Optimized scheduling and resource allocation construction method and system relating to water conservancy flood prevention

Through detailed processing and analysis of regional remote sensing image data, a detailed flood model is generated, risk areas are identified and resource allocation is optimized, and the shortcomings in risk identification and resource allocation of the existing flood control system are solved, and the comprehensiveness of the flood control system is improved. accuracy.

CN119026754AActive Publication Date: 2024-11-26PEARL RIVER HYDRAULIC RES INST OF PEARL RIVER WATER RESOURCES COMMISSION
3 Cites 10 Cited by

Patent Information

Application Number
CN202411495667.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2024-11-26
Estimated Expiration
2044-10-25

AI Technical Summary

Technical Problem

The existing flood control system lacks precise simulation and optimization in the identification of risk areas and resource allocation, resulting in low comprehensiveness and accuracy of system construction.

Method used

By obtaining regional remote sensing image data, pre-processing and screening, a standard data set is generated, rainfall trend analysis, flood mechanism research, urban flood model construction and coupling, simulate flood conditions, label risk areas, and perform resource allocation simulation optimization. Finally converted to 3D heatmap and real-time updates.

Benefits of technology

It has improved the ability to predict extreme rainfall events, the understanding of the causes of floods, the efficiency and accuracy of resource allocation, and enhanced the comprehensive flood control capabilities and decision-making support level of the flood control system.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to the technical field of heat map construction, in particular to a construction method and system for optimal scheduling and resource allocation of water conservancy flood prevention. The method comprises the following steps: acquiring regional remote sensing image data; performing data preprocessing on the regional remote sensing image data to generate standard regional remote sensing image data; flood prevention resource site screening is carried out on the standard area remote sensing image data, flood prevention resource site screening data are obtained, and the flood prevention resource site screening data comprise meteorological monitoring site data, flood monitoring site data, hydrology and water level site data and drainage pipe network monitoring data. According to the invention, through systematic data integration, dynamic comprehensive analysis, model optimization and coupling, accurate risk area identification and intelligent real-time updating, the accuracy, efficiency and intelligent level of the flood prevention resource allocation heat map system are improved.