbol new work order and the associated package new work order have target approval marks, then the device warehousing processing is performed based on the device new work order, the associated symbol new work order and / or the associated package new work order.

2. The device information management method according to claim 1, characterized in that: The device warehousing process based on the device newly added work order, the associated symbol newly added work order and / or the associated package newly added work order includes any of the following: If the associated symbol new work order exists in the device new work order, the association relationship between the device code to be processed in the device new work order and the printed circuit board package, and the association relationship between the device code to be processed in the device new work order and the new schematic symbol in the associated symbol new work order are put into storage; If the associated package new work order exists in the device new work order, the association relationship between the device code to be processed and the schematic symbol in the device new work order, and the association relationship between the device code to be processed in the device new work order and the new printed circuit board package in the associated package new work order are put into storage; If the newly added work order for the device contains the newly added work order for the associated symbol and the newly added work order for the associated package, the association relationship between the code of the device to be processed in the newly added work order for the device and the newly added schematic symbol in the newly added work order for the associated symbol, and the association relationship between the code of the device to be processed in the newly added work order for the device and the newly added printed circuit board package in the newly added work order for the associated package are put into storage.

3. The device information management method according to claim 1, characterized in that: After the association relationship between the device code to be processed and the schematic diagram symbol and the printed circuit board package in the device new work order is put into storage, it also includes: The status of the printed circuit board package corresponding to the to-be-processed device code is set to be associated with reference, and the to-be-processed device code and its corresponding association relationship and the set status information are synchronized to an electronic design automation tool.

4. The device information management method according to any one of claims 1 to 3, characterized in that: Also includes: Receive device-related change work orders; If the device association change work order is a device symbol association change work order, the association relationship between the device code to be changed corresponding to the device symbol association change work order in the preset device library and the current schematic symbol is adjusted to the association relationship between the device code to be changed and the target schematic symbol in the device symbol association change work order; If the device-associated change work order is a device package-associated change work order, the association relationship between the device code to be changed corresponding to the device package-associated change work order in the preset device library and the current printed circuit board package is adjusted to the association relationship between the device code to be changed and the target printed circuit board package in the device package-associated change work order.

5. A device information management apparatus, characterized in that: include: An acquisition module, used for acquiring a device code to be processed from a product life cycle management system; A generating module, configured to generate a device adding request based on the device code to be processed if the device code to be processed is different from all device codes in a preset device library; A warehousing module, configured to receive a device addition work order generated based on the device addition request, and perform device warehousing processing based on the device addition work order; the device addition work order includes an association relationship between the device code to be processed and the schematic symbol and the printed circuit board package; The warehousing module is also used to detect the approval mark of the new device work order; if it is determined that the new device work order has a target approval mark, the association relationship between the device code to be processed and the schematic symbol and the printed circuit board package in the new device work order is processed for warehousing; the target approval mark indicates that the work order has been approved; The warehousing module is also used to perform device warehousing processing based on the device new work order, the associated symbol new work order and / or the associated package new work order if there is an associated symbol new work order and / or an associated package new work order in the device new work order, and when the associated symbol new work order exists, the associated symbol new work order has a target approval mark, and when the associated package new work order exists, the associated package new work order has a target approval mark, and when the associated symbol new work order and the associated package new work order exist, both the associated symbol new work order and the associated package new work order have target approval marks.

6. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the device information management method according to any one of claims 1 to 4 is implemented.

7. A storage medium, the storage medium being a non-transitory computer-readable storage medium, on which a computer program is stored, characterized in that: When the computer program is executed by a processor, the device information management method according to any one of claims 1 to 4 is implemented.

8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the device information management method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Device information management method and device, electronic equipment and medium

    CN117474504A