Novel power distribution system collaborative planning-operation method

By building the joint optimization model of HESS-SOP node-network flexibility planning-operation, the problems of flexible resource coordination and supply and demand balance in the new distribution system are solved, and the flexibility of supply and demand balance at the dual level of time and space and the stable operation of the system is achieved. .

CN118899836AActive Publication Date: 2024-11-05SHANGHAI UNIVERSITY OF ELECTRIC POWER
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410957649.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-17
Publication Date
2024-11-05
Estimated Expiration
2044-07-17

AI Technical Summary

Technical Problem

When the new distribution system faces the random output defect of distributed renewable energy, the lack of node power support and insufficient flexibility caused by blockage of branch transmission leads to safety problems such as wind and light abandonment and loss of load, and existing research ignores The synergy between node-network flexibility resources leads to an imbalance in the system's flexibility in the multi-time and spatial domain.

Method used

Building a new distribution system planning for HESS-SOP node-network flexibility-operated joint optimization model, solving through hybrid optimization algorithms, establish flexible supply and demand balance constraints and HESS-SOP operation constraints, optimize SOP capacity and DCDC converter capacity , realize the coordinated adjustment of flexible resources and supply and demand balance.

Benefits of technology

At the dual level of time and space, it effectively alleviates the problem of unbalanced supply and demand of flexibility, optimizes the distribution of system trends, improves the flexible regulation capabilities and stable operation level of the power grid, and significantly reduces the cost of flexibility and grid loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118899836A_ABST
    Figure CN118899836A_ABST
Patent Text Reader

Abstract

The invention relates to a novel power distribution system collaborative planning-operation method, and the method comprises the steps: constructing a novel power distribution system planning-operation joint optimization model oriented to HESS-SOP node-network flexibility, the optimization model is divided into a planning layer and an operation layer, and the constraints of the planning layer comprise a flexible supply and demand balance constraint, a flexible supply and demand balance constraint and a flexible supply and demand balance constraint. The constraint of the operation layer comprises an HESS-SOP operation constraint; the joint optimization model is solved based on a hybrid optimization algorithm, optimal planning configuration and an operation strategy result are obtained, and the optimal planning configuration comprises the optimal SOP capacity and the optimal DCDC converter capacity. Compared with the prior art, the method has the advantages that the problem of unbalanced supply and demand of flexibility is relieved on the space-time dual level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of novel power distribution systems, and in particular to a novel power distribution system collaborative planning-operation method. Background Art

[0002] As the penetration rate of distributed renewable energy (DRG) in new distribution systems gradually increases, the distribution systems are faced with the dual flexibility challenges of insufficient node power support and branch transmission blockage due to their inherent random output defects, which can easily lead to major safety problems such as wind and solar power abandonment and load loss. It is urgent to scientifically plan and build sufficient flexible adjustment resources at key nodes and terminals of the power grid to improve the flexible adjustment capability and stable operation level of the power grid.

[0003] The hybrid energy storage system (HESS) has the dual advantages of energy-based storage (EBS) and power-based storage (PBS), and has become an important development trend to meet the system's multi-time scale regulation needs. It can use low-pass filtering, wavelet packet analysis, empirical mode decomposition and other methods to perform spectrum analysis on pulsating power, and achieve EBS and PBS to achieve hierarchical and refined control of power in different frequency bands. In addition, as an important carrier of flexibility resources, the rationality of the grid structure of the new distribution system is crucial to the flexibility resource regulation capability of the node and the balanced flow of branch power. The intelligent soft open point (SOP) is based on fully controlled power electronic devices, is not limited by the number of traditional mechanical switch actions, and has precise power flow control capabilities, becoming an important network-based flexible resource. Faced with the problem of insufficient dual flexibility of "node-network" in the new distribution system, the coordinated "planning-operation" of heterogeneous flexible resources such as node type and network type has become an important technical means to improve the flexible adjustment capability of system nodes and network transmission capacity margin, making the joint introduction of SOP and HESS in the new distribution system and participation in the flexible adjustment of system nodes and networks a research hotspot.

[0004] In addition, with the dramatic increase in the uncertainty factors of "source and load" in the system, higher requirements are put forward for flexibility regulation, which can be essentially regarded as a problem of supply and demand balance of flexibility resources at multiple spatiotemporal scales. Reasonable quantitative analysis is the theoretical basis for supporting flexibility evaluation, scheduling and optimization. However, most current studies focus on the supply and demand balance at the node level, ignoring the analysis of the transmission process of flexibility resources, breaking the interactive correlation of "node-network" flexibility, making it a new problem to comprehensively consider the coordinated role of node flexibility resources and network flexibility resources, supplemented by precise analysis and control, to achieve the "node-network" two-dimensional flexibility supply and demand balance of the system operating in multiple spatiotemporal domains. Summary of the invention

[0005] The purpose of the present invention is to provide a new distribution system collaborative planning-operation method to alleviate the problem of flexibility supply and demand imbalance at the dual levels of time and space.

[0006] The purpose of the present invention can be achieved by the following technical solutions:

[0007] A novel distribution system collaborative planning-operation method, the method comprising:

[0008] Constructing a new distribution system planning-operation joint optimization model for HESS-SOP node-network flexibility, wherein the optimization model is divided into a planning layer model and an operation layer model, wherein the constraints of the planning layer model include flexibility supply and demand balance constraints, and the constraints of the operation layer model include HESS-SOP operation constraints;

[0009] The joint optimization model is solved based on a hybrid optimization algorithm to obtain an optimal planning configuration and an operation strategy result, wherein the optimal planning configuration includes an optimal SOP capacity and an optimal DCDC converter capacity.

[0010] Furthermore, the novel power distribution system includes an intelligent soft switch SOP and a hybrid energy storage system HESS, the intelligent soft switch SOP includes a back-to-back voltage source converter VSC1 and a back-to-back voltage source converter VSC2, the back-to-back voltage source converter VSC1 is a converter ACDC1, the back-to-back voltage source converter VSC2 is a converter ACDC2, the converter ACDC1 and the converter ACDC2 are connected to each other and a capacitor is connected in parallel, the hybrid energy storage system HESS adopts an active topology structure, including a converter DCDC1 and a converter DCDC2, the converter DCDC1 and the converter DCDC2 are both connected to the converter ACDC1 and the converter ACDC2, lithium-ion batteries LIB are connected in parallel on both sides of the converter DCDC1, and supercapacitors SC are connected in parallel on both sides of the converter ACDC2.

[0011] Furthermore, the HESS-SOP operation constraints include charge and discharge characteristic constraints, power loss constraints, power balance constraints, state of charge constraints and SOP regulation constraints.

[0012] Furthermore, the charge and discharge characteristics are constrained as follows:

[0013]

[0014]

[0015] in, are the charge and discharge powers of LIB and SC at time t, are the charge and discharge flags of LIB and SC at time t, respectively, which are 0-1 variables, η LIB , η SC are the charge-discharge conversion efficiency of LIB and SC, are the total capacities of the two DC / DC converters respectively.

[0016] Furthermore, the SOP regulation constraints are:

[0017]

[0018] Among them, P sop,i,t , P sop,j,t and are the active power output and the corresponding active power loss of SOP from ports i and j at time t, respectively, where ports i and j represent two ports of ACDC1 and ACDC2, respectively; sop,i , A sop,j are the active power loss coefficients at ports i and j of the SOP respectively; Q sop,i,t , Q sop,j,t are the reactive power output at ports i and j of the SOP respectively; Q sop,i,min , Q sop,j,min and Q sop,i,max , Q sop,j,max They are the upper and lower limits of reactive power output at ports i and j of SOP respectively; are the rated capacity of converters at ports i and j of SOP respectively; is the total active power loss of the HESS-SOP device at time t.

[0019] Furthermore, the flexibility supply and demand balance constraint is:

[0020]

[0021] Among them, θ max is the maximum probability of insufficient flexibility of a given allowed line; E maxFor a given line flexibility that is less than the maximum expected value, E up 、E down are the expected values ​​of the flexibility deficit for upward and downward adjustments, θ up ,θ down Adjust the expected value of the probability of insufficient flexibility upward or downward respectively.

[0022] Furthermore, the expected values ​​of the upward and downward adjustment of the flexibility deficiency are specifically:

[0023]

[0024] Among them, Z1 and Z2 increase and decrease the number of intervals with insufficient flexibility respectively; k1 and k2 increase and decrease the sequence number of intervals with insufficient flexibility respectively; They are the left and right time boundary points of the k1th interval of insufficient upward flexibility; are the left and right time boundary points of the k2th insufficient downward flexibility interval, M is the number of lines in the system, is the required transmission volume of up and down flexibility of line j at time t.

[0025] Furthermore, the expected value of the probability of insufficient upward and downward flexibility is:

[0026]

[0027] in, are the total duration of the upward and downward insufficient flexibility intervals in a scheduling cycle; T is the total scheduling cycle.

[0028] Furthermore, the objective function of the planning layer model is:

[0029]

[0030] in, They are the annual investment cost and maintenance cost of SOP, HESS, etc.;

[0031] The objective function of the operational layer model is:

[0032] f R =C L +C A +C EP +C fle

[0033]

[0034] Among them, c LIB 、c SC 、c L are the unit power operation cost and unit active network loss cost of LIB and SC respectively; c EPThe price of electricity purchased from the higher-level power grid unit; The power support provided by the upper grid at time t in scenario s; is the total network loss of the distribution system at time t in scenario s; is the internal loss of HESS-SOP at time t in scenario s, N s is the number of scenes, P(s) is the scene probability; are the charge and discharge power of LIB and SC at time t in scenario s; c up 、c d It is the penalty factor for the flexibility exceeding the upper and lower limits.

[0035] Furthermore, the specific steps of solving the joint optimization model based on the hybrid optimization algorithm to obtain the optimal planning configuration and operation strategy results are as follows:

[0036] Initialize parameters and use Latin hypercube sampling to generate scenes;

[0037] Enter the planning layer model to obtain scenario parameters and HESS initial configuration plan;

[0038] Generate an initial configuration scheme population, the population includes SOP capacity and DCDC converter capacity, perform roulette wheel selection, multi-point crossover and multi-point mutation, and merge the parent and child populations;

[0039] The annual investment and maintenance cost of HESS-SOP devices is used as individual fitness to determine whether it meets the constraints of the planning layer. If not, the chromosome is regenerated. If so, the fitness is calculated, and then it is determined whether it meets the convergence conditions of the planning layer. If so, the configuration results obtained by the planning layer are input into the operation layer model. Otherwise, roulette wheel selection, multi-point crossover and multi-point mutation are repeated.

[0040] After the configuration results obtained by the planning layer model are input into the operation layer, the scenario s is set, the operation layer model is cone processed, the constraints of the operation layer are linearized, the solver is called to solve the operation layer model, and then the scenario is switched until all scenarios are traversed to determine whether the convergence conditions of the operation layer model are met. If not, the planning layer model is returned to be solved again. If so, it is determined whether the reproduction generation is reached. If so, the optimal planning configuration and operation strategy results are output. If not, roulette wheel selection, multi-point crossover and multi-point mutation are repeated.

[0041] Compared with the prior art, the present invention has the following beneficial effects:

[0042] The present invention constructs a new distribution system planning-operation joint optimization model for HESS-SOP node-network flexibility, wherein the constraints of the planning layer include flexibility supply and demand balance constraints, and flexibility supply and demand balance conditions and evaluation indicators are established in the balance constraints, which can effectively quantify and characterize flexibility resources, analyze the "node-network" two-dimensional supply and demand balance mechanism, and meet the actual needs of the new distribution system; at the same time, the constraints of the operation layer include HESS-SOP operation constraints, and the HESS-SOP operation constraints include constraints obtained by analyzing the HESS-SOP regulation characteristics. The charge and discharge states of two different energy storages of HESS and the HESS-SOP power balance constraints are determined by the charge and discharge characteristics. The two VSCs of SOP can control the bidirectional flow of power. A variety of operation states can be switched through these two parts, and while optimizing the system power flow distribution, the problem of flexibility supply and demand imbalance can be alleviated at the dual levels of time and space. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 This is a topological diagram of the grid-connected HESS-SOP of the present invention;

[0044] Figure 2 It is the feasible domain of HESS operation of the present invention;

[0045] Figure 3 A solution flow chart of the present invention of the present invention;

[0046] Figure 4 These are five typical scenarios and their occurrence probability diagrams of the present invention, where Figure 4 (a) is the output curve of scenario 1, Figure 4 (b) is the output curve of scenario 2. Figure 4 (c) is the output curve of scenario 3. Figure 4 (d) is the output curve of scenario 4. Figure 4 (e) is the output curve of scenario 5. Figure 4 (f) is the occurrence probability of each scene;

[0047] Figure 5 The topology diagram of HESS-SOP access to IEEE33 node system;

[0048] Figure 6 is the fluctuation range of net load of system nodes;

[0049] Figure 7 Comparison of the balance of supply and demand of reference line flexibility under the four schemes;

[0050] Figure 8 The power curves and SOC changes of different energy storage in scheme 4;

[0051] Fig. 9 Comparison of the average voltage of each node under four schemes. DETAILED DESCRIPTION

[0052] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0053] The present invention proposes a novel power distribution system collaborative planning-operation method, the method comprising the following steps:

[0054] Constructing a new distribution system planning-operation joint optimization model for HESS-SOP node-network flexibility, wherein the optimization model is divided into a planning layer model and an operation layer model, wherein the constraints of the planning layer model include flexibility supply and demand balance constraints, and the constraints of the operation layer model include HESS-SOP operation constraints;

[0055] The joint optimization model is solved based on a hybrid optimization algorithm to obtain an optimal planning configuration and an operation strategy result, wherein the optimal planning configuration includes an optimal SOP capacity and an optimal DCDC converter capacity.

[0056] First, the new power distribution system includes an intelligent soft switch SOP and a hybrid energy storage system HESS. The intelligent soft switch SOP includes a back-to-back voltage source converter VSC1 and a back-to-back voltage source converter VSC2. The back-to-back voltage source converter VSC1 is a converter ACDC1, and the back-to-back voltage source converter VSC2 is a converter ACDC2. The converter ACDC1 and the converter ACDC2 are connected to each other and a capacitor is connected in parallel. The hybrid energy storage system HESS adopts an active topology structure, including a converter DCDC1 and a converter DCDC2. The converter DCDC1 and the converter DCDC2 are both connected to the converter ACDC1 and the converter ACDC2. The two sides of the converter DCDC1 are connected in parallel with lithium-ion batteries LIB, and the two sides of the converter ACDC2 are connected in parallel with supercapacitors SC. The structural diagram of the new power distribution system is shown in FIG. Figure 1 shown.

[0057] The method of constructing a new distribution system planning-operation joint optimization model for HESS-SOP node-network flexibility in the present invention is as follows:

[0058] 1. Perform HESS-SOP topology analysis; The present invention uses back-to-back voltage source converter (B2B VSC) as the basic structure of SOP, adopts PQ-VdcQ control mode, and its controllable variable is active and reactive power output; HESS adopts active topology structure, lithium-ion battery (LIB) as energy storage, and supercapacitor (SC) as power storage. The power electronic converters at both ends of SOP are used to control the charge and discharge mode of the energy storage element, and the energy storage function is integrated on the basis of its power transmission control function, so that HESS-SOP becomes a highly integrated flexibility control device.

[0059] 2. Analysis of HESS-SOP regulation characteristics:

[0060] (1) HESS regulation characteristics

[0061] Charge and discharge characteristics: HESS charge and discharge power consists of two parts, and at time t, each type of energy storage is only in the charging or discharging state. Its model is as follows:

[0062]

[0063] Formula (1) is the HESS charging and discharging power model, where are the charge and discharge power of LIB and SC at time t respectively. The power value is set to be negative in the charging state and positive in the discharging state. Formula (2) is the charge and discharge mark model. are the charge and discharge flags of LIB and SC at time t, respectively, which are 0-1 variables; η LIB , η SC are the charge-discharge conversion efficiencies of LIB and SC respectively; Formula (3) is the charge-discharge power constraint, are the total capacities of the two DC / DC converters respectively.

[0064] The power loss during HESS operation mainly consists of two parts: LIB and SC charging and discharging power loss:

[0065]

[0066] Where: are the total loss and charging and discharging losses of HESS at time t respectively.

[0067] Power balance constraints:

[0068]

[0069] Where: E LIB,t 、E SC,tare the power of LIB and SC at time t, and Δt is the scheduling time interval.

[0070] State of Charge Constraints:

[0071]

[0072] Where: SOC L IB,t , SOC S C,t and are the state of charge and upper and lower limits of LIB and SC at time t; SOC L IB,t0 , SOC S C,t0 and SOC L IB,T , SOC L IB,T are the charge states of LIB and SC at the beginning and end of the scheduling period respectively; T is the duration of the scheduling period.

[0073] (2) SOP control characteristics

[0074]

[0075] Where: P sop,i,t , P sop,j,t and are the active power output of SOP from port i and port j at time t and the corresponding active power loss; A sop,i , A sop,j are the active power loss coefficients at ports i and j of the SOP respectively; Q sop,i,t , Q sop,j,t are the reactive power output at ports i and j of the SOP respectively; Q sop,i,min , Q sop,j,min and Q sop,i,max , Q sop,j,max They are the upper and lower limits of reactive power output at ports i and j of SOP respectively; are the rated capacity of converters at ports i and j of SOP respectively; is the total active power loss of the HESS-SOP device at time t.

[0076] Formula (8) is the HESS-SOP power balance constraint, which means that the sum of the active power output from both ends of SOP, the active power input from HESS to SOP, and the active power loss of SOP is 0. In addition, it is stipulated that the power outflow from SOP is in the positive direction and the power inflow is in the negative direction. The power inflow from HESS to SOP is in the positive direction and the power inflow from SOP to HESS is in the negative direction. Formula (9) is the expression of SOP active power loss. Formula (10) is the upper and lower limit constraint of SOP reactive power output. Formula (11) is the SOP capacity constraint, which usually sets the rated capacity at both ends equal, that is, Equation (12) represents the total loss of the HESS-SOP device.

[0077] Different from the primary SOP, the SOP with HESS adds energy storage devices. The sum of active power injected into the network by VSC1 and VSC2 is not always equal to 0, which greatly increases the operational flexibility. Its operational feasible domain is as follows: Figure 2 shown.

[0078] In the above process, formulas (1) and (2) are the HESS control characteristics, which determine the charging and discharging states of the two different energy storages of the HESS. Formula (8) is the HESS-SOP power balance constraint. The two VSCs of the SOP can control the bidirectional flow of power. Multiple operating states are defined through these two parts.

[0079] 3. HESS-SOP supports the dual flexibility analysis of "node-network" of new power distribution system:

[0080] (1) Node flexibility resource supply and demand model

[0081] The demand for node flexibility of the new distribution system mainly includes net load fluctuation and its corresponding prediction error, as shown in equations (13) and (14):

[0082]

[0083] Where: are the actual value and predicted value of net load at node i at time t respectively; are the actual load value and the predicted value respectively; are the actual values ​​of power support from wind and solar nodes to node i; are the predicted power support values ​​of wind and solar nodes to node i; Ω WT ,Ω PV are the wind and solar generator node sets respectively; ω i ,ω load,i ,ω WT,i ,ω PV,i They are respectively the system net load prediction error, load prediction error, wind turbine power support prediction error, and photovoltaic power support prediction error, all of which obey the normal distribution with an expected value of 0.

[0084] To calculate the net load fluctuation range, the standard deviation of the net load forecast error is defined as:

[0085]

[0086] In the formula are the standard deviation of net load, wind and solar units, and load forecast error, respectively; They are the installed capacities of wind and solar power units respectively.

[0087] The present invention sets the prediction confidence level to 95%, and the corresponding confidence level critical value z is 1.96 by comparing the Z-score table. Therefore, the net load fluctuation range at time t can be expressed as:

[0088]

[0089] The node up and down flexibility requirement boundaries are as follows:

[0090]

[0091] As an important node-type flexibility resource, HESS can support the bidirectional safety regulation of flexibility and extend the battery life by determining the scope of multiple types of energy storage. Its upper and lower flexibility regulation capabilities are shown in formula (19):

[0092]

[0093] Where: They are the upward and downward flexibility capabilities of the hybrid energy storage system at time t, respectively; They are the maximum active charge and discharge limits of the lithium battery and supercapacitor at time t respectively.

[0094] In addition, the upper main network is the most basic flexibility resource supporting the distribution network, and its regulation characteristics are as follows:

[0095]

[0096] Where: They are the upward and downward flexibility capabilities of the main grid system at time t; ΔP MG,max is the maximum value of the upper main grid climbing power; P MG,max Provides maximum power support for the upper power grid; is the power transmission from the upper power grid to the distribution network at time t.

[0097] (2) Grid flexibility resource supply and demand model

[0098] The node resource flexibility response capability fully releases the flexible transmission capability that is highly dependent on network resources. The connection between the two is established by introducing the injection shift distribution factor (ISDF), which reflects the impact of the node active power change on the line flow, as shown in formula (21):

[0099] ΔP Branch,j =I SDF,i:j ΔP i (twenty one)

[0100] Where: ΔP i The amount of active power injected into node i; ΔP Branch,j is the change in active power flow on line j; I SDF,i~j Inject the transfer distribution factor between node i and line j.

[0101] In the entire power distribution system, the node and line flexibility are highly coupled. The supply of node flexibility power can be allocated to each line through ISDF mapping, as shown in Equations (22) and (23):

[0102]

[0103] Where: The transmission capacity is provided for the flexibility of increasing and decreasing the line j at time t; I SDF,MG~j Inject the transfer distribution factor between the upper grid connection node and the j line; Ω HESS is the node where the HESS is located; M is the number of lines in the system. Similarly, the demand for node flexibility power is obtained from each line through ISDF allocation:

[0104]

[0105] Where: is the required transmission volume of up and down flexibility of line j at time t; N is the number of system nodes.

[0106] b03) Establishment of flexible supply and demand balance conditions and evaluation indicators

[0107] When the supply of flexibility resources of all lines in the system meets the demand envelope at the boundary of any time point and is within the transmission carrying capacity of the line, it means that the system flexibility resources are sufficient. However, in the new distribution system with high penetration of renewable energy, there are many types of flexibility resources and their regulation characteristics are very different. It is extremely difficult and uneconomical to achieve a complete envelope of flexibility demand. It is necessary to establish reasonable flexibility indicators to reflect the system's ability to cope with emergencies. Taking the balance of line supply and demand as the starting point, two types of flexibility indicators are established: the expected probability of insufficient flexibility (EPIF) and the expected value of insufficient flexibility (EIF).

[0108] EPIF describes the expected value of the ratio of the line inflexibility time period to the scheduling cycle duration, reflecting the probability of the occurrence of inflexibility inflexibility events, as shown in formula (24):

[0109]

[0110] Where: θ up ,θ down They are respectively adjusting the expected value of the probability of insufficient flexibility upward and downward; are the total duration of the upward and downward insufficient flexibility intervals in a scheduling cycle; T is the total scheduling cycle.

[0111] EIF describes the expected value of line flexibility deficiency and reflects the degree of inflexibility deficiency, as shown in formula (25):

[0112]

[0113] Where: E up 、E down They are respectively the expected value of the amount of insufficient flexibility adjusted upward and downward; Z1 and Z2 are respectively the number of insufficient flexibility intervals adjusted upward and downward; k1 and k2 are respectively the sequential numbering of insufficient flexibility intervals adjusted upward and downward; They are the left and right time boundary points of the k1th interval of insufficient upward flexibility; They are respectively the left and right time boundary points of the k2th interval of insufficient downward flexibility.

[0114] By reasonably relaxing the supply and demand balance conditions, the flexibility supply and demand balance criterion can be described as: 1) The expected value of the probability of insufficient flexibility in the system line is lower than the given threshold; 2) The expected value of insufficient flexibility in the system line is lower than the respective given maximum values. The formula can be described as follows:

[0115]

[0116] Where: θ max is the maximum probability of insufficient flexibility of a given allowed line; E max The flexibility of a given line is less than the maximum expected value. When all lines in the system meet the above two supply and demand balance criteria in the entire scheduling, the system achieves flexibility supply and demand balance.

[0117] Based on the above analysis, the model proposed by the present invention is as follows:

[0118] (1) Planning layer model:

[0119] (1) Objective function

[0120] The planning model takes the minimum annual comprehensive operating cost of HESS-SOP as the optimization goal and sets the objective function F p It mainly includes the annual investment and operation and maintenance costs of the HESS-SOP devices to be planned for the power distribution system, as shown below:

[0121]

[0122] Where: They are the annual investment cost and maintenance cost of SOP, HESS, etc.; their specific expressions are as follows:

[0123] SOP and other annual investment costs and maintenance costs:

[0124]

[0125] Where: d sop is the SOP discount rate; sop is the service life of SOP; c sop is the unit capacity investment cost; η sop is the annual operation and maintenance cost coefficient.

[0126] HESS equal annual investment cost and maintenance cost:

[0127]

[0128] Where: y LIB ,y sc are the service life of LIB and SC respectively; d H is the HESS discount rate; are the rated power and rated capacity of LIB and SC respectively; c LIB,P 、c LIB,E 、c SC,P 、c SC,E They are the installation costs per unit power and capacity of LIB and SC respectively;

[0129] cDCDC is the unit DC-DC converter capacity cost, ξ LIB , SC are the maintenance costs per unit capacity of LIB and SC, respectively, T For working hours, take 8760.

[0130] (2) Constraints

[0131] DC / AC Converter Configuration Constraints

[0132]

[0133] Where: The upper limit of the installation capacity allowed by SOP at the planned location; sop Unit installation capacity; m sop The number of SOP unit capacity configurations, which must be a non-negative integer.

[0134] DC / DC Converter Configuration Constraints

[0135]

[0136] Where: The upper limit of the DC / DC converter capacity allowed in HESS-SOP; DCDC is the unit installation capacity of the DC / DC converter; m DCDC Configure the quantity per unit capacity of the DC / DC converter.

[0137] In addition, the line flexibility supply and demand balance constraints must be met at the planning level, as shown in formula (26).

[0138] (2) Operational layer model:

[0139] In view of the mutual coupling between node flexibility resources and grid flexibility resources in the actual operation of the distribution system, the injection transfer distribution factor (ISDF) is introduced to transfer the supply and demand balance problem from the perspective of conventional nodes to the supply and demand balance problem of lines, and a flexibility over-limit evaluation index is established to simultaneously reflect the supply and demand balance of flexibility in both nodes and grids. The flexibility over-limit penalty cost factor is introduced into the operation layer model to map the system flexibility quality to an economic indicator, and the optimization goal is to minimize the total cost of the system under multiple scenarios. The objective function F R Mainly includes system network loss cost C L 、HESS-SOP action cost C A , Annual cost of purchasing electricity from the upper grid C EP , and the penalty cost C for exceeding the flexibility limit fle , the specific formula is as follows:

[0140] (1) Objective function

[0141] f R =C L +C A +C EP +C fle (36)

[0142]

[0143] Where: c LIB 、c SC 、c L are the unit power operation cost and unit active network loss cost of LIB and SC respectively; c EP The price of electricity purchased from the higher-level power grid unit; The power support provided by the upper grid at time t in scenario s; is the total network loss of the distribution system at time t in scenario s; is the internal loss of HESS-SOP at time t in scenario s, and its specific expression is shown in formula (12); N s is the number of scenes, P(s) is the scene probability; are the charge and discharge power of LIB and SC at time t in scenario s; c up 、c d It is the penalty factor for the flexibility exceeding the upper and lower limits.

[0144] (2) Constraints

[0145] The operation layer model needs to satisfy the HESS-SOP operation constraints, as shown in formulas (1)-(12); in addition, it also needs to satisfy the distribution system operation flow constraints, safety constraints, power balance constraints, etc. Considering that formulas (9), (11) and flow constraints are nonlinear models, the convex relaxation method is introduced to transform them into a second-order cone relaxation form.

[0146] The joint optimization model established above is difficult to solve using a single solution method or directly using a solver. Therefore, a hybrid optimization algorithm based on a combination of a genetic algorithm and cone programming is proposed. The basic idea is to use the genetic algorithm as the overall framework of the optimization algorithm to determine the configuration variables of the planning layer and pass them into the operation layer as constraints. In each iteration of the genetic algorithm, the Gurobi solver is called to solve the cone programming model of the operation layer in each scenario. The specific solution process is as follows: Figure 3 shown.

[0147] The beneficial effects of the present invention are:

[0148] 1) The established HESS-SOP topology and regulation characteristic model has significant practical value. Through multiple operating state transitions, it can optimize the system power flow distribution and alleviate the imbalance between flexibility supply and demand at both the temporal and spatial levels.

[0149] 2) The established flexibility supply and demand balance model and indicators based on transfer distribution factors can effectively quantify and characterize flexibility resources, analyze the "node-network" two-dimensional supply and demand balance mechanism, and meet the actual needs of the new distribution system;

[0150] 3) A new distribution system "planning-operation" joint optimization model is constructed for the "node-network" dual-dimensional flexibility of HESS-SOP, which combines the reasonable configuration and deployment of early flexibility resources with the optimal operation of multiple time-series scenarios, and significantly improves the system economy and flexibility through "planning-operation" joint optimization.

[0151] The following is an actual experimental analysis:

[0152] A case study is conducted based on the improved IEEE33 node power distribution system. Figure 5 As shown in the figure, wind turbines are connected to nodes 11 and 32, and photovoltaic units are connected to nodes 6 and 16. The specific parameter settings are shown in Table 1. Based on historical data, Latin hypercube sampling (LHS) is used to generate scenarios and the backward subtraction method is used to reduce the generated scenarios to 5 classic scenarios. The specific output curves are shown in Figure 3 As shown, in addition, the system structure parameters refer to the IEEE33 standard node system in the pandapower library, Table 2 is the hybrid energy storage parameter table, Table 3 is the intelligent soft switch parameter table, and Table 4 is other parameters.

[0153] Table 1 Wind and solar access location and capacity

[0154]

[0155] Table 2 Hybrid energy storage parameters

[0156]

[0157] Table 3 Intelligent soft switch parameters

[0158]

[0159] Table 4 Other related parameters

[0160]

[0161]

[0162] The analysis steps include:

[0163] a) Analysis on improving system economic efficiency;

[0164] b) Analysis on improving system flexibility;

[0165] c) Voltage fluctuation comparison.

[0166] The analysis of improving the economic efficiency of the system is as follows:

[0167] a01) Comparison scheme settings:

[0168] In order to compare and analyze the effect of connecting the HESS-SOP device to the distribution network on its economic efficiency and flexibility, four comparison schemes are set up:

[0169] Solution 1: Do not connect any power flow regulation device and only perform calculation and analysis on the original distribution network structure.

[0170] Solution 2: Access the general SOP for planning and operation analysis.

[0171] Solution 3: Connect to the E-SOP device for planning and operation analysis.

[0172] Solution 4: Connect the HESS-SOP device mentioned in this article to perform planning-operation analysis.

[0173] a02) Cost Analysis:

[0174] Table 5 Comparison of configuration results and costs of Schemes 2, 3, and 4

[0175]

[0176] Note: Configuration cost includes annual investment cost and operation and maintenance cost

[0177] Table 6 Comparison of annual operating costs under four schemes

[0178]

[0179] Note: The time scale for calculating each cost is one year; the total cost is the sum of the configuration cost and each operating cost

[0180] Table 5 compares the configuration results and costs of Schemes 2, 3, and 4. As shown in the table, compared with Scheme 2, which installs a normal SOP, the ACDC converter capacity (i.e., SOP capacity) configured in Schemes 3 and 4 is larger. This is because the ACDC converter capacity in ESOP and HESS-SOP needs to consider both the transmission power of the adapted branch and the transmission power of the energy storage system. Similarly, the DC / DC converter capacity in Schemes 3 and 4 needs to adapt to the transmission power of each energy storage system. In terms of energy storage system parameter configuration, considering that LIB and SC have different output characteristics and mission attributes, SC is usually configured with larger power and smaller capacity than LIB to cope with different operating strategies.

[0181] Table 6 is a comparison of the annual operating costs under the four schemes. Combining Tables 5 and 6, it can be seen that although the configuration cost of the distribution system is higher after the adjustment device is configured in Scheme 4, the total annual operating cost is reduced by 50.01%, 47.83%, and 0.82% compared with Schemes 1, 2, and 3, respectively. Among them, the annual network loss cost is reduced by 60.40%, 57.89%, and 15.77%, respectively, the flexibility cost is reduced by 83.89%, 75.68%, and 52.48%, respectively, and the annual electricity purchase cost is reduced by 89.39%, 85.85%, and 52.25%, respectively. Comparing Scheme 4 with Scheme 1, it can be seen that the total cost has dropped significantly after installing HESS-SOP, among which the flexibility cost and electricity purchase cost have improved most significantly, reducing by 6.4562 million yuan and 7.7701 million yuan respectively. The reason for this is that it can be seen from the definition of system flexibility supply and demand balance: when the system has sufficient flexibility to adjust resource supply up and down, the corresponding probability and cost of load loss and wind and solar abandonment will be reduced accordingly, and vice versa. The HESS-SOP device proposed in this article has both the flow optimization capability of SOP space level and the power collection and release capability of HESS time level, which significantly enhances the flexibility of the system and reduces the dependence on the external network. Comparing Scheme 4 with Scheme 3, it can be seen that compared with installing a single energy storage ESS, the HESS composed of LIB and SC can refine power distribution, take into account response speed and energy storage, and has better comprehensive economic benefits.

[0182] The analysis of improving the economic efficiency of the system is as follows:

[0183] b01) Analysis of the net load fluctuation of the original system nodes

[0184] Figure 6 The bar chart of the net load fluctuation range of nodes in the distribution system taking into account the prediction error. Combined with Table 1 and from a spatial perspective, it can be seen that compared with other nodes, the net load fluctuation range of nodes connected to wind and solar power (such as nodes 6, 11, 16, and 32) is significantly larger, that is, such nodes have a large flexibility shortage during operation; combined with the wind and solar power and load output curves and from a time perspective, compared with other times, at times when wind and solar power and load fluctuate violently (such as times 9:00, 13:00, 15:00, etc.), there is also a large net load fluctuation range. Similarly, such nodes also have a large flexibility shortage.

[0185] b02) Comparison of flexibility supply and demand balance

[0186] Conventional research methods based on the node perspective lack the analysis of the flexible resource transmission process. The introduction of the transfer factor transforms it into a study of the line supply and demand balance problem, which can simultaneously reflect the node flexibility resource regulation capability and the line flexibility resource transmission and distribution capability. Figure 3The analysis shows that there is a large flexibility shortage in node 11. During the scheduling process, the lines connected to it need to bear a heavier task of transmitting flexibility resources. Therefore, the reference line (see Figure 2 The supply and demand balance of line flexibility of the four schemes is compared and analyzed. Figure 7 shown.

[0187] Depend on Figure 7 As shown, the bar graph is the range of flexibility demand for the system, and the line graph is the flexibility supply for each solution. Affected by the net load fluctuation of the system nodes and the prediction error, the reference line has both flexibility demand for upward and downward adjustment at each time point. Combining the load fluctuation curve with the wind and solar output curve, when it is in the peak load period (6:00-11:00, 13:00-15:00), the line flexibility demand for upward adjustment peaks, and when it is in the peak wind and solar period (6:00-19:00), the line flexibility demand for downward adjustment peaks.

[0188] Compared with Scheme 1, Schemes 2, 3, and 4 are configured with SOP, which significantly improves the supply and demand balance of flexible resources on the line; and compared with Schemes 1 and 2, Schemes 3 and 4 configure energy storage systems to increase system node flexibility resources, which significantly improves the supply and demand of flexible resources on the line. From the comparison of the above two types of schemes, it can be seen that the system configuration SOP can better improve the balance of upward flexibility, while the configuration of energy storage systems tends to improve the downward flexibility. This is because the configuration capacity of the energy storage system is much smaller than the total system load due to economic costs, and Figure 4 From the demand bar graph, we can see that the reference line has a much larger amount of upward flexibility than downward flexibility, so the energy storage system cannot provide sufficient upward flexibility support. SOP can effectively optimize the system flow distribution, which significantly improves the balance between upward flexibility supply and demand. However, SOP does not generate / consume system power in essence. When the system has a downward flexibility shortage, the system without energy storage has a weaker ability to "accommodate" excess flexibility resources. Table 7 shows the comparison of the overall flexibility indicators of the system, and its numerical information is consistent with Figure 7 The conclusions are basically consistent with those of the reference line selection, which verifies the rationality of the reference line selection. In summary, configuring SOP and energy storage system at the same time can effectively take into account the flexibility requirements of the system both upward and downward.

[0189] Table 7 Comparison of system flexibility indicators under four schemes

[0190]

[0191] b03) Output analysis:

[0192] Since SC has the characteristics of fast charging and discharging, it is suitable for smoothing the high-frequency components in the net load curve; LIB has the characteristics of large capacity and long charging and discharging duration, which is suitable for smoothing the low-frequency components in the net load curve; however, the shortage of low-frequency components is large. If LIB of the same capacity is configured, it will undoubtedly greatly increase its investment and operation and maintenance costs. Therefore, it is considered to cooperate with the upper-level power grid to jointly smooth the low-frequency components under the premise of time-of-use electricity prices. Figure 8 The figure shows the active output curves and charge states of LIB and SC in scenario 1 of scheme 4. The sampling interval is 15 minutes. The initial SOC of LIB and SC are both set to 0.5 and remain consistent throughout a scheduling cycle. The figure shows that the active charge and discharge states of SC switch quickly, which can effectively smooth out the shortage of high-frequency components. During the valley hours (0:00-7:00, 21:00-24:00, valley price: 0.32 yuan / kWh), the upper power grid provides power support for the low-frequency component and charges the LIB, and its SOC continues to rise but should not exceed the upper limit of 0.8; during the peak hours (8:00-11:00, 17:00-20:00, peak price: 0.58 yuan / kWh), the LIB responds quickly and undertakes most of the power output. When it reaches the power output upper limit of 0.7MW, the rest is supplemented by the upper power grid. Similarly, the SOC of the LIB should not fall below the lower limit of 0.2 during the discharge process. Therefore, the SOC value should be increased during the valley hours and normal times (12:00-16:00, normal price 0.42 yuan / kWh) to "accumulate power" for the peak discharge of the LIB. The power combination strategy of LIB and the upper-level power grid can not only effectively smooth the low-frequency component of the net load, but also LIB can achieve arbitrage through "low storage and high generation".

[0193] Compared with the single energy storage scheme 3, scheme 4 gives full play to the technical characteristics of different types of energy storage media and uses them in coordination. In actual operation, it can avoid the risk of SOC over-limit, maintain the SC's ability to respond to high-frequency power shortages, and reduce the frequency of LIB charge and discharge state transitions, extending its service life. Overall, the introduction of HESS in scheme 4 enriches the types of system flexibility resources and enhances the flexibility adjustment potential for different scenarios.

[0194] The voltage fluctuation comparative analysis is specifically as follows:

[0195] Under the same scenario, the average voltage of each node in the four schemes during the entire scheduling period is compared, such as Fig. 9 shown. Fig. 9It is shown that some nodes in Scheme 1 have voltage over-limit, while Schemes 2, 3, and 4 do not have voltage over-limit. The reason is that Schemes 2, 3, and 4 are configured with SOP, which can not only optimize the active power flow of the system, but also provide continuous reactive power support, greatly improving the system voltage level; from the overall four curves, compared with Schemes 1 and 2, Schemes 3 and 4 are configured with energy storage systems, which can transfer and control active flexibility resources in time, making the overall voltage fluctuation curve smoother. In summary, the dual time and space regulation characteristics of SOP and energy storage systems can effectively improve the dual flexibility tests of weak system flexibility regulation ability and line power transmission congestion.

[0196] The preferred specific embodiments of the present invention are described in detail above. It should be understood that a person skilled in the art can make many modifications and changes based on the concept of the present invention without creative work. Therefore, any technical solution that can be obtained by a person skilled in the art through logical analysis, reasoning or limited experiments based on the concept of the present invention on the basis of the prior art should be within the scope of protection determined by the claims.

Claims

1. A novel distribution system collaborative planning-operation method, characterized in that: Methods include: Constructing a new distribution system planning-operation joint optimization model for HESS-SOP node-network flexibility, wherein the optimization model is divided into a planning layer model and an operation layer model, wherein the constraints of the planning layer model include flexibility supply and demand balance constraints, and the constraints of the operation layer model include HESS-SOP operation constraints; The joint optimization model is solved based on a hybrid optimization algorithm to obtain an optimal planning configuration and an operation strategy result, wherein the optimal planning configuration includes an optimal SOP capacity and an optimal DCDC converter capacity.

2. A novel power distribution system collaborative planning-operation method according to claim 1, characterized in that: The novel power distribution system includes an intelligent soft switch SOP and a hybrid energy storage system HESS. The intelligent soft switch SOP includes a back-to-back voltage source converter VSC1 and a back-to-back voltage source converter VSC2. The back-to-back voltage source converter VSC1 is a converter ACDC1, and the back-to-back voltage source converter VSC2 is a converter ACDC2. The converter ACDC1 and the converter ACDC2 are connected to each other and a capacitor is connected in parallel. The hybrid energy storage system HESS adopts an active topology structure, including a converter DCDC1 and a converter DCDC2. The converter DCDC1 and the converter DCDC2 are both connected to the converter ACDC1 and the converter ACDC2. Lithium-ion batteries LIB are connected in parallel on both sides of the converter DCDC1, and supercapacitors SC are connected in parallel on both sides of the converter ACDC2.

3. A novel power distribution system collaborative planning-operation method according to claim 2, characterized in that: The HESS-SOP operation constraints include charge and discharge characteristic constraints, power loss constraints, power balance constraints, state of charge constraints and SOP regulation constraints.

4. A novel power distribution system collaborative planning-operation method according to claim 3, characterized in that: The charge and discharge characteristic constraints are: in, are the charge and discharge powers of LIB and SC at time t, are the charge and discharge flags of LIB and SC at time t, respectively, which are 0-1 variables, η LIB , η SC are the charge-discharge conversion efficiency of LIB and SC, are the total capacities of the two DC / DC converters respectively.

5. A novel power distribution system collaborative planning-operation method according to claim 4, characterized in that: The SOP regulation constraints are: Among them, P sop,i,t , P sop,j,t and are the active power output and the corresponding active power loss of SOP from ports i and j at time t, respectively, where ports i and j represent two ports of ACDC1 and ACDC2, respectively; sop,i , A sop,j are the active power loss coefficients at ports i and j of the SOP respectively; Q sop,i,t , Q sop,j,t are the reactive power output at ports i and j of the SOP respectively; Q sop,i,min , Q sop,j,min and Q sop,i,max , Q sop,j,max They are the upper and lower limits of reactive power output at ports i and j of SOP respectively; are the rated capacity of converters at ports i and j of SOP respectively; is the total active power loss of the HESS-SOP device at time t.

6. A novel power distribution system collaborative planning-operation method according to claim 1, characterized in that: The flexibility supply and demand balance constraint is: Among them, θ max is the maximum probability of insufficient flexibility of a given allowed line; E max For a given line flexibility that is less than the maximum expected value, E up 、E down are the expected values ​​of the flexibility deficit for upward and downward adjustments, θ up ,θ down Adjust the expected value of the probability of insufficient flexibility upward or downward respectively.

7. A novel power distribution system collaborative planning-operation method according to claim 6, characterized in that: The expected values ​​of the upward and downward adjustment of the flexibility deficiency are specifically: Among them, Z1 and Z2 increase and decrease the number of intervals with insufficient flexibility respectively; k1 and k2 increase and decrease the sequence number of intervals with insufficient flexibility respectively; They are the left and right time boundary points of the k1th interval of insufficient upward flexibility; are the left and right time boundary points of the k2th insufficient downward flexibility interval, M is the number of lines in the system, is the required transmission volume of up and down flexibility of line j at time t.

8. A novel power distribution system collaborative planning-operation method according to claim 7, characterized in that: The expected probability of insufficient upward and downward flexibility is: in, are the total duration of the upward and downward insufficient flexibility intervals in a scheduling cycle; T is the total scheduling cycle.

9. A novel power distribution system collaborative planning-operation method according to claim 1, characterized in that: The objective function of the planning layer model is: in, They are the annual investment cost and maintenance cost of SOP, HESS, etc.; The objective function of the operational layer model is: minF R =C L +C A +C EP +C fle Among them, c LIB 、c SC 、c L are the unit power operation cost and unit active network loss cost of LIB and SC respectively; c EP The price of electricity purchased from the higher-level power grid unit; The power support provided by the upper grid at time t in scenario s; is the total network loss of the distribution system at time t in scenario s; is the internal loss of HESS-SOP at time t in scenario s, N s is the number of scenes, P(s) is the scene probability; are the charge and discharge power of LIB and SC at time t in scenario s; c up 、c d It is the penalty factor for the flexibility exceeding the upper and lower limits.

10. A novel power distribution system collaborative planning-operation method according to claim 1, characterized in that: The specific steps of solving the joint optimization model based on the hybrid optimization algorithm to obtain the optimal planning configuration and operation strategy results are as follows: Initialize parameters and use Latin hypercube sampling to generate scenes; Enter the planning layer model to obtain scenario parameters and HESS initial configuration plan; Generate an initial configuration scheme population, the population includes SOP capacity and DCDC converter capacity, perform roulette wheel selection, multi-point crossover and multi-point mutation, and merge the parent and child populations; The annual investment and maintenance cost of HESS-SOP devices is used as individual fitness to determine whether it meets the constraints of the planning layer. If not, the chromosome is regenerated. If so, the fitness is calculated, and then it is determined whether it meets the convergence conditions of the planning layer. If so, the configuration results obtained by the planning layer are input into the operation layer model. Otherwise, roulette wheel selection, multi-point crossover and multi-point mutation are repeated. After the configuration results obtained by the planning layer model are input into the operation layer, the scenario s is set, the operation layer model is cone processed, the constraints of the operation layer are linearized, the solver is called to solve the operation layer model, and then the scenario is switched until all scenarios are traversed to determine whether the convergence conditions of the operation layer model are met. If not, the planning layer model is returned to be solved again. If so, it is determined whether the reproduction generation is reached. If so, the optimal planning configuration and operation strategy results are output. If not, roulette wheel selection, multi-point crossover and multi-point mutation are repeated.

Citation Information

Patent Citations

  • Power distribution network optimization scheduling method considering source-network-load-storage flexible resources

    CN115222195A

  • Power transmission network probability planning method and system considering operation flexibility

    CN115423236A

  • Power grid system control method and device considering source grid load storage collaborative optimization

    CN118281962A

  • Dispatch method and device for power system

    US20200161863A1