Pile-soil interface multi-physical field monitoring method for composite foundation precast pile in permafrost region
By cutting grooves inside precast piles and installing fiber optic sensors and strain gauges, the problem of monitoring stress and strain at the pile-soil interface in permafrost regions has been solved, achieving stability and design innovation for permafrost roadbeds.
Patent Information
- Application Number
- CN202411292102.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-14
- Publication Date
- 2024-11-26
AI Technical Summary
Existing technologies cannot effectively monitor the physical and mechanical properties of precast pile composite foundations in permafrost regions, such as stress and strain at the pile-soil interface, which affects the stability and design of permafrost roadbeds.
By cutting grooves inside precast piles and installing fiber optic sensors and strain gauges, combined with adhesives and protective measures, multi-physics monitoring of the pile-soil interface can be achieved.
This technology enables reliable monitoring of the pile-soil interface, improves the accuracy of data acquisition and sensor protection, reveals the bearing mechanism of the pile-soil interface, and contributes to the stability and design innovation of composite foundations in permafrost regions.
Smart Images

Figure CN119021290A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a multi-physical field monitoring method for a pile-soil interface of a composite foundation prefabricated pile in a permafrost region. Background Art
[0002] The existing technical measures for the protection of permafrost roadbeds in traditional permafrost areas have become very limited in their ability to protect the permafrost under the roadbed as permafrost degradation is intensified due to climate change. The roadbeds of highways in permafrost areas still show serious problems such as single-point settlement, continuous wave deformation, differential deformation in transition sections, and longitudinal cracking.
[0003] As a composite foundation, precast pile composite foundation has the advantages of easy construction quality control, fast construction speed, small post-construction settlement and uneven settlement, large foundation treatment depth, large composite foundation bearing capacity, and moderate cost. It has been widely used in foundation treatment projects in permafrost areas. The bearing capacity of frozen soil precast pile composite foundation is mainly provided by the friction / freezing force of the pile-soil contact surface. The contact surface between the pile and the foundation soil is different from the mechanical properties of the general soil. This contact surface is called the pile-soil interface. Under the action of load, the interaction between the foundation soil and the pile body is a very complex mechanical behavior. Due to the limitation of the pile, the stress characteristics of the contact surface are very different from those of the soil in other regions, and the stress response of the contact surface will also have a great impact on it. Therefore, how to obtain the physical and mechanical properties such as stress and strain of the pile-soil interface, monitor the influence of frozen soil degradation on the mechanical properties of the pile-soil interface, and then reveal the structural evolution characteristics of the pile-soil interface of the precast pile is crucial to the design and construction of composite foundation structures in permafrost areas. Summary of the invention
[0004] The present invention aims to solve the technical problem that the physical and mechanical properties such as stress and strain of the pile-soil interface of the current precast pile composite foundation cannot be monitored on-site, and to provide a multi-physical field monitoring method for the pile-soil interface of the composite foundation precast pile in permafrost areas.
[0005] The multi-physical field monitoring method of the pile-soil interface of the composite foundation prefabricated pile in permafrost areas of the present invention is carried out according to the following steps:
[0006] S1: Pile body line drawing: Draw two parallel and equal-length line segments between the pile head and the pile tail of the prefabricated pile along the length direction of the pile, leaving a distance between the two line segments and the pile head and the pile tail, and the distance between the two line segments and the pile head is equal; draw a circle at the end point of the two line segments near the pile tail toward the pile tail, so that the optical fiber sensor will not be bent in the pile body and damaged;
[0007] S2: Prefabricated pile grooving: Use a cutting machine to cut a groove in the direction of the pile within the line drawn in S1. The groove includes a rectangle and a circle. When cutting, use a water spray device to spray water on the cutting machine slices to cool down and remove dust. After cutting the groove, use an electric pick to clean the groove, and then use a grinding disc to level the bottom of the groove;
[0008] S3: Pile head lead hole: Drill the first through hole in the groove cut in S2 and close to the pile head to facilitate the sensor line to be led into the inner cavity of the prefabricated pile. The size of the first through hole should be sufficient to allow all sensor lines to pass through;
[0009] S4: Marking sensor: According to the pile-soil temperature and stress monitoring scheme of the precast pile, the position of each strain gauge in the groove is determined and the position is marked in the groove. The strain gauge is designed on the side wall of the rectangular groove;
[0010] S5: Install the sensor: Install the strain gauge in the rectangular groove according to the position marked in S4, fix the strain gauge and the wire of the strain gauge with quick-drying glue, repeat the operation to fix the strain gauge between the pile tail and the pile head, introduce the optical fiber sensor from the opening of the inner cavity of the end face of the pile head, and then introduce the optical fiber sensor into the groove through the first through hole, and introduce the optical fiber sensor all the way to the direction of the groove tail, and make a circle around the inner wall of the circular groove at the pile tail, and then lead it out along the rectangular groove and the first through hole to the inner cavity of the prefabricated pile;
[0011] S6: Fix the sensor: Use adhesive to fix the optical fiber sensor in S5. After fixation, the optical fiber sensor should be close to the bottom or side wall of the groove and straightened. After the adhesive hardens, fill the entire groove with epoxy resin. The first through hole also needs to be filled with epoxy resin, and then the entire groove is sealed with waterproof tape. The main purpose of sealing the filled groove with waterproof tape is to prevent rainfall from occurring at the construction site in the permafrost area, which affects the curing effect of epoxy resin on the sensor and the pile body.
[0012] S7: Fix the sensor connector: Wrap the wire part of the sensor outside the pile into a set of coils, open a second through hole near the first through hole and outside the groove, take a thin iron wire and pass it through the second through hole and the sensor coil, and then seal the iron wire into a closed ring, so that the sensor connector is close to the second through hole, mainly to facilitate taking out the sensor connector from the inner wall of the pile body after the pile is driven into the foundation;
[0013] S8: Internal protection of pile top: roll the plastic protective film into a dense sphere, and then place the dense spherical plastic protective film in the inner cavity of the prefabricated pile and above the sensor joint to prevent the gravel in the foundation from entering the inner wall from the pile top and causing damage to the sensor joint;
[0014] S9: Pile top cover protection: Make a circular iron cover, the diameter of which is larger than the inner diameter of the precast pile and smaller than the outer diameter of the precast pile, and place the circular iron cover tightly against the top surface of the pile head and fix it;
[0015] S10: Precast pile sensor lead: Use a pipe pile static press to use another precast pile with the same outer diameter to press the precast pile with the sensor embedded into the ground, with the pile head located at the top and the pile tail located at the bottom. After the pipe pile construction is completed, the foundation soil above the pile top is cleaned up, the round iron cover is removed, and the iron wire in step S7 is removed. All sensor wires are led out of the pile and covered with a steel wire hose. Finally, the sensor connector is led out to the slope foot outside the roadbed for monitoring.
[0016] The beneficial effects of the present invention are:
[0017] 1. The present invention is suitable for conducting preliminary experiments to detect the deformation and temperature distribution of composite foundation precast piles, and provides theoretical and technical support for the subsequent design of composite foundation precast piles;
[0018] 2. The present invention can effectively protect the effectiveness of the sensor, avoid the problem that the sensor is attached to the surface of the prefabricated pile and is damaged by the friction between the pile and the soil during the pile pressing process, and can also achieve the reliability of the on-site monitoring of the test between the prefabricated piles of the composite foundation and the soil. At the same time, the joint monitoring of multiple strain sensors (optical fiber strain sensors and strain gauges) can improve the reliability and accuracy of the collected data;
[0019] 3. The present invention can monitor the temperature and deformation between the pile and the foundation, and can reveal the bearing mechanism and load diffusion mechanism of the interface between the composite foundation pile and the soil, which is conducive to innovating the new design concept of composite foundation in permafrost areas, and has important scientific significance for ensuring the stability of roadbed in permafrost areas and improving the life of frozen soil roadbed. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a process flow chart of the method of the present invention;
[0021] Figure 2 Schematic diagram of precast piles in Test 1. DETAILED DESCRIPTION
[0022] Specific implementation method 1: This implementation method is a multi-physical field monitoring method for the pile-soil interface of prefabricated piles of composite foundation in permafrost areas, which is specifically carried out in the following steps:
[0023] S1: Pile body line drawing: Draw two parallel and equal-length line segments between the pile head and pile tail of the precast pile along the length direction of the pile, leaving a distance between the two line segments and the pile head and the pile tail, and the distance between the two line segments and the pile head is equal; draw another circle at the end point of the two line segments near the pile tail towards the pile tail;
[0024] S2: Prefabricated pile grooving: Use a cutting machine to cut a groove in the direction of the pile within the line drawn in S1. The groove includes a rectangle and a circle. After the groove is cut, use an electric pick to clean the groove, and then use a grinding disc to level the bottom of the groove;
[0025] S3: Pile head lead hole: Drill a first through hole in the groove cut in S2 and close to the pile head to facilitate the sensor line to be led into the inner cavity of the prefabricated pile;
[0026] S4: Marking sensor: According to the pile-soil temperature and stress monitoring scheme of the precast pile, the position of each strain gauge in the groove is determined and the position is marked in the groove. All strain gauges are designed on the side wall of the rectangular groove;
[0027] S5: Install the sensor: Install the strain gauge in the rectangular groove according to the position marked in S4, fix the strain gauge and the wire of the strain gauge with quick-drying glue, repeat the operation to fix the strain gauge between the pile tail and the pile head, introduce the optical fiber sensor from the opening of the inner cavity of the end face of the pile head, and then introduce the optical fiber sensor into the groove through the first through hole, and introduce the optical fiber sensor all the way to the direction of the groove tail, and make a circle around the inner wall of the circular groove at the pile tail, and then lead it out along the rectangular groove and the first through hole to the inner cavity of the prefabricated pile;
[0028] S6: Fixing the sensor: Use adhesive to fix the optical fiber sensor in S5. After fixation, the optical fiber sensor should be close to the bottom or side wall of the groove and straightened. After the adhesive is hardened, fill the entire groove with epoxy resin. The first through hole also needs to be filled with epoxy resin, and then the entire groove is sealed with waterproof tape.
[0029] S7: Fix the sensor connector: Wrap the wire part of the sensor outside the pile into a set of coils, open a second through hole near the first through hole and outside the groove, take a thin iron wire and pass it through the second through hole and the sensor coil, and then seal the iron wire into a closed ring, so that the sensor connector is close to the second through hole;
[0030] S8: Internal protection of pile top: roll the plastic protective film into a dense sphere, and then place the dense spherical plastic protective film in the inner cavity of the prefabricated pile and above the sensor joint to prevent the gravel in the foundation from entering the inner wall from the pile top and causing damage to the sensor joint;
[0031] S9: Pile top cover protection: Make a circular iron cover, the diameter of which is larger than the inner diameter of the precast pile and smaller than the outer diameter of the precast pile, and place the circular iron cover tightly against the top surface of the pile head and fix it;
[0032] S10: Precast pile sensor lead: Use a pipe pile static press to use another precast pile with the same outer diameter to press the precast pile with the sensor embedded into the ground, with the pile head located at the top and the pile tail located at the bottom. After the pipe pile construction is completed, the foundation soil above the pile top is cleaned up, the round iron cover is removed, and the iron wire in step S7 is removed. All sensor wires are led out of the pile and covered with a steel wire hose. Finally, the sensor connector is led out to the slope foot outside the roadbed for monitoring.
[0033] Specific implementation method 2: This implementation method is different from the specific implementation method 1 in that the distance between the two line segments in S1 is less than or equal to 5 cm. The rest is the same as the specific implementation method 1.
[0034] Specific implementation method three: This implementation method is different from specific implementation method one or two in that: in S2, a water spray device is used to spray water on the slices of the cutting machine to cool and remove dust during cutting. Other aspects are the same as specific implementation method one or two.
[0035] Specific implementation method 4: This implementation method is different from the specific implementation methods 1 to 3 in that the depth of the groove in S2 is 2 cm to 3 cm. The rest is the same as the specific implementation methods 1 to 3.
[0036] Specific implementation example 5: This implementation example is different from specific implementation example 4 in that the size of the first through hole in S3 should be sufficient to allow all sensor lines to pass through. The rest is the same as specific implementation example 4.
[0037] Specific implementation example 6: This implementation example is different from specific implementation example 5 in that the optical fiber sensor described in S5 includes a temperature sensor and a strain sensor, the temperature sensor is used to monitor the temperature between the pile and soil interface, and the strain sensor and the strain gauge are used for joint detection to improve the monitoring accuracy and data validity. The rest is the same as specific implementation example 5.
[0038] Specific implementation example 7: This implementation example is different from specific implementation example 6 in that the adhesive described in S6 is marble glue. The rest is the same as specific implementation example 6.
[0039] Specific implementation example eight: This implementation example is different from specific implementation example seven in that the diameter of the second through hole described in S7 is 1 cm. Other aspects are the same as specific implementation example seven.
[0040] Specific embodiment 9: This embodiment is different from specific embodiment 8 in that the plastic protective film described in S8 is a moisture-proof polypropylene plastic protective film. Other aspects are the same as specific embodiment 8.
[0041] Specific embodiment 10: This embodiment differs from specific embodiment 9 in that in S9, the round iron cover is closely attached to the top surface of the pile head and fixed with quick-drying glue. The rest is the same as specific embodiment 9.
[0042] The present invention is verified by the following tests:
[0043] Experiment 1: This experiment is a multi-physics field monitoring method for the pile-soil interface of precast piles in composite foundation in permafrost areas. The field test section of a frozen soil roadbed on a national highway in the Qinghai-Tibet Plateau was selected as the actual operation site. Figure 2 As shown, the specific steps are as follows:
[0044] S1: Pile body line drawing: Draw two parallel and equal-length line segments between the pile head and the pile tail of the precast pile 1 along the length direction of the pile, leaving a distance between the two line segments and the pile head and the pile tail, and the distance between the two line segments and the pile head is equal; draw another circle at the end point of the two line segments near the pile tail towards the pile tail; the distance between the two line segments is equal to 4cm;
[0045] S2: Prefabricated pile grooving: Use a cutting machine to cut a groove in the direction of the pile within the line drawn in S1, with a depth of 3 cm; use a water spray device to spray water on the cutting machine slices to cool and remove dust during cutting; the groove includes a rectangular 1-1 and a circular 1-2. After the groove is cut, use an electric pick to clean the groove, and then use a grinding disc to level the groove bottom;
[0046] S3: Pile head lead hole: Drill a first through hole 1-3 in the rectangular groove 1-1 cut in S2 and close to the pile head to facilitate the sensor line to be led into the inner cavity of the prefabricated pile; the size of the first through hole should be sufficient to allow all sensor lines to pass through;
[0047] S4: Marking sensor: Determine the position of each strain gauge in the groove according to the pile-soil temperature and stress monitoring scheme of the precast pile 1 and mark the position in the groove. All strain gauges are designed on the side wall of the rectangular groove 1-1;
[0048] S5: Install the sensor: Install the strain gauge in the rectangular groove 1-1 according to the position marked in S4, fix the strain gauge and the wire of the strain gauge with quick-drying glue, repeat the operation to fix the strain gauge between the pile tail and the pile head, introduce the optical fiber sensor from the opening of the inner cavity 1-5 of the end face of the pile head, and then introduce the optical fiber sensor into the groove 1-1 through the first through hole 1-3, and introduce the optical fiber sensor in the direction of the groove tail, and make a circle around the inner wall of the circular groove 1-2 at the pile tail, and then lead it out along the rectangular groove 1-1 and the first through hole 1-3 to the inner cavity 1-5 of the prefabricated pile;
[0049] The optical fiber sensor includes a temperature sensor and a strain sensor. The temperature sensor is used to monitor the temperature between the pile and soil interface. The strain sensor and the strain gauge are used for joint detection to improve the monitoring accuracy and data validity.
[0050] S6: Fix the sensor: Use marble glue to fix the optical fiber sensor in S5. After fixation, the optical fiber sensor should be close to the bottom of the groove and straightened. After the marble glue is hardened, fill the entire grooves 1-1 and 1-2 with epoxy resin. The first through hole 1-3 also needs to be filled with epoxy resin, and then the entire groove is sealed with waterproof tape;
[0051] S7: Fix the sensor connector: Wrap the wire part of the sensor outside the pile into a group of coils, open a second through hole 1-4 near the first through hole 1-3 and outside the groove 1-1, take a thin iron wire 2 and pass it through the second through hole 1-4 and the sensor coil, and then seal the iron wire 2 into a closed ring, so that the sensor connector is close to the second through hole 1-4; the aperture of the second through hole 1-4 is 1 cm;
[0052] S8: Internal protection of the pile top: roll the moisture-proof polypropylene plastic protective film into a dense sphere, and then place the dense spherical moisture-proof polypropylene plastic protective film in the inner cavity of the prefabricated pile and above the sensor joint to prevent the gravel in the foundation from entering the inner wall from the pile top and causing damage to the sensor joint;
[0053] S9: Pile top cover protection: Make a circular iron cover with a diameter larger than the inner diameter of the precast pile and smaller than the outer diameter of the precast pile. Put the circular iron cover close to the top surface of the pile head and fix it with quick-drying glue;
[0054] S10: Precast pile sensor lead: Use a pipe pile static press to use another precast pile with the same outer diameter to press the precast pile 1 embedded with the sensor into the ground, with the pile head located at the top and the pile tail located at the bottom. After the pipe pile construction is completed, the foundation soil above the pile top is cleaned up, the round iron cover is removed, and the iron wire 2 in step S7 is removed. All sensor wires are led out of the pile and covered with a steel wire hose. Finally, the sensor connector is led out to the slope foot position outside the roadbed for monitoring.
[0055] The beneficial effects of this experiment are:
[0056] 1. The present invention is suitable for conducting preliminary experiments to detect the deformation and temperature distribution of composite foundation precast piles, and provides theoretical and technical support for the subsequent design of composite foundation precast piles;
[0057] 2. The present invention can effectively protect the effectiveness of the sensor, avoid the problem that the sensor is attached to the surface of the prefabricated pile and is damaged by the friction between the pile and the soil during the pile pressing process, and can also achieve the reliability of the on-site monitoring of the test between the prefabricated piles of the composite foundation and the soil. At the same time, the joint monitoring of multiple strain sensors (optical fiber strain sensors and strain gauges) can improve the reliability and accuracy of the collected data;
[0058] 3. The present invention can monitor the temperature and deformation between the pile and the foundation, and can reveal the bearing mechanism and load diffusion mechanism of the interface between the composite foundation pile and the soil, which is conducive to innovating the new design concept of composite foundation in permafrost areas, and has important scientific significance for ensuring the stability of roadbed in permafrost areas and improving the life of frozen soil roadbed.
Claims
1. A multi-physical field monitoring method for the pile-soil interface of prefabricated piles in composite foundations in permafrost areas, characterized in that The multi-physics field monitoring method of the pile-soil interface of precast piles in composite foundation in permafrost areas is carried out in the following steps: S1: Pile body line drawing: Draw two parallel and equal-length line segments between the pile head and pile tail of the precast pile along the length direction of the pile, leaving a distance between the two line segments and the pile head and the pile tail, and the distance between the two line segments and the pile head is equal; draw another circle at the end point of the two line segments near the pile tail towards the pile tail; S2: Prefabricated pile grooving: Use a cutting machine to cut a groove in the direction of the pile within the line drawn in S1. The groove includes a rectangle and a circle. After the groove is cut, use an electric pick to clean the groove, and then use a grinding disc to level the bottom of the groove; S3: Pile head lead hole: Drill a first through hole in the groove cut in S2 and close to the pile head to facilitate the sensor line to be led into the inner cavity of the prefabricated pile; S4: Marking sensor: According to the pile-soil temperature and stress monitoring scheme of the precast pile, the position of each strain gauge in the groove is determined and the position is marked in the groove. All strain gauges are designed on the side wall of the rectangular groove; S5: Install the sensor: Install the strain gauge in the rectangular groove according to the position marked in S4, fix the strain gauge and the wire of the strain gauge with quick-drying glue, repeat the operation to fix the strain gauge between the pile tail and the pile head, introduce the optical fiber sensor from the opening of the inner cavity of the end face of the pile head, and then introduce the optical fiber sensor into the groove through the first through hole, and introduce the optical fiber sensor all the way to the direction of the groove tail, and make a circle around the inner wall of the circular groove at the pile tail, and then lead it out along the rectangular groove and the first through hole to the inner cavity of the prefabricated pile; S6: Fixing the sensor: Use adhesive to fix the optical fiber sensor in S5. After fixation, the optical fiber sensor should be close to the bottom or side wall of the groove and straightened. After the adhesive is hardened, fill the entire groove with epoxy resin. The first through hole also needs to be filled with epoxy resin, and then the entire groove is sealed with waterproof tape. S7: Fix the sensor connector: Wrap the wire part of the sensor outside the pile into a set of coils, open a second through hole near the first through hole and outside the groove, take a thin iron wire and pass it through the second through hole and the sensor coil, and then seal the iron wire into a closed ring, so that the sensor connector is close to the second through hole; S8: Internal protection of pile top: roll the plastic protective film into a dense sphere, and then place the dense spherical plastic protective film in the inner cavity of the prefabricated pile and above the sensor joint to prevent the gravel in the foundation from entering the inner wall from the pile top and causing damage to the sensor joint; S9: Pile top cover protection: Make a circular iron cover, the diameter of which is larger than the inner diameter of the precast pile and smaller than the outer diameter of the precast pile, and place the circular iron cover tightly against the top surface of the pile head and fix it; S10: Precast pile sensor lead: Use a pipe pile static press to use another precast pile with the same outer diameter to press the precast pile with the sensor embedded into the ground, with the pile head located at the top and the pile tail located at the bottom. After the pipe pile construction is completed, the foundation soil above the pile top is cleaned up, the round iron cover is removed, and the iron wire in step S7 is removed. All sensor wires are led out of the pile and covered with a steel wire hose. Finally, the sensor connector is led out to the slope foot outside the roadbed for monitoring.
2. The method for monitoring the pile-soil interface of a composite foundation prefabricated pile in permafrost areas according to claim 1 is characterized in that The distance between two line segments in S1 is less than or equal to 5 cm.
3. The method for monitoring the pile-soil interface of a composite foundation prefabricated pile in permafrost areas according to claim 1, characterized in that During cutting in S2, a water spray device is used to spray water on the slices of the cutting machine to cool down and remove dust.
4. The method for monitoring the pile-soil interface of a composite foundation prefabricated pile in permafrost regions according to claim 1, characterized in that The depth of the groove in S2 is 2 cm to 3 cm.
5. The method for monitoring the pile-soil interface of a composite foundation prefabricated pile in permafrost areas according to claim 1, characterized in that The size of the first through hole in S3 should be sufficient to allow all sensor lines to pass through.
6. The method for monitoring the pile-soil interface of composite foundation prefabricated piles in permafrost regions according to claim 1, characterized in that The optical fiber sensor described in S5 includes a temperature sensor and a strain sensor. The temperature sensor is used to monitor the temperature between the pile and soil interface. The strain sensor and the strain gauge are used for joint detection to improve the monitoring accuracy and data validity.
7. The method for monitoring the pile-soil interface of composite foundation prefabricated piles in permafrost areas according to claim 1, characterized in that The binder described in S6 is marble glue.
8. The method for monitoring the pile-soil interface of composite foundation prefabricated piles in permafrost areas according to claim 1, characterized in that The diameter of the second through hole described in S7 is 1 cm.
9. The method for monitoring the pile-soil interface of composite foundation prefabricated piles in permafrost regions according to claim 1, characterized in that The plastic protective film described in S8 is a moisture-proof polypropylene plastic protective film.
10. The method for monitoring the pile-soil interface of composite foundation prefabricated piles in permafrost areas according to claim 1, characterized in that In S9, the round iron cover is pressed against the top surface of the pile head and fixed with quick-drying glue.
