Goaf roadway filling device and method
By using a combination device of intercept structure, filling pipe and rebate pipe in goaf tunnels, the problems of complex construction and poor filling in the existing technology are solved, and rapid and strict goaf filling is achieved, ensuring the space. area safety and fire protection.
Patent Information
- Application Number
- CN202411038813.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-11-08
AI Technical Summary
The existing coal mine goaf tunnel closure technology has problems such as large construction project volume, slow closure speed, poor filling and risk of overturning. It is mainly because the brick wall does not have water filtering function and cannot effectively carry the pressure of filling mortar, resulting in the failure to seal it. Timely and air leakage.
The device including an intercepting structure, filling pipe and rebate pipe is adopted to block the moisture in the mortar through the support frame and straw bag. The filling pipe and rebate pipe are used to achieve rapid water filtration and sand fixation of the mortar to ensure tight filling.
It has achieved rapid and strict filling of goaf tunnels, improved closure speed, reduced construction difficulty and cost, avoided air leakage and downturn risks, and ensured the safety and fire protection of goaf.
Smart Images

Figure CN118911760A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining, and in particular to a goaf tunnel filling device and a filling method. Background Art
[0002] After the mining of the working face of the mine is completed, according to the requirements of the "Safety Regulations for Coal Mines", the withdrawal and closure work must be completed within 45 days. In order to prevent spontaneous combustion in the goaf, the goaf tunnels need to be filled and closed with mortar. The existing technology is to construct two brick walls outside the tunnel that needs to be closed, with a wall spacing of 5m. If the spacing exceeds 5m, the brick wall is easily pushed down by the mortar. Grooves should be cut around the brick wall, the groove depth should not be less than 0.5m, the thickness of the brick wall should not be less than 0.5m, the inner brick wall should be constructed to the top plate of the tunnel at one time, and the outer brick wall should be constructed to the top plate of the tunnel in 3 times. When the first construction height reaches 1 / 3 of the tunnel, the 5m distance space between the two brick walls is filled with water and sand. After the filling sand is settled and the filling water is filtered out, the brick walls are constructed in sequence to 2 / 3 of the tunnel and the top plate for water and sand filling. The purpose of segmented construction is that the brick wall does not have the function of filtering water during filling, but instead blocks all the mortar. Filling can only be stopped when the mortar reaches the upper edge of the brick wall, and the water can be discharged after the filling sand has settled. If the brick wall is constructed to the top plate at one time, the filling water cannot be discharged in time, and the mortar inventory is too large to solidify in time, causing the mortar to push down the brick wall.
[0003] The disadvantages of the prior art are:
[0004] 1. The construction work of using brick walls to fix sand is large and the closing speed is slow. Since the brick wall does not have the function of filtering water, in order to effectively bear the pressure of filling mortar, the thickness of the brick wall should be designed to be no less than 0.5m, and the depth of the grooves around the brick wall should be no less than 0.5m. Both require manual construction. There is currently no small mechanized equipment for constructing brick walls and cutting grooves, or it cannot be used due to space constraints, which increases the construction difficulty and the closing speed of the goaf. Whether the goaf is closed in time is an important factor in preventing and controlling fires in mines.
[0005] 2. Since the brick wall does not have the function of filtering water, the filling water cannot be discharged in time, resulting in slow filling speed, high wall bearing pressure, and the risk of knocking down the brick wall. The main reason for the problem is that better water filtering materials and corresponding construction technology have not been found.
[0006] 3. When filling and sealing to the top plate, it is easy for water and sand to be discharged at the same time, resulting in poor sealing and air leakage. The reason for the problem is that if the brick wall and the top plate are completely connected, the water cannot be discharged, resulting in the filling sand not being able to be filled to the top plate; if a drainage port is left between the brick wall and the top plate, the filling water and sand will be discharged at the same time, which will also lead to poor filling. Summary of the invention
[0007] The present invention aims to solve at least one of the technical problems in the related art to a certain extent. To this end, the embodiment of the present invention provides a goaf tunnel filling device and filling method, which can quickly filter water and fix sand, make the filling more tight, and effectively prevent the goaf from spontaneous combustion.
[0008] On the one hand, an embodiment of the present invention proposes a device for filling a goaf tunnel, comprising: an intercepting structure, a filling pipe and a return pipe, wherein two intercepting structures are provided and are respectively installed on the two end faces of the space to be closed in the tunnel, the intercepting structure comprises a support frame and a straw bag, the support frame is supported and connected to the end face of the space to be closed, the straw bag is connected to one side of the support frame and completely covers the end face of the space to be closed, so as to block the mortar and filter out part of the accumulated water contained in the mortar; one end of the filling pipe is connected to a filling mechanism located on the ground, and the other end of the filling pipe extends downward into a groove opened at the top of the space to be closed, so as to fill the space to be closed with mortar; the return pipe is arranged in the tunnel, one end of the return pipe is located in the groove opened at the top of the space to be closed, and the other end of the return pipe extends out of the intercepting structure, so as to discharge the accumulated water on the upper part of the filled mortar from the space to be closed to the outside.
[0009] In some embodiments, the water inlet of the return water pipe is located above the discharge port of the filling pipe.
[0010] In some embodiments, the support frame includes beams and columns, and a plurality of beams and columns are respectively provided and cross-connected with each other to form a mesh structure.
[0011] In some embodiments, the straw bag is connected to a side of the support frame facing the space to be enclosed.
[0012] In some embodiments, the crossbeam is connected to the side of the column facing away from the enclosed space, and the straw bag is connected to the column by a plurality of mutually parallel cross wooden boards.
[0013] In some embodiments, the distance between two adjacent horizontal wooden boards is 2-4 cm.
[0014] Another embodiment of the present invention provides a method for filling a goaf tunnel, using the above-mentioned device, including the following steps: a groove is provided at the top of the space to be sealed in the tunnel, a filling pipe is extended from the ground downward into the groove, and one end of the filling pipe located on the ground is connected to a filling mechanism; a return water pipe is provided in the space to be sealed in the tunnel, a water inlet end of the return water pipe is extended into the groove, and the water inlet of the return water pipe is located above the discharge port of the filling pipe;
[0015] Install pre-assembled intercepting structures on the two end faces of the space to be enclosed in the tunnel, and extend the drainage outlet of the return pipe to the outside of the intercepting structure; start the filling mechanism, and grout the space to be enclosed. Part of the moisture contained in the injected mortar is discharged outward through the intercepting structure until water is discharged outward from the return pipe, indicating that the mortar has completely filled the space to be enclosed, and then close the filling mechanism.
[0016] In some embodiments, the depth of the groove is greater than 0.5 m.
[0017] In some embodiments, when installing the interception structure, several groups of installation grooves are first opened on both sides of the space to be enclosed, and the two ends of the beam of the interception structure are respectively clamped in the corresponding installation grooves, so that all the beams are arranged in parallel, and the joints between the columns and the beams are connected by fasteners, and the bottom of the column is supported and fixed by a diagonal brace.
[0018] In some embodiments, when assembling the interception structure, several horizontal wooden boards are fixed equidistantly on one side of the column in the vertical direction, and the horizontal wooden boards and the crossbeams are located on both sides of the column. Straw bags are fixed to the horizontal wooden boards with nails, and the straw bags completely cover the end surface of the space to be enclosed. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings.
[0020] in:
[0021] Figure 1 It is a schematic diagram of the goaf tunnel filling device in the embodiment of the present invention when in use;
[0022] Figure 2 for Figure 1 A schematic diagram of the structure of the interception structure;
[0023] Figure 3 for Figure 2 Right view of;
[0024] Figure 4 for Figure 2 Left view of
[0025] Reference numerals:
[0026] 1-interception structure; 11-crossbeam; 12-upright column; 13-cross board; 14-straw bag; 2-return pipe; 3-filling pipe; 4-groove; 5-space to be closed. DETAILED DESCRIPTION
[0027] Embodiments of the present invention are described in detail below, and examples of the embodiments are shown in the accompanying drawings. The embodiments described below with reference to the accompanying drawings are exemplary and intended to be used to explain the present invention, but should not be understood as limiting the present invention.
[0028] The goaf tunnel filling device and filling method according to the embodiments of the present invention will be described below with reference to the accompanying drawings.
[0029] like Figure 1-4 As shown, an embodiment of the present invention proposes a device for filling a goaf tunnel, comprising: an intercepting structure 1, a filling pipe 3 and a return pipe 2. Two intercepting structures 1 are provided, which are respectively installed on the two end faces of the space to be closed 5 in the tunnel. The intercepting structure 1 comprises a support frame and a straw bag 14. The support frame is supported and connected to the end face of the space to be closed 5. The straw bag 14 is connected to one side of the support frame and completely covers the end face of the space to be closed 5 to block the mortar and filter out part of the accumulated water contained in the mortar; one end of the filling pipe 3 is connected to the filling mechanism located on the ground, and the other end of the filling pipe 3 extends downward into the groove 4 opened at the top of the space to be closed 5 to fill the space to be closed 5 with mortar; the return pipe 2 is arranged in the tunnel, one end of the return pipe 2 is located in the groove 4 opened at the top of the space to be closed 5, and the other end of the return pipe 2 extends out of the intercepting structure 1 to discharge the accumulated water in the upper part of the filled mortar from the space to be closed 5 to the outside.
[0030] The embodiment of the present invention matches the support frame with the straw bag 14, and utilizes the gap between the straw bag 14 and the support frame to fix the sand in the filling mortar and filter out the moisture in the mortar, thereby achieving rapid water filtration and sand fixation, and then filling and sealing the tunnel, which can quickly complete the filling and sealing of the goaf tunnel after the mining of the mine working face is completed, and effectively prevent the goaf from spontaneous combustion. Compared with the previous method of using brick walls to fix sand, it has the advantages of simple construction, good sand fixation and water filtration effect, tighter filling, low requirements for the proportion of filling mortar, and low cost. It can be filled in one go, and the filling speed is fast, which greatly improves the speed of filling and sealing the goaf.
[0031] Moreover, the support frame is made of wood, and the straw bags 14 and wood materials are more convenient and faster to transport than red bricks, saving labor, having high safety, and avoiding the risk of being injured by red bricks.
[0032] When filling to the top, due to the obstruction of the straw bag 14, the water in the mortar can be discharged in time, and the filling sand is effectively blocked, so that the filling sand can be filled to the top plate of the tunnel, thereby improving the tightness of the filling and effectively avoiding air leakage.
[0033] In the embodiment of the present invention, a groove 4 is formed at the top of the space 5 to be sealed, and a return pipe 2 is provided, and the water inlet of the return pipe 2 is provided in the groove 4, so that the water on the mortar after deposition can be discharged through the return pipe 2. By providing a filling pipe 3 and making the discharge port of the filling pipe 3 higher than the space 5 to be sealed in the tunnel, the tunnel can be filled more tightly.
[0034] The distance between the two interception structures 1 of the embodiment of the present invention can reach 20m. The distance between the two brick walls in the prior art is 5m. If the distance exceeds 5m, the brick wall is easily pushed down by mortar. If a 20m long lane needs to be filled, 5 brick walls need to be built, which consumes a lot of manpower and material resources.
[0035] In some embodiments, the water inlet of the return pipe 2 is located above the discharge port of the filling pipe 3. Whether water is discharged from the return pipe 2 can be used to determine whether the mortar has completely filled the space to be closed 5 in the tunnel.
[0036] In some embodiments, the support frame includes a crossbeam 11 and a column 12, and a plurality of crossbeams 11 and columns 12 are respectively provided and cross-connected to each other to form a mesh structure. This structure is more solid and is conducive to draining water from the filled mortar.
[0037] In some embodiments, the straw bag 14 is connected to the side of the support frame facing the to-be-enclosed space 5. The filling sand in the mortar is stably filled between the straw bags 14 at both ends, and the support frame supports the straw bag 14 to prevent the filling sand from knocking over the straw bag 14.
[0038] In some embodiments, the crossbeam 11 is connected to the side of the column 12 facing away from the enclosed space 5, and the straw bag 14 is connected to the column 12 by a plurality of mutually parallel cross planks 13. The straw bag 14 is further reinforced to improve the stability of the straw bag 14 and the support frame.
[0039] In some embodiments, the distance between two adjacent horizontal wooden boards 13 is 2-4 cm, which is conducive to draining moisture from the mortar.
[0040] Preferably, the distance between two adjacent horizontal planks 13 is 3 cm.
[0041] Another embodiment of the present invention provides a method for filling a goaf tunnel, using the above-mentioned device, comprising the following steps: a groove 4 is provided at the top of the space 5 to be sealed in the tunnel, a filling pipe 3 is extended from the ground downward into the groove 4, and one end of the filling pipe 3 located on the ground is connected to a filling mechanism; a return water pipe 2 is provided in the space 5 to be sealed in the tunnel, a water inlet end of the return water pipe 2 is extended into the groove 4, and the water inlet of the return water pipe 2 is located above the discharge port of the filling pipe 3;
[0042] A pre-assembled intercepting structure 1 is installed on the two end faces of the space to be enclosed 5 in the tunnel, and the drainage outlet of the return pipe 2 is extended to the outside of the intercepting structure 1; the filling mechanism is started to inject grout into the space to be enclosed 5, and part of the moisture contained in the injected mortar is discharged outward through the intercepting structure 1 until water is discharged outward from the return pipe 2, indicating that the mortar has completely filled the space to be enclosed 5, and the filling mechanism is closed.
[0043] It should be noted that after filling the mortar, the sand will sink quickly due to its greater specific gravity, and the accumulated water on the sand will be continuously filtered out through the gaps in the straw bag 14 and the gaps in the support frame. Since the filling pipe 3 is suspended in the groove 4 at the top and is lower than the return pipe 2, when the return pipe 2 flows out the filling water, it means that the filling height is greater than the height of the tunnel and the filling pipe 3, which further indicates that the space to be enclosed 5 has been filled with sand, ensuring that the tunnel is filled tightly without air leakage.
[0044] It can be understood that the drainage location of the return pipe 2 is a designated drainage point in the tunnel.
[0045] The embodiment of the present invention matches the support frame with the straw bag 14, and utilizes the gap between the straw bag 14 and the support frame to fix the sand in the filling mortar and filter out the moisture in the mortar, thereby achieving rapid water filtration and sand fixation, and then filling and sealing the tunnel, which can quickly complete the filling and sealing of the goaf tunnel after the mining of the mine working face is completed, and effectively prevent the goaf from spontaneous combustion. Compared with the previous method of using brick walls to fix sand, it has the advantages of simple construction, good sand fixation and water filtration effect, tighter filling, low requirements for the proportion of filling mortar, and low cost. It can be filled in one go, and the filling speed is fast, which greatly improves the speed of filling and sealing the goaf.
[0046] Moreover, the support frame is made of wood, and the straw bags 14 and wood materials are more convenient and faster to transport than red bricks, saving labor, having high safety, and avoiding the risk of being injured by red bricks.
[0047] When filling to the top, due to the obstruction of the straw bag 14, the water in the mortar can be discharged in time, and the filling sand is effectively blocked, so that the filling sand can be filled to the top plate of the tunnel, thereby improving the tightness of the filling and effectively avoiding air leakage.
[0048] In the embodiment of the present invention, a groove 4 is formed at the top of the space 5 to be sealed, and a return pipe 2 is provided, and the water inlet of the return pipe 2 is provided in the groove 4, so that the water on the mortar after deposition can be discharged through the return pipe 2. By providing a filling pipe 3 and making the discharge port of the filling pipe 3 higher than the space 5 to be sealed in the tunnel, the tunnel can be filled more tightly.
[0049] Furthermore, the groove 4 is located in the middle of the top of the space 5 to be enclosed, so that the mortar can be filled in the space 5 to be enclosed more evenly.
[0050] In some embodiments, the depth of the groove 4 is greater than 0.5 m, so that the depth of the groove 4 can be greater than the sum of the thicknesses of the filling pipe 3 and the return pipe 2 .
[0051] In some embodiments, when installing the interception structure 1, firstly, a plurality of installation grooves are opened on both sides of the space 5 to be enclosed, and the two ends of the cross beam 11 of the interception structure 1 are respectively clamped in the corresponding installation grooves, so that all the cross beams 11 are arranged in parallel, and the joints between the columns 12 and the cross beams 11 are connected by fasteners, and the bottom of the column 12 is supported and fixed by a diagonal brace, so that the cross beam 11 and the column 12 are more stable.
[0052] Furthermore, the depth of the installation groove is 0.5 m.
[0053] Furthermore, the fastener is a wire or a nail.
[0054] Furthermore, mounting grooves may be provided at the top and bottom of the space to be enclosed 5 for inserting the columns 12 .
[0055] In some embodiments, when assembling the interception structure 1, a number of horizontal wooden boards 13 are fixed equidistantly along the vertical direction on one side of the column 12, the horizontal wooden boards 13 and the crossbeams 11 are located on both sides of the column 12, and the straw bags 14 are fixed to the horizontal wooden boards 13 by nails, and the straw bags 14 completely cover the end surface of the space 5 to be enclosed.
[0056] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0057] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0058] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral one; it can be a mechanical connection, an electrical connection, or communication with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0059] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0060] In the present invention, the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" etc. mean that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the described specific features, structures, materials or characteristics may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.
[0061] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.
Claims
1. A goaf tunnel filling device, It is characterized in that include: An interception structure, wherein two interception structures are provided and are respectively installed on two end surfaces of the space to be enclosed in the tunnel, and the interception structure comprises a support frame and a straw bag, wherein the support frame is supported and connected to the end surface of the space to be enclosed, and the straw bag is connected to one side of the support frame and completely covers the end surface of the space to be enclosed, so as to block the mortar and filter out part of the accumulated water contained in the mortar; A filling pipe, one end of which is connected to a filling mechanism on the ground, and the other end of which extends downward into a groove formed at the top of the space to be enclosed, so as to fill the space to be enclosed with mortar; A return water pipe is arranged in the tunnel, one end of the return water pipe is located in a groove opened at the top of the space to be enclosed, and the other end of the return water pipe extends out of the intercepting structure to discharge the accumulated water on the upper part of the filled mortar from the space to be enclosed to the outside.
2. The goaf tunnel filling device according to claim 1, It is characterized in that The water inlet of the return water pipe is located above the discharge port of the filling pipe.
3. The goaf tunnel filling device according to claim 1, It is characterized in that The support frame includes a crossbeam and a column. A plurality of the crossbeams and a plurality of the columns are respectively provided and cross-connected with each other to form a mesh structure.
4. The goaf tunnel filling device according to claim 3, It is characterized in that The straw bag is connected to a side of the support frame facing the space to be enclosed.
5. The goaf tunnel filling device according to claim 4, It is characterized in that The crossbeam is connected to the side of the column facing away from the space to be enclosed, and the straw bag is connected to the column through a plurality of mutually parallel cross wooden boards.
6. The goaf tunnel filling device according to claim 5, It is characterized in that The spacing between two adjacent horizontal planks is 2-4 cm.
7. A method for filling goaf tunnels, It is characterized in that Using the device according to any one of claims 1 to 6, comprising the following steps: A groove is provided at the top of the space to be closed in the tunnel, a filling pipe is extended downward from the ground into the groove, and one end of the filling pipe located on the ground is connected to the filling mechanism; A return water pipe is arranged in the space to be closed in the lane, and the water inlet end of the return water pipe is extended into the groove, and the water inlet of the return water pipe is located above the discharge port of the filling pipe; Install the pre-assembled interception structure on the two end faces of the space to be enclosed in the laneway, and extend the drainage outlet of the return water pipe out of the interception structure; The filling mechanism is started to inject grout into the enclosed space, and part of the water contained in the injected mortar is discharged outward through the interception structure until water is discharged outward from the return pipe, indicating that the mortar has completely filled the enclosed space, and the filling mechanism is closed.
8. The method for filling goaf tunnels according to claim 7, It is characterized in that The depth of the groove is greater than 0.5m.
9. The method for filling goaf tunnel according to claim 7, It is characterized in that When installing the interception structure, first open several groups of installation grooves on both sides of the space to be enclosed, and respectively clamp the two ends of the beam of the interception structure in the corresponding installation grooves, so that all the beams are arranged in parallel, and the joints between the columns and the beams are connected by fasteners, and the bottom of the columns are supported and fixed by diagonal braces.
10. The method for filling goaf tunnel according to claim 9, It is characterized in that When assembling the interception structure, several horizontal wooden boards are fixed equidistantly on one side of the column in the vertical direction. The horizontal wooden boards and the crossbeams are respectively located on both sides of the column. Straw bags are fixed on the horizontal wooden boards by nails. The straw bags completely cover the end surface of the space to be enclosed.