Project task execution method and device, electronic equipment and storage medium
By screening, detecting, and saving project tasks in the project management system, it is ensured that the operators complete the tasks according to the required instruments, materials, and steps, thus solving the problem of inaccurate task results in the chemical materials industry and achieving accurate execution of task results and improved management efficiency.
Patent Information
- Application Number
- CN202411085136.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-15
AI Technical Summary
In R&D projects in the chemical materials industry, project tasks cannot be carried out based on a project management system, leading to operators completing task details independently and resulting in inaccurate task results.
By acquiring project information data of the target project, project tasks are selected from the preset task database, task feasibility is tested, operation objects are selected, and the task results of the operation objects in completing the project tasks based on the task instruments, task materials and task steps are obtained and saved.
This ensured the accurate execution of project tasks, improved the accuracy of task results, reduced manual intervention, and enhanced the efficiency and accuracy of project management.
Smart Images

Figure CN118967047A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of project management, and in particular to a project task execution method and device, electronic equipment and storage medium. Background Art
[0002] The project management system is a full life cycle management system centered on R&D projects. The project management system can enhance the core capabilities of project management, strengthen the visual management of project progress, and grasp the progress and status of the entire project process in real time. In the chemical materials industry, various project tasks need to be completed in the process of completing R&D projects. In related technologies, these project tasks cannot be performed based on the project management system. Operators need to complete them independently. The details of completing project tasks are also determined subjectively by operators, which places high demands on operators and will lead to inaccurate task results. For example, when the project task is an experimental task, the operator decides independently how to complete the experiment, which will lead to inaccurate experimental results. Therefore, how to improve the accuracy of task results in R&D projects has become a technical problem that needs to be solved urgently. Summary of the invention
[0003] The main purpose of the embodiments of the present application is to propose a project task execution method and device, electronic device and storage medium, aiming to improve the accuracy of task results in R&D projects.
[0004] To achieve the above-mentioned purpose, a first aspect of an embodiment of the present application proposes a project task execution method, which is applied to a project management system, wherein the project management system has a target project, and the method comprises:
[0005] Acquire project information data of the target project;
[0006] Screening out project tasks from a preset task database according to the project information data; wherein the project tasks include task instruments, task materials and task steps;
[0007] Performing a task feasibility test on the project task to obtain a task feasibility result; wherein the task feasibility result represents the feasibility of the project task;
[0008] If the task feasibility result indicates that the project task is feasible, then selecting an operation object from a preset object set according to the project task;
[0009] Sending the project task to the operation object;
[0010] The task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps is obtained, and the task result is saved.
[0011] In some embodiments, performing task feasibility detection on the project task to obtain a task feasibility result includes:
[0012] Auditing the task instrument to obtain a first audit result; wherein the first audit result indicates that the task instrument is idle or occupied;
[0013] Reviewing the task material to obtain a second review result; wherein the second review result indicates whether the task material is a dangerous article or a non-dangerous article;
[0014] Reviewing the task step to obtain a third review result; wherein the third review result indicates whether the task step is correct or wrong;
[0015] The task feasibility result is obtained according to the first audit result, the second audit result and the third audit result.
[0016] In some embodiments, after obtaining the task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps, and saving the task result, the method further includes:
[0017] Obtain audit and testing standards;
[0018] Auditing the task result according to the audit test standard to obtain a task audit result; wherein the task audit result indicates whether the project task is correct or wrong;
[0019] If the task review result is an error, the project task will be returned to the operation object.
[0020] In some embodiments, after obtaining the task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps, and saving the task result, the method further includes:
[0021] Obtaining the operation hours of the operation object and the equipment hours of the task instrument;
[0022] Calculating the depreciation amount of the task instrument according to the equipment working hours to obtain the instrument depreciation amount;
[0023] Cost calculation is performed based on the operating hours and the instrument depreciation amount to obtain the cost of the project task.
[0024] In some embodiments, before acquiring the project information data of the target project, the method further includes:
[0025] Obtaining a material warehousing request for the task material; wherein the material warehousing request includes first material data;
[0026] Saving the first material data according to the material storage request;
[0027] Obtaining a material outbound request for the task material; wherein the material outbound request includes second material data;
[0028] The first material data is modified according to the second material data.
[0029] In some embodiments, before acquiring the project information data of the target project, the method further includes:
[0030] Acquire instrument information data of the task instrument and save the instrument information data; wherein the instrument information data includes an idle time period of the task instrument;
[0031] Obtaining an instrument use request of the task instrument; wherein the instrument use request includes a use time;
[0032] The idle time period is modified according to the usage time.
[0033] In some embodiments, constructing the task database specifically includes:
[0034] Acquire project information data of each of the target projects and project tasks of each of the target projects;
[0035] The task database is constructed according to each of the project information data and each of the project tasks; wherein the task database stores the mapping relationship between the project information data and the project tasks.
[0036] To achieve the above-mentioned purpose, a second aspect of an embodiment of the present application proposes a project task execution device, which is applied to a project management system. The project management system has a target project. The device includes:
[0037] An acquisition module, used to acquire project information data of the target project;
[0038] A first screening module is used to screen out project tasks from a preset task database according to the project information data; wherein the project tasks include task instruments, task materials and task steps;
[0039] A detection module, used to perform a task feasibility test on the project task to obtain a task feasibility result; wherein the task feasibility result represents the feasibility of the project task;
[0040] A second screening module, if the task feasibility result indicates that the project task is feasible, the second screening module is used to screen out operation objects from a preset object set according to the project task;
[0041] A sending module, used for sending the project task to the operation object;
[0042] The saving module is used to obtain the task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps, and save the task result.
[0043] To achieve the above objectives, a third aspect of an embodiment of the present application proposes an electronic device, which includes a memory and a processor, wherein the memory stores a computer program, and when the processor executes the computer program, the method described in the first aspect is implemented.
[0044] To achieve the above-mentioned purpose, the fourth aspect of an embodiment of the present application proposes a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method described in the first aspect is implemented.
[0045] The project task execution method and device, electronic device and storage medium proposed in the present application obtain the project information data of the target project, and filter out the project tasks from the preset task database according to the project information data, wherein the project tasks include task instruments, task materials and task steps. Perform task feasibility detection on the project task to obtain the task feasibility result, wherein the task feasibility result represents the feasibility of the project task. If the task feasibility result represents that the project task is feasible, the operation object is filtered out from the preset object set according to the project task, and the project task is sent to the operation object. Obtain the task result of the operation object completing the project task feedback based on the task instrument, task material and task step, and save the task result. Enable each operation object to obtain the project tasks required for the target project, as well as the task instruments, task materials and task steps required to complete the project tasks from the project management system, so as to complete the project tasks according to the task instruments, task materials and task steps to obtain accurate task results. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 It is an optional flowchart of the project task execution method provided in the embodiment of the present application;
[0047] Figure 2 yes Figure 1 Flow chart of step S103 in FIG.
[0048] Figure 3 is a flowchart of a project task execution method provided by another embodiment of the present application;
[0049] Figure 4 is a flowchart of a project task execution method provided by a third embodiment of the present application;
[0050] Figure 5 is a flowchart of a project task execution method provided by a fourth embodiment of the present application;
[0051] Figure 6 is a flowchart of a project task execution method provided by a fifth embodiment of the present application;
[0052] Figure 7 is a flowchart of constructing a task database provided by an embodiment of the present application;
[0053] Figure 8 It is a structural diagram of a project task execution device provided in an embodiment of the present application;
[0054] Fig. 9 It is a schematic diagram of the hardware structure of the electronic device provided in the embodiment of the present application. DETAILED DESCRIPTION
[0055] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0056] It should be noted that, although the functional modules are divided in the device schematic diagram and the logical order is shown in the flowchart, in some cases, the steps shown or described may be performed in a different order than the module division in the device or the order in the flowchart. The terms "first", "second", etc. in the specification, claims and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.
[0057] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application and are not intended to limit this application.
[0058] First, some nouns involved in this application are analyzed:
[0059] Project management system: a software system that assists enterprises in project management and collaboration. It is mainly used to achieve project planning, task allocation, progress tracking, problem solving, resource allocation, on-time delivery and other functions.
[0060] In the chemical materials industry, various project tasks need to be completed during the completion of R&D projects. In related technologies, these project tasks cannot be performed based on the project management system. Operators need to complete them independently. The details of completing the project tasks are also determined subjectively by the operators, which places high demands on the operators and leads to inaccurate task results. For example, when the project task is an experimental task, the operator decides independently how to complete the experiment, which leads to inaccurate experimental results.
[0061] Based on this, the embodiment of the present application provides a project task execution method and device, electronic device and storage medium, which is intended to obtain the project information data of the target project and then filter out the project tasks from a preset task database according to the project information data. The project task includes task instruments, task materials and task steps. The project task is assigned to the operation object, and the task result of the operation object completing the project task feedback based on the task instrument, task material and task steps is obtained, and the task result is saved. Each operation object can obtain the task instrument, task material and task step required to complete the project task from the project management system, so as to complete the project task according to the task instrument, task material and task step to obtain accurate task results.
[0062] The project task execution method and device, electronic device and storage medium provided in the embodiments of the present application are specifically illustrated through the following embodiments. First, the project task execution method in the embodiments of the present application is described.
[0063] The embodiments of the present application can acquire and process relevant data based on artificial intelligence technology. Artificial Intelligence (AI) is the theory, method, technology and application system that uses digital computers or machines controlled by digital computers to simulate, extend and expand human intelligence, perceive the environment, acquire knowledge and use knowledge to obtain the best results.
[0064] AI basic technologies generally include sensors, dedicated AI chips, cloud computing, distributed storage, big data processing technology, operation / interaction systems, mechatronics, etc. AI software technologies mainly include computer vision technology, robotics technology, biometrics technology, speech processing technology, natural language processing technology, and machine learning / deep learning.
[0065] The project task execution method provided in the embodiment of the present application can be applied to the terminal, can also be applied to the server side, and can also be software running in the terminal or the server side. In some embodiments, the terminal can be a smart phone, a tablet computer, a laptop computer, a desktop computer, etc.; the server side can be configured as an independent physical server, or a server cluster or distributed system composed of multiple physical servers, and can also be configured as a cloud server that provides basic cloud computing services such as cloud services, cloud databases, cloud computing, cloud functions, cloud storage, network services, cloud communications, middleware services, domain name services, security services, CDN, and big data and artificial intelligence platforms; the software can be an application that implements the project task execution method, etc., but is not limited to the above forms.
[0066] The present application can be used in many general or special computer system environments or configurations. For example: personal computers, server computers, handheld or portable devices, tablet devices, multiprocessor systems, microprocessor-based systems, set-top boxes, programmable consumer electronics, network PCs, minicomputers, mainframe computers, distributed computing environments including any of the above systems or devices, etc. The present application can be described in the general context of computer-executable instructions executed by a computer, such as program modules. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform specific tasks or implement specific abstract data types. The present application can also be practiced in distributed computing environments, in which tasks are performed by remote processing devices connected through a communication network. In a distributed computing environment, program modules can be located in local and remote computer storage media including storage devices.
[0067] Please refer to Figure 1 , Figure 1 It is an optional flow chart of a project task execution method provided in an embodiment of the present application. The project task execution method is applied to a project management system, and the project management system has a target project. Figure 1 The method may include but is not limited to steps S101 to S106.
[0068] Step S101, obtaining project information data of the target project;
[0069] Step S102, screening out project tasks from a preset task database according to the project information data; wherein the project tasks include task instruments, task materials and task steps;
[0070] Step S103, performing a task feasibility test on the project task to obtain a task feasibility result; wherein the task feasibility result represents the feasibility of the project task;
[0071] Step S104, if the task feasibility result indicates that the project task is feasible, then select an operation object from a preset object set according to the project task;
[0072] Step S105, sending the project task to the operation object;
[0073] Step S106, obtaining the task result of the operation object completing the project task feedback based on the task instrument, task material and task steps, and saving the task result.
[0074] In step S101 of some embodiments, when the R&D personnel want to create a R&D project, they need to go through the process of project creation and project application in the project management system and enter the project information data. When the R&D project is approved, the project management system saves the R&D project. The R&D project that needs to carry out the project task is called the target project, and the project information data of the target project is obtained. The project information data includes data such as the project name, project members, and project plan.
[0075] Specifically, there are many ways to determine whether a research and development project needs to perform project tasks. For example, there is a drop-down option list in the interface for creating a project, and you can choose whether to perform project tasks or not. Or create a task mapping table of the project name and whether the project tasks are required, and by looking up the task mapping table, you can determine whether the research and development project needs to perform project tasks. Alternatively, both of the above methods can be performed at the same time. If the drop-down option list method and the table lookup method conflict, that is, the drop-down option list selects that a project task is required, but the task mapping table shows that a project task is not required, a pop-up window will pop up to inquire, and the confirmation result of the R&D personnel will prevail, so that you can more flexibly choose whether to perform project tasks, or when the R&D personnel choose not to perform project tasks but the table lookup shows that project tasks are required, the R&D personnel can be reminded to confirm. The task mapping table can also be added, deleted, and modified as needed.
[0076] In step S102 of some embodiments, a task database is pre-built, and the task database stores at least one project task required for each target project. In one example, the task database stores the correspondence between the project name and at least one project task. For example, the project tasks corresponding to project 1 include project task a and project task b, and the project tasks corresponding to project 2 include project task c. If the project name of the target project is project 2, the project task selected is project task c.
[0077] It should be noted that if the project task is an experimental task, the task instrument is the experimental instrument, the task material is the experimental material, and the task step is the experimental formula. The experimental materials and experimental instruments are the same, but different experimental formulas are also different experimental tasks. Different experimental formulas mean different material proportions / different experimental temperatures / different process steps. During the experiment, operators often need to use the same experimental materials and experimental instruments to conduct experiments according to different experimental formulas, and finally produce multiple samples to be tested, and further test these samples to be tested to obtain the best product. This series of processes are all recorded in the project management system, and data is continuously accumulated. Compared with the original traditional offline mode, this embodiment records the optimal formula of various experiments and the entire experimental process in the project management system, which is convenient for query and prevents the loss of the experimental process. At the same time, through strict authority settings, it plays a role in confidentiality and prevents information leakage.
[0078] In step S103 of some embodiments, the task feasibility test is that the auditor audits the project task. If the audit passes, it means that the project task is feasible. If the audit fails, the reason for the failure is determined and the project task is modified. For example, if the project instruments used in some project tasks have been eliminated, the project instruments used in the project tasks are modified, and the corresponding content in the task database is modified. After the modification, the project task is audited again until the task feasibility result indicates that the project task is feasible.
[0079] In step S104 of some embodiments, the feasibility of the project task indicates that the project task can be sent to the operation object. Therefore, if the project task is feasible, the operation object is screened from the preset object set according to the project task. The preset object set is a plurality of operation objects that can perform the project task. Since different operation objects can process different project tasks, different project tasks correspond to different preset object sets. The operation objects in the preset object set can be added, modified, and deleted.
[0080] In one example, the number of project tasks for each operation object in the preset object set can also be displayed, so that the operation objects with fewer project tasks can be screened out, and the project tasks are allocated to the operation objects with fewer project tasks, so as to achieve reasonable allocation of the project tasks.
[0081] In steps S105 to S106 of some embodiments, sending the project task to the operation object means sending the project task to the project management system account where the operation object is located. When the operation object logs into the project management system, the project task can be viewed. The operation object can complete the project task based on the task instrument, task material and task steps, obtain the task result, and upload the task result to the project management system for storage, so that the task result can be recorded.
[0082] Steps S101 to S106 shown in the embodiment of the present application, by obtaining the project information data of the target project, filter out the project tasks from the preset task database according to the project information data, wherein the project tasks include task instruments, task materials and task steps. Perform task feasibility detection on the project tasks to obtain task feasibility results, wherein the task feasibility results characterize the feasibility of the project tasks. If the task feasibility results characterize that the project tasks are feasible, then filter out the operation objects from the preset object set according to the project tasks, and send the project tasks to the operation objects. Obtain the task results of the operation objects completing the project task feedback based on the task instruments, task materials and task steps, and save the task results. Enable each operation object to obtain the project tasks required for the target project from the project management system, as well as the task instruments, task materials and task steps required to complete the project tasks, so as to complete the project tasks according to the task instruments, task materials and task steps, so as to obtain accurate task results.
[0083] See also Figure 2 In some embodiments, step S103 may include but is not limited to steps S201 to S204:
[0084] Step S201, auditing the task instrument to obtain a first audit result; wherein the first audit result indicates that the task instrument is idle or occupied;
[0085] Step S202, reviewing the task materials to obtain a second review result; wherein the second review result indicates whether the task materials are dangerous goods or non-dangerous goods;
[0086] Step S203, review the task steps to obtain a third review result; wherein the third review result indicates whether the task steps are correct or wrong;
[0087] Step S204, obtaining a task feasibility result according to the first review result, the second review result and the third review result.
[0088] In step S201 of some embodiments, the project management system records the idle time period of each task instrument. If the time when the task instrument is required to be used is within the idle time period, it means that the first audit result is passed, that is, the first audit result indicates that the task instrument is idle. In one example, the maintenance period or other aspects of the task instrument can also be audited.
[0089] In step S202 of some embodiments, the task materials are reviewed to determine whether they involve dangerous goods. If the second review result is that the task materials are not dangerous goods, then the second review result is approved.
[0090] In step S203 of some embodiments, the task steps are reviewed to check whether each step in the task steps is correct. If the third review result indicates that the task steps are correct, the third review result is approved. If the task step is an experimental formula, the proportion and material addition steps in the experimental formula are reviewed to check whether they are correct. If the third review result indicates that the experimental formula is correct, the third review result is approved.
[0091] In step S204 of some embodiments, if the first audit result, the second audit result and the third audit result are all audited, the task feasibility result is that the project task is feasible. If there is at least one audit result that fails, the project task is modified and then re-audited until the task feasibility result is that the project task is feasible.
[0092] Steps S201 to S204 shown in this embodiment review the task instruments, task materials and task steps, and only send them to the operation object after determining that the project task is feasible, thereby preventing the operation object from completing the project task based on incorrect task instruments, task materials or task steps.
[0093] See also Figure 3 In some embodiments, after step S106, the project task execution method may further include but is not limited to steps S301 to S303:
[0094] Step S301, obtaining the audit and testing standards;
[0095] Step S302, auditing the task result according to the audit test standard to obtain the task audit result; wherein the task audit result indicates whether the project task is correct or wrong;
[0096] Step S303: If the task review result is an error, the project task is returned to the operation object.
[0097] In step S301 of some embodiments, different audit and testing standards are set for different project tasks. If the project result does not meet the audit and testing standard, it means that an error occurred in the process of completing the project task. In order to obtain accurate task results, the audit and testing standard needs to be obtained to audit the task results.
[0098] In step S302 of some embodiments, the task result is audited according to the audit test standard to obtain the task audit result; wherein the task audit result indicates whether the project task is correct or wrong. For example, if the audit test standard limits the value range of a certain parameter, but the value of the parameter in the task result is outside the range, then the task audit result indicates that the project task is wrong, that is, the task audit result is that the audit fails. If the task results all meet the audit test standard, then the task audit result indicates that the project task is correct.
[0099] In step S303 of some embodiments, if the task review result is that the project task is wrong, the project task is returned to the operation object so that the operation object can complete the project task again. If the task review result is that the project task is correct, the task result is saved.
[0100] Steps S301 to S303 shown in this embodiment audit the task results through the audit inspection standards to determine whether the task results are correct. When the task results are wrong, the project task is returned to the operation object so that the operation object can complete the project task again, further improving the accuracy of the task results.
[0101] See also Figure 4 In some embodiments, after step S106, the project task execution method may further include but is not limited to steps S401 to S403:
[0102] Step S401, obtaining the operation hours of the operation object and the equipment hours of the task instrument;
[0103] Step S402, calculating the depreciation amount of the task instrument according to the equipment working hours to obtain the instrument depreciation amount;
[0104] Step S403, performing cost calculation based on the operation hours and the instrument depreciation amount to obtain the cost of the project task.
[0105] In step S401 of some embodiments, after the operation object completes the project task, the operation time and equipment time can be filled in the project management system. Alternatively, the operation object can fill in the task start time and task end time in the project management system at the beginning and end of the project task, and the project management system automatically obtains the task start time and task end time to calculate the operation time. The equipment time can be calculated according to the appointment time of the task instrument.
[0106] In step S402 of some embodiments, the proportion of the task instrument's working hours on all target projects is counted based on the equipment working hours, and the depreciation of the task instrument is the total depreciation amount of the task instrument*the proportion of working hours, thereby calculating the instrument depreciation.
[0107] In step S403 of some embodiments, the cost of the project task is obtained by multiplying the amount corresponding to each operating hour by the operating hours and adding the instrument depreciation amount. The cost of at least one project task corresponding to the target project is added together to obtain the cost of the target project. In this embodiment, the project management system can automatically calculate the cost of each project task and the cost of each target project, thereby providing reference data for decision analysis.
[0108] In one example, the project management system can also summarize the material costs and water and electricity costs of project tasks, compare and analyze them with the corresponding cost budget, and issue regular cost overrun warnings.
[0109] In step S401 to step S403 shown in this embodiment, the cost of the project task is obtained by automatically obtaining the operation hours and equipment hours, calculating the instrument depreciation amount according to the equipment hours, and performing cost calculation according to the operation hours and instrument depreciation amount. This reduces a lot of manual statistical work, provides managers with reference data for decision-making analysis, and achieves refined management of project costs.
[0110] See also Figure 5 In some embodiments, before step S101, the project task execution method further includes but is not limited to steps S501 to S504:
[0111] Step S501, obtaining a material storage request for a task material; wherein the material storage request includes first material data;
[0112] Step S502, saving the first material data according to the material storage request;
[0113] Step S503, obtaining a material outbound request for the task material; wherein the material outbound request includes second material data;
[0114] Step S504: modify the first material data according to the second material data.
[0115] In step S501 of some embodiments, the project management module can also manage the task materials. The first material data includes the material name, name abbreviation, platform, material type and material quantity. After the filler enters the first material data in the material storage interface, submits the material storage request, and the project management system obtains the material storage request.
[0116] In step S502 of some embodiments, after the project management system obtains the material storage request, it saves the first material data according to the material storage request. In one example, the material manager can also review the first material data, and only save the first material data if the review is passed, and return the first material data to the filler for re-filling if the review is not passed.
[0117] In step S503 of some embodiments, when the operation object needs task materials to complete the project task, it is necessary to fill in the second material data in the material outbound interface in the project management system. The second material data includes the task materials that need to be outbound and the outbound quantity. After filling in, submit the material outbound request, and the project management system obtains the material outbound request.
[0118] In step S504 of some embodiments, when the task material is shipped out, the first material data will change, so the first material data needs to be modified according to the second material data. For example, if the material quantity is 10 and the shipped quantity is 3, the material quantity is modified to 7 after confirming that the task material is shipped out. In one example, the material manager can also review the second material data, and the task material can be shipped out only after the review is passed, and the first material data is modified according to the second material data. If the review fails, it will be returned to the person filling in the form for re-filling.
[0119] In steps S501 to S504 shown in this embodiment, the project management system is used to manage the entry and exit of task materials, thereby realizing intelligent material management.
[0120] See also Figure 6 In some embodiments, before step S101, the project task execution method may also include but is not limited to steps S601 to S603:
[0121] Step S601, obtaining instrument information data of the task instrument and saving the instrument information data; wherein the instrument information data includes an idle time period of the task instrument;
[0122] Step S602, obtaining an instrument use request of the task instrument; wherein the instrument use request includes a use time;
[0123] Step S603: modify the idle time period according to the usage time.
[0124] In step S601 of some embodiments, when a task instrument needs to be added to the project management system, the person filling in the form fills in the instrument information data in the new instrument interface in the project management system. The project management system obtains the instrument information data and saves it. Among them, the idle time period of the newly added task instrument is all time periods.
[0125] In steps S602 to S603 of some embodiments, when the operation object needs to use the task instrument to complete the project task, it is necessary to submit an instrument use request, and the instrument use request includes the name of the task instrument and the use time. After the project management system obtains the instrument use request, it modifies the idle time period according to the use time to update the idle time period. When the use time is not within the idle time period, the operation object is reminded to reselect the use time to prevent the task instrument reservation conflict.
[0126] In step S601 to step S603 shown in this embodiment, task instruments are managed through the project management system, so that task instruments can be managed intelligently to prevent task instrument reservation conflicts from affecting the progress of project tasks.
[0127] Please refer to Figure 7 In some embodiments, the project task execution method may also construct a task database, including but not limited to steps S701 to S702:
[0128] Step S701, obtaining project information data of each target project and project tasks of each target project;
[0129] Step S702: construct a task database according to each project information data and each project task; wherein the task database stores the mapping relationship between the project information data and the project tasks.
[0130] In step S701 to step S702 shown in this embodiment, a target project may correspond to at least one project task, and the project information data and the corresponding project task of each target project are saved in the task database in advance, thereby completing the construction of the task database. By constructing the task database, the project tasks can be quickly filtered out from the task database according to the project information data.
[0131] See also Figure 8 The embodiment of the present application further provides a project task execution device, which is applied to a project management system and can implement the above-mentioned project task execution method. The device includes:
[0132] The acquisition module 801 is used to acquire the project information data of the target project;
[0133] The first screening module 802 is used to screen out project tasks from a preset task database according to project information data; wherein the project tasks include task instruments, task materials and task steps;
[0134] The detection module 803 is used to perform task feasibility detection on the project task to obtain a task feasibility result; wherein the task feasibility result represents the feasibility of the project task;
[0135] A second screening module 804, if the task feasibility result indicates that the project task is feasible, the second screening module 804 is used to screen out operation objects from a preset object set according to the project task;
[0136] The sending module 805 is used to send the project task to the operation object;
[0137] The saving module 806 is used to obtain the task result of the operation object completing the project task feedback based on the task instrument, task material and task steps, and save the task result.
[0138] The specific implementation of the project task execution device is basically the same as the specific implementation example of the above-mentioned project task execution method, and will not be repeated here.
[0139] The embodiment of the present application also provides an electronic device, the electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the above project task execution method when executing the computer program. The electronic device can be any smart terminal including a tablet computer, a car computer, etc.
[0140] See also Fig. 9 , Fig. 9 The hardware structure of an electronic device of another embodiment is illustrated, and the electronic device includes:
[0141] The processor 901 may be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of the present application.
[0142] The memory 902 can be implemented in the form of a read-only memory (ROM), a static storage device, a dynamic storage device, or a random access memory (RAM). The memory 902 can store an operating system and other application programs. When the technical solution provided in the embodiment of this specification is implemented by software or firmware, the relevant program code is stored in the memory 902, and the processor 901 calls and executes the project task execution method of the embodiment of this application;
[0143] Input / output interface 903, used to implement information input and output;
[0144] Communication interface 904, used to realize communication interaction between the device and other devices, which can be realized through wired mode (such as USB, network cable, etc.) or wireless mode (such as mobile network, WI FI, Bluetooth, etc.);
[0145] A bus 905 that transmits information between various components of the device (e.g., the processor 901, the memory 902, the input / output interface 903, and the communication interface 904);
[0146] The processor 901 , the memory 902 , the input / output interface 903 and the communication interface 904 are connected to each other in communication within the device via a bus 905 .
[0147] An embodiment of the present application also provides a computer-readable storage medium, which stores a computer program, and when the computer program is executed by a processor, the above-mentioned project task execution method is implemented.
[0148] The memory, as a non-transient computer-readable storage medium, can be used to store non-transient software programs and non-transient computer executable programs. In addition, the memory may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some embodiments, the memory may optionally include a memory remotely disposed relative to the processor, and these remote memories may be connected to the processor via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0149] The embodiments described in the embodiments of the present application are intended to more clearly illustrate the technical solutions of the embodiments of the present application and do not constitute a limitation on the technical solutions provided in the embodiments of the present application. Those skilled in the art will appreciate that with the evolution of technology and the emergence of new application scenarios, the technical solutions provided in the embodiments of the present application are also applicable to similar technical problems.
[0150] Those skilled in the art will appreciate that the technical solutions shown in the figures do not constitute a limitation on the embodiments of the present application, and may include more or fewer steps than shown in the figures, or a combination of certain steps, or different steps.
[0151] The device embodiments described above are merely illustrative, and the units described as separate components may or may not be physically separated, that is, they may be located in one place or distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0152] Those skilled in the art will appreciate that all or some of the steps in the methods disclosed above, and the functional modules / units in the systems and devices may be implemented as software, firmware, hardware, or a suitable combination thereof.
[0153] The terms "first", "second", "third", "fourth", etc. (if any) in the specification of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0154] It should be understood that in the present application, "at least one (item)" means one or more, and "plurality" means two or more. "And / or" is used to describe the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" can mean: only A exists, only B exists, and A and B exist at the same time, where A and B can be singular or plural. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "At least one of the following" or similar expressions refers to any combination of these items, including any combination of single or plural items. For example, at least one of a, b or c can mean: a, b, c, "a and b", "a and c", "b and c", or "a and b and c", where a, b, c can be single or multiple.
[0155] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the above units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0156] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0157] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0158] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including multiple instructions to enable a computer device (which can be a personal computer, server, or network device, etc.) to execute all or part of the steps of the methods of various embodiments of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory, referred to as ROM), random access memory (Random Access Memory, referred to as RAM), disk or optical disk and other media that can store programs.
[0159] The preferred embodiments of the present invention are described above with reference to the accompanying drawings, but the scope of the rights of the present invention is not limited thereto. Any modification, equivalent substitution and improvement made by a person skilled in the art without departing from the scope and essence of the present invention should be within the scope of the rights of the present invention.
Claims
1. A project task execution method, characterized in that: Applied to a project management system, the project management system having a target project, the method comprising: Acquire project information data of the target project; Screening out project tasks from a preset task database according to the project information data; wherein the project tasks include task instruments, task materials and task steps; Performing a task feasibility test on the project task to obtain a task feasibility result; wherein the task feasibility result represents the feasibility of the project task; If the task feasibility result indicates that the project task is feasible, then selecting an operation object from a preset object set according to the project task; Sending the project task to the operation object; The task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps is obtained, and the task result is saved.
2. The method according to claim 1, characterized in that The performing of task feasibility detection on the project task to obtain a task feasibility result includes: Auditing the task instrument to obtain a first audit result; wherein the first audit result indicates that the task instrument is idle or occupied; Reviewing the task material to obtain a second review result; wherein the second review result indicates whether the task material is a dangerous article or a non-dangerous article; Reviewing the task step to obtain a third review result; wherein the third review result indicates whether the task step is correct or wrong; The task feasibility result is obtained according to the first audit result, the second audit result and the third audit result.
3. The method according to claim 1, characterized in that After obtaining the task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps, and saving the task result, the method further includes: Obtain audit testing standards; Auditing the task result according to the audit test standard to obtain a task audit result; wherein the task audit result indicates whether the project task is correct or wrong; If the task review result is an error, the project task will be returned to the operation object.
4. The method according to claim 1, characterized in that: After obtaining the task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps, and saving the task result, the method further includes: Obtaining the operation hours of the operation object and the equipment hours of the task instrument; Calculating the depreciation amount of the task instrument according to the equipment working hours to obtain the instrument depreciation amount; Cost calculation is performed based on the operating hours and the instrument depreciation amount to obtain the cost of the project task.
5. The method according to claim 1, characterized in that: Before obtaining the project information data of the target project, the method further includes: Obtaining a material warehousing request for the task material; wherein the material warehousing request includes first material data; Saving the first material data according to the material storage request; Obtaining a material outbound request for the task material; wherein the material outbound request includes second material data; The first material data is modified according to the second material data.
6. The method according to claim 1, characterized in that Before obtaining the project information data of the target project, the method further includes: Acquire instrument information data of the task instrument and save the instrument information data; wherein the instrument information data includes an idle time period of the task instrument; Obtaining an instrument use request of the task instrument; wherein the instrument use request includes a use time; The idle time period is modified according to the usage time.
7. The method according to claim 1, characterized in that Constructing the task database specifically includes: Acquire project information data of each of the target projects and project tasks of each of the target projects; The task database is constructed according to each of the project information data and each of the project tasks; wherein the task database stores the mapping relationship between the project information data and the project tasks.
8. A project task execution device, characterized in that: Applied to a project management system, the project management system has a target project, the device comprises: An acquisition module, used to acquire project information data of the target project; A first screening module is used to screen out project tasks from a preset task database according to the project information data; wherein the project tasks include task instruments, task materials and task steps; A detection module, used to perform a task feasibility test on the project task to obtain a task feasibility result; wherein the task feasibility result represents the feasibility of the project task; A second screening module, if the task feasibility result indicates that the project task is feasible, the second screening module is used to screen out operation objects from a preset object set according to the project task; A sending module, used for sending the project task to the operation object; The saving module is used to obtain the task result of the operation object completing the project task feedback based on the task instrument, the task material and the task steps, and save the task result.
9. An electronic device, characterized in that: The electronic device includes a memory and a processor, the memory stores a computer program, and the processor implements the project task execution method according to any one of claims 1 to 7 when executing the computer program.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the project task execution method described in any one of claims 1 to 7 is implemented.