Method and system for evaluating oil and gas storage increasing potential of storage increasing zone
By analyzing the reserve trap, retained reserves and inferring the resource amount, combining the Monte Carlo method and the Paletto sequence method, the oil and gas resource potential of the storage zone is calculated, and the lack of scientific evaluation of the resource potential of the storage zone in the existing technology is solved. The problem of sexual intercourse has achieved a more accurate assessment of oil and gas resources.
Patent Information
- Application Number
- CN202310589799.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-23
- Publication Date
- 2024-11-26
AI Technical Summary
The existing technology cannot scientifically evaluate the potential of oil and gas resource storage increase based on the resource composition characteristics of the storage increase zone, and lacks scientificity.
By analyzing the amount of reserve trap resources, retained reserves and inferred resources, the success rate of drilled traps and proven reserves per unit trap area were calculated, and the probability distribution of key parameters under similar geological conditions was established. Random sampling was performed by Monte Carlo method. Combined with the Paleto reservoir scale sequence method, the reserve upgrade potential is calculated, and a comprehensive evaluation method for oil and gas resources in the storage area is formed.
It has improved the scientific nature of the potential evaluation of oil and gas resources in the storage area, and has been successfully applied to the annual and long-term plans of oil and gas exploration, providing a more accurate assessment of resource potential.
Smart Images

Figure CN119026966A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of oil and gas resource potential evaluation, and specifically to a method and system for evaluating the oil and gas reserve enhancement potential in a reserve enhancement zone. Background Art
[0002] In the past, the resource potential evaluation methods of oil and gas zones were mostly single, using the genetic method, volumetric method, statistical method, analogy method and expert evaluation method. The genetic method is also called the material balance method, and its fundamental principle comes from Tissot's late hydrocarbon generation theory of kerogen thermal degradation. The essence of the volumetric method is to directly calculate the volume or mass of oil and gas in the pore space of the oil-bearing layer (reservoir or source layer). The statistical method is the most commonly used resource evaluation method abroad. It is based on the mathematical statistics of a large number of sample data. By analyzing the exploration workload input and oil and gas reserve discovery in high-exploration areas, relevant mathematical statistical models are established to predict the scale and structure of oil and gas resources. The analogy method adopts the classic geological idea of inferring unknown information from known information. Expert judgment method: For the evaluation of oil and gas resource potential, even in high-exploration areas, it is difficult to obtain sufficient data to obtain accurate resource evaluation results. Therefore, in the process of resource evaluation, it is also necessary to conduct expert judgment in order to select the most appropriate resource estimation result from a series of possible answers.
[0003] The reserve-increasing zones have a high degree of exploration and are the most realistic reserve-increasing position for oil and gas companies. However, existing technologies cannot evaluate the resource reserve-increasing potential based on the composition characteristics of the resources in the reserve-increasing zones, and lack scientificity. Summary of the invention
[0004] In view of this, the present application provides a method and system for evaluating the oil and gas reserve enhancement potential in a reserve enhancement zone, so as to solve the problem that the resource potential evaluation of the reserve enhancement zone in the prior art cannot evaluate the resource reserve enhancement potential according to the resource occurrence characteristics and exploration depth, and lacks scientificity.
[0005] In a first aspect, an embodiment of the present application provides a method for evaluating the oil and gas reserve increase potential in a reserve increase zone, the method comprising the following operations:
[0006] Analyze the status of different resources in the reserve-increasing zones, mainly including reserve trapped resources, retained reserves, and inferred resources;
[0007] The number of reserve traps with industrial oil and gas flow is calculated based on the success rate of drilled traps, and the reserve traps of this number are randomly selected to obtain the resource conversion potential of the reserve traps based on the proven reserves per unit trap area;
[0008] Establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions, randomly sample the key parameter values after the upgrade, obtain the probability distribution of the key parameter upgrade coefficient, calculate the probability distribution of the key parameters after the target reserve block is upgraded, randomly sample each parameter to obtain the reserve probability distribution, and convert P 50 As a potential for upgrading reserves;
[0009] For the known proven oil reservoirs, they are numbered in descending order according to their size. The Pareto reservoir size sequence method is used, with the proven oil reservoir size as the ordinate and the reservoir number as the abscissa. The positions of the proven oil reservoirs are found respectively, and the number and size of the undiscovered oil reservoirs are calculated. The conversion potential of the inferred resources is obtained by accumulation.
[0010] The resource potential of the reserve-enclosed resource conversion potential, the potential for upgrading the retained reserves, and the potential for converting the inferred resources are added together to obtain the resource potential of the reserve-increasing zone.
[0011] Preferably, the success rate of drilled closures is the ratio of the number of industrial oil and gas flow closures obtained to the total number of drilled closures; the proved reserves per unit closure area is the ratio of the total proved reserves of zone closures to the total area of closures submitted for proved reserves; the number of reserve closures for obtaining industrial oil and gas flow is the product of the success rate of drilled closures and the total number of reserve closures; the reserve closure resource conversion potential is the product of the proved reserves per unit closure area and the area of each reserve closure, and then the sum is added up.
[0012] Preferably, the key calculation parameters include oil-bearing area, effective thickness, effective porosity and oil saturation parameters.
[0013] Preferably, the random sampling adopts the Monte Carlo method.
[0014] In a second aspect, the embodiment of the present application further provides a system for evaluating the oil and gas reserve increase potential in a reserve increase zone, the system comprising:
[0015] The resource sorting module of the reserve-increasing area is used to analyze the status of different resources in the reserve-increasing area, mainly including the reserve trapped resources, the remaining reserves, and the inferred resources;
[0016] The reserve trap resource potential calculation module is used to calculate the number of reserve traps that can obtain industrial oil and gas flow based on the success rate of drilled traps, randomly select the number of reserve traps, and obtain the reserve trap resource conversion potential based on the proven reserves per unit trap area;
[0017] The reserve calculation module is used to establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions, randomly sample the key parameter values after the upgrade, obtain the probability distribution of the key parameter upgrade coefficient, calculate the probability distribution of the key parameters after the target reserve block is upgraded, randomly sample each parameter to obtain the reserve probability distribution, and convert P50 As a potential for upgrading reserves;
[0018] The inferred resource calculation module is used to number the known proven oil reservoirs in descending order according to their size, and adopt the Pareto reservoir size sequence method, with the proven oil reservoir size as the ordinate and the reservoir number as the abscissa, to find the location of the proven oil reservoir size, calculate the number and size of undiscovered oil reservoirs, and obtain the conversion potential of inferred resources by accumulation;
[0019] The resource potential statistics module of the reserve-increasing zone is used to add up the potential for conversion of reserve-trapped resources, the potential for upgrading the retained reserves, and the potential for conversion of inferred resources to obtain the resource potential of the reserve-increasing zone.
[0020] Preferably, the success rate of drilled closures is the ratio of the number of industrial oil and gas flow closures obtained to the total number of drilled closures; the proved reserves per unit closure area is the ratio of the total proved reserves of zone closures to the total area of closures submitted for proved reserves; the number of reserve closures for obtaining industrial oil and gas flow is the product of the success rate of drilled closures and the total number of reserve closures; the reserve closure resource conversion potential is the product of the proved reserves per unit closure area and the area of each reserve closure, and then the sum is added up.
[0021] Preferably, the key calculation parameters include oil-bearing area, effective thickness, effective porosity and oil saturation parameters.
[0022] Preferably, the random sampling adopts the Monte Carlo method.
[0023] In a third aspect, an embodiment of the present application further provides an electronic device, including:
[0024] processor;
[0025] Memory;
[0026] And a computer program, wherein the computer program is stored in the memory, and the computer program includes instructions, which, when executed by the processor, enable the electronic device to execute the method for evaluating the oil and gas reserve increase potential in a reserve increase zone.
[0027] In a fourth aspect, an embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the method for evaluating the oil and gas reserve enhancement potential in a reserve enhancement zone.
[0028] In the embodiments of the present application, according to the characteristics of the resource composition of the reserve-increasing zone, it is divided into three categories: reserve enclosed resources, retained reserves, and inferred resources. According to the characteristics of the resource categories, a potential resource conversion capacity evaluation method, a retained resource upgrade potential evaluation method, and an inferred resource conversion capacity evaluation method are established respectively, and a comprehensive method for evaluating the reserve-increasing potential of oil and gas resources in the reserve-increasing zone is formed, which improves the scientific nature of the evaluation, and the method is successfully applied to the annual plan and long-term plan of oil and gas exploration. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0030] Figure 1 A flow chart of a method for evaluating the oil and gas reserve increase potential in a reserve increase zone provided in an embodiment of the present application;
[0031] Figure 2 A schematic diagram of the probability distribution of key parameters of reserves of a certain geological type before and after the upgrade and the probability distribution of the upgrade coefficient provided in the embodiment of the present application;
[0032] Figure 3 A schematic diagram of the probability distribution of key parameters after upgrading a certain type of retained reserve block provided in an embodiment of the present application;
[0033] Figure 4 A probability distribution diagram of a certain type of reserved reserve block reserve upgrade provided in an embodiment of the present application;
[0034] Figure 5 A schematic diagram of the reservoir scale sequence provided for the embodiment of the present application;
[0035] Figure 6 A block diagram of a system for evaluating the oil and gas reserve increase potential in a reserve increase zone provided in an embodiment of the present application;
[0036] Figure 7 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION
[0037] In order to better understand the technical solution of the present application, the embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0038] It should be clear that the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in the field without creative work are within the scope of protection of the present application.
[0039] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0040] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0041] like Figure 1 As shown, the embodiment of the present invention discloses a method for evaluating the oil and gas reserve increase potential in a reserve increase zone, comprising the following operations:
[0042] S1. Analyze the status of different resources in the reserve-increasing zone, mainly including reserve trapped resources (potential resources), proven reserves, and inferred resources.
[0043] S2. Calculate the number of reserve traps for industrial oil and gas flow based on the success rate of drilled traps, randomly select the number of reserve traps, and obtain the resource conversion potential of the reserve traps based on the proven reserves per unit trap area;
[0044] For the conversion potential of reserve trap resources, first calculate the success rate of drilled traps A, which is the ratio of the number of industrial oil and gas flow traps obtained to the total number of drilled traps. Then calculate the proved reserves per unit trap area B, which is the ratio of the total proved reserves of zone traps to the total area of proved reserves submitted. Then calculate the number of reserve traps with industrial oil and gas flow C, which is the product of the success rate of drilled traps and the total number of reserve traps. Finally, calculate the conversion potential of reserve traps, randomly select C reserve traps, multiply the proved reserves per unit trap area by the area of each reserve trap, obtain the proved reserves of each extracted trap, and then add up the proved reserves of each extracted trap to obtain the conversion potential of reserve trap resources.
[0045] S3. Establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions, randomly sample the key parameter values after the upgrade, obtain the probability distribution of the key parameter upgrade coefficient, calculate the probability distribution of the key parameters after the target reserve block is upgraded, and randomly sample each parameter to obtain the reserve probability distribution;
[0046] For the potential for reserve upgrade, we first establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions. The key calculation parameters include oil-bearing area, effective thickness, effective porosity and oil saturation parameters. Secondly, we use the Monte Carlo method to randomly sample and extract the key parameter values after the upgrade. The key parameter values after the upgrade and the corresponding key parameters before the upgrade are used as the key parameter upgrade coefficients, thereby establishing the probability distribution of the key reserve parameter upgrade coefficients under similar geological conditions. We calculate the probability distribution of the key parameters after the target reserve block is upgraded again, and multiply the effective thickness, effective porosity and oil saturation parameters of the target reserve block before the upgrade by the key parameter upgrade coefficients to obtain the probability distribution of each parameter after the upgrade. Finally, we use the Monte Carlo method to randomly extract each parameter and bring it into the reserve calculation formula to obtain the reserve probability distribution, and take P 50 As a potential for upgrading reserves, P 50 There is at least 50% reliability for the calculation of reserves.
[0047] S4. For the known proven oil reservoirs, number them in descending order according to their size, and use the Pareto reservoir size sequence method, with the proven oil reservoir size as the ordinate and the reservoir number as the abscissa, to find the location of the proven oil reservoir size, calculate the number and size of undiscovered oil reservoirs, and obtain the conversion potential of inferred resources by accumulation;
[0048] For the conversion potential of inferred resources, the proved reserves of each extraction trap, the proved reserves of each reserve upgrade, and the proven reserves that have been discovered are first taken as the known proven reservoir scale, and numbered in descending order according to the size of the proven reservoir. Secondly, the Pareto reservoir scale sequence method is used, with the proven reservoir scale as the ordinate and the reservoir number as the abscissa. In the double logarithmic coordinate system, the distribution of the proven reservoir is approximately a straight line. The location of the proven reservoir scale is found respectively, and the number and scale of the undiscovered reservoirs are calculated. Finally, the scale of the undiscovered reservoir is accumulated to obtain the conversion potential of inferred resources.
[0049] S5. Add the potential for conversion of reserve trapped resources, the potential for upgrading the available reserves, and the potential for conversion of inferred resources to obtain the resource potential of the reserve-increasing zone.
[0050] The embodiment of the present invention takes the Q zone of Shengli Oilfield as an example to calculate the conversion potential of reserve trapped resources, the potential for upgrading the retained reserves and the potential for conversion of inferred resources respectively.
[0051] Calculate the potential for conversion of reserve and trapped resources:
[0052] First, the success rate of drilled traps A is calculated. Currently, 12 traps have been drilled in the Q zone, and 5 industrial oil and gas flow traps have been obtained. The success rate of drilled traps A is 41.7%;
[0053] Secondly, calculate the proved reserves per unit area of the trap B. At present, the proved reserves of the Q zone are 46.5 million tons. The total area of the proved reserves of the trap submitted is 290 square kilometers, so the proved reserves per unit area of the trap are 160,000 tons;
[0054] The number of reserve traps with industrial oil and gas flow, C, is calculated again. Since the total number of reserve traps is 6, the number of reserve traps with industrial oil and gas flow, C, is 2.52, about 3.
[0055] Finally, three reserve traps with areas of 40, 61, and 74 square kilometers were randomly selected, and the proven reserves were 6.4 million tons, 9.76 million tons, and 11.84 million tons, respectively. The resource conversion potential of the reserve traps is 6.40+9.76+11.84=28 million tons.
[0056] Calculate the potential for reserve upgrades:
[0057] The probability distribution of the key calculation parameters of oil-bearing area, effective thickness, effective porosity and oil saturation before and after the reserve upgrade under similar geological conditions is established. Secondly, the Monte Carlo method is used for random sampling to extract the ratio of the key parameter value after the upgrade to the corresponding key parameter value before the upgrade as the key parameter upgrade coefficient, and the probability distribution of the key reserve parameter upgrade coefficient under similar geological conditions is established, such as Figure 2 Calculate the probability distribution of key parameters after the target reserve block is upgraded, multiply the parameters such as effective thickness, effective porosity, oil saturation and so on of the target reserve block before the upgrade by the probability distribution of the upgrade coefficient, and obtain the probability distribution of each parameter after the upgrade, as shown in Figure 3 Using the Monte Carlo method, we randomly selected various parameters and put them into the reserve calculation formula to obtain the reserve probability distribution. 50 As the potential value of reserve upgrade, such as Figure 4 As shown, P 50 =1.4636 million tons.
[0058] Calculate the potential for conversion of inferred resources:
[0059] The proved reserves of each extraction trap, the proved reserves upgraded from each retained reserves, and the proven reserves that have been discovered are regarded as the known proved reservoir scale, and are numbered in descending order according to the size of the proved reservoir. Using the Pareto reservoir scale sequence method, with the proved reservoir scale as the ordinate and the reservoir number as the abscissa, the distribution of the proved reservoir in the double logarithmic coordinate system is approximately a straight line, as shown in Figure 1. Figure 5 As shown in the figure, the locations of proven oil reservoirs are found respectively, and the number and size of undiscovered oil reservoirs are calculated. The size of undiscovered oil reservoirs is accumulated to obtain the potential for conversion of inferred resources. It is calculated that there are 81 undiscovered oil reservoirs with a total of 190 million tons.
[0060] To calculate the resource upgrade potential of the reserve-increasing zone, add the reserve closure conversion potential, the potential for upgrading the proven reserves, and the potential for converting the inferred resources to obtain the resource potential of the reserve-increasing zone. It can be seen that the reserve-increasing zone's reserve potential is: 28 million tons + 50 million tons + 190 million tons = 268 million tons.
[0061] The embodiment of the present invention divides the resources in the reserve-increasing zone into three categories: reserve trapped resources, retained reserves, and inferred resources according to the resource composition characteristics. According to the resource category characteristics, a potential resource conversion capacity evaluation method, a retained resource upgrade potential evaluation method, and an inferred resource conversion capacity evaluation method are respectively established to form a comprehensive method for evaluating the reserve-increasing potential of oil and gas resources in the reserve-increasing zone, thereby improving the scientific nature of the evaluation. The method has been successfully applied to annual and long-term plans for oil and gas exploration.
[0062] Corresponding to the above-mentioned embodiments, the present application also provides a system for evaluating the oil and gas reserve enhancement potential in a reserve enhancement zone.
[0063] See also Figure 6 , which is a structural block diagram of a system for evaluating the oil and gas reserve potential in a reserve zone provided in this application. Figure 6 As shown, it mainly includes the following modules.
[0064] The resource sorting module of the reserve-increasing area is used to analyze the status of different resources in the reserve-increasing area, mainly including the reserve trapped resources, the remaining reserves, and the inferred resources;
[0065] The reserve trap resource potential calculation module is used to calculate the number of reserve traps that can obtain industrial oil and gas flow based on the success rate of drilled traps, randomly select the number of reserve traps, and obtain the reserve trap resource conversion potential based on the proven reserves per unit trap area;
[0066] The reserve calculation module is used to establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions, randomly sample the key parameter values after the upgrade, obtain the probability distribution of the key parameter upgrade coefficient, calculate the probability distribution of the key parameters after the target reserve block is upgraded, randomly sample each parameter to obtain the reserve probability distribution, and convert P 50 As a potential for upgrading reserves;
[0067] The inferred resource calculation module is used to number the known proven oil reservoirs in descending order according to their size, and adopt the Pareto reservoir size sequence method, with the proven oil reservoir size as the ordinate and the reservoir number as the abscissa, to find the location of the proven oil reservoir size, calculate the number and size of undiscovered oil reservoirs, and obtain the conversion potential of inferred resources by accumulation;
[0068] The resource potential statistics module of the reserve-increasing zone is used to add up the potential for conversion of reserve-trapped resources, the potential for upgrading the retained reserves, and the potential for conversion of inferred resources to obtain the resource potential of the reserve-increasing zone.
[0069] It should be pointed out that the specific contents involved in the embodiments of the present application can be found in the description of the above method embodiments, and for the sake of brevity, they will not be repeated here.
[0070] Corresponding to the above embodiment, an embodiment of the present application further provides an electronic device.
[0071] See also Figure 7 , is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 7 As shown, the electronic device 700 may include: a processor 701, a memory 702 and a communication unit 703. These components communicate via one or more buses. Those skilled in the art may understand that the electronic device structure shown in the figure does not constitute a limitation on the embodiments of the present application. It may be a bus structure or a star structure, and may include more or fewer components than shown in the figure, or combine certain components, or arrange components differently.
[0072] The communication unit 703 is used to establish a communication channel so that the electronic device can communicate with other devices.
[0073] The processor 701 is the control center of the electronic device. It uses various interfaces and lines to connect various parts of the entire electronic device. It runs or executes software programs and / or modules stored in the memory 702, and calls data stored in the memory to perform various functions of the electronic device and / or process data. The processor can be composed of an integrated circuit (IC), for example, it can be composed of a single packaged IC, or it can be composed of multiple packaged ICs with the same or different functions. For example, the processor 701 can include only a central processing unit (CPU). In the embodiment of the present application, the CPU can be a single computing core or multiple computing cores.
[0074] The memory 702 is used to store the execution instructions of the processor 701. The memory 702 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk.
[0075] When the execution instructions in the memory 702 are executed by the processor 701 , the electronic device 700 is enabled to execute part or all of the steps in the above method embodiments.
[0076] Corresponding to the above embodiment, the embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium may store a program, wherein when the program is running, the device where the computer-readable storage medium is located may be controlled to perform some or all of the steps in the above method embodiment. In a specific implementation, the computer-readable storage medium may be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM).
[0077] Corresponding to the above-mentioned embodiment, the embodiment of the present application further provides a computer program product, which includes executable instructions. When the executable instructions are executed on a computer, the computer executes some or all of the steps in the above-mentioned method embodiment.
[0078] In the embodiments of the present application, "at least one" refers to one or more, and "plurality" refers to two or more. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent the existence of A alone, the existence of A and B at the same time, and the existence of B alone. Among them, A and B can be singular or plural. The character " / " generally indicates that the previous and subsequent associated objects are in an "or" relationship. "At least one of the following" and similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b and c can be represented by: a, b, c, ab, ac, bc, or abc, where a, b, c can be single or multiple.
[0079] Those of ordinary skill in the art will appreciate that the various units and algorithm steps described in the embodiments disclosed herein can be implemented in a combination of electronic hardware, computer software, and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0080] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0081] In several embodiments provided in the present application, if any function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or the part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (read-only memory, referred to as ROM), random access memory (random access memory, referred to as RAM), disk or optical disk and other media that can store program codes.
[0082] The above is only a specific implementation of the present application. Any person skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. The protection scope of the present application should be based on the protection scope of the claims.
Claims
1. A method for evaluating the oil and gas reserve increase potential in a reserve increase zone, characterized in that: The method comprises the following operations: Analyze the status of different resources in the reserve-increasing zones, mainly including reserve trapped resources, retained reserves, and inferred resources; The number of reserve traps with industrial oil and gas flow is calculated based on the success rate of drilled traps, and the reserve traps of this number are randomly selected to obtain the resource conversion potential of the reserve traps based on the proven reserves per unit trap area; Establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions, randomly sample the key parameter values after the upgrade, obtain the probability distribution of the key parameter upgrade coefficient, calculate the probability distribution of the key parameters after the target reserve block is upgraded, randomly sample each parameter to obtain the reserve probability distribution, and convert P 50 As a reserve upgrade potential; For the known proven oil reservoirs, they are numbered in descending order according to their size. The Pareto reservoir size sequence method is used, with the proven oil reservoir size as the ordinate and the reservoir number as the abscissa. The positions of the proven oil reservoirs are found respectively, and the number and size of the undiscovered oil reservoirs are calculated. The conversion potential of the inferred resources is obtained by accumulation. The resource potential of the reserve-enclosed resource conversion potential, the potential for upgrading the retained reserves, and the potential for converting the inferred resources are added together to obtain the resource potential of the reserve-increasing zone.
2. The method for evaluating the oil and gas reserve increase potential of a reserve increase zone according to claim 1, characterized in that: The success rate of drilled closures is the ratio of the number of industrial oil and gas flow closures obtained to the total number of drilled closures; the proved reserves per unit closure area is the ratio of the total proved reserves of zone closures to the total area of closures submitted for proved reserves; the number of reserve closures that obtain industrial oil and gas flow is the product of the success rate of drilled closures and the total number of reserve closures; the resource conversion potential of reserve closures is the product of the proved reserves per unit closure area and the area of each reserve closure, and then the sum is added up.
3. The method for evaluating the oil and gas reserve increase potential of a reserve increase zone according to claim 1, characterized in that: The key calculation parameters include oil-bearing area, effective thickness, effective porosity and oil saturation parameters.
4. The method for evaluating the oil and gas reserve increase potential of a reserve increase zone according to claim 1, characterized in that: The random sampling adopts the Monte Carlo method.
5. A system for evaluating the oil and gas reserve potential in a reserve-increasing zone, characterized in that: The system comprises: The resource sorting module of the reserve-increasing area is used to analyze the status of different resources in the reserve-increasing area, mainly including the reserve trapped resources, the remaining reserves, and the inferred resources; The reserve trap resource potential calculation module is used to calculate the number of reserve traps that can obtain industrial oil and gas flow based on the success rate of drilled traps, randomly select the number of reserve traps, and obtain the reserve trap resource conversion potential based on the proven reserves per unit trap area; The reserve calculation module is used to establish the probability distribution of key calculation parameters before and after the reserve upgrade under similar geological conditions, randomly sample the key parameter values after the upgrade, obtain the probability distribution of the key parameter upgrade coefficient, calculate the probability distribution of the key parameters after the target reserve block is upgraded, randomly sample each parameter to obtain the reserve probability distribution, and convert P 50 As a reserve upgrade potential; The inferred resource calculation module is used to number the known proven oil reservoirs in descending order according to their size, and adopt the Pareto reservoir size sequence method, with the proven oil reservoir size as the ordinate and the reservoir number as the abscissa, to find the location of the proven oil reservoir size, calculate the number and size of undiscovered oil reservoirs, and obtain the conversion potential of inferred resources by accumulation; The resource potential statistics module of the reserve-increasing zone is used to add up the potential for conversion of reserve-trapped resources, the potential for upgrading the retained reserves, and the potential for conversion of inferred resources to obtain the resource potential of the reserve-increasing zone.
6. The system for evaluating the oil and gas reserve increase potential in a reserve increase zone according to claim 5, characterized in that: The success rate of drilled closures is the ratio of the number of industrial oil and gas flow closures obtained to the total number of drilled closures; the proved reserves per unit closure area is the ratio of the total proved reserves of zone closures to the total area of closures submitted for proved reserves; the number of reserve closures that obtain industrial oil and gas flow is the product of the success rate of drilled closures and the total number of reserve closures; the resource conversion potential of reserve closures is the product of the proved reserves per unit closure area and the area of each reserve closure, and then the sum is added up.
7. The system for evaluating the oil and gas reserve increase potential in a reserve increase zone according to claim 5, characterized in that: The key calculation parameters include oil-bearing area, effective thickness, effective porosity and oil saturation parameters.
8. The system for evaluating the oil and gas reserve increase potential in a reserve increase zone according to claim 5, characterized in that: The random sampling adopts the Monte Carlo method.
9. An electronic device, characterized in that: include: processor; Memory; And a computer program, wherein the computer program is stored in the memory, and the computer program includes instructions, which, when executed by the processor, enable the electronic device to execute a method for evaluating the oil and gas reserve enhancement potential in a reserve enhancement zone as described in any one of claims 1 to 4.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute a method for evaluating the oil and gas reserve enhancement potential in a reserve enhancement zone as described in any one of claims 1 to 4.
