Electric vehicle V2G scheduling scheme evaluation method, device and equipment
By constructing an electric vehicle V2G scheduling optimization model and evaluating the scheduling strategy of the electric vehicle V2G system, the problem of difficult to determine the effect of the scheduling strategy of the electric vehicle V2G system in the existing technology is solved, and a comprehensive evaluation and optimization of the electric vehicle V2G system has been achieved.
Patent Information
- Application Number
- CN202411090972.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-22
AI Technical Summary
The existing technology lacks a comprehensive and targeted evaluation plan for the V2G system of electric vehicles, and it is impossible to determine the scheduling effect of the scheduling strategy of the electric vehicle V2G system, which makes it difficult to improve the selection and optimization of the scheduling strategy.
By building an optimization model based on the basic data information and preset scheduling constraints of the electric vehicle V2G scheduling system, a target scheduling scheme that meets the preset evaluation standards is generated, and multiple scheduling evaluation indicators are calculated, such as renewable energy consumption ratio, Scheduling capacity, scheduling response time and load stability are evaluated.
提供了较为全面且具有针对性的多个调度评估指标,能够满足调度方案的评估需求,为系统调度后续工作提供准确可靠的分析支撑,解决了现有技术中电动汽车V2G系统调度策略效果难以确定 The problem.
Smart Images

Figure CN119009978A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of new energy power grid technology, and in particular to a method, device and equipment for evaluating a V2G scheduling scheme for electric vehicles. Background Art
[0002] As an environmentally friendly means of transportation, electric vehicles (EVs) have been vigorously promoted around the world in recent years. As a mobile load storage resource, EVs are different from other conventional loads in the power system. They can not only be charged at any node in the power system, but also feed back power to nodes in the system through vehicle to grid (V2G) technology. While the large-scale development of EVs promotes carbon reduction and emission reduction, it also poses huge challenges to the operation of the power system. The V2G scheduling strategy further explores the mobile load storage resources of EVs by studying the spatiotemporal characteristics of EVs, thereby supporting the power grid to shift peaks and fill valleys and increase the proportion of renewable energy consumption. Therefore, it is of great practical significance to reasonably guide EVs to participate in V2G scheduling in specific time and space, and to carry out multi-index evaluation and analysis under the V2G scheduling strategy.
[0003] However, the existing technology has not yet conducted a comprehensive and targeted evaluation and analysis of the electric vehicle V2G system, lacks a scientific and reliable evaluation plan, and is unable to grasp the scheduling effect of the electric vehicle V2G system scheduling strategy. Therefore, the selection and optimization of the scheduling strategy are difficult to achieve significant improvement and development. Summary of the invention
[0004] The present application provides an electric vehicle V2G scheduling scheme evaluation method, device and equipment, which are used to solve the technical problem that the prior art lacks a comprehensive and targeted evaluation scheme for the electric vehicle V2G system and cannot determine the scheduling effect of the electric vehicle V2G system scheduling strategy.
[0005] In view of this, the first aspect of the present application provides an electric vehicle V2G scheduling scheme evaluation method, comprising:
[0006] Building a V2G dispatch optimization model based on basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, wherein the preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints;
[0007] The V2G scheduling optimization model is used to generate a target scheduling solution that meets the preset evaluation criteria;
[0008] Calculating a plurality of dispatch evaluation indicators of the target dispatch scheme, wherein the dispatch evaluation indicators include renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability and dispatch operation economic benefits;
[0009] The scheduling effect of the target scheduling scheme is evaluated according to the scheduling evaluation index to obtain an evaluation result.
[0010] Preferably, the V2G scheduling optimization model is constructed based on the basic data information of the electric vehicle V2G scheduling system and preset scheduling constraints, including:
[0011] Obtaining basic data information of an electric vehicle V2G dispatching system, wherein the basic data information includes offline demand and trip planning;
[0012] Initialize model parameters and set electric vehicle V2G service information, wherein the electric vehicle 2VG service information includes service price, charging and discharging price and EV status information;
[0013] Constructing a target optimization function of the electric vehicle V2G dispatching system based on the basic data information, the model parameters and the electric vehicle 2VG service information;
[0014] The preset scheduling constraints are configured for the target optimization function to generate a V2G scheduling optimization model.
[0015] Preferably, the step of using the V2G scheduling optimization model to generate a target scheduling solution that meets a preset evaluation standard further includes:
[0016] If the generated scheduling plan does not meet the preset evaluation criteria, the model parameters and travel-related parameters of the V2G scheduling optimization model are adjusted until a target scheduling plan that meets the preset evaluation criteria is generated, and the travel-related parameters include charging amount, start time and service time.
[0017] Preferably, the step of calculating a plurality of scheduling evaluation indicators of the target scheduling solution further includes:
[0018] The scheduling evaluation index is standardized by using a preset standardization algorithm, and the preset standardization algorithm includes a cloud model and a min-max algorithm.
[0019] Preferably, the step of evaluating the scheduling effect of the target scheduling scheme according to the scheduling evaluation index to obtain an evaluation result further includes:
[0020] Calculate the scheduling SOC thresholds of the charging and discharging processes respectively according to the charging and discharging information in the target scheduling scheme, wherein the scheduling SOC thresholds include a charging scheduling SOC threshold and a discharging scheduling SOC threshold;
[0021] The dispatchable potential capacity of the electric vehicle V2G dispatching system is evaluated according to the dispatching schedule and the dispatching SOC threshold to obtain a potential capacity evaluation value.
[0022] The second aspect of the present application provides an electric vehicle V2G scheduling scheme evaluation device, comprising:
[0023] A model building unit, used to build a V2G dispatch optimization model based on basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, wherein the preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints;
[0024] A scheme generating unit, configured to generate a target scheduling scheme that meets a preset evaluation standard by using the V2G scheduling optimization model;
[0025] An index calculation unit, used to calculate a plurality of dispatch evaluation indicators of the target dispatch scheme, wherein the dispatch evaluation indicators include renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability and dispatch operation economic benefits;
[0026] The scheduling evaluation unit is used to evaluate the scheduling effect of the target scheduling scheme according to the scheduling evaluation index to obtain an evaluation result.
[0027] Preferably, the model building unit is specifically used for:
[0028] Obtaining basic data information of an electric vehicle V2G dispatching system, wherein the basic data information includes offline demand and trip planning;
[0029] Initialize model parameters and set electric vehicle V2G service information, wherein the electric vehicle 2VG service information includes service price, charging and discharging price and EV status information;
[0030] Constructing a target optimization function of the electric vehicle V2G dispatching system based on the basic data information, the model parameters and the electric vehicle 2VG service information;
[0031] The preset scheduling constraints are configured for the target optimization function to generate a V2G scheduling optimization model.
[0032] Preferably, it also includes:
[0033] The standardization unit is used to standardize the scheduling evaluation index using a preset standardization algorithm, and the preset standardization algorithm includes a cloud model and a min-max algorithm.
[0034] Preferably, it also includes:
[0035] An SOC threshold calculation unit, configured to calculate the scheduling SOC thresholds of the charging and discharging processes respectively according to the charging and discharging information in the target scheduling scheme, wherein the scheduling SOC thresholds include a charging scheduling SOC threshold and a discharging scheduling SOC threshold;
[0036] The potential capacity evaluation unit is used to evaluate the dispatchable potential capacity of the electric vehicle V2G dispatch system according to the dispatch schedule and the dispatch SOC threshold to obtain a potential capacity evaluation value.
[0037] A third aspect of the present application provides an electric vehicle V2G scheduling scheme evaluation device, the device comprising a processor and a memory;
[0038] The memory is used to store program codes and transmit the program codes to the processor;
[0039] The processor is used to execute the electric vehicle V2G scheduling scheme evaluation method described in the first aspect according to the instructions in the program code.
[0040] It can be seen from the above technical solutions that the embodiments of the present application have the following advantages:
[0041] In the present application, a method for evaluating a V2G dispatching scheme for an electric vehicle is provided, comprising: constructing a V2G dispatching optimization model based on basic data information of a V2G dispatching system for an electric vehicle and preset dispatching constraints, wherein the preset dispatching constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints; using the V2G dispatching optimization model to generate a target dispatching scheme that meets preset evaluation criteria; calculating multiple dispatching evaluation indicators of the target dispatching scheme, wherein the dispatching evaluation indicators include renewable energy absorption ratio, dispatchable capacity, dispatching response time, load smoothness, and dispatching operation economic benefits; and evaluating the dispatching effect of the target dispatching scheme according to the dispatching evaluation indicators to obtain an evaluation result.
[0042] The electric vehicle V2G scheduling scheme evaluation method provided in this application can generate a variety of target scheduling schemes that meet the evaluation criteria through the V2G scheduling optimization model; then, according to the scheduling evaluation indicators corresponding to the different target scheduling schemes obtained by calculation, a comprehensive scheduling evaluation can be performed on the current scheme to determine the effect of the electric vehicle V2G system scheduling scheme; this process provides a relatively comprehensive and targeted multiple scheduling evaluation indicators, which can meet the evaluation requirements of the scheduling scheme and provide accurate and reliable evaluation and analysis support for the subsequent work of system scheduling. Therefore, this application can solve the technical problem that the prior art lacks a comprehensive and targeted evaluation scheme for the electric vehicle V2G system and cannot determine the scheduling effect of the electric vehicle V2G system scheduling strategy. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] Figure 1 A flow chart of a method for evaluating a V2G scheduling scheme for electric vehicles provided in an embodiment of the present application;
[0044] Figure 2A schematic diagram of the structure of an electric vehicle V2G scheduling scheme evaluation device provided in an embodiment of the present application;
[0045] Figure 3 A schematic diagram of a multi-index evaluation framework for an electric vehicle V2G dispatching system provided in an embodiment of the present application;
[0046] Figure 4 A schematic diagram of the SOC variation range in different states when an electric vehicle provided in an embodiment of the present application performs a V2G dispatching task;
[0047] Figure 5 The SOC curve diagram of the electric vehicle in different states provided by the embodiment of the present application;
[0048] Figure 6 Load variation curves for different regions provided for the application example of this application. DETAILED DESCRIPTION
[0049] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0050] For easier understanding, see Figure 1 , an embodiment of an electric vehicle V2G scheduling scheme evaluation method provided by the present application includes:
[0051] Step 101: construct a V2G dispatch optimization model based on basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, where the preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints.
[0052] Furthermore, step 101 includes:
[0053] Obtain basic data information of the electric vehicle V2G dispatching system, including offline demand and trip planning;
[0054] Initialize model parameters and set electric vehicle V2G service information, which includes service price, charging and discharging price, and EV status information;
[0055] Construct the target optimization function of the electric vehicle V2G dispatching system based on basic data information, model parameters and electric vehicle V2G service information;
[0056] Configure preset scheduling constraints for the target optimization function and generate a V2G scheduling optimization model.
[0057] It should be noted that the electric vehicle V2G system of this embodiment is composed of V2G charging and discharging piles, power loads, renewable energy power generation equipment and traditional generator equipment; all system components interact in real time through bidirectional information flow and energy flow. The information flow includes bidirectional communication between the V2G dispatch center and distributed power generation, charging pile operators, power loads and EVs. The energy flow includes bidirectional energy flow between the power grid and charging piles, and between charging piles and EVs.
[0058] The multi-index evaluation framework of this application is established on the basis of the V2G day-ahead dispatch model, which evaluates the dispatch result status within the dispatch period, and the evaluation result reflects the ideal level of dispatch operation. Combined with the traditional energy storage comprehensive evaluation model, this paper proposes a post-dispatch evaluation scheme for the power system and expands the evaluation ideas of the application architecture design, constructs quantifiable evaluation indicators from different participants, forms a multi-index evaluation system for V2G dispatch strategies, and finally compares the operation of dispatch strategies. The multi-index evaluation framework of the regional V2G dispatch system is as follows: Figure 3 shown.
[0059] The dispatch analysis of the electric vehicle V2G dispatch system of this embodiment includes all data before, during and after the entire dispatch process, wherein the system data is preprocessed beforehand, the strategy execution process is simulated, and the in-process data is obtained. Feedback is given to the dispatch strategy based on the in-process data, and finally the dispatch result is obtained afterward. A multi-index evaluation is performed on the entire dispatch process, and a comparative analysis is performed with the expected goals of the dispatch strategy, and the dispatch strategy parameters are adjusted in a closed loop so that the simulated dispatch result meets the expectations of the dispatch strategy.
[0060] In the electric vehicle V2G dispatching system, the V2G dispatching model for the day and the day focuses on the travel needs of EV users, such as travel distance, travel start and end time, as well as vehicle characteristic parameters such as battery type, capacity, and energy consumption per unit mileage. V2G dispatching can fully and effectively dispatch the mobile storage resources of large-scale EVs for charging and discharging, so that the system can achieve the expected operating goals, such as balancing grid load fluctuations, increasing the proportion of renewable energy consumption, and maximizing the economic benefits of dispatching operations; based on this, the objective function of the model can be constructed. The preset dispatching constraints of the V2G dispatching optimization model include EV service constraints, EV grid-connected power constraints, and power system balance constraints.
[0061] Specifically, basic data information refers to the basic characteristic data of electric vehicles EV and other related equipment in the target area, such as initial status, offline requirements and itinerary planning, etc. These basic data information serve as the basis for building a scheduling model. In addition, it is also necessary to set relevant scheduling policy fee standards, such as service rates and charging and discharging rates. In the initial stage of modeling, some necessary model parameters need to be initialized, including but not limited to EV initial status and driving characteristic parameters. Moreover, setting service information is also a necessary operation. It can be understood that electric vehicle 2VG service information includes but is not limited to service prices, charging and discharging prices and EV status information.
[0062] After the above operations are completed, the target optimization function can be constructed based on the information of all cars participating in the V2G activity and the corresponding above information, and the corresponding preset scheduling constraints can be configured to generate a V2G scheduling optimization model. By adjusting the parameters of the V2G scheduling optimization model, scheduling solutions for various scenarios can be generated.
[0063] The preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints. The specific constraints are analyzed as follows:
[0064] For EV service constraints, in an electric vehicle V2G system consisting of M charging and discharging piles and N network nodes, the length of the simulated scheduling cycle is T. In this scheduling planning stage, there are a total of I electric vehicles that accept the V2G service invitation. For any vehicle in this fleet of |I| electric vehicles, its storage capacity is C i ; The upper limit of battery storage capacity ratio (state of charge, SOC) is The lower limit of SOC is The starting time of accessing the grid and participating in V2G is T i start , the off-grid time is T i stop , online time interval [T i start , T i stop ]. The time when this car starts to connect to the power grid is T i start , the time to leave the grid is T i stop , and its range of activity between these two moments is the online period [T i start , T i stop], that is, the online time period. When the vehicle is connected to the Internet, it will respond to the V2G dispatch commands issued by the dispatch center regarding charging, discharging, or no operation (neither charging nor discharging). In order to meet the needs of the driver, the vehicle must maintain a SOC higher than the expected level when offline, and to prevent safety issues caused by battery overload, the maximum charging and discharging power needs to be limited.
[0065] For the state changes and SOC change range of the vehicle when performing V2G dispatch tasks, please refer to Figure 4 All V2G-responsive service vehicles are within the grid connection period. That is, there are constraints when EV responds to V2G scheduling online, that is, the EV service constraints are as follows:
[0066]
[0067]
[0068]
[0069]
[0070]
[0071]
[0072] in, For EV i Charge and discharge efficiency, s i,t For EV i The state of charge at time t is For EV i The charging state at time t is: For EV i The discharge state at time t, For EV i The charging power at time t is For EV i The discharge power at time t; P i ev For EV i Self-charging and discharging power, For EV i The minimum battery state of charge allowed by the user, For EV i The user requires a minimum state of charge when leaving. For EV grid-connected power constraints, the V2G system dispatch center assigns EVs to the grid according to the EV activity area. i The number of charging piles allocated to the desired service area is m, and the EV i The response power is not only limited by its own charging and discharging power Pi ev With the current dispatchable capacity C i ·s i,t , and is also limited by the rated charging and discharging power of the charging pile Therefore, the grid-connected power constraint participating in the V2G response is:
[0073]
[0074]
[0075] Among them, ΔT is the unit time, and the time simulation step is set to 1h.
[0076] For the power system balance constraint, the system can have three sides of the power system: source, load, and storage, connected to multiple power network nodes. Conventional loads, conventional power generation equipment, renewable energy generation, charging and discharging piles, etc. are all distributed on the power network nodes, and the inflow and outflow power of the nodes are balanced at all times. Therefore, there are the following constraints:
[0077]
[0078]
[0079]
[0080]
[0081] in, is the set of connection lines flowing into node n; is the set of connecting lines outflowing from node n; is the power that can flow between the two ends of the power line l; f l,t It is the bidirectional power flowing through the line phase l. When it is positive, it flows in the direction indicated by the mark, and when it is negative, it flows in the opposite direction. and They represent the inflow power and outflow power of node n at time t respectively; is the conventional power generation power of node n; The renewable energy power generation power of node n; is the normal load of node n; is the sum of the charging powers of EVs connected to node n; is the sum of the discharge powers of EVs connected to node n; is the inflow power of node n at time t; is the outflow power of node n at time t.
[0082] Step 102: Use the V2G scheduling optimization model to generate a target scheduling solution that meets the preset evaluation criteria.
[0083] Furthermore, step 102 further includes:
[0084] If the generated scheduling plan does not meet the preset evaluation criteria, the model parameters and travel-related parameters of the V2G scheduling optimization model are adjusted until a target scheduling plan that meets the preset evaluation criteria is generated. The travel-related parameters include charging amount, start time and service time.
[0085] It should be noted that the scheduling scheme generated based on the V2G scheduling optimization model needs to meet the preset evaluation criteria, that is, the generated scheduling scheme must meet certain requirements, otherwise, the scheduling scheme is invalid and the model parameters need to be adjusted until a qualified scheme is generated. The preset evaluation criteria can be used to control the basic effect of the scheduling scheme to ensure the effectiveness of the scheduling scheme. Moreover, the preset evaluation criteria can be set according to the actual situation and are not limited here.
[0086] In addition, there are two main ways to adjust model parameters. One is to adjust the relevant data of the model-generated scheduling strategy, that is, the model parameters; the other is to adjust the operation-related parameters. The operation-related parameters include but are not limited to the charging amount, start time and service time, and may also include information such as charging points. The specific information is not limited here and is only used as an example.
[0087] Step 103: Calculate multiple dispatch evaluation indicators of the target dispatch scheme, where the dispatch evaluation indicators include renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability, and dispatch operation economic benefits.
[0088] This embodiment selects multiple dispatch evaluation indicators to make a comprehensive analysis and diversified evaluation of how electric vehicles participating in V2G activities bring benefits to the power system and its operators; this process can evaluate the dispatchability, dispatch response speed, renewable energy utilization ratio, load stability and dispatch operation cost of the dispatch process. The evaluation scheme has a complete systematization feature and is targeted to a certain extent, which can ensure the reliability of the evaluation results.
[0089] For the renewable energy absorption ratio, this embodiment measures the proportion of renewable energy absorbed by the power grid by comparing its overall consumption and generated energy. Since the way renewable energy is generated has the characteristics of small inertia and large fluctuations, large-scale access to the power grid may lead to safety problems. At present, in order to ensure the safe operation of the power grid, it is necessary to equip each renewable energy device with storage facilities according to certain standards. As a flexible storage resource, electric vehicles (EVs) can consume renewable energy at specific locations according to dispatch commands. Therefore, this embodiment proposes a method for calculating the renewable energy absorption ratio of the V2G dispatching system:
[0090]
[0091] Among them, p rc is the actual consumption of renewable energy, p gr The output capacity of renewable energy, β rc is the renewable energy consumption ratio.
[0092] For the dispatchable capacity of EV, under the premise of meeting basic traffic needs, the dispatchable capacity of EV represents the V2G capacity that can be provided by the EV groups willing to participate in the dispatch. When EV is responding to the dispatch, the interaction energy between it and the charging / discharging equipment is constrained by the dispatch command, the existing battery capacity of the electric vehicle, the maximum charging and discharging capacity of the electric vehicle, and the maximum charging and discharging capacity of the charging station. The actual dispatchable capacity of the system is defined as the sum of the V2G discharge power of all vehicles participating in the V2G. Therefore, the calculation process of the discharge dispatchable capacity of the V2G dispatch system is:
[0093]
[0094] in, is the dispatchable capacity, For EV i The discharge state at time t.
[0095] Dispatch response time refers to the dispatch reaction speed of electric vehicles. It measures the time it takes for electric vehicles to execute dispatch commands from receiving V2G service invitations. When the demand on the power system rises sharply, but the supply of power generation equipment cannot keep up quickly, this may cause the speed of the generator to drop and the frequency of the power grid to slow down. In order to cope with this situation, V2G dispatch can make full use of the advantage of the smaller inertia of the electric vehicle group to respond to the needs of power grid dispatch at a faster speed. At time t, The dispatch response time of the vehicle cluster is recorded as Δτ(t):
[0096]
[0097] Among them, ΔQ gr (t) is the fluctuation of renewable energy generation capacity, ΔQ l (t) is the system load demand capacity fluctuation, f m is the charging and discharging state of charging pile m, f m =1 means charging and discharging pile m is charging EV, f m =-1 means that the charging and discharging pile m accepts EV discharge, f m =0 indicates the idle state of the charging and discharging pile m.
[0098] Load stability is an indicator that describes the stability of EV dispatch load. Specifically, it refers to the change between the highest and lowest loads of the power system when the electric vehicle cluster joins the V2G dispatch. Considering that regional electricity consumption usually has peak and valley characteristics, the peak degree of system load can be effectively reduced by reasonably planning the time sequence and power distribution of electric vehicle charging and discharging, thereby alleviating the operating burden of the power system and increasing its minimum load level, so as to optimize the use of power resources and reduce the amplitude of load fluctuations of the entire power system. Assume that the load stability of the power system is α g , then:
[0099]
[0100] in, They respectively represent the maximum load and minimum load within the scheduling operation range.
[0101] The economic benefits of EV dispatching are mainly reflected in the comprehensive benefits of the entire V2G system. Effectively guiding EVs to join V2G dispatching in time and place can not only reduce the pressure on the power network caused by random EV charging, but also improve the economic value of all parties by adjusting peak and valley periods and adjusting frequency. Assuming that the user response service benefit is F1, the environmental benefit is F2, the compensation caused by the node load failure is F3, and the grid access fee is F4; the specific calculation process is:
[0102]
[0103]
[0104]
[0105]
[0106] in, and are the charging and discharging unit prices of EV participating in V2G at time t respectively; is the overall power of the nth node after adopting V2G scheduling. is the power transmitted by the lth line network at time t after V2G dispatching; λ, δ and γ are the carbon emission reduction value coefficient, compensation coefficient and grid load profit and loss ratio coefficient respectively. Combining the above 4 benefits, the dispatching and operating economic benefits of EV dispatching can be obtained.
[0107] Furthermore, step 103 further includes:
[0108] The scheduling evaluation indicators are standardized using preset standardization algorithms, which include cloud models and min-max algorithms.
[0109] Since V2G scheduling strategies need to be evaluated and measured based on a variety of different indicators, but the unit differences and result ranges between the indicators are not uniform, it is difficult to determine the advantages and disadvantages of each strategy. Therefore, it is necessary to standardize the evaluation results.
[0110] This embodiment uses the cloud model to process the dispatchable capacity and dispatch response time, because the dispatchable capacity and dispatch response time are step-related proofs. In the cloud model, it is necessary to assume that there is a set Q = {x} where the variable x is the domain. For any element x in the set Q, there is a random number with a stable tendency 0≤μ(x)≤1, μ(x) is the membership degree, and the distribution on the domain Q is called a cloud. Using the hyperentropy H e The index reflects the cohesion of the element distribution in the domain space. The specific calculation process is:
[0111]
[0112]
[0113]
[0114]
[0115] Among them, E x 、E n are the sample mean and the entropy value of the uncertainty of the sample, S is the sample variance, N is the number of samples, x i is the i-th variable, which can be substituted into the dispatchable capacity and dispatch response time to achieve standard normalization processing based on the cloud model.
[0116] The min-max algorithm can be used to perform standard normalization processing on the renewable energy consumption ratio, load stability and dispatching economic benefits:
[0117]
[0118] Among them, x min 、x max are the maximum and minimum values of the current indicator value respectively, and x can be any one of the indicators including renewable energy consumption ratio, load smoothness and economic benefit of dispatching operation.
[0119] Step 104: Evaluate the scheduling effect of the target scheduling solution according to the scheduling evaluation index to obtain an evaluation result.
[0120] Combined with the standardized dispatch evaluation indicators, the dispatch effect of the target dispatch scheme can be comprehensively evaluated, and the evaluation quantitative results of different aspects such as renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability and dispatch operation economic benefits can be obtained. The evaluation results obtained can provide reliable and accurate data support for subsequent dispatch operations.
[0121] Furthermore, step 104 further includes:
[0122] According to the charging and discharging information in the target scheduling scheme, the scheduling SOC thresholds of the charging and discharging processes are calculated respectively, and the scheduling SOC thresholds include the charging scheduling SOC threshold and the discharging scheduling SOC threshold;
[0123] The dispatchable potential capacity of the electric vehicle V2G dispatching system is evaluated according to the dispatching schedule and the dispatching SOC threshold, and the potential capacity evaluation value is obtained.
[0124] It should be noted that there are differentiated needs on both sides of the power dispatching department and the end customers. The time difference caused by different dispatching strategies is due to various adjustment modes in the power network; on the other hand, as a transportation device, electric vehicles are limited by the mobility needs of users, so their battery capacity cannot be adjusted indefinitely. The potential energy storage of electric vehicles that can be regulated should take into account the requirements of power dispatching for vehicle charging and discharging. In addition, whether electric vehicles need to be dispatched mainly depends on the current remaining energy state (SOC) of the electric vehicle to make a decision. Only when it is ensured that the power will not be damaged during this charging and the start of the next trip, can the power grid further implement capacity dispatching.
[0125] The grid can decide whether to export or absorb power by adjusting the state of electric vehicles, so the available capacity of these vehicles can be divided into two types: charging and discharging. In order to determine this potential capacity, it is necessary to consider the maximum measurement that electric vehicles can achieve under scenarios that meet real driving and charging / discharging conditions. Based on the existing data on electric vehicle battery usage, some time periods suitable for scheduling can be selected, and then the possible scheduling capacity can be estimated.
[0126] See also Figure 5 , the different states of the car can be expressed by the SOC curve. SOC i0 The power when charging starts after stopping for the i-th trip; t parking is the parking time; after t charge After the charging time, stop charging and the car's power becomes SOC i 0 , that is, the starting power SOC of the i+1th trip i+1 , from then on until the end of parking t spareThe period is the idle period. The SOC curve remains horizontal, indicating that the vehicle is not used or has not received any charging treatment, and this stage lasts longer than the time required for power distribution. Vehicles that meet this condition have potential for dispatching, and vehicles in other situations cannot participate in dispatching. At the same time, if the vehicle is idle, it needs to ensure that its SOC value is not lower than the initial SOC value of the next trip before leaving the power grid to avoid affecting subsequent trips.
[0127] When the car is in an idle state and the SOC value is high, it is possible for the car to be discharged and scheduled. In order to explore the maximum discharge dispatchable potential capacity of electric vehicles, the car starts charging immediately after the discharge is completed until it is off the grid. Only when the following conditions are met: when the car leaves the working area, there is still enough power to start the next journey, that is, the SOC value when leaving the grid is not lower than the starting SOC value of the car's next trip, then the car has the potential to be dispatched. The discharge depth of lithium batteries is negatively correlated with their service life. According to the data, when the discharge depth of lithium batteries is 80%, the cycle life is 3000 times, which meets the lithium battery use standards. In order to provide more dispatchable capacity and reduce the impact on the life of lithium batteries, this embodiment sets the SOC value after each response to discharge scheduling to not be less than 0.2, then the calculation process of the charging scheduling SOC threshold is:
[0128]
[0129] in, is the idle power of the i-th trip, or the starting power of the next trip, is the amount of electricity when the i-th trip is off-grid after the end of the scheduling, SOC iend is the amount of electricity after the car enters the grid in response to the discharge scheduling during the ith trip, P is the charging power of the grid, and t c is the charging time from the end of the vehicle discharge to the time of leaving the grid, η is the charging efficiency, E SOC is the battery capacity, and its value is 0.9.
[0130] The calculation process of the amount of electricity after the vehicle enters the grid in response to the discharge scheduling is:
[0131]
[0132] In the formula, SOC lim Take 0.2, t d To schedule time.
[0133] When an electric vehicle is idle in the grid, it has charging scheduling potential as long as the battery is not fully charged. Therefore, the calculation process of the charging scheduling SOC threshold is:
[0134]
[0135] Among them, t d is the scheduling time. In addition, charging scheduling also needs to meet certain constraints:
[0136] SOC 0 i =SOC charge_i
[0137]
[0138] Among them, SOC charge_i It indicates the maximum value of the idle power of electric vehicles connected to the power grid, that is, the charging threshold. It can be understood that the above-mentioned relevant data based on charging and discharging scheduling can be obtained according to the system under the target scheduling scheme, and the specific details are not repeated.
[0139] The dispatching schedule is used to obtain the dispatching time, and the real-time dispatchable potential capacity of electric vehicles is used to assist the grid frequency regulation, which is generally divided into primary, secondary and tertiary frequency regulation. Primary frequency regulation is carried out through the speed regulation system of the generator set for differential regulation, which generally lasts for 15 minutes; secondary frequency regulation is carried out through the automatic power generation system for error adjustment, which lasts for about 30 minutes; tertiary frequency regulation is carried out through manual coordination of power generation loads between power plants, which lasts for 1-2 hours. Correspondingly, the dispatchable potential capacity of electric vehicles for different purposes is divided into primary, secondary and tertiary dispatchable potential capacity. The dispatching time of different dispatching methods is not the same. The dispatching time of primary frequency regulation is 15 minutes, the dispatching time of secondary frequency regulation is 30 minutes, and the dispatching time of tertiary frequency regulation is 120 minutes. In addition, in the calculation process of the dispatching SOC threshold, if the idle time of the electric vehicle on the grid is not shorter than the dispatchable time, then t d The value can be taken according to the scheduling schedule, otherwise the scheduling conditions are not met.
[0140] For ease of understanding, this application provides a specific example scenario for analysis, and conducts a data survey on power load in three typical scenarios (industrial area, commercial activity area and residential area) in a city. Figure 6 , Figure 6 The data show that: ① The use of renewable energy such as photovoltaic power generation and wind power generation in these places accounts for about one-third of the total electricity consumption in the entire region, among which the smallest thermal power generation equipment only operates at 10% of its maximum load; ② The power usage in the commercial activity area is from the closure of business after 23:00 to the start of business before 8:00 the next day, its power load will drop to an extremely low level, and there will be obvious peaks in the midday and evening to night time periods; ③ For the power usage in residential areas, it will gradually increase after the factory work ends.
[0141] There are 228 charging and discharging piles in the area, distributed at nodes 0, 7, 21, and 24 of the improved IEEE-33 node distribution network, and the EV charging and discharging efficiency is 0.95. The characteristics are shown in Table 1.
[0142] Table 1 Distribution of charging piles
[0143] Distributed Nodes Charging pile number Charge / discharge rated power / kW 0 0~45 50 7 46~129 100 21 130~189 80 24 190~227 40
[0144] This example has 1253 EVs, and EVs with similar characteristic parameters such as battery capacity and power are classified into the same type of EV clusters. The results are shown in Table 2.
[0145] Table 2 Electric vehicle cluster parameters
[0146] Cluster Type capacity serial number Maximum charge and discharge power / kW I 100 0~26 100 II 75 27~550 50 III 60 551~618 40 IV 50 619~786 25 V 35 787~1252 20
[0147] In order to further effectively utilize the storage resources of EVs, EVs are encouraged to discharge more and charge less during peak load periods, and to charge more and discharge less during off-peak periods. Discharge price Refer to the peak-valley and flat electricity prices for industrial and commercial industries in a certain city, as shown in Table 3.
[0148] Table 3 Time-of-use electricity prices
[0149]
[0150] The carbon emission reduction value coefficient λ is 0.1568 yuan / (kW·h), the compensation coefficient δ is 0.069 yuan / (kW·h), and the grid load profit and loss ratio coefficient γ is 0.58 yuan / (MW·h) 2 . Assuming that each simulation scenario adopts three scheduling methods: time-of-day electricity prices, exemption of parking fees, and promotion of renewable energy consumption, the main features of these three schemes are as follows: The method of implementing time-of-day electricity prices is to regulate the prices of peak, valley, and flat charging or discharging in the region, and its optimization goal is to achieve the maximum benefit MaxF = F1 + F2-F3-F4; the parking fee reduction strategy increases the online time of EVs and the time they can participate in V2G, and the objective function is the maximum stability: MaxF = α g ; The renewable energy consumption strategy dynamically adjusts the charging and discharging prices according to the changes in renewable energy generation, and the objective function is maximum consumption: MaxF = β re .
[0151] The three dispatching strategies of time-of-use electricity price, parking fee reduction and exemption, and renewable energy consumption are implemented in the industrial area in turn. The peak and valley loads of the system after implementing different dispatching strategies in different scenarios are shown in Table 4.
[0152] Table 4 Peak and valley loads of systems executing different scheduling strategies in different scenarios
[0153]
[0154] Table 4 shows that in the industrial zone, after implementing the control measures such as time-of-use electricity price, exemption of parking fees and optimization of renewable energy utilization, the maximum charging power of electric vehicles (EV) decreased by 65.5%, 62.2% and 18.5% respectively; similarly, for commercial areas, these control measures led to a reduction of 76.6%, 67.2% and 47.5% in the maximum charging power of electric vehicles; and in the residential area, the same adjustment method made the maximum charging power of electric vehicles decrease by 71.2%, 51.6% and 60.9%. In addition, the study also shows that the regulation method of exempting parking fees can effectively stimulate the enthusiasm of electric vehicle owners to participate in vehicle-to-grid (V2G) interaction and increase their maximum discharge power. This strategy is particularly suitable for industrial and commercial areas.
[0155] After implementing three control schemes, time-of-use electricity prices, parking fee reductions, and renewable energy consumption, a diversified evaluation was conducted for different types of industrial areas. The evaluation results are shown in Table 5. From the evaluation data, in the industrial zone environment, the use of time-of-use electricity prices as a strategy for V2G scheduling can achieve a comprehensive performance of balancing the renewable energy consumption ratio, dispatchable capacity, dispatch response time, load smoothness, and dispatch operation economic benefits. However, if the dispatchable capacity of the V2G system in the industrial park is to be improved and the response time is to be shortened, it is necessary to make corresponding adjustments to its capacity constraints and the number of on-board equipment. In addition, the use of free parking policies or renewable energy consumption can also effectively enhance the dispatchable capacity and response time indicators. However, as more electric vehicles join the V2G network, the total load fluctuation in the short term will become larger, which will seriously affect the power stability of the power grid during operation and reduce the economic benefits of operation.
[0156] Table 5 Evaluation results of different strategies
[0157]
[0158] In the commercial area scenario, there is no significant difference in the new energy consumption indicators under the three strategies. The peak period of new energy power generation does not overlap with the peak period of electricity consumption in the commercial area, and the new energy power generation can be absorbed by daily operations. Compared with the other two strategies, the time-of-use electricity price strategy brings better financial results, but it is not as good as the free parking policy in terms of dispatch response time and dispatchable capacity. The parking fee reduction strategy is more suitable for commercial areas, and the free parking policy is more applicable because it allows more electric vehicles to be dispatched during the dispatch process, and also extends the duration of the service, so as to better complete the peak regulation work. In the residential area scenario, since most car owners have a rigid demand for parking, the use of a free parking policy helps stimulate their willingness to participate in V2G, increase the probability of vehicle grid connection, and thus increase the dispatchable capacity. In addition, the load gap between high and low peak periods is very obvious, and both time-of-use electricity prices and free parking policies can bring better economic benefits.
[0159] The electric vehicle V2G scheduling scheme evaluation method provided in the embodiment of the present application can generate a variety of target scheduling schemes that meet the evaluation criteria through the V2G scheduling optimization model; then, according to the scheduling evaluation indicators corresponding to the different target scheduling schemes obtained by calculation, a comprehensive scheduling evaluation can be performed on the current scheme to determine the effect of the electric vehicle V2G system scheduling scheme; this process provides a relatively comprehensive and targeted multiple scheduling evaluation indicators, which can meet the evaluation requirements of the scheduling scheme and provide accurate and reliable evaluation and analysis support for the subsequent work of system scheduling. Therefore, the embodiment of the present application can solve the technical problem that the prior art lacks a comprehensive and targeted evaluation scheme for the electric vehicle V2G system and cannot determine the scheduling effect of the electric vehicle V2G system scheduling strategy.
[0160] For easier understanding, see Figure 2 The present application provides an embodiment of an electric vehicle V2G scheduling scheme evaluation device, comprising:
[0161] A model building unit 201 is used to build a V2G dispatch optimization model based on basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, where the preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints;
[0162] A scheme generating unit 202 is used to generate a target scheduling scheme that meets a preset evaluation standard using a V2G scheduling optimization model;
[0163] An index calculation unit 203 is used to calculate multiple dispatch evaluation indicators of the target dispatch scheme, the dispatch evaluation indicators including renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability and dispatch operation economic benefits;
[0164] The scheduling evaluation unit 204 is used to evaluate the scheduling effect of the target scheduling solution according to the scheduling evaluation index to obtain an evaluation result.
[0165] Furthermore, the model building unit 201 is specifically used for:
[0166] Obtain basic data information of the electric vehicle V2G dispatching system, including offline demand and trip planning;
[0167] Initialize model parameters and set electric vehicle V2G service information. The electric vehicle 2VG service information includes service price, charging and discharging price and EV status information;
[0168] Construct the target optimization function of the electric vehicle V2G dispatching system based on basic data information, model parameters and electric vehicle 2VG service information;
[0169] Configure preset scheduling constraints for the target optimization function and generate a V2G scheduling optimization model.
[0170] Furthermore, it also includes:
[0171] The standardization unit 205 is used to standardize the scheduling evaluation index using a preset standardization algorithm, where the preset standardization algorithm includes a cloud model and a min-max algorithm.
[0172] Furthermore, it also includes:
[0173] An SOC threshold calculation unit 206, used to calculate the scheduling SOC thresholds of the charging and discharging processes respectively according to the charging and discharging information in the target scheduling scheme, and the scheduling SOC thresholds include a charging scheduling SOC threshold and a discharging scheduling SOC threshold;
[0174] The potential capacity evaluation unit 207 is used to evaluate the dispatchable potential capacity of the electric vehicle V2G dispatch system according to the dispatch schedule and the dispatch SOC threshold to obtain a potential capacity evaluation value.
[0175] The present application also provides an electric vehicle V2G scheduling scheme evaluation device, the device comprising a processor and a memory;
[0176] The memory is used to store the program code and transmit the program code to the processor;
[0177] The processor is used to execute the electric vehicle V2G scheduling scheme evaluation method in the above method embodiment according to the instructions in the program code.
[0178] In the several embodiments provided in the present application, it should be understood that the disclosed devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0179] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0180] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0181] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for executing all or part of the steps of the method described in each embodiment of the present application through a computer device (which can be a personal computer, a server, or a network device, etc.). The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (full name in English: Read-Only Memory, English abbreviation: ROM), random access memory (full name in English: Random Access Memory, English abbreviation: RAM), disk or optical disk and other media that can store program codes.
[0182] As described above, the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.
Claims
1. A method for evaluating an electric vehicle V2G scheduling scheme, characterized in that: include: Building a V2G dispatch optimization model based on basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, wherein the preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints; The V2G scheduling optimization model is used to generate a target scheduling solution that meets the preset evaluation criteria; Calculating a plurality of dispatch evaluation indicators of the target dispatch scheme, wherein the dispatch evaluation indicators include renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability and dispatch operation economic benefits; The scheduling effect of the target scheduling scheme is evaluated according to the scheduling evaluation index to obtain an evaluation result.
2. The electric vehicle V2G scheduling scheme evaluation method according to claim 1 is characterized in that: The V2G dispatch optimization model is constructed based on the basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, including: Obtaining basic data information of an electric vehicle V2G dispatching system, wherein the basic data information includes offline demand and trip planning; Initialize model parameters and set electric vehicle V2G service information, wherein the electric vehicle 2VG service information includes service price, charging and discharging price and EV status information; Constructing a target optimization function of the electric vehicle V2G dispatching system based on the basic data information, the model parameters and the electric vehicle 2VG service information; The preset scheduling constraints are configured for the target optimization function to generate a V2G scheduling optimization model.
3. The electric vehicle V2G scheduling scheme evaluation method according to claim 1 is characterized in that: The method of using the V2G scheduling optimization model to generate a target scheduling solution that meets the preset evaluation criteria also includes: If the generated scheduling plan does not meet the preset evaluation criteria, the model parameters and travel-related parameters of the V2G scheduling optimization model are adjusted until a target scheduling plan that meets the preset evaluation criteria is generated, and the travel-related parameters include charging amount, start time and service time.
4. The electric vehicle V2G scheduling scheme evaluation method according to claim 1 is characterized in that: The step of calculating a plurality of scheduling evaluation indicators of the target scheduling solution further includes: The scheduling evaluation index is standardized by using a preset standardization algorithm, and the preset standardization algorithm includes a cloud model and a min-max algorithm.
5. The electric vehicle V2G scheduling scheme evaluation method according to claim 1 is characterized in that: The step of evaluating the scheduling effect of the target scheduling solution according to the scheduling evaluation index to obtain an evaluation result further includes: Calculate the scheduling SOC thresholds of the charging and discharging processes respectively according to the charging and discharging information in the target scheduling scheme, wherein the scheduling SOC thresholds include a charging scheduling SOC threshold and a discharging scheduling SOC threshold; The dispatchable potential capacity of the electric vehicle V2G dispatching system is evaluated according to the dispatching schedule and the dispatching SOC threshold to obtain a potential capacity evaluation value.
6. An electric vehicle V2G dispatching scheme evaluation device, characterized in that: include: A model building unit, used to build a V2G dispatch optimization model based on basic data information of the electric vehicle V2G dispatch system and preset dispatch constraints, wherein the preset dispatch constraints include EV service constraints, EV grid-connected power constraints, and power system balance constraints; A scheme generating unit, configured to generate a target scheduling scheme that meets a preset evaluation standard by using the V2G scheduling optimization model; An index calculation unit, used to calculate a plurality of dispatch evaluation indicators of the target dispatch scheme, wherein the dispatch evaluation indicators include renewable energy consumption ratio, dispatchable capacity, dispatch response time, load stability and dispatch operation economic benefits; The scheduling evaluation unit is used to evaluate the scheduling effect of the target scheduling scheme according to the scheduling evaluation index to obtain an evaluation result.
7. The electric vehicle V2G dispatching scheme evaluation device according to claim 6, characterized in that: The model building unit is specifically used for: Obtaining basic data information of an electric vehicle V2G dispatching system, wherein the basic data information includes offline demand and trip planning; Initialize model parameters and set electric vehicle V2G service information, wherein the electric vehicle 2VG service information includes service price, charging and discharging price and EV status information; Constructing a target optimization function of the electric vehicle V2G dispatching system based on the basic data information, the model parameters and the electric vehicle 2VG service information; The preset scheduling constraints are configured for the target optimization function to generate a V2G scheduling optimization model.
8. The electric vehicle V2G dispatching scheme evaluation device according to claim 6, characterized in that: Also includes: The standardization unit is used to standardize the scheduling evaluation index using a preset standardization algorithm, and the preset standardization algorithm includes a cloud model and a min-max algorithm.
9. The electric vehicle V2G dispatching scheme evaluation device according to claim 6, characterized in that: Also includes: An SOC threshold calculation unit, configured to calculate the scheduling SOC thresholds of the charging and discharging processes respectively according to the charging and discharging information in the target scheduling scheme, wherein the scheduling SOC thresholds include a charging scheduling SOC threshold and a discharging scheduling SOC threshold; The potential capacity evaluation unit is used to evaluate the dispatchable potential capacity of the electric vehicle V2G dispatch system according to the dispatch schedule and the dispatch SOC threshold to obtain a potential capacity evaluation value.
10. An electric vehicle V2G dispatching scheme evaluation device, characterized in that: The device comprises a processor and a memory; The memory is used to store program code and transmit the program code to the processor; The processor is used to execute the electric vehicle V2G scheduling scheme evaluation method according to any one of claims 1-5 according to the instructions in the program code.
Citation Information
Patent Citations
Quantitative evaluation method and system for power grid access regulation capability of electric vehicle
CN117220281A
Wind power-containing system optimization scheduling method considering regulation and control potential of electric vehicle
CN117353355A
Electric vehicle charging and discharging low-carbon scheduling method considering regulation potential evaluation
CN118100180A
Cited By
Vehicle control method and device and vehicle
CN121133446A
V2G grid-connected power configuration suitability evaluation method for multiple scenes
CN121308084A