Light high-damping shed tunnel buffering cushion layer, filtered water collecting system and construction method

Through the combination of EPS bead-sand buffer layer and geogrid reinforcement body, combined with composite geodrain drainage network and water tank, efficient buffering and filtering of the shed hole buffer layer is achieved, and the buffering effect and filtration in the existing technology are solved. The problem of insufficient water function provides stable water resources and reduces the impact of falling rocks.

CN118932896APending Publication Date: 2024-11-12TONGJI UNIV
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411020828.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing shed hole buffer cushion layer has insufficient buffering effect and water filtering collection function, resulting in excessive transmission of rockfall impact force and inability to effectively utilize mountain precipitation resources.

Method used

Using the combination of EPS bead-sand buffer layer and geogrid reinforced body, EPS beads have high adsorption rate and deformation coordination properties. A water filter collection system is constructed through a composite geodrain network and water tank to achieve both buffering and water filtering functions.

Benefits of technology

The EPS bead-sand buffer layer has excellent buffering effect and water filtration function, which can effectively reduce the impact force of falling rocks, extend the service life of the buffer layer, and solve the problem of water shortage in mountainous areas through the water filter collection system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118932896A_ABST
    Figure CN118932896A_ABST
Patent Text Reader

Abstract

The invention relates to a light high-damping shed tunnel buffering cushion layer, a filtered water collecting system and a construction method. The buffering cushion layer comprises an EPS bead-sand buffering layer (2), and at least one layer of geogrid reinforcement body (3) is further arranged in the EPS bead-sand buffering layer (2); and the EPS bead-sand buffer layer (2) comprises sandy soil and EPS beads (21) dispersed in the sandy soil. The filtered water collecting system comprises a shed tunnel buffer cushion layer, a composite geotechnical drainage net (4) and a water tank (5) for collecting water; the composite geotechnical drainage net (4) is laid on the top face of the reinforced concrete structure (1), and the buffering cushion layer is laid on the composite geotechnical drainage net (4). And the composite geotechnical drainage network (4) is communicated with the water tank (5) through a drainage pipeline (6). Compared with the prior art, the shed tunnel buffering cushion layer has an excellent buffering effect on slope rockfall, and meanwhile, the shed tunnel buffering cushion layer is matched with a water filtering and collecting system to achieve a good water filtering and collecting effect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of civil engineering, and in particular relates to a lightweight high-damping shed tunnel buffer layer, a water filtration collection system and a construction method. Background Art

[0002] Shed tunnels are a common means of preventing rockfalls on mountain roads and tunnel entrances and exits, and are usually composed of a cushion layer and a reinforced concrete structure. Most of the impact energy of rockfall is dissipated through the cushion layer, and the remaining impact energy is transmitted to the reinforced concrete structure below. Therefore, the energy dissipation capacity of the cushion layer is critical to the long-term use of the shelf tunnel structure.

[0003] Commonly used cushion layers include: ① directly using plain fill as cushion layer; ② using a layer of backfill and a layer of impact-resistant plate to form a sandwich structure; ③ laying a sand layer on the upper part and laying EPS board on the lower part to form a cushion layer; ④ using assembled rubber energy dissipation board as cushion layer. However, these protective cushion layers all have certain problems. The buffering effect of pure fill is poor. In order to achieve the buffering effect, the thickness of the buffer cushion layer is set larger, but it will produce a larger static load on the lower structure, thereby increasing the project cost; although the combined use of backfill soil and impact-resistant plates has a better buffering effect, its construction is complicated and the cost is high. Under the impact of high-energy rockfall, it may cause plastic deformation or damage to the impact-resistant plates; the sand layer and EPS board cushion layer have a better buffering effect, but under the action of high-energy impact, the EPS board will undergo plastic deformation, and the stress diffusion effect of the EPS board is poor, which easily causes stress to concentrate below the impact point, and the transportation of the EPS board is extremely inconvenient, further limiting the application of the buffer cushion layer of this structure; the use of assembled rubber energy dissipation plates has a better buffering effect, but directly bearing the impact of falling rocks will damage the buffer cushion layer, and the use and maintenance costs are high.

[0004] In addition, shed-tunnel structures are widely used in mountain roads. Many mountainous areas have long-term water shortages due to complex terrain and uneven precipitation distribution. Residents often face difficulties in accessing water, especially in the dry season. In addition, the spread of wildfires is often closely related to the lack of water resources. The shed-tunnel buffer layer can be used as a rainwater collection device to alleviate the problem of water shortage in mountainous areas by filtering and collecting precipitation. This not only provides residents with a stable source of water, but also plays an important role in the dry season and preventing wildfires.

[0005] Therefore, it is urgent to develop a shed cave buffer cushion layer and a corresponding water filtration and collection system that take into account both buffering effect and water filtration and collection effect. Summary of the invention

[0006] The purpose of the present invention is to provide a lightweight and high-damping shed cave buffer layer, a water filtering and collecting system and a construction method in order to overcome the defects of the existing shed cave buffer layer, such as poor buffering effect and lack of water filtering and collecting function.

[0007] The purpose of the present invention can be achieved by the following technical solutions:

[0008] The present invention provides a lightweight high-damping shed cave cushion layer, the cushion layer comprising an EPS bead-sand cushion layer, and at least one layer of geogrid reinforcement body is further arranged in the EPS bead-sand cushion layer;

[0009] The EPS bead-sand buffer layer includes sand and EPS beads dispersed in the sand.

[0010] Furthermore, the amount of EPS beads added is 0.25-0.75% of the total mass of the EPS bead-sand buffer layer. When the amount of EPS beads added is low, the buffering properties cannot be well exerted, and when the amount of EPS beads added is high, falling rocks are easy to penetrate the buffer layer, thereby causing damage to the concrete structure below.

[0011] Furthermore, the diameter of the EPS beads is 3-5 mm.

[0012] Furthermore, the porosity of the EPS beads is 45-55%.

[0013] Furthermore, the EPS beads have a relatively high adsorption rate of about 80-90%; at the same time, the EPS beads have a relatively large specific surface area, both indicating that they have excellent adsorption and filtration effects.

[0014] Furthermore, the EPS beads have excellent deformation coordination performance, and can produce a deformation of more than 90% of their own volume and are easy to recover after deformation.

[0015] EPS beads, also known as expandable polystyrene foam filter beads, are white beads made by adding liquefied petroleum gas to suspended polystyrene resin and are a lightweight filter material.

[0016] Furthermore, the ratio of the distance from the geogrid reinforcement body to the bottom of the cushion layer to the thickness of the cushion layer is 0.5-0.75.

[0017] The present invention also provides a water filtration and collection system comprising the above-mentioned shed hole buffer cushion layer, and also comprising a composite geotextile drainage net and a water tank for collecting water;

[0018] The composite geotextile drainage net is laid on the top surface of the reinforced concrete structure, and the buffer cushion layer is laid on the composite geotextile drainage net;

[0019] The composite geotextile drainage net is communicated with the water tank through a drainage pipe.

[0020] Furthermore, a geomembrane is laid between the reinforced concrete structure and the slope.

[0021] Furthermore, the reinforced concrete structure is a box structure, which has good load-bearing capacity and can withstand the impact of falling rocks on the slope after laying the EPS bead-sand buffer layer.

[0022] Furthermore, a plurality of drainage holes are provided in the reinforced concrete structure.

[0023] Furthermore, the diameter of the drainage hole is 8-12 cm, preferably 10 cm.

[0024] Furthermore, the drainage holes are arranged at intervals with a spacing of 0.5-1.0m.

[0025] Furthermore, the drainage pipe includes a drainage transverse branch pipe and a drainage longitudinal branch pipe connected to the drainage transverse branch pipe.

[0026] Furthermore, the water flows through the composite geotextile drainage net and is then discharged through the drainage holes, and then enters the water tank through the drainage horizontal branch pipe and the drainage vertical branch pipe in sequence.

[0027] Furthermore, the water tank is arranged below the shed hole, and the capacity of the water tank depends on the local water demand.

[0028] Furthermore, the water tank comprises a water inlet and a water outlet, wherein the water inlet is connected to a drainage pipe.

[0029] The present invention also provides a construction method of a water filtration and collection system, comprising the following steps:

[0030] S1: Casting reinforced concrete structure and opening drainage holes in the reinforced concrete structure;

[0031] S2: Install drainage pipes on the side of the shed hole and lay out a water tank under the shed hole;

[0032] S3: Lay composite geotextile drainage net on the top surface of reinforced concrete structure;

[0033] S4: The EPS beads are mixed evenly with sand and then laid on the composite geotextile drainage net to form an EPS bead-sand buffer layer, and geogrid reinforcement is laid in the EPS bead-sand buffer layer to form a shed cave buffer layer.

[0034] Furthermore, in step S4, water is added during the stirring and mixing process, and the mass of the water is 4-6% of the total mass of the EPS beads and the sand, preferably 5%, to promote the mixing of the EPS beads and the sand.

[0035] Furthermore, after the rockfall impact, the rocks need to be cleared out in time, and the impact pit needs to be loosened and filled using a shovel.

[0036] Compared with the prior art, the present invention has the following beneficial effects:

[0037] (1) In the shed cave cushion layer of the present invention, the combined use of the lightweight and high-damping EPS bead-sand cushion layer and the geogrid reinforcement body has an excellent cushioning effect; at the same time, the EPS bead-sand cushion layer has excellent filtering and adsorption functions, which can realize its water filtration and collection function.

[0038] (2) The geogrid-reinforced EPS bead-sand cushion layer of the present invention has the advantages of light weight, high damping and high energy consumption, which can significantly reduce the impact force of falling rocks and diffuse the impact stress. The friction and locking effect between the geogrid reinforcement body and the cushion layer can effectively convert the vertical impact force into horizontal tension, thereby significantly reducing the impact force transmitted to the reinforced concrete structure.

[0039] (3) The EPS beads of the present invention can produce a deformation of more than 90% of their own volume and are easy to recover after deformation. The deformation coordination of the EPS beads can compensate for the degradation of the cushioning layer performance after the impact of falling rocks, thereby improving the ability of the cushioning layer to resist multiple impacts of falling rocks.

[0040] (4) The combined use of the EPS beads and the composite geotextile drainage net of the present invention has excellent filtering and water purification effects. The filtered and purified rainwater and fissure water can be used for drinking, irrigation, forest fire fighting, etc.

[0041] (5) The shed hole buffer layer of the present invention, the composite geotextile drainage net, the drainage pipe and the water tank together constitute a water filtration and collection system, which is simple to construct and maintain, and has excellent buffering and water filtration and collection effects.

[0042] (6) The EPS beads used in the present invention can be obtained by extruding waste EPS materials, which is low-cost and environmentally friendly. EPS beads are easy to transport and can be used to lay the cushion layer by simple mechanical mixing with sand, which is convenient for construction. In addition, the EPS beads used in the present invention are light in weight and have a density of 0.019 g / cm 3 , uniform particles, good deformation and rebound characteristics, and long service life.

[0043] (7) The shed cave cushion layer of the present invention is easy to repair. After the rockfall impact, the impact pit can be loosened and filled to restore the performance of the cushion layer. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 Schematic diagram of the structure and force of the EPS bead-sand buffer layer of Example 1 of the present invention.

[0045] Figure 2 This is a schematic diagram of the deformation of the EPS beads of Example 1 of the present invention.

[0046] Figure 3 This is a microscopic schematic diagram of the filtration of EPS beads in Example 1 of the present invention.

[0047] Figure 4 It is a structural schematic diagram of the shed cave structure and the water filtration and collection system of Example 2 of the present invention.

[0048] Figure 5 This is a schematic structural diagram of a water tank according to Embodiment 2 of the present invention.

[0049] Figure 6 The maximum impact force of falling rocks under multiple impacts in Example 3 of the present invention: (a) unreinforced cushion layer; (b) 1 / 3 geogrid reinforced cushion layer; (c) 1 / 2 geogrid reinforced cushion layer; (d) 2 / 3 geogrid reinforced cushion layer.

[0050] Description of the markings in the figure:

[0051] 1- reinforced concrete structure, 11- drainage hole, 2- EPS bead-sand buffer layer, 21- EPS bead, 3- geogrid reinforcement, 4- composite geonet drainage net, 5- water tank, 51- water inlet, 52- water outlet, 6- drainage pipe, 61- drainage horizontal branch pipe, 62- drainage vertical branch pipe, 7- geomembrane. DETAILED DESCRIPTION

[0052] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is implemented based on the technical solution of the present invention, and provides a detailed implementation method and specific operation process, but the protection scope of the present invention is not limited to the following embodiments.

[0053] In the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention; the terms "first", "second", and "third" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance; in addition, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0054] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0055] Embodiment 1:

[0056] The present embodiment provides a lightweight high-damping shed cave cushion layer, which includes an EPS bead-sand cushion layer 2, wherein the EPS bead-sand cushion layer 2 includes sand and EPS beads 21 dispersed in the sand. At least one layer of geogrid reinforcement 3 is also provided in the EPS bead-sand cushion layer 2, and the ratio of the distance from the geogrid reinforcement 3 to the bottom of the cushion layer to the thickness of the cushion layer is 0.5-0.75, preferably 2 / 3.

[0057] The amount of EPS beads 21 added in this embodiment is 0.25-0.75% of the total mass of the EPS bead-sand buffer layer 2, preferably 0.75%. When the amount of EPS beads 21 added is low, its buffering properties cannot be fully exerted. When the amount of EPS beads 21 added is high, falling rocks are easy to penetrate the buffer layer, thereby causing damage to the concrete structure below. Figure 1 As shown, the shed hole buffer layer of this embodiment can significantly reduce the impact force of falling rocks and diffuse the impact stress. The friction and locking effect between the geogrid reinforcement body and the buffer layer can effectively convert the vertical impact force into horizontal tension, thereby significantly reducing the impact force transmitted to the reinforced concrete structure. Figure 2 As shown, the EPS beads 21 can produce a deformation of more than 90% of their own volume and are easy to recover after deformation. The deformation coordination of the EPS beads 21 can compensate for the degradation of the cushion layer performance after the rockfall impact, and improve the ability of the cushion layer to resist multiple rockfall impacts. In addition,

[0058] The diameter of the EPS beads 21 in this embodiment is 3-5 mm, and the porosity of the EPS beads 21 is about 50%. At the same time, it has a high adsorption rate and a large specific surface area. Since the EPS beads have excellent filtering, adsorption, separation, oxygenation and water quality regulation functions, their large specific surface area can adsorb particulate matter, suspended matter, positive ions and negative ions in water ( Figure 3 Therefore, the cushion layer of this embodiment can also be used as an excellent water resource filtering and collecting container, which can filter and collect rainwater and fissure water.

[0059] Therefore, the EPS bead-sand buffer layer 2 of this embodiment has the characteristics of light weight, high damping and significant energy dissipation effect. The combined use with the geogrid reinforcement body 3 reduces the penetration of falling rocks, diffuses and transforms the impact force of falling rocks, and also has good water filtration and collection functions.

[0060] Embodiment 2:

[0061] This embodiment provides a filtered water collection system. Figure 4 As shown, the filtered water collection system includes not only the shed hole buffer layer of Example 1, but also a composite geotextile drainage net 4 and a water tank 5 for collecting water. The composite geotextile drainage net 4 is laid on the top surface of the reinforced concrete structure 1, the buffer layer is laid on the composite geotextile drainage net 4, and the composite geotextile drainage net 4 is connected to the water tank 5 through a drainage pipe 6.

[0062] In order to ensure the drainage direction and prevent underwater leakage, a geomembrane 7 is laid between the reinforced concrete structure 1 and the slope in this embodiment. In order to collect and filter rainwater and fissure water, a plurality of drainage holes 11 are opened in the reinforced concrete structure 1 of this embodiment. The drainage pipe 6 includes a drainage lateral branch pipe 61 and a drainage longitudinal branch pipe 62 connected to the drainage lateral branch pipe 61. The water is filtered by the composite geotextile drainage net 4 and then discharged through the drainage hole 11, and then passes through the drainage lateral branch pipe 61 and the drainage longitudinal branch pipe 62 in sequence to enter the water tank 5. The water tank 5 of this embodiment is set below the shed hole, such as Figure 5 As shown, the water tank 5 of this embodiment includes a water inlet 51 and a water outlet 52 , wherein the water inlet 51 is connected to the drainage pipe 7 .

[0063] The construction method of the water filtering and collecting system of this embodiment comprises the following steps:

[0064] S1: pouring a reinforced concrete structure 1 and opening a drainage hole 11 in the reinforced concrete structure 1;

[0065] S2: Install a drainage pipe 6 on the side of the shed hole and lay a water tank 5 under the shed hole;

[0066] S3: laying a composite geotextile drainage net 4 on the top surface of the reinforced concrete structure 1;

[0067] S4: EPS beads 21 and sand are stirred and mixed evenly, and water is added during the stirring and mixing process, and the mass of water is 5% of the total mass of EPS beads 21 and sand. Then, the EPS beads-sand buffer layer 2 is laid on the composite geotextile drainage net 4, and the geogrid reinforcement body 3 is laid in the EPS beads-sand buffer layer 2 to form a shed hole buffer layer.

[0068] Embodiment 3:

[0069] Based on the problems existing in conventional buffer pads and the current situation of water shortage in mountainous areas, this embodiment provides a multifunctional buffer pad that is lightweight, highly damped, highly durable, and can filter and collect water resources, as well as a water filtration and collection system including the buffer pad and a construction method thereof.

[0070] As a lightweight, high-damping buffer material, EPS bead-sand can prolong the interaction time between falling rocks and the buffer layer, thereby reducing the impact force of falling rocks. However, when the amount of EPS beads 21 added is low, its buffering properties cannot be fully utilized. When the amount of EPS beads 21 added is high, falling rocks are easy to penetrate the buffer layer, thereby causing damage to the concrete structure below. In view of this, the present invention lays a geogrid reinforcement body 3 inside the EPS bead-sand buffer layer 2 to reduce the penetration depth of falling rocks, diffuse the impact force of falling rocks, and convert the vertical impact force into horizontal reinforcement tension ( Figure 4 shown).

[0071] The combined use of 0.75% EPS beads-sand and 2 / 3 geogrid in this embodiment has obvious advantages in reducing the impact force of falling rocks, diffusing impact stress and resisting multiple impacts of falling rocks. Specifically, 0.75% EPS beads-sand means that the EPS beads account for 0.75% of the total mass of the EPS beads-sand buffer layer 2, and 2 / 3 geogrid means that the ratio of the distance from the geogrid to the roof of the shed cave (i.e., the bottom of the buffer layer) to the thickness of the buffer layer is 2 / 3. When the EPS bead dosage is 0.75%, its volume ratio has exceeded 58% of the buffer layer. If EPS beads are added continuously, it is difficult to carry out large-scale mechanical stirring and mixing evenly. Therefore, this embodiment uses EPS beads 21 with dosages of 0%, 0.25%, 0.5% and 0.75% for impact resistance testing. The tensioning and locking effect of the geogrid reinforcement body 3 can drive more buffer materials to resist the impact of falling rocks, diffuse the impact force of falling rocks, and convert the vertical impact force of falling rocks into horizontal tension of the reinforcement. The laying position of the geogrid reinforcement body 3 is a key factor affecting the tensioning and locking effect of the geogrid. Therefore, the laying position of the geogrid reinforcement body 3 in this embodiment is set to 1 / 3, 1 / 2 and 2 / 3 (the ratio of the distance from the geogrid reinforcement body 3 to the bottom of the buffer layer to the thickness of the buffer layer).

[0072] Figure 6 The maximum impact force of the cushion layer with different EPS bead 21 content and different geogrid reinforcement position under multiple rockfall impacts is given. Figure 6 a), the maximum impact force of 0.75% EPS bead-sand cushion layer is the smallest under low energy impact, but as the number of impacts increases, the maximum impact force exceeds that of 0.5% EPS bead-sand cushion layer, and the growth rate increases significantly. This is due to the large penetration depth of the cushion layer. The coupling of 2 / 3 geogrid and 0.75% EPS beads has excellent buffering and force reduction effect. Its maximum impact force is the smallest under multiple impacts of falling rocks, and the maximum impact force growth rate is the smallest ( Figure 6 d), which shows that the 2 / 3 geogrid reinforced 0.75% EPS bead-sand cushion layer has the characteristics of "hardness and flexibility", excellent force reduction effect, and also improves the ability of the cushion layer to resist multiple impacts of falling rocks.

[0073] In addition, the EPS beads 21 of this embodiment have excellent filtering, adsorption, separation, oxygenation and water quality regulation functions. Its large specific surface area can adsorb particulate matter, suspended matter, positive ions and negative ions in water. Therefore, the cushion layer of this embodiment can also be used as an excellent water resource filter and collection container, which can filter and collect rainwater and crack water on the slope. A composite geotextile drainage net 4 is laid at the bottom of the cushion layer to filter the collected water again, and then the filtered water is discharged to the drainage hole 11 through the drainage channel of the reinforced concrete structure 1.

[0074] In addition, in order to ensure the drainage direction and prevent underwater leakage, a geomembrane 7 is laid between the slope and the reinforced concrete structure. The collected filtered water is discharged to the water tank 5 through the drainage horizontal branch pipe 61 and the drainage vertical branch pipe 62; the water tank 5 includes a water inlet 51 and a drain outlet 52. The filtered water can be used for drinking, irrigation, forest fire fighting, etc. The location of the water tank 5 should be below the shed hole and can be set according to the actual specific water use location.

[0075] The construction process of the geogrid reinforced EPS bead-sand cushion layer in this embodiment is as follows:

[0076] (1) After the reinforced concrete structure 1 is poured, drainage holes 11 are set according to the maximum water volume in the local flood season, and the intervals are set between 0.5-1.0m. The diameter of the drainage holes 11 should not be too small.

[0077] (2) A drainage transverse branch pipe 61 is installed on the side of the shed hole, and a drainage longitudinal branch pipe 62 is arranged according to the required position of the water tank 5. Generally, one drainage longitudinal branch pipe 62 corresponds to one water tank 5.

[0078] (3) A water tank 5 is arranged at an appropriate location. The capacity of the water tank 5 depends on the local water demand. The water tank 5 should be located below the shed hole.

[0079] (4) Lay a composite geotextile drainage net 4 on the top surface of the reinforced concrete structure 1.

[0080] (5) The EPS beads 21 and sand are mechanically stirred and mixed. The amount of EPS beads 21 added is preferably 0.75%. During the mixing process, 5% of the total mass ratio of water needs to be added to ensure uniform mixing.

[0081] (6) The EPS bead-sand buffer layer 2 is laid in layers, a geomembrane 7 is laid between the slope and the reinforced concrete structure 1 , and a geogrid reinforcement body 6 is laid in the EPS bead-sand buffer layer 2 .

[0082] (7) Maintenance of cushion layer: After the rockfall impact, remove the rocks and use a shovel to loosen and fill the impact pit.

[0083] The above description of the embodiments is to facilitate the understanding and use of the invention by those skilled in the art. It is obvious that those skilled in the art can easily make various modifications to these embodiments and apply the general principles described herein to other embodiments without creative work. Therefore, the present invention is not limited to the above embodiments, and improvements and modifications made by those skilled in the art based on the disclosure of the present invention without departing from the scope of the present invention should be within the scope of protection of the present invention.

Claims

1. A lightweight high damping shed cave cushion layer, characterized in that: The cushion layer comprises an EPS bead-sand cushion layer (2), and at least one layer of geogrid reinforcement body (3) is further provided in the EPS bead-sand cushion layer (2); The EPS bead-sand buffer layer (2) comprises sand and EPS beads (21) dispersed in the sand.

2. A lightweight high damping shed cave cushion layer according to claim 1, characterized in that: The amount of the EPS beads (21) added is 0.25-0.75% of the total mass of the EPS beads-sand buffer layer (2).

3. The lightweight high damping shed cave cushion layer according to claim 1 is characterized in that: The diameter of the EPS beads (21) is 3-5 mm, and the porosity of the EPS beads (21) is 45-55%.

4. The lightweight high damping shed cave cushion layer according to claim 1 is characterized in that: The ratio of the distance from the geogrid reinforcement body (3) to the bottom of the cushion layer to the thickness of the cushion layer is 0.5-0.

75.

5. A water filtration and collection system comprising the shed cave buffer layer according to any one of claims 1 to 4, characterized in that: It also includes a composite geotextile drainage net (4) and a water tank (5) for collecting water; The composite geotextile drainage net (4) is laid on the top surface of the reinforced concrete structure (1), and the buffer cushion layer is laid on the composite geotextile drainage net (4); The composite geotextile drainage net (4) is connected to the water tank (5) via a drainage pipe (6).

6. A filtered water collection system according to claim 5, characterized in that: A geomembrane (7) is laid between the reinforced concrete structure (1) and the slope.

7. A filtered water collection system according to claim 5, characterized in that: A plurality of drainage holes (11) are provided in the reinforced concrete structure (1); The drainage pipe (6) comprises a drainage transverse branch pipe (61) and a drainage longitudinal branch pipe (62) connected to the drainage transverse branch pipe (61). Water flows through the composite geotextile drainage net (4) and is discharged through the drainage hole (11), and then passes through the drainage transverse branch pipe (61) and the drainage longitudinal branch pipe (62) in sequence and enters the water tank (5).

8. A filtered water collection system according to claim 5, characterized in that: The water tank (5) is arranged below the shed hole; The water tank (5) comprises a water inlet (51) and a water outlet (52), wherein the water inlet (51) is in communication with a drainage pipe (6).

9. A construction method of the water filtration and collection system according to claim 5, characterized in that: The following steps are involved: S1: pouring a reinforced concrete structure (1), and opening a drainage hole (11) in the reinforced concrete structure (1); S2: Install a drainage pipe (6) on the side of the shed hole and lay a water tank (5) under the shed hole; S3: laying a composite geotextile drainage net (4) on the top surface of the reinforced concrete structure (1); S4: The EPS beads (21) are mixed evenly with sand and soil, and then laid on the composite geotextile drainage net (4) to form an EPS bead-sand buffer layer (2), and a geogrid reinforcement body (3) is laid in the EPS bead-sand buffer layer (2) to form a shed cave buffer layer.

10. A construction method for a water filtration and collection system according to claim 9, characterized in that: In step S4, water is added during the stirring and mixing process, and the mass of the water is 4-6% of the total mass of the EPS beads (21) and the sand.

Citation Information

Patent Citations

  • Lightweight high-energy-consumption rockfall protection geotextile bag buffer cushion layer and construction method thereof

    CN115162403A

  • Guide and discharge device

    CN117926845A

  • Seepage prevention structure applied to evaporation pond in coal chemical industry

    CN203188252U

  • Hangar tunnel top structure that anti mud -rock flow and falling rocks strike

    CN206000550U

  • Drainage system applied to shed tunnel

    CN220057678U