Installation method of large-span hangar based on deformation control in whole construction process
CN118517153BActive Publication Date: 2026-07-03ZHEJIANG SOUTHEAST SPACE FRAME CO LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- ZHEJIANG SOUTHEAST SPACE FRAME CO LTD
- Filing Date
- 2024-06-07
- Publication Date
- 2026-07-03
Smart Images

Figure CN118517153B_ABST
Abstract
This invention relates to an installation method for a large-span hangar based on deformation control throughout the construction process, belonging to the field of steel structure technology. The method includes the following steps: Step 1: Disassemble the structure into a space frame and truss, then further disassemble these into several large modules, and finally further disassemble these large modules into several small modules. Step 2: Arrange support columns on the construction site, and simultaneously assemble the small modules of the space frame and truss, cambering in the Z direction. Step 3: Assemble the small modules into large modules, cambering in the XYZ directions. Step 4: Assemble the large space frame modules into a space frame, and assemble the large truss modules into a truss. Step 5: Lift the space frame by 3 meters. Step 6: Connect the lifted space frame to the truss on the ground. Step 7: Remove the hydraulic lifting devices on the truss. Step 8: Lift the complete steel roof structure. Step 9: Add connecting members to the surrounding structures. Step 10: Finally, complete the supplementary and fitted sections. This method solves the problem of controlling the horizontal displacement of the support column tops and the steel roof during the lifting process.
Need to check novelty before this filing date? Find Prior Art