Hydraulic engineering slope stability monitoring device and use method thereof
By designing an adjustable slope monitoring device for water conservancy projects, using clamped components and elastic fixed blocks, the monitoring problem when the embedded parts cannot be embedded is solved, and effective monitoring and feedback on the stability of the slope is achieved.
Patent Information
- Application Number
- CN202410956010.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-17
- Publication Date
- 2024-11-05
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing slope monitoring device for water conservancy projects cannot conduct slope stability monitoring when the embedded parts cannot be embedded.
A monitoring device including a first fixing rod, a second fixing rod, a first connecting rod and a second connecting rod is designed. By rotating the second fixing rod to adjust the height, the fixing device is achieved by using a clamping assembly and an elastic fixing block. and adjust to ensure that the measuring rod comes into contact with the slope surface, and the drawing pen draws lines during movement to feedback the slope stability.
It is realized that the slope with fence can be applied or the stability of the same slope can be measured without moving the first fixed rod, and the stability of the slope can be reflected by the length of the line.
Smart Images

Figure CN118895790A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water conservancy engineering, and in particular to a water conservancy engineering slope stability monitoring device and a use method thereof. Background Art
[0002] Water conservancy projects are a general term for various engineering projects built to control, utilize and protect surface and underground water resources and the environment.
[0003] The construction of water conservancy projects has changed the original state of the ground and exerted a certain amount of pressure on the foundation of the building, which will inevitably cause deformation of the foundation and the surrounding strata. In the prior art, a Chinese invention with a publication number of CN115077479B discloses a water conservancy project slope settlement monitoring device, wherein the slope fixing mechanism is fixedly arranged at a monitoring point on the river slope, the vertical settlement monitoring structure is arranged in the leveling base rod and connected to the horizontal monitoring component, the monitoring screen is installed on the top of the leveling base rod, and the horizontal monitoring component and the vertical settlement monitoring structure are both connected to the monitoring screen; the slope fixing mechanism drives the horizontal monitoring component to move downward or move obliquely downward along the slope angle, and the horizontal displacement at the location is monitored by the horizontal monitoring component, and the horizontal monitoring component can drive the vertical settlement monitoring structure to move downward, and the vertical settlement monitoring structure is used to monitor the vertical settlement at the location; the horizontal displacement and the vertical settlement are both fed back to the monitoring screen, and the settlement at the location is intuitively reflected through the monitoring screen, including the horizontal displacement and settlement caused by the landslide;
[0004] In the above technology, the horizontal offset of the location is monitored by the horizontal monitoring component, and at the same time, the horizontal monitoring component can drive the vertical settlement monitoring structure to move downward, and the vertical settlement monitoring structure is used to monitor the vertical settlement of the location; the horizontal offset and the vertical settlement are both fed back to the monitoring screen, and the settlement situation of the location is intuitively reflected through the monitoring screen. However, when using it, the slope fixing parts need to be fixed to the slope through embedded parts. If the embedded parts cannot be embedded, the slope fixing parts cannot be fixed to the slope, which causes the slope monitoring device to be unable to monitor the stability of the slope. Summary of the invention
[0005] The object of the present invention is to provide a water conservancy project slope stability monitoring device and a use method thereof, so as to solve the problem that the slope monitoring device cannot monitor the slope stability when the slope cannot be pre-embedded with embedded parts.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A water conservancy project slope stability monitoring device and a method of using the same, comprising:
[0008] A first fixing rod, wherein a matching second fixing rod is threadedly connected to an end of the first fixing rod, and a clamping assembly is arranged inside the first fixing rod at a position corresponding to the second fixing rod, and the clamping assembly includes a rotatably arranged clamping ring;
[0009] A first connecting rod is rotatably connected to an end of the second fixing rod, and a fixing assembly is provided at a position of the end of the second fixing rod corresponding to the position of the first connecting rod, wherein the fixing assembly includes an elastically arranged fixing block;
[0010] The second connecting rod is rotatably connected to the first connecting rod, and one end of the second connecting rod away from the first connecting rod is rotatably connected to a monitoring component, and the monitoring component includes a measuring rod.
[0011] Preferably, a fixing plate is fixedly connected to one end of the first fixing rod away from the second fixing rod, and the first fixing rod is fixed to the slope of the water conservancy project through the fixing plate;
[0012] A clearance hole is formed at one end of the first fixing rod away from the fixing plate, and one end of the second fixing rod is inserted and arranged inside the clearance hole.
[0013] Preferably, the clamping assembly further comprises a clearance groove provided inside the end of the first fixing rod away from the fixing plate, the clamping ring is rotatably arranged inside the clearance groove, and the second fixing rod is inserted inside the clamping ring;
[0014] The outer surface of the second fixing rod is provided with matching guide grooves, and at least one group of guide grooves is provided. A matching guide block is fixedly provided on the inner wall of the clamping ring at the position corresponding to the guide groove. The clamping ring rotates following the second fixing rod through the cooperation of the guide block and the guide groove.
[0015] Preferably, the outer surface of the clamping ring is provided with a plurality of groups of tooth grooves evenly spaced in a circumferential state, the inner wall of the give way groove is provided with a matching groove corresponding to the position of at least one group of the tooth grooves, a matching plug-in block is inserted into the interior of the groove, a first return spring is provided between the end of the plug-in block and the inner side wall of the groove, and the plug-in block is elastically inserted into the interior of one group of the tooth grooves through the first return spring.
[0016] Preferably, a matching second clearance hole is provided at one end of the first connecting rod at a position corresponding to the end of the second fixing rod, the end of the second fixing rod is rotatably inserted into the inside of the second clearance hole, and a matching limiting ring is fixedly provided on the outer surface of the end of the second fixing rod, and a matching first limiting groove is provided at the inner side wall of the second clearance hole at a position corresponding to the limiting ring;
[0017] A first countersunk hole is provided at the center of the upper end surface of the second fixing rod, a matching first airbag is fixedly disposed inside the first countersunk hole, and a matching second return spring is fixedly disposed inside the first airbag;
[0018] A through hole is provided at the inner top end of the second clearance hole at a position corresponding to the first airbag, a matching pull rod is inserted into the through hole, and one end of the pull rod passes through the through hole and is fixedly connected to the upper end surface of the first airbag.
[0019] Preferably, the inner side wall of the second clearance hole is provided with a fixing groove, and the fixing groove is provided in multiple groups, and the multiple groups of fixing grooves are evenly spaced and distributed in a circumferential state;
[0020] Matching first receiving grooves are respectively provided on the outer surface of the end portion of the second fixing rod at the positions corresponding to two groups of the fixing grooves, a matching fixing block is inserted into the interior of each of the first receiving grooves, and a matching second airbag is fixedly provided between the end portion of the fixing block and the inner side wall of the first receiving groove, and a matching third return spring is fixedly provided inside the second airbag.
[0021] Preferably, an exhaust pipe is provided between the first airbag and each of the second airbags, the interior of the first airbag is connected to the interior of the exhaust pipe through the second airbag, and the elastic force of the second return spring is greater than the elastic force of the third return spring.
[0022] Preferably, one end of the second connecting rod away from the first connecting rod is rotatably connected to a matching connecting block, and the measuring rod is slidably connected to the connecting block;
[0023] A matching slider is fixedly provided on the side wall of the connecting block facing the measuring rod, a matching slide groove is provided on the side wall of the measuring rod at the position corresponding to the slider, and a limiting block is fixedly provided on the side wall of the slider, and a matching second limiting groove is provided on the inner side wall of the slide groove at the position corresponding to the limiting block.
[0024] Preferably, a holding ball is fixedly arranged at one end of the measuring rod, a second countersunk hole is opened on the side wall of the end of the measuring rod away from the holding ball, a matching drawing pen is inserted inside the second countersunk hole, and a fourth return spring is arranged between the end of the drawing pen and the inner side wall of the second countersunk hole;
[0025] A support rod is fixedly arranged at the end of the first connecting rod at a position corresponding to the drawing pen, and a drawing board is fixedly connected to the support rod, and the drawing board is located at the end of the drawing pen.
[0026] Preferably, the method of use comprises:
[0027] Fixing of the monitoring device: Place the fixing plate on a relatively flat ground position on one side of the slope of the water conservancy project, and then fix the monitoring device through the cooperation of fixing bolts and fixing holes opened on the fixing plate;
[0028] Adjustment of the monitoring device: after the fixing is completed, first rotate the second fixing rod. During the rotation process, the second fixing rod will gradually drive the first connecting rod to adjust the height. After adjusting to a certain height, pull up the pull rod. During the lifting process, the pull rod will gradually stop squeezing the first airbag. At this time, under the action of the third reset spring, the fixing block will no longer be inserted into the fixing groove. At this time, rotate the first connecting rod to make the second connecting rod face the direction of the slope of the water conservancy project;
[0029] Rotate the second connecting rod to make the angle of the connection between the second connecting rod and the first connecting rod match the angle of the slope of the water conservancy project, and at the same time fine-tune the position of the connecting block and the second connecting rod so that the abutting ball at the end of the measuring rod contacts the ground and the slider is located at the center of the slide groove;
[0030] Slope stability detection of water conservancy projects: Then install the support rod on the first connecting rod. At the same time, the side wall of the drawing board contacts the end of the drawing pen. When the slope moves, the sliding measuring rod will change with the change of the slope angle. When the angle changes, the measuring rod will move along the connecting block. During the movement, it will drive the drawing pen to move synchronously. During the movement, the drawing pen will draw lines on the surface of the drawing board, and the length of the line can provide feedback on the stability of the slope.
[0031] Compared with the prior art, the present invention has the following beneficial effects:
[0032] The height of the monitoring device is adjusted by rotating the second fixed rod, so that the monitoring device can be applied to some slopes with fences, or the stability of different positions of the same slope can be measured without moving the first fixed rod. The first connecting rod is rotatably connected to the second fixed rod, and the rotatable first connecting rod can drive the monitoring device to rotate. Without moving the first fixed rod, the position of the monitoring device can be adjusted by rotating the first connecting rod, so that the stability of other positions of the slope can be monitored.
[0033] By rotating the angles of the second connecting rod and the connecting block, the end of the sliding measuring rod can be brought into contact with the surface of the slope. At the same time, the sliding slider can be located at the center of the slide groove. When the slope is unstable, the end of the sliding measuring rod will also be brought into contact with the surface of the slope. However, when the sliding measuring rod moves, it will drive the drawing pen to move, and the moving drawing pen will draw lines on the surface of the drawing board. The length of the line can reflect the stability of the slope. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of the installation of the three-dimensional structure of the present invention;
[0035] Figure 2 It is a schematic diagram of the three-dimensional structure of the present invention;
[0036] Figure 3 It is a cross-sectional schematic diagram of the connection structure of the first fixing rod and the second fixing rod of the present invention;
[0037] Figure 4 for Figure 3 A schematic diagram of the structure enlargement in the middle;
[0038] Figure 5 is a schematic cross-sectional view of a first fixing rod structure of the present invention;
[0039] Figure 6 for Figure 5 A magnified schematic diagram of the structure at B in the middle;
[0040] Figure 7 for Figure 3 A magnified schematic diagram of the structure at C in the middle;
[0041] Figure 8 It is a schematic diagram of the connection between the second connecting rod and the measuring rod structure of the present invention;
[0042] Fig. 9 It is a schematic diagram of the connection between the measuring rod and the connecting block structure of the present invention.
[0043] In the figure: a first fixing rod 1, a second fixing rod 2, a first connecting rod 3, a second connecting rod 4, a measuring rod 5, a drawing board 6, a fixing plate 7, a supporting rod 8, a connecting block 9, a holding ball 10, a clearance hole 11, a clearance groove 12, a guide groove 13, a guide block 14, a clamping ring 15, an insert block 16, a groove 17, a first return spring 18, a pull rod 19, a through hole 20, a second clearance hole 21, a first countersunk hole 22, a first air bag 23, a second return spring 24, a first limiting groove 25, a limiting ring 26, a fixing groove 27, a fixing block 28, a first receiving groove 29, a second air bag 30, a third return spring 31, an exhaust pipe 32, a drawing pen 33, a second countersunk hole 34, a fourth return spring 35, a slide groove 36, a second limiting groove 37, a slider 38, and a limiting block 39. DETAILED DESCRIPTION
[0044] In order to more clearly illustrate the overall concept of the present invention, a detailed description is given below in an exemplary manner in conjunction with the accompanying drawings.
[0045] It should be noted that many specific details are set forth in the following description to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.
[0046] In addition, in the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present invention.
[0047] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral one; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. However, if it is indicated as a direct connection, it means that the two connected bodies are not connected through an intermediate structure, but are only connected to form a whole through a connecting structure. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.
[0048] In the present invention, unless otherwise clearly specified and limited, the first feature "on" or "under" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.
[0049] Embodiment 1:
[0050] See also Figures 1 to 9 The present invention provides a technical solution: a device for monitoring the slope stability of a water conservancy project, comprising:
[0051] A first fixing rod 1, wherein a matching second fixing rod 2 is threadedly provided at an end of the first fixing rod 1, and a clamping assembly is provided inside the first fixing rod 1 at a position corresponding to the second fixing rod 2, wherein the clamping assembly includes a rotatably arranged clamping ring 15;
[0052] A first connecting rod 3 is rotatably connected to an end of the second fixing rod 2, and a fixing assembly is provided at the end of the second fixing rod 2 at a position corresponding to the first connecting rod 3, and the fixing assembly includes an elastically arranged fixing block 28;
[0053] A second connecting rod 4 is rotatably connected to the first connecting rod 3, and one end of the second connecting rod 4 away from the first connecting rod 3 is rotatably connected to a monitoring component, and the monitoring component includes a measuring rod 5;
[0054] By limiting the length of the first fixed rod 1 and the second fixed rod 2 through the clamping assembly, the position of the first connecting rod 3 and the monitoring assembly connected to the first connecting rod 3 relative to the slope is adjusted. After the adjustment is completed, the second connecting rod 4 is rotated to make the angle of the connection between the first connecting rod 3 and the second connecting rod 4 match the angle of the slope, so that the measuring rod 5 is perpendicular to the slope, which is convenient for monitoring the stability of the slope.
[0055] Embodiment 2:
[0056] like Figure 2-Figure 6 As shown, the structure of the water conservancy project slope stability monitoring device and the use method thereof disclosed in the second embodiment of the present invention is basically the same as that in the first embodiment, except that:
[0057] The end of the first fixing rod 1 away from the second fixing rod 2 is fixedly connected to a fixing plate 7, and the first fixing rod 1 is fixed to the slope of the water conservancy project through the fixing plate 7;
[0058] A clearance hole 11 is formed at one end of the first fixing rod 1 away from the fixing plate 7, and one end of the second fixing rod 2 is inserted into the clearance hole 11;
[0059] The clamping assembly further includes a clearance groove 12 formed inside the end of the first fixing rod 1 away from the fixing plate 7, the clamping ring 15 is rotatably disposed inside the clearance groove 12, and the second fixing rod 2 is inserted into the inside of the clamping ring 15;
[0060] The outer surface of the second fixing rod 2 is provided with a matching guide groove 13, and the guide groove 13 is provided with at least one group, and the inner wall of the clamping ring 15 is fixedly provided with a matching guide block 14 at the position corresponding to the guide groove 13, and the clamping ring 15 rotates with the second fixing rod 2 through the cooperation of the guide block 14 and the guide groove 13;
[0061] The outer surface of the clamping ring 15 is provided with a plurality of groups of tooth grooves evenly spaced in a circumferential state, and the inner wall of the giving way groove 12 is provided with a matching groove 17 at the position corresponding to at least one group of the tooth grooves, and a matching plug-in block 16 is inserted in the groove 17, and a first return spring 18 is provided between the end of the plug-in block 16 and the inner side wall of the groove 17, and the plug-in block 16 is elastically inserted in the interior of one group of the tooth grooves through the first return spring 18;
[0062] The fixing plate 7 is placed on a relatively flat ground position on one side of the slope of the water conservancy project, and then the monitoring device is fixed by the cooperation of the fixing bolts and the fixing holes opened on the fixing plate 7. After the fixing is completed, the second fixing rod 2 is rotated. During the rotation process, the second fixing rod 2 will gradually drive the first connecting rod 3 to adjust the height, and the second fixing rod 2 will drive the clamping ring 15 to rotate synchronously during the rotation process. During the rotation process, the clamping ring 15 needs to continuously push the elastically arranged plug block 16 outward through the tooth groove, thereby increasing the force overcome by the rotation of the second fixing rod 2. When the second fixing rod 2 no longer rotates, a certain force can be applied to the second fixing rod 2 through the elastically arranged plug block 16, thereby increasing the force overcome by the self-rotation of the second fixing rod 2 and reducing the possibility of the self-rotation of the second fixing rod 2.
[0063] Embodiment three:
[0064] like Figure 7 As shown, the structure of the water conservancy project slope stability monitoring device and the use method thereof disclosed in the third embodiment of the present invention is basically the same as that in the second embodiment, except that:
[0065] A matching second clearance hole 21 is provided at one end of the first connecting rod 3 at a position corresponding to the end of the second fixing rod 2. The end of the second fixing rod 2 is rotatably inserted into the second clearance hole 21. A matching limiting ring 26 is fixedly provided on the outer surface of the end of the second fixing rod 2. A matching first limiting groove 25 is provided at the inner side wall of the second clearance hole 21 at a position corresponding to the limiting ring 26.
[0066] A first countersunk hole 22 is provided at the center of the upper end surface of the second fixing rod 2, a matching first airbag 23 is fixedly disposed inside the first countersunk hole 22, and a matching second return spring 24 is fixedly disposed inside the first airbag 23;
[0067] A through hole 20 is provided at the inner top of the second clearance hole 21 at a position corresponding to the first airbag 23, and a matching pull rod 19 is inserted into the inner part of the through hole 20, and one end of the pull rod 19 passes through the through hole 20 and is fixedly connected to the upper end surface of the first airbag 23;
[0068] The inner side wall of the second clearance hole 21 is provided with a fixing groove 27, and the fixing groove 27 is provided with multiple groups, and the multiple groups of fixing grooves 27 are evenly spaced and distributed in a circumferential state;
[0069] The outer surface of the end of the second fixing rod 2 is respectively provided with matching first receiving grooves 29 at positions corresponding to two groups of the fixing grooves 27, and a matching fixing block 28 is inserted in the interior of each of the first receiving grooves 29, and a matching second airbag 30 is fixedly arranged between the end of the fixing block 28 and the inner side wall of the first receiving groove 29, and a matching third return spring 31 is fixedly arranged inside the second airbag 30;
[0070] An exhaust pipe 32 is provided between the first airbag 23 and each of the second airbags 30. The interior of the first airbag 23 is connected to the interior of the exhaust pipe 32 through the second airbag 30. The elastic force of the second return spring 24 is greater than the elastic force of the third return spring 31.
[0071] Pull up the pull rod 19. During the lifting process, the pull rod 19 will gradually stop squeezing the first airbag 23. At this time, under the action of the third return spring 31, the fixed block 28 will no longer be inserted into the fixed groove 27. At this time, rotate the first connecting rod 3 to make the second connecting rod 4 face the direction of the slope of the water conservancy project. After the angle adjustment is completed, cancel the force on the pull rod 19. Under the action of the second return spring 24, the first airbag 23 is squeezed, and the gas is discharged to the inside of the second airbag 30 through the exhaust pipe 32. The second airbag 30 expands and pushes the fixed block 28 to be inserted into the fixed groove 27, completing the limiting of the rotation setting of the first connecting rod 3, and then rotate the second connecting rod 4 to make the angle of the connection between the second connecting rod 4 and the first connecting rod 3 match the angle of the slope of the water conservancy project.
[0072] Embodiment 4:
[0073] like Figure 8-Figure 9 As shown, the structure of the water conservancy project slope stability monitoring device and the use method thereof disclosed in the fourth embodiment of the present invention is basically the same as that in the third embodiment, except that:
[0074] One end of the second connecting rod 4 away from the first connecting rod 3 is rotatably connected to a matching connecting block 9, and the measuring rod 5 is slidably connected to the connecting block 9;
[0075] A matching slider 38 is fixedly provided on a side wall of the connecting block 9 facing the measuring rod 5, a matching slide groove 36 is provided on the side wall of the measuring rod 5 at a position corresponding to the slider 38, and a limiting block 39 is fixedly provided on the side wall of the slider 38, and a matching second limiting groove 37 is provided on the inner side wall of the slide groove 36 at a position corresponding to the limiting block 39;
[0076] A holding ball 10 is fixedly provided at one end of the measuring rod 5, and a second countersunk hole 34 is provided on the side wall of the end of the measuring rod 5 away from the holding ball 10, a matching drawing pen 33 is inserted into the interior of the second countersunk hole 34, and a fourth return spring 35 is provided between the end of the drawing pen 33 and the inner side wall of the second countersunk hole 34;
[0077] A support rod 8 is fixedly provided at the end of the first connecting rod 3 at the position corresponding to the drawing pen 33, and the support rod 8 is fixedly connected to a drawing board 6, and the drawing board 6 is located at the end of the drawing pen 33;
[0078] Fine-tune the position of the connecting block 9 and the second connecting rod 4 so that the abutting ball 10 at the end of the measuring rod 5 contacts the ground and the slider 38 is located at the center of the slide groove 36. Then install the support rod 8 on the first connecting rod 3. At the same time, the side wall of the drawing board 6 contacts the end of the drawing pen 33. When the slope moves, the sliding measuring rod 5 will change with the change of the slope angle. When the angle changes, the measuring rod 5 will move along the connecting block 9. During the movement, it will drive the drawing pen 33 to move synchronously. During the movement, the drawing pen 33 will draw lines on the surface of the drawing board 6, and the length of the line can provide feedback on the stability of the slope.
[0079] The specific solution is as follows: the fixing plate 7 is placed at a relatively flat ground position on one side of the water conservancy project slope, and then the monitoring device is fixed by the cooperation of the fixing bolts and the fixing holes opened on the fixing plate 7. After the fixing is completed, the second fixing rod 2 is rotated first. During the rotation process, the second fixing rod 2 will gradually drive the first connecting rod 3 to adjust the height. After adjusting to a certain height, the pull rod 19 is pulled up. During the lifting process, the pull rod 19 will gradually stop squeezing the first airbag 23. At this time, under the action of the third reset spring 31, the fixing block 28 will no longer be inserted into the fixing groove 27. At this time, the first connecting rod 3 is rotated to make the second connecting rod 4 face the direction of the water conservancy project slope;
[0080] Then rotate the second connecting rod 4 to match the angle of the connection between the second connecting rod 4 and the first connecting rod 3 with the angle of the slope of the water conservancy project. At the same time, fine-tune the position of the connecting block 9 and the second connecting rod 4 so that the supporting ball 10 at the end of the measuring rod 5 is in contact with the ground and the slider 38 is located at the center of the slide groove 36. Then install the support rod 8 on the first connecting rod 3. At the same time, the side wall of the drawing board 6 is in contact with the end of the drawing pen 33. When the slope moves, the sliding measuring rod 5 will change with the change of the slope angle. When the angle changes, the measuring rod 5 will move along the connecting block 9. During the movement, it will drive the drawing pen 33 to move synchronously. During the movement, the drawing pen 33 will draw lines on the surface of the drawing board 6, and the length of the lines can provide feedback on the stability of the slope.
[0081] Those skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present invention (including the claims) is limited to these examples. Under the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.
[0082] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A water conservancy project slope stability monitoring device, characterized in that: include: A first fixing rod (1), wherein a matching second fixing rod (2) is threadedly connected to an end of the first fixing rod (1), and a clamping assembly is arranged inside the first fixing rod (1) at a position corresponding to the second fixing rod (2), and the clamping assembly comprises a rotatably arranged clamping ring (15); A first connecting rod (3) is rotatably connected to the end of the second fixing rod (2), and a fixing assembly is arranged at the end of the second fixing rod (2) at a position corresponding to the first connecting rod (3), and the fixing assembly includes an elastically arranged fixing block (28); The second connecting rod (4) is rotatably connected to the first connecting rod (3), and one end of the second connecting rod (4) away from the first connecting rod (3) is rotatably connected to a monitoring component, wherein the monitoring component includes a measuring rod (5).
2. The water conservancy project slope stability monitoring device according to claim 1 is characterized in that: A fixing plate (7) is fixedly connected to one end of the first fixing rod (1) away from the second fixing rod (2), and the first fixing rod (1) is fixed to the slope of the water conservancy project through the fixing plate (7); A clearance hole (11) is provided at one end of the first fixing rod (1) away from the fixing plate (7), and one end of the second fixing rod (2) is inserted into the clearance hole (11).
3. The water conservancy project slope stability monitoring device according to claim 2 is characterized in that: The clamping assembly further comprises a clearance groove (12) formed inside an end of the first fixing rod (1) away from the fixing plate (7); the clamping ring (15) is rotatably arranged inside the clearance groove (12), and the second fixing rod (2) is inserted into the inside of the clamping ring (15); The outer surface of the second fixing rod (2) is provided with a matching guide groove (13), and at least one group of the guide grooves (13) is provided. A matching guide block (14) is fixedly provided on the inner wall of the clamping ring (15) at a position corresponding to the guide groove (13). The clamping ring (15) rotates following the second fixing rod (2) through the cooperation between the guide block (14) and the guide groove (13).
4. The water conservancy project slope stability monitoring device according to claim 3 is characterized in that: The outer surface of the clamping ring (15) is provided with a plurality of groups of tooth grooves evenly spaced in a circumferential state, and the inner wall of the clearance groove (12) is provided with a matching groove (17) at the position corresponding to at least one group of the tooth grooves, and a matching plug-in block (16) is inserted into the interior of the groove (17), and a first return spring (18) is provided between the end of the plug-in block (16) and the inner side wall of the groove (17), and the plug-in block (16) is elastically inserted into the interior of one group of the tooth grooves through the first return spring (18).
5. The water conservancy project slope stability monitoring device according to claim 1, characterized in that: A matching second clearance hole (21) is provided at one end of the first connecting rod (3) at a position corresponding to the end of the second fixing rod (2); the end of the second fixing rod (2) is rotatably inserted into the interior of the second clearance hole (21); a matching limiting ring (26) is fixedly provided on the outer surface of the end of the second fixing rod (2); and a matching first limiting groove (25) is provided on the inner side wall of the second clearance hole (21) at a position corresponding to the limiting ring (26); A first countersunk hole (22) is provided at the center of the upper end surface of the second fixing rod (2), a matching first air bag (23) is fixedly arranged inside the first countersunk hole (22), and a matching second return spring (24) is fixedly arranged inside the first air bag (23); A through hole (20) is provided at the inner top end of the second clearance hole (21) at a position corresponding to the first airbag (23), and a matching pull rod (19) is inserted into the interior of the through hole (20), and one end of the pull rod (19) passes through the through hole (20) and is fixedly connected to the upper end surface of the first airbag (23).
6. The water conservancy project slope stability monitoring device according to claim 5, characterized in that: The inner side wall of the second clearance hole (21) is provided with a fixing groove (27), and the fixing groove (27) is provided in a plurality of groups, and the plurality of groups of the fixing grooves (27) are evenly spaced and distributed in a circumferential state; Matching first receiving grooves (29) are respectively provided on the outer surface of the end portion of the second fixing rod (2) at positions corresponding to two groups of the fixing grooves (27); a matching fixing block (28) is inserted into the interior of each of the first receiving grooves (29); a matching second airbag (30) is fixedly provided between the end portion of the fixing block (28) and the inner side wall of the first receiving groove (29); and a matching third return spring (31) is fixedly provided inside the second airbag (30).
7. The water conservancy project slope stability monitoring device according to claim 6, characterized in that: An exhaust pipe (32) is provided between the first airbag (23) and each of the second airbags (30); the interior of the first airbag (23) is connected to the interior of the exhaust pipe (32) through the second airbag (30); and the elastic force of the second return spring (24) is greater than the elastic force of the third return spring (31).
8. The water conservancy project slope stability monitoring device according to claim 1, characterized in that: One end of the second connecting rod (4) away from the first connecting rod (3) is rotatably connected to a matching connecting block (9), and the measuring rod (5) is slidably connected to the connecting block (9); A matching sliding block (38) is fixedly provided on a side wall of the connecting block (9) facing the measuring rod (5); a matching sliding groove (36) is provided on the side wall of the measuring rod (5) at a position corresponding to the sliding block (38); a limiting block (39) is fixedly provided on the side wall of the sliding block (38); and a matching second limiting groove (37) is provided on the inner side wall of the sliding groove (36) at a position corresponding to the limiting block (39).
9. The water conservancy project slope stability monitoring device according to claim 8, characterized in that: A holding ball (10) is fixedly arranged at one end of the measuring rod (5); a second countersunk hole (34) is provided on a side wall of an end of the measuring rod (5) away from the holding ball (10); a matching drawing pen (33) is inserted into the interior of the second countersunk hole (34); and a fourth return spring (35) is arranged between the end of the drawing pen (33) and the inner side wall of the second countersunk hole (34); A support rod (8) is fixedly arranged at the end of the first connecting rod (3) corresponding to the position of the drawing pen (33), and the support rod (8) is fixedly connected to a drawing board (6), and the drawing board (6) is located at the end position of the drawing pen (33).
10. A method for using a water conservancy project slope stability monitoring device, characterized in that: The device for monitoring the slope stability of a water conservancy project according to any one of claims 1 to 9, wherein the method of using the device comprises: Fixing of the monitoring device: placing the fixing plate (7) on a relatively flat ground position on one side of the slope of the water conservancy project, and then fixing the monitoring device by means of the cooperation of fixing bolts and fixing holes provided on the fixing plate (7); Adjustment of the monitoring device: after the fixing is completed, the second fixing rod (2) is rotated first. During the rotation process, the second fixing rod (2) will gradually drive the first connecting rod (3) to adjust the height. After adjusting to a certain height, the pull rod (19) is pulled up. During the lifting process, the pull rod (19) will gradually stop squeezing the first air bag (23). At this time, under the action of the third return spring (31), the fixing block (28) will no longer be inserted into the fixing groove (27). At this time, the first connecting rod (3) is rotated to make the second connecting rod (4) face the direction of the slope of the water conservancy project; The second connecting rod (4) is rotated to make the angle of the connection between the second connecting rod (4) and the first connecting rod (3) match the angle of the slope of the water conservancy project, and the positions of the connecting block (9) and the second connecting rod (4) are finely adjusted to make the abutting ball (10) at the end of the measuring rod (5) contact the ground and the slider (38) be located at the center of the slide groove (36); Slope stability detection of water conservancy project: the support rod (8) is then installed on the first connecting rod (3), and at the same time, the side wall of the drawing board (6) contacts the end of the drawing pen (33). When the slope moves, the sliding measuring rod (5) will change with the change of the slope angle. When the angle changes, the measuring rod (5) will move along the connecting block (9). During the movement, it will drive the drawing pen (33) to move synchronously. During the movement, the drawing pen (33) will draw lines on the surface of the drawing board (6), and the length of the line can provide feedback on the stability of the slope.
Citation Information
Patent Citations
Slope body stability monitoring device and method
CN112945197A
Water conservancy project slope settlement monitoring equipment
CN115077479A
Foundation pit settlement monitoring device
CN117988399A
Highway subgrade construction slope detection ruler
CN210952814U
Foundation pit deformation monitoring device
CN215253057U