Industrial park carbon data visualization method and system based on UE5

Through Unreal Engine UE5 and the Internet of Things platform, a high-precision three-dimensional twin model is built and carbon data is monitored in real time, which solves the problems of insufficient details and low data processing efficiency in the existing technology, and realizes comprehensive carbon data analysis and display of industrial parks. Support scientific decision-making.

CN118965516APending Publication Date: 2024-11-15SHANGHAI JIAOTONG UNIV +1
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411013814.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-15

AI Technical Summary

Technical Problem

The existing carbon data visualization system has insufficient details of the three-dimensional model in the industrial park, low data processing efficiency, and failed to realize real-time data monitoring and comprehensive analysis, which affects decision makers' scientific decisions.

Method used

Using Unreal Engine UE5 to build a three-dimensional twin model, combined with Rhino and C4D software for refined modeling, obtain and process carbon data in real time through the Internet of Things platform, and use blueprints to analyze and visualize display to achieve carbon emissions, carbon sinks and carbon offsets calculation and presentation.

Benefits of technology

It improves the accuracy and details of the three-dimensional model, realizes real-time data monitoring and comprehensive analysis, improves user experience and decision-making support capabilities, and provides a scientific and low-carbon development plan.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118965516A_ABST
    Figure CN118965516A_ABST
Patent Text Reader

Abstract

The invention provides a UE5-based industrial park carbon data visualization method and system, and the method comprises the steps: constructing a three-dimensional twinborn model comprising an industrial park and a city base according to the industrial park and surrounding city buildings; the method comprises the following steps: monitoring and collecting various original data according to a sensor deployed in an industrial park, and calculating real-time carbon emission, carbon sink and carbon offset of the industrial park; obtaining various original data of the industrial park in real time through an Internet of Things platform and a data interface, and processing the original data to obtain various carbon data of the industrial park; and performing visual presentation and local browser deployment on various carbon data and industrial information data of the industrial park in cooperation with the three-dimensional twinborn model. According to the method, the unreal engine UE5 is used as an engine of a carbon data visualization system, Rhino and C4D software is used for modeling an industrial park model, the industrial park model is combined with a city base model, and the three-dimensional twin model is created by importing the model into the unreal engine UE5, so that the three-dimensional visualization problem of the industrial park is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of carbon data visualization, and in particular to a method and system for visualizing carbon data of an industrial park based on UE5. Background Art

[0002] Currently, in the field of carbon data visualization systems, the existing models are limited by their low accuracy, resulting in insufficient visualization details in the three-dimensional model of the industrial park, which can easily lead to misunderstandings among decision makers. Limited by the low efficiency of data processing in the existing models, the carbon data and twin models cannot be interacted after data cleaning and analysis, which may require more manual settings and affect the user experience; the existing models have certain limitations in the display of park data, and fail to fully and clearly display all aspects of the industrial park, such as industrial park information, carbon emission trends, carbon sinks, etc., which affects the decision makers' scientific decision-making.

[0003] In the patent document with publication number CN116579902A, a digital park electric carbon data mapping method, system, equipment and storage medium are disclosed, which belongs to the method of building a digital park electric carbon analysis method. Although it can support the electric carbon analysis of the digital park, it cannot achieve real-time data Internet of Things, three-dimensional twin model visualization interaction and comprehensive monitoring and analysis of the park's carbon data. Summary of the invention

[0004] In view of the defects in the prior art, the purpose of the present invention is to provide an industrial park carbon data visualization method and system based on UE5.

[0005] According to the present invention, a method for visualizing carbon data of an industrial park based on UE5 includes:

[0006] Steps to build a 3D twin model: Based on the industrial park and surrounding urban buildings, build a 3D twin model that includes the industrial park and the urban base;

[0007] Steps to build a carbon emission and carbon sink calculation model: Based on the sensors deployed in the industrial park, monitor and collect various raw data to calculate the real-time carbon emissions, carbon sinks and carbon offsets of the industrial park;

[0008] Steps to obtain carbon data: Build an IoT platform, obtain various raw data of the industrial park in real time through the IoT platform and data interface, and process the raw data to obtain various carbon data of the industrial park;

[0009] Steps for deploying the three-dimensional twin model: Integrate the carbon data and industrial information data of the industrial park with the three-dimensional twin model for visualization and local browser deployment.

[0010] Preferably, the step of constructing a three-dimensional twin model includes: obtaining urban satellite image data, industrial park POI data, DEM elevation data, building ship data, traffic network data, water system data, lake data and OSM data around the industrial park, performing data processing in QGIS software, and importing the processed data into city2022 software to generate a city base model;

[0011] The industrial park was modeled using Rhino and C4D software, and then the industrial park model was merged with the urban base model through C4D software. After the merger, it was imported into Unreal Engine UE5 to generate a three-dimensional twin model.

[0012] Preferably, the generation of the three-dimensional twin model includes:

[0013] In Unreal Engine UE5, the industrial park model and the city base model are merged through plug-ins, and the lighting system, sky system and camera system are introduced.

[0014] Preferably, the carbon emissions calculation formula of the industrial park is as follows:

[0015] E=Σ(AP×EF)

[0016] Where: E represents emissions, AP represents activity data, EF represents emission factor, ∑ represents summation, and the emissions are obtained by multiplying the sum of each activity data by the corresponding emission factor;

[0017] The carbon sequestration calculation formula of the industrial park is as follows:

[0018] Carbon sink = A × C;

[0019] In the formula: A represents area, C represents carbon sink coefficient;

[0020] The carbon offset calculation formula for the industrial park is as follows:

[0021] N=(C×I) / Q

[0022] In the formula: N represents the number of times the mobile phone is charged, Q represents the power, C represents the battery capacity of the mobile phone, and I represents the output power of the charger.

[0023] Preferably, the carbon data include international carbon data and park carbon data. The international carbon data include global carbon emission data, global carbon emission data of various sectors, annual changes in carbon fixation in domestic ecosystems, global carbon emission data rankings, and renewable energy development in Europe. The park carbon data include the overall carbon emissions of the park, the park's electricity consumption and carbon emissions, the park's ecological carbon sink, the park's carbon emissions for the month, the day's carbon emissions, the park's annual carbon sink, and the city's annual carbon sink.

[0024] Preferably, the carbon data acquisition method includes: deploying a NODE dependent environment in a server, opening ports, installing an Xmysql module, establishing a link with the Mysql database, opening server port 8888, generating a database API access interface through the configured Xmysql, and testing data real-time performance with Postman.

[0025] Preferably, the deployment of the server includes: installing the operating system as Centos7.2, deploying the Baota panel on the server, installing and creating a Mysql database, setting the data storage format to Json format, then configuring the MQTT server and EMQX server on the server, and writing an action protocol to link with the Mysql database;

[0026] The power sensor, water sensor and air detector are installed in the industrial park, and the data forwarding protocol is set to verify the real-time monitoring data and perform edge computing on the data, perform preliminary data filtering, set the data forwarding protocol to the MQTT protocol, configure the MQTT server KEY and NAME to connect to the MQTT server, and realize data forwarding to the cloud database through the MQTT protocol and store it in the cloud database.

[0027] Preferably, the three-dimensional twin model deployment step includes: opening the level blueprint in the Unreal Engine UE5, creating a Yuanqu control link event to start running, selecting the already created park carbon data control blueprint in Class, adding the target user control, and selecting the function to add to the viewport to realize the presentation of the park carbon data and the three-dimensional twin model.

[0028] Preferably, the localized deployment includes: localizing and packaging the entire project, installing the Pixel Streaming plug-in in the Unreal Engine UE5, deploying the node.js environment on the Windows system, and setting additional startup parameters in the Unreal Engine UE5 editor preferences as follows:

[0029] AudioMixer-PixelStreamingIP=localhost-PixelStreamingPort=8888, package the project to generate a Windows platform distribution version.

[0030] According to the present invention, a UE5-based industrial park carbon data visualization system is provided, comprising:

[0031] 3D twin model visualization module: Use Rhino to build a 3D model of the industrial park, import it into Unreal Engine UE5 to refine the model accuracy, set the model interaction process through blueprints, and realize the digital twin of the 3D model;

[0032] Internet of Things platform module: including power sensors, water sensors and air detectors, which can obtain various original data of the park in real time through the Internet of Things and data interfaces, perform data cleaning, multi-dimensional time data integration, and carbon-electricity coupling and synergistic conversion to realize carbon data analysis;

[0033] The park data display module maps the processed data into charts through blueprints, showing the industrial park's building energy consumption trends, energy consumption trends of various types of electrical appliances, carbon emission trends, basic park information, carbon sinks, park carbon emission forecasts and other information.

[0034] Compared with the prior art, the present invention has the following beneficial effects:

[0035] 1. The present invention adopts Unreal Engine UE5 as the engine of the carbon data visualization system, uses Rhino and C4D software to perform detailed modeling and mapping of the industrial park model, then merges it with the urban base model, and finally imports it into Unreal Engine UE5 to create a three-dimensional twin model, thereby solving the three-dimensional visualization problem of the industrial park.

[0036] 2. By using power sensors, water sensors and air detectors to build an Internet of Things platform, and cooperating with the UE5 blueprint for data processing and analysis, the Internet of Things platform can be used to obtain and monitor various original data of the industrial park in real time, thus solving the problem of data collection and monitoring.

[0037] 3. Through data processing and multi-dimensional time data integration, the analysis of carbon data is realized, and the processed data is mapped into charts using blueprints to show information such as the carbon emission trends and carbon sink conditions of the industrial park, thus solving the problem of data processing and display.

[0038] 4. By designing the UI interface and creating the control blueprint, the user's visualization and interactive operation of carbon data are realized, solving the problem of data visualization and user interaction.

[0039] 5. The local browser deployment of the project is realized through the settings of the signaling server and Unreal Engine UE5, solving the deployment and operation problems of the project. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:

[0041] Figure 1 This is a flow chart of the industrial park carbon data visualization method based on UE5 disclosed in the present invention. DETAILED DESCRIPTION

[0042] The present invention is described in detail below in conjunction with specific embodiments. The following embodiments will help those skilled in the art to further understand the present invention, but are not intended to limit the present invention in any form. It should be noted that, for those of ordinary skill in the art, several changes and improvements can also be made without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0043] The present invention discloses a method for visualizing carbon data of an industrial park based on UE5, comprising the following steps:

[0044] Steps to construct a three-dimensional twin model: Based on the industrial park and surrounding urban buildings, construct a three-dimensional twin model that includes the industrial park and the urban base.

[0045] Specifically, they include:

[0046] Obtain urban satellite image data within 50KM around the industrial park, industrial park POI data, DEM elevation data, building ship data, transportation network data, water system data, lake data and OSM data.

[0047] Add urban satellite image data, industrial park POI data, and DEM elevation data in QGIS for processing, use the coordinate deformation projection algorithm, set the layer coordinates, and unify the coordinate type to 32650 / WGS84 UTM zone 50N.

[0048] Add building and ship data in QGIS for processing, use the coordinate deformation projection algorithm to convert the coordinates of the vector data, use the mask layer algorithm to crop, use the merge algorithm to merge the layers, approve the building and ship data, use R2V to obtain the missing vector building outlines, use the area function in the field calculator to automatically calculate the area and height, and use uft-8 for data encoding.

[0049] Add traffic network data, water system data, and lake data in QGIS for processing, use the fusion algorithm to fuse the traffic network data, water system data, and lake data of the same level, select NAME as the fusion field, and use the single component algorithm to convert the processed data into a single component.

[0050] Import the processed urban satellite image data, industrial park POI data, DEM elevation data, building ship data, transportation network data, water system data, lake data and OSM data into city2022 (CityEngine2022.1) to realize the presentation of three-dimensional elements at all levels, set the vertical world coordinate axis to the vertical of the floor, select the script that automatically generates the city model according to the floor height and programmatically generates the road model, and realize the production of the city base model.

[0051] The industrial park model is finely modeled and textured using Rhino and C4D software, and then the industrial park model is merged with the urban base model through the C4D software.

[0052] The merged model of the industrial park and the urban base is imported into the Unreal Engine UE5, and the lighting system, sky system, and camera system are introduced to generate the three-dimensional twin model.

[0053] The specific generation of 3D twin models includes:

[0054] Create project level 1 in Unreal Engine UE5, add the Datasmith C4D Importer plug-in, import the merged model of the industrial park and the urban base into Unreal Engine UE5 through the plug-in, and add textures and materials.

[0055] Introduce the lighting system and sky system in Unreal Engine UE5, add DirectionalLight light source, Exponentiall height fog, SkyAtmosphere atmosphere and SkyLight skylight, set various parameters to the optimal value, and present the best rendering effect.

[0056] Set up the camera system in Unreal Engine UE5, create a Pawn, player controller, and game mode basics, add axis mapping, write initial position and displacement scripts in the Pawn blueprint, and implement scene roaming function.

[0057] Steps to build a carbon emission and carbon sink calculation model: Deploy power sensors, water sensors, and air detectors in the industrial park to monitor and collect various raw data; calculate the real-time carbon emissions, carbon sinks, and carbon offsets of the industrial park based on various monitoring data;

[0058] The carbon emissions calculation formula of the industrial park is as follows:

[0059] E=Σ(AP×EF)

[0060] Where: E represents emissions, AP represents activity data, which can be 10,000 kWh (10,000 kWh) or 1 million kilojoules (GJ); EF represents emission factor, which can be tons of CO2 / 10,000 kWh or tons of CO2 / 1 million kilojoules. ∑ in the formula represents summation, and the emissions are calculated by multiplying the sum of each activity data by the corresponding emission factor.

[0061] The carbon sequestration calculation formula of the industrial park is as follows:

[0062] Carbon sink = A × C;

[0063] Where: A represents area, unit is hectare (hm 2), C represents the carbon sink coefficient, the unit is kilogram carbon / hectare (kg / hm 2 ), the green plants in the industrial park are mainly grass, so the carbon sink coefficient C is 0.014Kg / hm 2 .

[0064] The carbon offset calculation formula for the industrial park is as follows:

[0065] N=(C×I) / Q

[0066] In the formula: The carbon offset calculation formula takes mobile phone charging as an example, N represents the number of times the mobile phone is charged, Q represents the power (mAh), C represents the mobile phone battery capacity (mAh), and I represents the charger output power (A).

[0067] Steps to build the IoT platform: Obtain the original data of the industrial park in real time through the IoT and data interface, and process the data to obtain the carbon data of the industrial park;

[0068] The carbon data of industrial parks include benchmarked international carbon data and park carbon data. Among them, the international carbon data includes global carbon emissions data, global sector carbon emissions data, annual changes in domestic ecosystem carbon fixation, global carbon emissions data rankings, and renewable energy development in Europe. The park carbon data includes the overall carbon emissions of the park, the park’s electricity consumption and carbon emissions, the park’s ecological carbon sinks, the park’s carbon emissions for the month, the day’s carbon emissions, the park’s annual carbon sinks, and the city’s annual carbon sinks.

[0069] The steps to obtain carbon data of industrial parks include:

[0070] Deploy the NODE dependency environment in the server, open the port, install the Xmysql module, establish a link with the Mysql database, open the server port 8888, generate the database API access interface through the configured Xmysql, and use Postman to test the real-time performance of the data.

[0071] Itemized meter sensors are configured in the industrial park. By building the MQTT protocol, the data detected by the itemized meter is transmitted to the cloud server. The meter data is stored in the cloud MYSQL database through EMQX configuration rules and actions.

[0072] Ps and Ai design software are used to design UI interfaces, including the international carbon data, park carbon data interface design and login interface. Control blueprints are created in the Unreal Engine UE5 respectively, and canvas panels, borders, overlays, buttons, vertical boxes and texts are added. The designed international carbon data and park carbon data interfaces are imported through the borders.

[0073] The plug-in WebBrowser is installed in the Unreal Engine UE5, and GET and POST request blueprints are written in the control blueprint to request the database data through the API interface, and a data filter is written in the blueprint to process the acquired data, and the carbon emission calculation formula and the acquired meter data are written as Javascript code to convert the meter data into various carbon data, and then a mapping blueprint is written so that the data can be mapped into a bar chart, a pie chart and other forms for display.

[0074] Among them, the steps for deploying the server are: the operating system is installed as Centos7.2, the Baota panel is deployed on the server, the Mysql database is installed and created, the data storage format is set to Json format, and then the MQTT server and EMQX server are configured on the server, and the action protocol is written to link with the Mysql database.

[0075] The power sensor, water sensor and air detector are installed in the industrial park, and the data forwarding protocol is set to verify the real-time monitoring data and perform edge computing on the data, perform preliminary data filtering, set the data forwarding protocol to the MQTT protocol, configure the MQTT server KEY and NAME to connect to the MQTT server, and realize data forwarding to the cloud database through the MQTT protocol and store it in the cloud database.

[0076] Steps for deploying the three-dimensional twin model: Integrate the carbon data, industrial information data and other data (industrial park building data and industrial park air monitoring data) of the industrial park into a three-dimensional twin model for visualization and local browser deployment.

[0077] Specifically, open the above-mentioned project level 1 in Unreal Engine UE5, open the level blueprint, create a Yuanqu control link event to start running, select the already created park carbon data control blueprint as Class, add the target user control, select the function to add to the viewport, and realize the presentation of the park carbon data and the three-dimensional twin model.

[0078] Create an international carbon data game level in the Unreal Engine UE5, open the level blueprint, create a Guoji control link event to start running, select the already created international carbon data control blueprint in Class, add the target user control, select the function to add to the viewport, realize the binding of international carbon data and the game level, then write the interaction blueprint of the button, and design the function of opening the engineering level 1 when clicked.

[0079] Create a login interface game level in the Unreal Engine UE5, import the designed login interface through the boundary in the login interface control blueprint, then open the level blueprint, create a Denglu control link event to start running, select the created login interface control blueprint in Class, add the target user control, select Add to Viewport as the function, realize the binding of the login interface and the game level, then write the interaction blueprint of the button, and design the function of opening the international carbon data when clicked.

[0080] The steps for local browser deployment include:

[0081] Localize and package the entire project for deployment, install the Pixel Streaming plugin in Unreal Engine UE5, deploy the node.js environment on Windows, set the additional startup parameters in the Unreal Engine UE5 editor preferences to AudioMixer-PixelStreamingIP=localhost-PixelStreamingPort=8888, package the project, and select the Windows platform distribution.

[0082] To start the signaling server, run:

[0083] In the run_local.bat file in the Samples\PixelStreaming\WebServers\SignallingWebServer\platform_scripts\cmd directory, right-click the packaged project file to open the property panel, add "-AudioMixer-PixelStreamingIP=localhost-PixelStreamingPort=8888" after the target location, run the shortcut, connect the UE project to the signaling server, open the browser and enter the URL: '127.0.0.1:80' and press Enter to start the project.

[0084] This application also discloses a UE5-based industrial park carbon data visualization system, including:

[0085] The 3D twin model visualization module uses Rhino to build a 3D model of the industrial park, which is imported into UnrealEngine 5 to refine the model accuracy. The model interaction process is set through blueprints to realize the digital twin of the 3D model and complete the visualization interaction of the 3D twin model.

[0086] The IoT platform module, including power sensors, water sensors and air detectors, obtains various raw data of the park in real time through the IoT and data interfaces, performs data cleaning, multi-dimensional time data integration, and carbon-electricity coupling and synergistic conversion to realize carbon data analysis;

[0087] The park data display module maps the processed data into charts through blueprints, showing the building energy consumption trends, energy consumption trends of various types of electrical appliances, carbon emission trends, basic park information, carbon sinks, and park carbon emission forecasts. This module works in conjunction with the three-dimensional twin model to present comprehensive and clear industrial park carbon data;

[0088] The present invention provides a practical decision-making plan for building a low-carbon industrial park by realizing comprehensive monitoring and analysis of the carbon data of the industrial park, thereby promoting the development of the park in a more environmentally friendly and sustainable direction.

[0089] Those skilled in the art know that, in addition to realizing the system and its various devices, modules, and units provided by the present invention in a purely computer-readable program code, it is entirely possible to realize the same functions in the form of logic gates, switches, application-specific integrated circuits, programmable logic controllers, and embedded microcontrollers by logically programming the method steps. Therefore, the system and its various devices, modules, and units provided by the present invention can be considered as a hardware component, and the devices, modules, and units included therein for realizing various functions can also be regarded as structures within the hardware component; the devices, modules, and units for realizing various functions can also be regarded as both software modules for realizing the method and structures within the hardware component.

[0090] The above describes the specific embodiments of the present invention. It should be understood that the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes or modifications within the scope of the claims, which does not affect the essence of the present invention. In the absence of conflict, the embodiments of the present application and the features in the embodiments can be combined with each other arbitrarily.

Claims

1. A method for visualizing carbon data of industrial parks based on UE5, characterized in that: include: Steps to build a 3D twin model: Based on the industrial park and surrounding urban buildings, build a 3D twin model that includes the industrial park and the urban base; Steps to build a carbon emission and carbon sink calculation model: Based on the sensors deployed in the industrial park, monitor and collect various raw data to calculate the real-time carbon emissions, carbon sinks and carbon offsets of the industrial park; Steps to obtain carbon data: Build an IoT platform, obtain various raw data of the industrial park in real time through the IoT platform and data interface, and process the raw data to obtain various carbon data of the industrial park; Steps for deploying the three-dimensional twin model: Integrate the carbon data and industrial information data of the industrial park with the three-dimensional twin model for visualization and local browser deployment.

2. The method for visualizing carbon data of an industrial park based on UE5 according to claim 1 is characterized in that: The steps of constructing a three-dimensional twin model include: obtaining urban satellite image data, industrial park POI data, DEM elevation data, building ship data, traffic network data, water system data, lake data and OSM data around the industrial park, processing the data in QGIS software, importing the processed data into city2022 software, and generating a city base model; The industrial park was modeled using Rhino and C4D software, and then the industrial park model was merged with the urban base model through C4D software. After the merger, it was imported into Unreal Engine UE5 to generate a three-dimensional twin model.

3. The method for visualizing carbon data of an industrial park based on UE5 according to claim 2 is characterized in that: The generation of the three-dimensional twin model includes: In Unreal Engine UE5, the industrial park model and the city base model are merged through plug-ins, and the lighting system, sky system and camera system are introduced.

4. The method for visualizing carbon data of an industrial park based on UE5 according to claim 1, characterized in that: The carbon emissions calculation formula of the industrial park is as follows: E=Σ(AP×EF) Where: E represents emissions, AP represents activity data, EF represents emission factor, ∑ represents summation, and the emissions are obtained by multiplying the sum of each activity data by the corresponding emission factor; The carbon sequestration calculation formula of the industrial park is as follows: Carbon sink = A × C; In the formula: A represents area, C represents carbon sink coefficient; The carbon offset calculation formula for the industrial park is as follows: N = (C × I) / Q; In the formula: N represents the number of times the mobile phone is charged, Q represents the power, C represents the battery capacity of the mobile phone, and I represents the output power of the charger.

5. The method for visualizing carbon data of an industrial park based on UE5 according to claim 1, characterized in that: The carbon data include international carbon data and park carbon data. The international carbon data include global carbon emission data, global carbon emission data of various sectors, annual changes in carbon fixation in domestic ecosystems, global carbon emission data rankings, and renewable energy development in Europe. The park carbon data include the overall carbon emissions of the park, the park’s electricity consumption and carbon emissions, the park’s ecological carbon sinks, the park’s carbon emissions for the month, the day’s carbon emissions, the park’s annual carbon sinks, and the city’s annual carbon sinks.

6. The method for visualizing carbon data of an industrial park based on UE5 according to claim 1, characterized in that: The carbon data acquisition method includes: deploying a NODE dependent environment in a server, opening ports, installing an Xmysql module, establishing a link with the Mysql database, opening server port 8888, generating a database API access interface through the configured Xmysql, and testing data real-time performance using Postman.

7. The method for visualizing carbon data of an industrial park based on UE5 according to claim 5, characterized in that: The deployment of the server includes: installing the operating system as Centos7.2, deploying the Baota panel on the server, installing and creating a Mysql database, setting the data storage format to Json format, then configuring the MQTT server and EMQX server on the server, and writing an action protocol to link with the Mysql database; The power sensor, water sensor and air detector are installed in the industrial park, and the data forwarding protocol is set to verify the real-time monitoring data and perform edge computing on the data, perform preliminary data filtering, set the data forwarding protocol to the MQTT protocol, configure the MQTT server KEY and NAME to connect to the MQTT server, and realize data forwarding to the cloud database through the MQTT protocol and store it in the cloud database.

8. The method for visualizing carbon data of an industrial park based on UE5 according to claim 1, characterized in that: The three-dimensional twin model deployment steps include: opening the level blueprint in the Unreal Engine UE5, creating a Yuanqu control link event to start running, selecting the already created park carbon data control blueprint in Class, adding the target user control, and selecting the function to add to the viewport to realize the presentation of the park carbon data and the three-dimensional twin model.

9. The method for visualizing carbon data of an industrial park based on UE5 according to claim 1, characterized in that: The localized deployment includes: localizing and packaging the entire project, installing the PixelStreaming plug-in in the Unreal Engine UE5, deploying the node.js environment on the Windows system, and setting additional startup parameters in the Unreal Engine UE5 editor preferences as follows: AudioMixer-PixelStreamingIP=localhost-PixelStreamingPort=8888, package the project to generate a Windows platform distribution version.

10. An industrial park carbon data visualization system based on UE5, characterized in that: include: 3D twin model visualization module: Use Rhino to build a 3D model of the industrial park, import it into Unreal Engine UE5 to refine the model accuracy, set the model interaction process through blueprints, and realize the digital twin of the 3D model; Internet of Things platform module: including power sensors, water sensors and air detectors, which can obtain various original data of the park in real time through the Internet of Things and data interfaces, perform data cleaning, multi-dimensional time data integration, and carbon-electricity coupling and synergistic conversion to realize carbon data analysis; The park data display module maps the processed data into charts through blueprints, showing the industrial park's building energy consumption trends, energy consumption trends of various types of electrical appliances, carbon emission trends, basic park information, carbon sinks, park carbon emission forecasts and other information.

Citation Information

Cited By

  • Construction period carbon emission visual regulation and control method and system

    CN121300674A

  • Low-carbon park energy consumption management method based on digital twinning

    CN122288117A