Construction method of super-long concrete floor plate

By using prefabricated casting strips instead of telescopic casting strips in the construction of ultra-long concrete floor panels, the entire layer is poured at one time, solving the problems of large engineering volume and long casting time in the existing technology, avoiding leakage risks and Cracks caused by temperature stress improve construction efficiency and structural stability.

CN119021405AActive Publication Date: 2024-11-26CHINA FIRST METALLURGICAL GROUP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411325941.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-26
Estimated Expiration
2044-09-23

AI Technical Summary

Technical Problem

Among the existing construction methods for ultra-long concrete floor panels, the post-pouring tape method increases the project volume and leakage risks, and the warehouse jump method leads to excessive pouring time and affects engineering projects with tight construction periods.

Method used

The first pouring tape is used instead of the expansion and contraction and then pouring tape. The first pouring tape is used as a prefabricated component, pre-buried water stop tape and stressed steel bars, and the entire floor panel is poured at one time to avoid leaving expansion joints, and the formwork is removed after the concrete strength reaches.

Benefits of technology

It greatly reduces the pouring time, avoids the project volume and leakage risks of later construction, solves the crack problems caused by temperature stress, and improves construction efficiency and structural stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021405A_ABST
    Figure CN119021405A_ABST
Patent Text Reader

Abstract

The invention discloses a super-long concrete floorboard construction method which comprises the following steps: replacing a telescopic post-cast strip with a pre-cast strip, the pre-cast strip is a floor part in a pure floor area, the pre-cast strip is a floor-beam composite part in a floor-beam intersection area, the pre-cast strip is a prefabricated part, two sides of the pre-cast strip are scabbled, and extended water-stop strips and stressed steel bars are pre-buried; the extension length of the load-bearing steel bar meets the subsequent anchoring requirement; during construction, steel bars of columns and formworks are installed firstly, then supporting frames of beams and floor slabs and formworks are installed, then a pre-cast strip is installed in place, steel bars of the beams and the floor slabs are installed, stressed steel bars on the two sides of a floor slab part are connected with floor slab steel bars on the two sides correspondingly, and stressed steel bars on the two sides of a building beam composite part are connected with steel bars of the floor slabs and the beams on the two sides correspondingly; and then columns and beams and floor slabs on the two sides of the pre-cast strip are cast at a time, and formwork removal is conducted after the concrete strength meets the requirement. According to the method, the whole floor plate is formed through one-time pouring, the pouring time is shortened, and the situation that a telescopic post-pouring belt is reserved is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to floor slab construction, and in particular to a super-long concrete floor slab construction method. Background Art

[0002] The super-long concrete structure is a reinforced concrete structure whose length exceeds the maximum spacing limit of the expansion joint. At present, the methods used in the construction of super-long concrete floor panels at home and abroad to control temperature cracks mainly include post-casting strip method and skipping method, among which: The post-cast strip method is to leave a temporary construction joint at the corresponding position of the floor slab according to the design drawings, and then pour the concrete of the temporary construction joint after a period of time to connect the structure into a whole. This method requires the protection, cleaning and roughening of the post-cast strip, which invisibly adds a certain amount of work to the later construction and increases the risk of leakage; The skip-bin method divides an extra-long concrete structure into multiple units of a certain size and pours concrete at intervals. The time interval between pouring concrete in adjacent bins should not be less than 7 days. This results in the entire layer of concrete structure being unable to be poured continuously at one time to form a whole. Overall, each layer requires a longer pouring time, which is very unfavorable for engineering projects with tight schedules. Summary of the invention

[0003] In view of the situation that the post-casting strip method used in the current construction of ultra-long concrete floor panels is likely to increase the workload and increase the risk of leakage, and the skip-bin method requires a long casting time and is not conducive to projects with tight construction schedules, the purpose of the present invention is to provide a construction method for ultra-long concrete floor panels. This method allows the entire floor panel to be cast at one time to form a whole, greatly reducing the casting time, avoiding the need to leave a telescopic post-casting strip, and reducing the amount of later construction work and eliminating the risk of leakage.

[0004] The technical solution adopted by the present invention is: A method for constructing an ultra-long concrete floor slab, in which a telescopic post-cast strip is replaced with a pre-cast strip, wherein the pre-cast strip is a floor slab portion in a pure floor slab area and a floor-beam composite portion in an area where the floor slab intersects with a beam, the pre-cast strip is a prefabricated component and both sides are roughened and pre-embedded with a protruding water stop strip and stress-bearing steel bars, and the protruding length of the stress-bearing steel bars meets the subsequent anchoring requirements; during construction, the steel bars and formwork of the column are first installed, and then the support frames and formwork of the beam and floor slab are installed, and then the pre-cast strip is installed in place, and then the steel bars of the beam and floor slab are installed, so that the stress-bearing steel bars on both sides of the floor slab portion are respectively connected to the floor slab steel bars on both sides, and the stress-bearing steel bars on both sides of the floor-beam composite portion are respectively connected to the floor slab and beam steel bars on both sides, and then the column and the beam and floor slab on both sides of the pre-cast strip are cast at one time, and then the formwork is removed after the concrete strength reaches the requirement.

[0005] Preferably, the precast strip is divided into multiple sections along the length direction and chamfers are provided at the upper and lower openings between adjacent sections.

[0006] Preferably, after demoulding, the chamfers along the precast strip are sealed with polymer modified mortar.

[0007] Preferably, for the floor portion, the waterstop is located in the middle position of the side of the precast strip, and the stress-bearing steel bars are located in the upper and lower positions of the side of the precast strip; for the floor-beam composite portion, the waterstop is located in the middle position of the floor area on the side of the precast strip, and the stress-bearing steel bars are located in the upper and lower positions of the floor area and the beam area on the side of the precast strip.

[0008] Preferably, the stress-bearing steel bars pass through the precast strip transversely and extend from both ends of the precast strip.

[0009] Preferably, before construction, the axes, side lines, and control lines of the columns and beams are measured and drawn on the floor panel of the next floor using a theodolite or a total station based on known control points and design drawings.

[0010] Preferably, the method for installing the steel bars and formwork of the column is: first correct the embedded column steel bars and put on the column hoops, then extend the vertical bars and connect and fix them, use a marker to draw the stirrup spacing on the vertical bars, tie and fix the stirrups and vertical bars according to the spacing, and then place the steel bar protective layer pads; after acceptance, start the column formwork installation, first stick the sealing strip along the edge of the formwork, then erect the column sheet formwork, then install the column hoops, and at the same time correct the squareness, verticality and position of the column, and after a comprehensive inspection and correction, perform group fixation.

[0011] Preferably, the method for installing the support frame and formwork of the beams and floor slabs is: erect the support frame according to the formwork engineering construction plan, first adjust the support beams and place the support beams, then place and fix the beam bottom formwork, arch the beam bottom according to the beam span length and design requirements, then install the beam side formwork, pull wires on the side formwork for support, then review the beam formwork size, elevation, and position; then lay the floor slab formwork to connect and fix it with the adjacent beam formwork, finally clean and oil it, and check the overall beam and floor slab formwork elevation, flatness, and support firmness again.

[0012] Preferably, the method for installing the precast strip is: transport the precast strip to the construction site in advance according to the project schedule. After the formwork construction is completed, first draw the edge line of the precast strip position on the formwork, stick a sealing strip on the edge line, and then use lifting equipment to install the precast strip in place.

[0013] Preferably, when installing the steel bars of beams and floor slabs, the beam steel bars are installed first and then the floor slab steel bars are installed.

[0014] The beneficial effects of the present invention are: This method replaces the expansion joint with the pre-cast joint, which allows the entire floor panel to be cast at one time to form a whole, greatly reducing the casting time, and avoids leaving the expansion joint. The later construction workload is small, there is no leakage risk, and the super-long floor panel structure is divided into multiple sections, solving the problem that the super-long concrete floor panel structure is prone to cracks due to temperature stress and temperature shrinkage. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 Schematic diagram of the position of the precast strip on the super-long concrete floor slab in an embodiment of the present invention.

[0016] Figure 2 2 is a transverse cross-sectional view of the precast strip floor portion and both sides in an embodiment of the present invention, wherein b is the width of the precast strip.

[0017] Figure 3 : is a longitudinal cross-sectional view of the precast strip in an embodiment of the present invention, wherein L is the length of the precast strip, h is the thickness of the floor slab portion, and H is the thickness of the composite portion of the beam.

[0018] Figure 4 It is a transverse cross-sectional view of the precast floor slab portion in an embodiment of the present invention.

[0019] Figure 5 It is a transverse cross-sectional view of the composite part of the precast floor beam in an embodiment of the present invention.

[0020] Figure 6 It is a schematic diagram of the splicing between adjacent sections of the precast strip in an embodiment of the present invention.

[0021] In the figure: 1-column; 2-main beam; 3-precast strip; 31-floor slab; 32-floor-beam composite part; 4-secondary beam; 5-floor slab; 6-waterstop; 7-tension steel bar; 8-chamfer. DETAILED DESCRIPTION

[0022] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0023] This embodiment discloses a method for constructing an ultra-long concrete floor panel. Figure 1 As shown, the principle is to replace the telescopic post-casting strip with the pre-casting strip 3, such as Figure 4 and Figure 5 As shown, the precast strip 3 is a floor slab portion 31 in the area of ​​the pure floor slab 5, and is a floor beam composite portion 32 in the area where the floor slab 5 intersects with the beam. The precast strip 3 is a prefabricated component and both sides are roughened and pre-embedded with extended water stop strips 6 and stressed steel bars 7. The extended length of the stressed steel bars 7 meets the subsequent anchoring requirements. The specific steps are: S1. Measurement and laying out Use a theodolite or total station to measure and draw the axis, side lines and control lines of column 1 and beam on the floor panel of the next floor according to the known control points and design drawings.

[0024] S2. Install the steel bars and formwork of column 1 First, correct the embedded column reinforcement and put on the column hoops, then extend the vertical reinforcement and connect and fix them, use a marker to mark the stirrup spacing on the vertical reinforcement, tie and fix the stirrups and vertical reinforcement according to the spacing, and then place the reinforcement protective layer pads; after acceptance, start installing the formwork for column 1, first stick the sealing strip along the edge of the formwork, then erect the sheet formwork for column 1, and then install the column hoops, and at the same time correct the squareness, verticality and position of column 1, and after a comprehensive inspection and correction, carry out group fixation.

[0025] S3, installation of beam and floor 5 support frame and formwork According to the formwork construction plan, set up the support frame, first adjust the support beam and place the supporting beam, then place and fix the beam bottom formwork, arch the beam bottom according to the beam span length and design requirements, then install the beam side formwork, and support it with wires on the side formwork (beam height plus tension bolts), then review the beam formwork size, elevation, and position; then lay the formwork of floor slab 5, connect and fix it with the formwork of adjacent beams, finally clean and oil it, and check the elevation, flatness, and support firmness of the formwork of the overall beam and floor slab 5 again.

[0026] S4, install the precast strip 3 The precast strip 3 is transported to the construction site in advance according to the project schedule. After the formwork construction is completed, the edge line of the position of the precast strip 3 is first drawn on the formwork, a sealing strip is attached to the edge line, and then the precast strip 3 is installed in place using lifting equipment.

[0027] S5. Install the steel bars of beams and floor slabs 5 Install the beam reinforcement first, then install the floor slab 5 reinforcement. Figure 2 and Figure 3 As shown, the stress-bearing steel bars 7 on both sides of the floor slab portion 31 are respectively connected to the steel bars of the floor slab 5 on both sides, and the stress-bearing steel bars 7 on both sides of the floor-beam composite portion 32 are respectively connected to the steel bars of the floor slab 5 and the beam on both sides.

[0028] S6. Casting and demoulding The column 1 and the beams and floor slabs 5 on both sides of the precast strip 3 are cast at one time, and then the formwork is removed after the concrete strength reaches the requirement.

[0029] like Figure 1 As shown, in this embodiment, preferably: the precast strip 3 is divided into multiple sections along the length direction and chamfers 8 are set at the upper and lower ends between adjacent sections. The number of sections can be set according to the lifting capacity, and the chamfers 8 avoid bumps during lifting; after demolding, the chamfers 8 along the precast strip 3 can be sealed with polymer modified mortar.

[0030] like Figure 4 and Figure 5As shown, in the present embodiment, preferably: for the floor portion 31, the waterstop 6 is located in the middle position of the side of the precast strip 3, and the stress-bearing steel bars 7 are located in the upper and lower positions of the side of the precast strip 3; for the floor-beam composite portion 32, the waterstop 6 is located in the middle position of the floor area on the side of the precast strip 3, and the stress-bearing steel bars 7 are located in the upper and lower positions of the floor area and the beam area on the side of the precast strip 3, which can ensure the water-stopping and connection effects; the stress-bearing steel bars 7 transversely pass through the precast strip 3 and extend from both ends of the precast strip 3, which can improve the stress-bearing performance.

[0031] The method replaces the expansion joint with the pre-cast joint 3, so that the entire floor panel is cast at one time to form a whole, which greatly reduces the casting time, and avoids leaving the expansion joint. The later construction work is small, there is no leakage risk, and the super-long floor panel structure is divided into multiple sections, which solves the problem that the super-long concrete floor panel structure is prone to cracks due to temperature stress and temperature shrinkage.

[0032] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

Claims

1. A method for constructing an ultra-long concrete floor panel, characterized in that: The expansion joint is replaced by the precast joint. The precast joint is the floor part in the pure floor area and the floor-beam composite part in the area where the floor and the beam intersect. The precast joint is a prefabricated component with roughened sides and pre-embedded protruding waterstop and stress-bearing steel bars. The protruding length of the stress-bearing steel bars meets the subsequent anchoring requirements. During construction, the steel bars and formwork of the column are installed first, and then the support frame and formwork of the beam and floor are installed. Then the precast joint is installed in place, and then the steel bars of the beam and floor are installed, so that the stress-bearing steel bars on both sides of the floor part are respectively connected to the floor steel bars on both sides, and the stress-bearing steel bars on both sides of the floor-beam composite part are respectively connected to the floor and beam steel bars on both sides. Then, the column and the beam and floor on both sides of the precast joint are cast at one time, and then the formwork is removed after the concrete strength reaches the requirement.

2. The method for constructing an ultra-long concrete floor slab according to claim 1, characterized in that: The precast strip is divided into multiple sections along the length direction and chamfers are set at the upper and lower openings between adjacent sections.

3. The method for constructing an ultra-long concrete floor slab according to claim 2, characterized in that: After demolding, polymer modified mortar is used to seal the chamfers along the precast strip.

4. The method for constructing an ultra-long concrete floor slab according to claim 1, characterized in that: For the floor section, the waterstop is located in the middle position of the side of the pre-cast strip, and the stress-bearing steel bars are located in the upper and lower positions of the side of the pre-cast strip; for the floor-beam composite section, the waterstop is located in the middle position of the floor area on the side of the pre-cast strip, and the stress-bearing steel bars are located in the upper and lower positions of the floor area and the beam area on the side of the pre-cast strip.

5. The method for constructing an ultra-long concrete floor slab according to claim 1, characterized in that: The stress-bearing steel bars pass through the precast strip transversely and extend from both ends of the precast strip.

6. The method for constructing an ultra-long concrete floor slab according to any one of claims 1 to 5, characterized in that: Before construction, use a theodolite or total station to measure and draw the axis, edge lines, and control lines of the columns and beams on the floor panel of the next floor based on known control points and design drawings.

7. The method for constructing an ultra-long concrete floor slab according to any one of claims 1 to 5, characterized in that: The method of installing the column reinforcement and formwork is: first correct the embedded column reinforcement and put on the column hoops, then extend the vertical reinforcement and connect and fix it, use a marker to draw the stirrup spacing on the vertical reinforcement, tie and fix the stirrups and vertical reinforcement according to the spacing, and then place the reinforcement protective layer pads; after acceptance, start the column formwork installation, first stick the sealing strip along the edge of the formwork, then erect the column sheet formwork, then install the column hoops, and at the same time correct the squareness, verticality and position of the column, and after a comprehensive inspection and correction, carry out group fixation.

8. The method for constructing an ultra-long concrete floor slab according to any one of claims 1 to 5, characterized in that: The method for installing the support frame and formwork of beams and floor slabs is: erect the support frame according to the formwork construction plan, first adjust the support beams and place the support beams, then place and fix the beam bottom formwork, arch the bottom of the beam according to the beam span length and design requirements, then install the beam side formwork, pull wires on the side formwork for support, then review the beam formwork size, elevation, and position; then lay the floor slab formwork to connect and fix it with the adjacent beam formwork, finally clean and oil it, and check the overall beam and floor slab formwork elevation, flatness, and support firmness again.

9. The method for constructing an ultra-long concrete floor slab according to any one of claims 1 to 5, characterized in that: The method of installing the precast strip is: transport the precast strip to the construction site in advance according to the project schedule. After the formwork construction is completed, first draw the edge line of the precast strip position on the formwork, stick a sealing strip on the edge line, and then use lifting equipment to install the precast strip in place.

10. The method for constructing an ultra-long concrete floor slab according to any one of claims 1 to 5, characterized in that: When installing the steel bars for beams and slabs, install the beam steel bars first and then the slab steel bars.

Citation Information

Patent Citations

  • Construction method and device of reinforced concrete double-layer plates

    CN109113245A

  • Post-cast strip structure and construction process thereof

    CN111074951A

  • Device for supporting water stop steel plate of basement exterior wall

    CN219175328U