Penetrating type lifting appliance and lifting method for heavy prefabricated concrete stand column
By designing a through-type spreader, the end strength of the suspension shaft is enhanced by using an enlarged head and an integral stop, and combining a steel casing and a steel pad to protect the column, the safety and stability problems of heavy-duty concrete column hoisting in the prior art are solved. , achieving a firm and safe lifting of 240t-level columns.
Patent Information
- Application Number
- CN202411308408.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-19
- Publication Date
- 2024-11-22
AI Technical Summary
The prior art cannot effectively lift heavy-duty precast concrete columns, especially columns of 240t level, which have problems such as damage to the end of the suspension shaft, broken traction ropes and insufficient tightening flange, which cannot meet the needs of large-tonnage lifting.
A through-type spreader is designed, including a pre-embedded steel casing and a steel suspension shaft. The two ends of the suspension shaft are equipped with enlarged heads, and the traction rope is connected to the enlarged head, using an annular steel baffle, connecting rod and steel end The plate forms an integral stop, strengthens the end strength of the suspension shaft, and separates the traction rope and columns through a steel casing and steel pads to protect the suspension shaft and columns.
Improve the strength and firmness of the end of the suspension shaft, avoid breakage and escape from hidden dangers, ensure the stable constraints of the traction rope, enhance the safety and stability of the lifting process, meet the lifting needs of large-tonnage columns, and pass the hollow The structure saves materials and reduces cost.
Smart Images

Figure CN118992806A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of concrete column hoisting construction, in particular to a through-type hoisting device for heavy prefabricated concrete columns with a tonnage of 240 tons or more and a method for hoisting using the hoisting device. Background Art
[0002] At present, prefabricated concrete columns are mostly used in large buildings such as exhibition halls, stadiums, auditoriums, warehouses, and factories. The construction process is to tie the steel cage on the ground in advance and pour the horizontal concrete columns, and then hoist them vertically into place after they are dry and hard. The concrete columns of the above-mentioned large buildings are often huge in size and tonnage. Some columns are even as long as 38m, with a cross-sectional size of 1.5×1.5m and a tonnage of 240t. The traditional method of pre-embedded lifting rings in the columns or simply tying them with wire ropes and then lifting them obviously cannot meet the current hoisting needs of heavy prefabricated concrete columns.
[0003] Of course, some people in the industry have also proposed a through-type lifting solution, such as the application with application number 201710622237, which pre-buries a through-type casing in the concrete column, and passes a lifting shaft through the casing, and provides lifting ears and fastening flanges on both sides of the lifting shaft. The lifting ears are used to connect the traction rope and the fastening flange is locked to the end of the lifting shaft with bolts, in order to restrain the traction rope and prevent the traction rope from moving laterally away from the lifting shaft.
[0004] However, the structure of the above-mentioned hoist is simple and imperfect. During the actual hoisting process, workers found that the hoist may be barely feasible for hoisting columns of conventional tonnage, but it cannot meet the hoisting requirements of heavy columns, especially 240t level, and there are a series of defects and hidden dangers. Specifically, during hoisting, the end of the hoist shaft will be subjected to the force of the column concrete and casing, which is easy to cause damage to the end of the hoist shaft due to stress concentration; moreover, the traction rope is connected to the hoist shaft through the lifting ear, but the lifting ear is thin and not firm, and there is a risk of breakage and falling during large-tonnage hoisting; furthermore, the fastening flange at the end of the hoist shaft is also thin and insufficient in strength. During large-tonnage hoisting, it is impossible to restrain the traction rope in the axial direction. The traction rope is easy to move axially, be squeezed and damaged, and pass over the fastening flange, resulting in detachment and falling. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a through-type hoist for heavy prefabricated concrete columns which can make the hoisting process firm, safe and stable.
[0006] The technical solution of the present invention is to provide a through-type hanger for heavy precast concrete columns, which includes a steel casing that is pre-buried and horizontally penetrates the concrete column, and the steel casing is sleeved with a steel hanging shaft; the two ends of the steel hanging shaft respectively extend out of the left and right openings of the steel casing; an enlarged head is provided at each end of the steel hanging shaft, and each enlarged head extends inward from the end of the steel hanging shaft to the opening of the steel casing; the rope loop of the traction rope is sleeved on the part of the enlarged head that extends out of the opening of the steel casing; each enlarged head is sleeved with an annular steel baffle plate, and the outer surface of each annular steel baffle plate is connected to a steel end plate via multiple connecting rods; the steel end plate abuts against the outer end face of the enlarged head on the same side, and the steel end plate and the outer end face of the enlarged head are connected via a fastening bolt; the annular steel baffle plate, the connecting rod and the steel end plate on the same side form an integral stopper for restraining the outward movement of the traction rope.
[0007] Compared with the prior art, the through-type hanger for heavy precast concrete columns using the above structure has the following advantages.
[0008] First of all, the main load-bearing parts of the suspension shaft, that is, the two ends of the steel suspension shaft, have been targetedly strengthened and thickened to form an enlarged head, which effectively improves the strength and firmness of this part and avoids damage due to stress concentration; and the traction rope is directly fitted on the end of the enlarged head, and the strength of this position is reliable and firm, avoiding the hidden danger of breakage and falling; moreover, the integral hollow block composed of annular steel baffles, connecting rods and steel end plates has sufficient strength and provides a firm and stable axial limit for the rope loop of the traction rope, preventing the rope loop from moving laterally from the steel suspension shaft and falling; moreover, the hollow block structure is both elastic and more resilient to the constraint of the traction rope, and is more firm and reliable; furthermore, the hollow structure has a light weight, which saves materials and reduces the cost while ensuring sufficient strength, and the lighter weight makes it convenient for workers to manually disassemble it after the lifting is completed. In summary, the above-mentioned slings make the lifting process safer, more stable and firm, which is enough to meet the actual lifting needs of large-tonnage columns.
[0009] Preferably, each enlarged head is also gap-fitted with a steel pad for separating the rope loop of the traction rope and the corresponding side of the concrete column; each enlarged head is gap-fitted with a steel casing for separating the enlarged head and the rope loop of the traction rope, and the steel casing is located between the steel pad and the annular steel baffle; in this way, the steel pad separates and protects the inner concrete column, and bears the wear caused by the rope loop during lifting. Similarly, the steel casing separates and protects the steel lifting shaft, and also bears the wear caused by the rope loop during lifting; the steel pad and steel casing are both consumable parts, but they are easy to replace after wear and the cost is not high, which effectively protects more expensive or non-replaceable components such as columns, steel guard plates, steel lifting shafts, etc.
[0010] Moreover, the above-mentioned steel casing and steel pad are movably fitted with the enlarged head, and the lateral position of the steel casing and the steel pad is adjustable on the steel hanging shaft. In this way, when the hanger is installed, it will not hinder the lateral movement of the steel hanging shaft, and the length of the steel casing extending out of the left and right ends of the steel hanging shaft can be flexibly adjusted to ensure that after the fastening bolts at each end are tightened, the steel end plate of the integral stopper just presses against the outer end face of the enlarged head on the same side of the steel hanging shaft, thereby ensuring that the force on the hanging shaft is balanced and reasonable and meets the design requirements.
[0011] As a gain, each integral stopper also includes an outer lifting ring, the two sides of which are respectively fixed to the annular steel baffle plate and the steel end plate of the integral stopper; a convex ring is welded to the normal shaft section in the middle of the steel suspension shaft, and the outer diameter of the convex ring is smaller than the inner diameter of the steel casing; an arc-shaped plate inner lifting ring is hinged on one side of the convex ring; when the arc-shaped plate inner lifting ring is placed horizontally, it is accommodated in the annular space between the side of the steel suspension shaft and the inner wall of the steel casing.
[0012] Correspondingly, after the concrete column is vertically hoisted into place and fixed firmly, the process of dismantling the hoist is to first move down and remove the two traction ropes at both ends of the steel hoist shaft; then the workers take the lift to the left end of the steel hoist shaft, and remove the fastening bolts, integral blocks, steel casing and steel pads at the left end of the steel hoist shaft in turn; then, the workers take the lift to the right end of the steel hoist shaft, directly tie and pull the outer lifting ring at the right end of the steel hoist shaft with the first lifting belt, so that the steel hoist shaft moves horizontally to the right for a distance until the inner lifting ring of the arc plate in the middle section of the steel hoist shaft is pulled out from the right opening of the steel casing, flip and erect the inner lifting ring of the arc plate and tie the second lifting belt; use the two lifting belts to lift the steel hoist shaft horizontally to the ground in the form of two left and right lifting points, and the fastening bolts, integral blocks, steel casing and steel pads at the right end are lifted to the ground as a whole with the steel hoist shaft at one time, and then completely disassembled.
[0013] The advantages of the above-described gain structure and method are as follows.
[0014] First of all, if there is no above-mentioned lifting ring, the disassembly process will be very cumbersome, and workers are required to take a lifting vehicle to reach the left end of the steel lifting shaft first, and remove the fastening bolts, integral blocks, steel casing and steel pads at this end in turn, and then take a lifting vehicle to reach the right end of the steel lifting shaft, and remove the fastening bolts, integral blocks, steel casing and steel pads at this end, and then tie the right end of the steel lifting shaft with a lifting rope, and pull the steel lifting shaft out of the steel casing of the column; the whole process has many steps, slow speed, time-consuming and labor-intensive, and when the steel lifting shaft is pulled out of the horizontal steel casing, the steel lifting shaft will swing 90 degrees from horizontal to vertical, causing shaking and vibration, and there is a safety hazard.
[0015] On the contrary, after adopting the present gain structure and method, first of all, the disassembly process is facilitated. It is only necessary to remove the fastening bolts, integral block, steel casing and steel pad on the left end, while the fastening bolts, integral block, steel casing and steel pad on the right end do not need to be disassembled one by one at high altitude, but are hoisted to the ground together with the steel hanging shaft as a whole, which reduces the workload of high-altitude operations by half, saves time and effort, and makes disassembly quick and efficient; moreover, an outer lifting ring is provided on the left block and an inner lifting ring that can be erected and unfolded is provided in the middle section of the steel hanging shaft, so that double-hanging-point horizontal lifting is realized, so that the steel hanging shaft maintains the horizontal direction during lifting, avoiding the 90-degree swinging vibration that occurs when the prior art detaches from the steel casing, and ensuring that the disassembly process is smooth, stable and safe; moreover, the original steel casing and steel pad on the right end are slidably fitted with the steel hanging shaft However, the sliding member is just restricted and constrained between the first sling and the second sling, eliminating the safety hazard of the sliding member falling when the steel shaft is hoisted; furthermore, the structure of the inner lifting ring of the arc plate also has highlights. The arc plate is designed so that when the inner lifting ring is placed horizontally, it is just contained in the annular gap between the steel shaft and the steel casing, without affecting and destroying the force and conduction form of the steel shaft, and after the inner lifting ring is flipped vertically, it is convenient to tie it with the sling; and the connection method in which the inner lifting ring is hinged to the convex ring and the convex ring is welded to the steel shaft, not only ensures the firmness and stability of the hinge between the inner lifting ring and the steel shaft, but also makes it possible to install the hinge without drilling holes in the steel shaft itself, without destroying the integrity of the shaft, without affecting the cross-section of the steel shaft, without perforations or concave, and without reducing the structural force and strength of the steel shaft. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of the heavy precast concrete column involved in the present invention when the steel cage is transversely tied.
[0017] Figure 2 The present invention is a schematic structural diagram of a heavy precast concrete column after horizontally pouring concrete.
[0018] Figure 3 It is a structural schematic diagram of a through-type hanger for a heavy precast concrete column of the present invention.
[0019] Figure 4 The invention is a schematic structural diagram of a heavy precast concrete column after the column is half-cut by a through-type hanger.
[0020] Figure 5 The present invention is a structural schematic diagram of a traction rope, a fastening bolt, an integral stopper, a steel casing and a steel backing plate at one end of the sling after being disassembled.
[0021] Figure 6 Yes Figure 5 Schematic diagram of the structure of the Sinosteel lifting shaft during horizontal lifting.
[0022] Figure 7 yes Figure 5 Enlarged schematic diagram of part A.
[0023] Figure 8 yes Figure 6 Schematic diagram of the enlarged portion B.
[0024] As shown in the figure, 1. concrete column, 2. steel casing, 3. steel hanging shaft, 3.1. enlarged head, 4. steel guard plate, 5. traction rope, 5.1. rope loop, 6. annular steel baffle, 7. connecting rod, 8. steel end plate, 9. fastening bolt, 10. threaded blind hole, 11. steel pad, 12. steel casing, 13. outer lifting ring, 14. convex ring, 15. inner lifting ring of arc plate, 16. steel cage, 17. first lifting strap, 18. second lifting strap. DETAILED DESCRIPTION
[0025] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
[0026] like Figures 1 to 8 As shown, the through-type hoist of the heavy precast concrete column of the present invention comprises a steel casing 2 embedded in the concrete column 1, and the steel casing 2 penetrates the concrete column 1 in the horizontal direction, that is, the width direction of the concrete column 1. The single column hoisted by the present application is up to 38m long, with a cross-sectional size of 1.5×1.5m and a tonnage of 240t, which belongs to the heavy concrete column 1. In order to meet the safe hoisting requirements of this tonnage, the hoist of the present application has made a series of targeted improvements.
[0027] The steel casing 2 is sleeved with a steel suspension shaft 3; the two ends of the steel suspension shaft 3 extend out of the left and right openings of the steel casing 2 respectively; two steel guard plates 4 are welded to the two ends of the steel casing 2 respectively, and the two steel guard plates 4 are pre-buried in the concrete column 1. That is, the main body of each steel guard plate 4 is pre-buried in the concrete column 1 and the outer surface of the steel guard plate 4 is exposed on the left side or right side of the concrete column 1. In this way, the original weak area of the column is strengthened and protected in a targeted manner, and the concrete in the end area of the steel casing 2 is prevented from being fractured and damaged.
[0028] An enlarged head 3.1 is provided at each end of the steel suspension shaft 3, and each enlarged head 3.1 extends inward from the end of the steel suspension shaft 3 to the opening of the steel casing 2; the rope loop 5.1 of the traction rope 5 is sleeved on the portion of the enlarged head 3.1 extending out of the opening of the steel casing 2. In other words, the portion where the end of the steel suspension shaft 3 and the traction rope 5 are sleeved, and the portion where the end of the steel suspension shaft 3 and the center hole of the steel guard plate 4 correspond, are all thickened for targeted reinforcement.
[0029] Each enlarged head 3.1 is covered with an annular steel baffle plate 6, and the outer surface of each annular steel baffle plate 6 is connected to a steel end plate 8 via a plurality of connecting rods 7. The annular steel baffle plate 6, connecting rods 7 and steel end plate 8 on the same side form an integral stopper for restraining the outward movement of the traction rope 5. The steel end plate 8 abuts against the outer end surface of the enlarged head 3.1 on the same side, and the steel end plate 8 and the outer end surface of the enlarged head 3.1 are connected via a fastening bolt 9; that is, the outer end surface of the enlarged head 3.1 is provided with a threaded blind hole 10, the rod of the fastening bolt 9 is screwed into the threaded blind hole 10, and the head of the fastening bolt 9 abuts against the steel end plate 8 inwardly so that the steel end plate 8 is tightly abutted against the enlarged head 3.1 on the same side.
[0030] Each enlarged head 3.1 also has a gap fitted with a steel pad 11 for separating the rope loop 5.1 of the traction rope 5 and the corresponding side of the concrete column 1; each enlarged head 3.1 also has a gap fitted with a steel casing 12 for separating the enlarged head 3.1 and the rope loop 5.1 of the traction rope 5, and the steel casing 12 is located between the steel pad 11 and the annular steel baffle 6.
[0031] Each integral stopper also includes an outer lifting ring 13, the two sides of which are respectively welded and fixed to the annular steel stopper plate 6 and the steel end plate 8 of the integral stopper. A steel convex ring 14 is welded to the normal shaft section in the middle of the steel suspension shaft 3, and the outer diameter of the convex ring 14 is smaller than the inner diameter of the steel casing 2; an arc-shaped plate inner lifting ring 15 is hinged on one side of the convex ring 14; the arc-shaped plate inner lifting ring 15 is accommodated in the annular space between the side of the steel suspension shaft 3 and the inner wall of the steel casing 2 when placed horizontally.
[0032] like Figures 1 to 8 As shown, the method for lifting using the through-type lifting device of the present invention has the following steps.
[0033] First, a steel cage 16 is tied on the ground at the construction site and the steel casing 2 and the steel guard plate 4 are also fixed in the steel cage 16, a side formwork is set up and concrete is poured to form a transversely extending concrete column 1 on the ground, and the steel casing 2 and the steel guard plate 4 are pre-buried in the concrete.
[0034] After the concrete column 1 is dry and hard and reaches the strength requirement, the steel shaft 3 of the sling is passed through the steel casing 2, and the steel pad 11, steel casing 12 and integral block are put on the enlarged head 3.1 of the steel shaft 3, and the fastening bolts 9 are tightened, and then the rope loop 5.1 of the traction rope 5 is put on the outside of the steel casing 12, thereby completing the installation of the sling.
[0035] The concrete column 1 is hoisted and rotated 90 degrees to be hoisted vertically in place, and the bottom foundation of the concrete column 1 is fixed. The above are conventional pouring and hoisting steps, and the improvement of the hoisting method of the present application lies in disassembly.
[0036] After the concrete column 1 is vertically hoisted into place and firmly fixed, the process of disassembling the hoist is as follows.
[0037] First, move down and remove the two traction ropes 5 at both ends of the steel suspension shaft 3; the rope loop 5.1 of the traction rope 5 is originally larger than the integral block, and in the taut suspension state, the rope loop 5.1 of the traction rope 5 is restricted between the integral block and the steel pad 11, but in the relaxed state, it can easily cross the integral block to detach from the steel suspension shaft 3.
[0038] Then the workers take the lifting vehicle to the left end of the steel hanging shaft 3, and remove the fastening bolts 9, the integral stopper, the steel casing 12 and the steel pad 11 at the left end of the steel hanging shaft 3 in sequence.
[0039] Then, the worker takes the lifting vehicle to the right end of the steel suspension shaft 3, directly ties and pulls the outer lifting ring 13 at the right end of the steel suspension shaft 3 with the first lifting belt 17, so that the steel suspension shaft 3 moves horizontally to the right for a distance, until the inner lifting ring 15 of the arc plate in the middle section of the steel suspension shaft 3 is pulled out from the right opening of the steel casing 2, flips and erects the inner lifting ring 15 of the arc plate and ties the second lifting belt 18; thereby, the steel pad 11 and steel casing 12 at the right end are just restricted between the two lifting belts and will not fall; the steel suspension shaft 3 is lifted horizontally to the ground in the form of two left and right lifting points by using the two lifting belts, and the fastening bolts 9, the integral block, the steel casing 12 and the steel pad 11 at the right end do not need to be disassembled at high altitude, but are lifted to the ground as a whole together with the steel suspension shaft 3 at one time, and then completely disassembled after reaching the ground.
Claims
1. A through-type hanger for a heavy precast concrete column, comprising a steel casing pre-buried and transversely penetrating the concrete column, the steel casing being sleeved with a steel hanging shaft; characterized in that: The two ends of the steel suspension shaft extend out of the left and right openings of the steel casing respectively; an enlarged head is arranged at each end of the steel suspension shaft, and each enlarged head extends inward from the end of the steel suspension shaft to the opening of the steel casing; the rope loop of the traction rope is put on the part of the enlarged head extending out of the opening of the steel casing; each enlarged head is covered with an annular steel baffle plate, and the outer surface of each annular steel baffle plate is connected to a steel end plate through multiple connecting rods; the steel end plate abuts against the outer end surface of the enlarged head on the same side, and the steel end plate and the outer end surface of the enlarged head are connected by a fastening bolt; the annular steel baffle plate, connecting rod and steel end plate on the same side form an integral baffle block for restraining the outward movement of the traction rope.
2. The through-type hanger for heavy precast concrete columns according to claim 1 is characterized in that: Each enlarged head also has a gap fitted with a steel pad for separating the traction rope loop and the corresponding side of the concrete column; each enlarged head has a gap fitted with a steel casing for separating the enlarged head and the traction rope loop, and the steel casing is located between the steel pad and the annular steel baffle.
3. The through-type hanger for heavy precast concrete columns according to claim 2 is characterized in that: Each integral stopper also includes an outer lifting ring, the two sides of which are respectively fixed to the annular steel baffle plate and the steel end plate of the integral stopper; a convex ring is welded to the normal shaft section in the middle of the steel suspension shaft, and the outer diameter of the convex ring is smaller than the inner diameter of the steel casing; an arc-shaped plate inner lifting ring is hinged on one side of the convex ring; when the arc-shaped plate inner lifting ring is placed horizontally, it is accommodated in the annular space between the side of the steel suspension shaft and the inner wall of the steel casing.
4. A method for hoisting using the through-type hoisting device according to claim 3, characterized in that: After the concrete column is vertically hoisted into place and fixed firmly, the process of dismantling the hoist is as follows: First, move down and remove the two traction ropes at both ends of the steel suspension shaft; then the workers take the lift to the left end of the steel suspension shaft, and remove the fastening bolts, integral block, steel casing and steel pad on the left end of the steel suspension shaft in turn; then, the workers take the lift to the right end of the steel suspension shaft, directly use the first lifting belt to tie and pull the outer lifting ring on the right end of the steel suspension shaft, so that the steel suspension shaft moves horizontally to the right for a distance, until the inner lifting ring of the arc plate in the middle section of the steel suspension shaft is pulled out from the right opening of the steel casing, turn over and erect the inner lifting ring of the arc plate and tie the second lifting belt; use two lifting belts to lift the steel suspension shaft horizontally to the ground in the form of two left and right lifting points, and the fastening bolts, integral block, steel casing and steel pad on the right end are lifted to the ground as a whole with the steel suspension shaft at one time, and then completely disassembled.