A planting management method and system for smart agriculture
Through the planting management method of smart agriculture, greenhouse information monitoring and equipment demand analysis are used to realize intelligent control of temperature in the greenhouse, solve the problem of insufficient human management, increase crop yield and quality, and enhance the intelligent level and level of agricultural management. Production efficiency.
Patent Information
- Application Number
- CN202410695022.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-31
- Publication Date
- 2024-10-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing agricultural planting management relies on artificial methods, lacks scientificity and data support, and cannot be intelligent and efficient, resulting in an unsuitable crop growth environment and low agricultural operation efficiency.
Adopting the planting management method of smart agriculture, through greenhouse information monitoring, temperature prediction analysis, equipment temperature testing and equipment demand analysis, the direction of the hot fan placement and equipment demand in each sub-region are determined to achieve intelligent control of the temperature in the greenhouse.
It improves crop yield and quality, reduces human management burden, meets the planting needs of different crops, improves the intelligent level of agricultural management and production quality, and obtains high profits.
Smart Images

Figure CN118466647B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of planting management, and in particular to a planting management method and system for smart agriculture. Background Art
[0002] With the continuous development of smart agriculture, agricultural operations have gradually become intelligent. By reasonably installing equipment, the temperature in the greenhouse can be better controlled to provide a more suitable environment for crop growth, thereby increasing crop yields and improving crop quality, achieving high-quality agricultural development, and ensuring the economic benefits of agricultural operations. In addition, smart agriculture can achieve the best temperature control with the lowest energy consumption by reasonably arranging the optimal installation location and quantity of equipment, thereby reducing agricultural management costs and improving the level of intelligence in agricultural management.
[0003] At present, agricultural planting management still mainly relies on manual methods. This manual agricultural planting management method is relatively cumbersome, and the planting management technology it relies on is mainly based on manual observation and years of management experience. It lacks certain scientific and data-based support and cannot achieve intelligent and efficient agricultural planting management. At the same time, the demand for agricultural planting management is large, and the workload of managers will continue to increase, which will make agricultural planting management unable to obtain comprehensive technical support, unable to provide a suitable growth environment for crops, and agricultural operations cannot be guaranteed, which will greatly reduce the benefits of agricultural operations. Summary of the invention
[0004] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a planting management method and system for smart agriculture.
[0005] To solve the above technical problems, the present invention adopts the following technical solutions: The present invention provides a planting management method for smart agriculture, including: Step 1, greenhouse information monitoring: Divide the corresponding land in the greenhouse into sub-areas according to a preset area to obtain each sub-area, and then obtain the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area, and analyze and obtain the heat transfer rate corresponding to each monitoring point in each sub-area.
[0006] Step 2: Temperature prediction and analysis: Obtain the regional temperature and crop required temperature corresponding to the current greenhouse, and predict the predicted temperature corresponding to each monitoring point in each sub-area based on the heat transfer rate corresponding to each monitoring point in each sub-area.
[0007] Step 3, equipment temperature test: set up each temperature test group, and then put the hot fans to be tested into each temperature test group in the greenhouse to perform temperature tests, so as to collect the temperature test information corresponding to each temperature test group in the greenhouse, analyze and obtain the performance evaluation coefficient of the hot fans to be tested corresponding to each temperature test group, and screen the upper limit of the operating temperature of the hot fans to be tested.
[0008] Step 4: Equipment demand analysis: Compare the predicted temperature corresponding to each monitoring point in each sub-area with the test temperature of the hot fan to be tested. If a monitoring point in a sub-area is lower than the test temperature of the hot fan to be tested, analyze and obtain the hot fan placement direction corresponding to each monitoring point in each sub-area. If a monitoring point in a sub-area is higher than the test temperature of the hot fan to be tested, record the sub-area as the target sub-area, and calculate the equipment demand corresponding to each target sub-area.
[0009] Step 5. Result display: Display the heat fan placement direction corresponding to each monitoring point in each sub-area, and the equipment demand corresponding to each target monitoring point in each target sub-area.
[0010] Preferably, the analysis obtains the heat transfer rate corresponding to each monitoring point in each sub-area, and the specific acquisition process is as follows: by calculating the formula , the heat transfer rate corresponding to each monitoring point in each sub-area is obtained by analysis , Indicates the number of each sub-area, , is any integer greater than 2, Indicates the number of each monitoring point. , is any integer greater than 2, For the Sub-region The heat transfer area corresponding to each monitoring point is For the Sub-region The temperature outside the greenhouse corresponding to each monitoring point is For the Sub-region The temperature in the greenhouse corresponding to each monitoring point is For the Sub-region The distance between two temperatures corresponding to a monitoring point, is the compensation factor of the heat transfer rate corresponding to the set sub-area monitoring point, .
[0011] Preferably, the prediction obtains the predicted temperature corresponding to each monitoring point in each sub-area, and the specific prediction process is as follows: by calculating the formula , predict the predicted temperature corresponding to each monitoring point in each sub-area , Indicates the number of each sub-area, , is any integer greater than 2, Indicates the number of each monitoring point. , is any integer greater than 2, For the Sub-region The crop requirement temperature corresponding to each monitoring point is: No. Sub-region The regional temperature corresponding to each monitoring point is is the compensation factor of the predicted temperature corresponding to the sub-region monitoring point, .
[0012] Preferably, the temperature test is performed, and the specific test process is as follows: S1, taking the upper limit value of the standard environment operation range corresponding to the thermal fan to be tested as the temperature reference value, and setting each temperature test group according to the preset temperature difference, and placing each thermal fan of the same type into the temperature test group in turn;
[0013] S2, turning on the switch corresponding to the thermal fan to be tested in each temperature test group, and testing the thermal fan to be tested in each temperature test group;
[0014] S3. When the temperature corresponding to the hot fan to be tested in each temperature test group reaches the highest, the switch is turned off to stop the test, and the temperature test information corresponding to each temperature test group is collected. After the collection is completed, the temperature test is ended.
[0015] Preferably, the analysis obtains the performance evaluation coefficient of the thermal fan to be tested corresponding to each temperature test group, and selects the upper limit of the operating temperature of the thermal fan to be tested. The specific analysis process is as follows: by calculating the formula , the analysis results are The temperature test group corresponds to the performance evaluation coefficient of the thermal fan to be tested , Indicates the number of each sub-area, , is any integer greater than 2, is the set volume, For the Each temperature test group corresponds to the sound volume of the hot fan to be tested. For the set efficiency, For the Each temperature test group corresponds to the efficiency of the thermal fan to be tested. , is the weight factor of the set volume and efficiency, , ;
[0016] The performance evaluation coefficients of the thermal fans to be tested corresponding to the temperature test groups are sorted in descending order, and the test temperature with the first-ranked performance evaluation coefficient is used as the upper limit of the operating temperature corresponding to the thermal fans to be tested.
[0017] Preferably, the predicted temperature corresponding to each monitoring point in each sub-area is compared with the test temperature of the thermal fan to be tested. The specific comparison process is as follows: the predicted temperature corresponding to each monitoring point in each sub-area is compared with the test temperature of the thermal fan to be tested. If the predicted temperature corresponding to a monitoring point in a sub-area is less than or equal to the test temperature of the thermal fan to be tested, it is determined that the number of thermal fans to be tested does not need to be increased. If the predicted temperature corresponding to a monitoring point in a sub-area is greater than the test temperature of the thermal fan to be tested, it is determined that the number of thermal fans to be tested needs to be increased. The sub-area is recorded as a target sub-area to obtain each target sub-area.
[0018] Preferably, the analysis obtains the placement direction of the hot fan corresponding to each monitoring point in each sub-area, and the specific analysis process is as follows: the hot fan image corresponding to each monitoring point in each sub-area of the hot fan is obtained through a camera, and the hot fan placement position corresponding to each monitoring point in each sub-area of the hot fan is obtained from the hot fan image corresponding to each monitoring point in each sub-area of the hot fan, and then the hot fan placement position corresponding to each monitoring point in each sub-area of the hot fan is imported into a set plane rectangular coordinate system to obtain the hot fan placement position coordinates corresponding to each monitoring point in each sub-area of the hot fan, which are recorded as , and then according to the calculation formula , calculate the placement direction of the heat fan corresponding to each monitoring point in each sub-area , , They respectively represent the coordinates of the hot fan placement positions corresponding to the set hot fans. For the Sub-region The placement of the heat fan corresponding to each monitoring point.
[0019] Preferably, the calculation obtains the equipment demand corresponding to each target sub-area, and the specific calculation process is as follows: the predicted temperature corresponding to each target monitoring point in each target sub-area is divided by the test temperature of the hot fan to be tested corresponding to each temperature test group to obtain the temperature multiplier, and the temperature multiplier is used as the equipment demand corresponding to each target sub-area.
[0020] In a second aspect, the present invention provides a smart agriculture planting management system, including: a greenhouse information monitoring module, which is used to divide the corresponding land in the greenhouse into sub-areas according to a preset area, so as to obtain each sub-area, and then obtain the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area, and analyze and obtain the heat transfer rate corresponding to each monitoring point in each sub-area.
[0021] The temperature prediction and analysis module is used to obtain the regional temperature and crop required temperature corresponding to the current greenhouse, and predict the predicted temperature corresponding to each monitoring point in each sub-area based on the heat transfer rate corresponding to each monitoring point in each sub-area.
[0022] The equipment temperature test module is used to set up each temperature test group, and then put the hot fans to be tested into each temperature test group in the greenhouse to perform temperature tests, so as to collect the temperature test information corresponding to each temperature test group in the greenhouse, analyze and obtain the performance evaluation coefficient of the hot fans to be tested corresponding to each temperature test group, and screen the upper limit of the operating temperature of the hot fans to be tested.
[0023] The equipment demand analysis module is used to compare the predicted temperature corresponding to each monitoring point in each sub-area with the test temperature of the hot fan to be tested. If a monitoring point in a sub-area is lower than the test temperature of the hot fan to be tested, the hot fan placement direction corresponding to each monitoring point in each sub-area is analyzed; if a monitoring point in a sub-area is higher than the test temperature of the hot fan to be tested, the sub-area is recorded as a target sub-area, and the equipment demand corresponding to each target sub-area is calculated.
[0024] The result terminal is used to display the placement direction of the heat fans corresponding to each monitoring point in each sub-area and the equipment demand corresponding to each target sub-area.
[0025] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention provides a planting management method and system for smart agriculture, which monitors the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area of the greenhouse, and then analyzes and obtains the heat transfer rate corresponding to each monitoring point in each sub-area, obtains the regional temperature and crop demand temperature corresponding to the current greenhouse, and then predicts the predicted temperature corresponding to each monitoring point in each sub-area, and analyzes the maximum temperature operating upper limit corresponding to the hot fan, and then compares it with the predicted temperature corresponding to each monitoring point in each sub-area, so as to obtain the equipment demand corresponding to each target sub-area, and then realizes the reasonable installation of equipment in the greenhouse, ensures the healthy growth of crops, and solves the shortcomings of the current technology. Smart agriculture better controls the temperature in the greenhouse through comprehensive intelligent monitoring and analysis of greenhouse planting management, and provides a more suitable growth environment for crops, so as to increase crop yield and improve quality. In addition, the emergence of smart agricultural technology can effectively reduce the burden of artificial planting management, better meet the planting needs of different crops, improve the intelligence level of agricultural management, improve the quality of agricultural production, and obtain high profits from agricultural operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0027] Figure 1 The present invention is a schematic flow chart of the steps for implementing the method.
[0028] Figure 2 It is a schematic diagram of the system structure connection of the present invention. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0030] See also Figure 1 As shown, the present invention provides a planting management method for smart agriculture, comprising:
[0031] Step 1: Greenhouse information monitoring: Divide the corresponding land in the greenhouse into sub-areas according to the preset area to obtain each sub-area, and then obtain the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area, and analyze and obtain the heat transfer rate corresponding to each monitoring point in each sub-area.
[0032] It should be noted that temperature sensors are respectively installed inside and outside the greenhouse to obtain the temperature inside and outside the greenhouse corresponding to each monitoring point in each sub-area.
[0033] It should also be noted that the heat transfer area is the heated area of the greenhouse when it is exposed to temperature, and the distance between the two temperatures is obtained by the thickness of the greenhouse or the thickness of the isolation layer.
[0034] As an optional implementation, the analysis obtains the heat transfer rate corresponding to each monitoring point in each sub-area. The specific acquisition process is as follows: by calculating the formula , the heat transfer rate corresponding to each monitoring point in each sub-area is obtained by analysis , Indicates the number of each sub-area, , is any integer greater than 2, Indicates the number of each monitoring point. , is any integer greater than 2, For the Sub-region The heat transfer area corresponding to each monitoring point is For the Sub-region The temperature outside the greenhouse corresponding to each monitoring point is For the Sub-region The temperature in the greenhouse corresponding to each monitoring point is For the Sub-region The distance between two temperatures corresponding to a monitoring point, is the compensation factor of the heat transfer rate corresponding to the set sub-area monitoring point, .
[0035] Step 2: Temperature prediction and analysis: Obtain the regional temperature and crop required temperature corresponding to the current greenhouse, and predict the predicted temperature corresponding to each monitoring point in each sub-area based on the heat transfer rate corresponding to each monitoring point in each sub-area.
[0036] It should be noted that the regional temperature corresponding to the current greenhouse is obtained by checking the meteorological information, and the crop requirement temperature is obtained from the database.
[0037] As an optional implementation, the prediction obtains the predicted temperature corresponding to each monitoring point in each sub-area. The specific prediction process is as follows: by calculating the formula , predict the predicted temperature corresponding to each monitoring point in each sub-area , Indicates the number of each sub-area, , is any integer greater than 2, Indicates the number of each monitoring point. , is any integer greater than 2, For the Sub-region The crop requirement temperature corresponding to each monitoring point is: No. Sub-region The regional temperature corresponding to each monitoring point is is the compensation factor of the predicted temperature corresponding to the sub-region monitoring point, .
[0038] Step 3, equipment temperature test: set up each temperature test group, and then put the hot fans to be tested into each temperature test group in the greenhouse to perform temperature tests, so as to collect the temperature test information corresponding to each temperature test group in the greenhouse, analyze and obtain the performance evaluation coefficient of the hot fans to be tested corresponding to each temperature test group, and screen the upper limit of the operating temperature of the hot fans to be tested.
[0039] It should be noted that a sound level meter is installed in the greenhouse, and the sound volume of the hot fans to be tested corresponding to each temperature test group is obtained through the sound level meter, and the total number of hot fans to be tested that have completed heating and the heating completion time of each temperature test group are obtained from the database, and the total number of completed heating is divided by the heating completion time to obtain the efficiency of the hot fans to be tested corresponding to each temperature test group.
[0040] It should also be noted that the efficiency refers to the efficiency of the tested thermal fan in increasing the temperature during operation.
[0041] As an optional implementation, the temperature test is performed, and the specific test process is as follows: S1, taking the upper limit value of the standard environment operation range corresponding to the thermal fan to be tested as the temperature reference value, and setting each temperature test group according to the preset temperature difference, and placing each thermal fan of the same type into the temperature test group in turn;
[0042] S2, turning on the switch corresponding to the thermal fan to be tested in each temperature test group, and testing the thermal fan to be tested in each temperature test group;
[0043] S3. When the temperature corresponding to the hot fan to be tested in each temperature test group reaches the highest, the switch is turned off to stop the test, and the temperature test information corresponding to each temperature test group is collected. After the collection is completed, the temperature test is ended.
[0044] As an optional implementation, the analysis obtains the performance evaluation coefficient of the thermal fan to be tested corresponding to each temperature test group, and selects the upper limit of the operating temperature of the thermal fan to be tested. The specific analysis process is as follows: By calculating the formula , the analysis results are The temperature test group corresponds to the performance evaluation coefficient of the thermal fan to be tested , Indicates the number of each sub-area, , is any integer greater than 2, is the set volume, For the Each temperature test group corresponds to the sound volume of the hot fan to be tested. For the set efficiency, For the Each temperature test group corresponds to the efficiency of the thermal fan to be tested. , is the weight factor of the set volume and efficiency, , .
[0045] The performance evaluation coefficients of the thermal fans to be tested corresponding to the temperature test groups are sorted in descending order, and the test temperature with the first-ranked performance evaluation coefficient is used as the upper limit of the operating temperature corresponding to the thermal fans to be tested.
[0046] Step 4: Equipment demand analysis: Compare the predicted temperature corresponding to each monitoring point in each sub-area with the test temperature of the hot fan to be tested. If a monitoring point in a sub-area is lower than the test temperature of the hot fan to be tested, analyze and obtain the hot fan placement direction corresponding to each monitoring point in each sub-area. If a monitoring point in a sub-area is higher than the test temperature of the hot fan to be tested, record the sub-area as the target sub-area, and calculate the equipment demand corresponding to each target sub-area.
[0047] As an optional implementation, the predicted temperature corresponding to each monitoring point in each sub-area is compared with the test temperature of the thermal fan to be tested. The specific comparison process is as follows: the predicted temperature corresponding to each monitoring point in each sub-area is compared with the test temperature of the thermal fan to be tested. If the predicted temperature corresponding to a monitoring point in a sub-area is less than or equal to the test temperature of the thermal fan to be tested, it is determined that the number of thermal fans to be tested does not need to be increased. If the predicted temperature corresponding to a monitoring point in a sub-area is greater than the test temperature of the thermal fan to be tested, it is determined that the number of thermal fans to be tested needs to be increased. The sub-area is recorded as a target sub-area to obtain each target sub-area.
[0048] As an optional implementation, the analysis obtains the placement direction of the hot fan corresponding to each monitoring point in each sub-area, and the specific analysis process is as follows: the hot fan image corresponding to each monitoring point in each sub-area of the hot fan is obtained through a camera, and the hot fan placement position corresponding to each monitoring point in each sub-area of the hot fan is obtained from the hot fan image corresponding to each monitoring point in each sub-area of the hot fan, and then the hot fan placement position corresponding to each monitoring point in each sub-area of the hot fan is imported into a set plane rectangular coordinate system to obtain the hot fan placement position coordinates corresponding to each monitoring point in each sub-area of the hot fan, which are recorded as , and then according to the calculation formula , calculate the placement direction of the heat fan corresponding to each monitoring point in each sub-area , , They respectively represent the coordinates of the hot fan placement positions corresponding to the set hot fans. For the Sub-region The placement of the heat fan corresponding to each monitoring point.
[0049] As an optional implementation, the calculation obtains the equipment demand corresponding to each target sub-area, and the specific calculation process is as follows: the predicted temperature corresponding to each target monitoring point in each target sub-area is divided by the test temperature of the hot fan to be tested corresponding to each temperature test group to obtain the temperature multiplier, and the temperature multiplier is used as the equipment demand corresponding to each target sub-area.
[0050] Step 5: Result display: Display the heat fan placement direction corresponding to each monitoring point in each sub-area and the equipment demand corresponding to each target sub-area.
[0051] See also Figure 2 As shown, a planting management system for smart agriculture includes a greenhouse information monitoring module, a temperature prediction and analysis module, an equipment temperature testing module, an equipment demand analysis module and a display terminal.
[0052] The greenhouse information monitoring module is connected to the temperature prediction and analysis module and the equipment temperature testing module respectively, and the equipment temperature testing module is connected to the equipment demand analysis module and the display terminal respectively.
[0053] The greenhouse information monitoring module is used to divide the corresponding land in the greenhouse into sub-areas according to the preset area, so as to obtain each sub-area, and then obtain the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area, and analyze and obtain the heat transfer rate corresponding to each monitoring point in each sub-area.
[0054] The temperature prediction and analysis module is used to obtain the regional temperature and crop required temperature corresponding to the current greenhouse, and predict the predicted temperature corresponding to each monitoring point in each sub-area based on the heat transfer rate corresponding to each monitoring point in each sub-area.
[0055] The equipment temperature test module is used to set up each temperature test group, and then put the hot fans to be tested into each temperature test group in the greenhouse to perform temperature tests, so as to collect the temperature test information corresponding to each temperature test group in the greenhouse, analyze and obtain the performance evaluation coefficient of the hot fans to be tested corresponding to each temperature test group, and screen the upper limit of the operating temperature of the hot fans to be tested.
[0056] The equipment demand analysis module is used to compare the predicted temperature corresponding to each monitoring point in each sub-area with the test temperature of the hot fan to be tested. If a monitoring point in a sub-area is lower than the test temperature of the hot fan to be tested, the hot fan placement direction corresponding to each monitoring point in each sub-area is analyzed; if a monitoring point in a sub-area is higher than the test temperature of the hot fan to be tested, the sub-area is recorded as a target sub-area, and the equipment demand corresponding to each target sub-area is calculated.
[0057] The result terminal is used to display the placement direction of the heat fans corresponding to each monitoring point in each sub-area and the equipment demand corresponding to each target sub-area.
[0058] In a specific embodiment, the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area of the greenhouse are monitored, and then the heat transfer rate corresponding to each monitoring point in each sub-area is obtained by analyzing. The regional temperature and crop demand temperature corresponding to the current greenhouse are obtained, and then the predicted temperature corresponding to each monitoring point in each sub-area is predicted, and the maximum temperature operating upper limit corresponding to the hot fan is analyzed, and then compared with the predicted temperature corresponding to each monitoring point in each sub-area, so as to obtain the equipment demand corresponding to each target sub-area, and then the reasonable installation of equipment in the greenhouse is realized to ensure the healthy growth of crops, and solve the deficiencies in the current technology. Smart agriculture can better control the temperature in the greenhouse through comprehensive intelligent monitoring and analysis of greenhouse planting management, provide crops with a more suitable growth environment, so as to increase crop yield and improve quality. In addition, the emergence of smart agricultural technology can effectively reduce the burden of artificial planting management, better meet the planting needs of different crops, improve the intelligence level of agricultural management, improve the quality of agricultural production, and obtain high profits from agricultural operations.
[0059] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this specification, they shall all fall within the protection scope of the present invention.
Claims
1. A planting management method for smart agriculture, characterized in that: include: Step 1: Greenhouse information monitoring: Divide the corresponding land in the greenhouse into sub-areas according to the preset area to obtain each sub-area, and then obtain the indoor temperature and outdoor temperature corresponding to each monitoring point in each sub-area, and analyze and obtain the heat transfer rate corresponding to each monitoring point in each sub-area; The analysis obtains the heat transfer rate corresponding to each monitoring point in each sub-area, and the specific acquisition process is as follows: By calculating the formula , the heat transfer rate corresponding to each monitoring point in each sub-area is obtained by analysis , Indicates the number of each sub-area, , is any integer greater than 2, Indicates the number of each monitoring point. , is any integer greater than 2, For the Sub-region The heat transfer area corresponding to each monitoring point is For the Sub-region The temperature outside the greenhouse corresponding to each monitoring point is For the Sub-region The temperature in the greenhouse corresponding to each monitoring point is For the Sub-region The distance between two temperatures corresponding to a monitoring point, is the compensation factor of the heat transfer rate corresponding to the set sub-area monitoring point, ; Step 2: Temperature prediction analysis: Obtain the regional temperature and crop required temperature corresponding to the current greenhouse, and predict the predicted temperature corresponding to each monitoring point in each sub-region based on the heat transfer rate corresponding to each monitoring point in each sub-region; The prediction obtains the predicted temperature corresponding to each monitoring point in each sub-area, and the specific prediction process is as follows: By calculating the formula , predict the predicted temperature corresponding to each monitoring point in each sub-area , Indicates the number of each sub-area, , is any integer greater than 2, Indicates the number of each monitoring point. , is any integer greater than 2, For the Sub-region The crop requirement temperature corresponding to each monitoring point is: No. Sub-region The regional temperature corresponding to each monitoring point is is the compensation factor of the predicted temperature corresponding to the sub-region monitoring point, ; Step 3, equipment temperature test: set up each temperature test group, and then put the hot fans to be tested into each temperature test group in the greenhouse to perform temperature tests, so as to collect the temperature test information corresponding to each temperature test group in the greenhouse, analyze and obtain the performance evaluation coefficient of the hot fans to be tested corresponding to each temperature test group, and screen the upper limit of the operating temperature of the hot fans to be tested; The analysis obtains the performance evaluation coefficient of the thermal fan to be tested corresponding to each temperature test group, and selects the upper limit of the operating temperature of the thermal fan to be tested. The specific analysis process is as follows: By calculating the formula , the analysis results are The temperature test group corresponds to the performance evaluation coefficient of the thermal fan to be tested , Indicates the number of each sub-area, , is any integer greater than 2, is the set volume, For the Each temperature test group corresponds to the sound volume of the hot fan to be tested. For the set efficiency, For the Each temperature test group corresponds to the efficiency of the thermal fan to be tested. , is the weight factor of the set volume and efficiency, , ; The performance evaluation coefficients of the thermal fans to be tested corresponding to the temperature test groups are sorted in descending order, and the test temperature with the highest performance evaluation coefficient is used as the upper limit of the operating temperature corresponding to the thermal fans to be tested; Step 4, equipment demand analysis: compare the predicted temperature corresponding to each monitoring point in each sub-area with the test temperature of the hot fan to be tested. If a monitoring point in a sub-area is lower than the test temperature of the hot fan to be tested, the hot fan placement direction corresponding to each monitoring point in each sub-area is analyzed. If a monitoring point in a sub-area is higher than the test temperature of the hot fan to be tested, the sub-area is recorded as a target sub-area, and the equipment demand corresponding to each target sub-area is calculated; The analysis obtains the placement direction of the heat fans corresponding to each monitoring point in each sub-area. The specific analysis process is as follows: The hot fan image corresponding to each monitoring point in each sub-area of the hot fan is obtained through the camera, and the hot fan placement position corresponding to each monitoring point in each sub-area of the hot fan is obtained from the hot fan image corresponding to each monitoring point in each sub-area of the hot fan, and then the hot fan placement position corresponding to each monitoring point in each sub-area of the hot fan is imported into the set plane rectangular coordinate system to obtain the hot fan placement position coordinates corresponding to each monitoring point in each sub-area of the hot fan, which are recorded as , and then according to the calculation formula , calculate the placement direction of the heat fan corresponding to each monitoring point in each sub-area , , They respectively represent the coordinates of the hot fan placement positions corresponding to the set hot fans. For the Sub-region The placement of the heat fans corresponding to each monitoring point; Step 5: Result display: Display the heat fan placement direction corresponding to each monitoring point in each sub-area and the equipment demand corresponding to each target sub-area.
2. A planting management method for smart agriculture as claimed in claim 1, characterized in that: The temperature test is carried out as follows: S1, taking the upper limit value of the standard environment operation range corresponding to the thermal fan to be tested as the temperature reference value, and setting each temperature test group according to the preset temperature difference, and placing each thermal fan of the same type into the temperature test group in turn; S2, turning on the switch corresponding to the thermal fan to be tested in each temperature test group, and testing the thermal fan to be tested in each temperature test group; S3. When the temperature corresponding to the hot fan to be tested in each temperature test group reaches the highest, the switch is turned off to stop the test, and the temperature test information corresponding to each temperature test group is collected. After the collection is completed, the temperature test is ended.
3. The planting management method of smart agriculture according to claim 1, characterized in that: The predicted temperature corresponding to each monitoring point in each sub-area is compared with the test temperature of the thermal fan to be tested. The specific comparison process is as follows: The predicted temperature corresponding to each monitoring point in each sub-area is compared with the test temperature of the thermal fan to be tested. If the predicted temperature corresponding to a monitoring point in a sub-area is less than or equal to the test temperature of the thermal fan to be tested, it is determined that the number of thermal fans to be tested does not need to be increased. If the predicted temperature corresponding to a monitoring point in a sub-area is greater than the test temperature of the thermal fan to be tested, it is determined that the number of thermal fans to be tested needs to be increased. The sub-area is recorded as a target sub-area to obtain each target sub-area.
4. The planting management method of smart agriculture according to claim 1, characterized in that: The calculation obtains the equipment demand corresponding to each target sub-area, and the specific calculation process is as follows: The predicted temperature corresponding to each target monitoring point in each target sub-area is divided by the test temperature of the hot fan to be tested corresponding to each temperature test group to obtain the temperature multiple, and the temperature multiple is used as the equipment demand corresponding to each target sub-area.
5. A planting management system for executing the planting management method of smart agriculture according to any one of claims 1 to 4, characterized in that: include: The greenhouse information monitoring module is used to divide the corresponding land in the greenhouse into sub-areas according to the preset area, so as to obtain each sub-area, and then obtain the temperature inside and outside the greenhouse corresponding to each monitoring point in each sub-area, and analyze and obtain the heat transfer rate corresponding to each monitoring point in each sub-area; The temperature prediction and analysis module is used to obtain the regional temperature and crop required temperature corresponding to the current greenhouse, and predict the predicted temperature corresponding to each monitoring point in each sub-area based on the heat transfer rate corresponding to each monitoring point in each sub-area; The equipment temperature test module is used to set each temperature test group, and then put the hot fans to be tested into each temperature test group in the greenhouse to perform temperature tests, so as to collect the temperature test information corresponding to each temperature test group in the greenhouse, analyze and obtain the performance evaluation coefficient of the hot fans to be tested corresponding to each temperature test group, and screen the upper limit of the operating temperature of the hot fans to be tested; The equipment demand analysis module is used to compare the predicted temperature corresponding to each monitoring point in each sub-area with the test temperature of the hot fan to be tested. If a monitoring point in a sub-area is lower than the test temperature of the hot fan to be tested, the hot fan placement direction corresponding to each monitoring point in each sub-area is analyzed and obtained. If a monitoring point in a sub-area is higher than the test temperature of the hot fan to be tested, the sub-area is recorded as a target sub-area, and the equipment demand corresponding to each target sub-area is calculated; The result terminal is used to display the placement direction of the heat fans corresponding to each monitoring point in each sub-area and the equipment demand corresponding to each target sub-area.
