Voltage control method and device considering load side flexibility resources and electronic equipment
By obtaining the load parameters and models of flexible resources in the distribution network, combined with the ADMM algorithm, the problem that the existing technology cannot meet the control needs of flexible resources is solved, and the distributed voltage control and voltage regulation performance optimization of the power grid is achieved.
Patent Information
- Application Number
- CN202411116358.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-26
AI Technical Summary
The prior art cannot meet the control needs of various resources of the power grid after introducing flexible resources, especially in terms of voltage control, resulting in the inability to achieve effective distributed voltage management.
By obtaining the load parameters of flexible resource load in the distribution network, the load regulation model, current model and power supply model are determined, and the voltage control strategy model with the minimum network loss and voltage deviation are adopted, and the ADMM algorithm is used to perform distributed solutions to optimize voltage control.
It realizes distributed control of voltage while taking into account the load-side flexibility resources, optimizes the voltage regulation performance of the power system, meets the control needs of flexible resources, and improves the robustness and computing efficiency of the system.
Smart Images

Figure CN119029901A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of voltage control technology, and in particular, to a voltage control method considering load-side flexibility resources, a voltage control device considering load-side flexibility resources, a computer-readable storage medium, and an electronic device. Background Art
[0002] At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. In the traditional hierarchical control, the first-level control unit does not include the distributed energy units and the flexible resources on the load side. The second-level control is the AVC substation control system, which is mainly responsible for controlling the reactive power regulation resources in the plant. After introducing various flexible resources, the control substation based on the plant may not be able to meet the control requirements of various resources.
[0003] Therefore, a distributed voltage control strategy that considers flexibility resources is needed. Summary of the invention
[0004] The main purpose of this application is to provide a voltage control method considering the flexibility resources on the load side, a voltage control device considering the flexibility resources on the load side, a computer-readable storage medium and an electronic device, so as to at least solve the problem that the control requirements of flexibility resources cannot be met in the prior art.
[0005] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a voltage control method considering the flexibility resources on the load side is provided, including: obtaining the load parameters of the flexibility resource load in the distribution network, and determining the load regulation model according to the load parameters, and determining the flow model and power supply model of the distribution network, wherein the load parameters are the electrical parameters of the flexibility resource load; determining the objective function with the goal of minimizing network loss and voltage deviation, and determining the voltage control strategy model with the load regulation model, the flow model and the power supply model as constraints according to the objective function and the constraints; solving the voltage control strategy model to obtain the voltage control scheme of the flexibility resource load, and controlling the operation of the flexibility resource load in the distribution network according to the voltage control scheme.
[0006] Optionally, the load parameters of the flexible resource load in the distribution network are obtained, and a load regulation model is determined according to the load parameters, including: obtaining the load parameters of the conventional flexible resource load, determining the load regulation model of the conventional flexible resource load as The conventional flexibility resource load is a load that provides demand response. is the active power of the original load of node i in period t, is the actual load active power of node i after participating in demand response in period t, is the load demand response active power regulation capacity, is the reactive power of the original load of node i in period t, is the reactive power of the actual load of node i after participating in demand response in period t, is the load demand response reactive power regulation capacity, is the upper limit of active power regulation capacity, is the power factor angle of the load, T represents a time period; obtain the load parameters of the electric vehicle, and determine the load regulation model of the electric vehicle as in, is the original active power load of the electric vehicle charging station at node i during period t, is the active power actually consumed by the electric vehicle charging station at node i during period t, is the active power provided by the electric vehicle charging station at node i to the grid during period t, is the additional active power absorbed by the electric vehicle charging station at node i from the grid during period t, is the reactive power injected into the electric vehicle charging station during period t, is the power factor of the electric vehicle charging station, represents the maximum value of active power provided by the electric vehicle charging station at node i to the grid during period t, represents the maximum value of the additional active power absorbed by the electric vehicle charging station at node i from the power grid during time period t, where T represents a time period; obtain the load parameters of hydrogen production by electrolysis, and determine the load regulation model of hydrogen production by electrolysis as in, represents the amount of hydrogen produced, η is the energy conversion efficiency of hydrogen production by electrolysis, is the active power consumed by the electrolytic hydrogen production equipment, is the reactive power consumed by the electrolytic hydrogen production equipment, H CV is the calorific value of hydrogen, P EZ,min is the minimum operating power of the electrolytic hydrogen production equipment, P EZ,max is the maximum operating power of the electrolytic hydrogen production equipment, H D,min is the minimum hydrogen demand, is the power factor angle of the electrolytic hydrogen production equipment, H D,min Indicates the minimum amount of hydrogen produced.
[0007] Optionally, determining the power flow model of the distribution network includes: determining the power flow model of the distribution network as Among them, P ij,t is the active power transmitted from node i to node j in period t, Qij,t is the reactive power transmitted from node i to node j during period t, P jk,t is the active power transmitted from node j to node k in period t, Q jk,t is the reactive power transmitted from node j to node k in period t, α(j) represents the set of branches whose head end is node j, P j,t is the active power injected into node j during period t, Q j,t is the reactive power injected into node j during period t, I ij,t =(i ij,t ) 2 ,i ij,t is the branch current from node i to node j during period t, V i,t =(v i,t ) 2 , v i,t is the voltage at node i during period t and represents the minimum voltage of node i during period t, represents the maximum voltage of node i during period t, represents the maximum value of the branch current from node i to node j, r ij represents the resistance from node i to node j, x ij represents the reactance from node i to node j, V j,t represents the voltage of node j during period t.
[0008] Optionally, determining the power supply model of the distribution network includes: determining that the power supply model of the distribution network is in, is the active power transmitted on the feeder between the distribution network and the main grid, is the minimum value of active power transmitted on the feeder between the distribution network and the main grid, is the maximum value of active power transmitted on the feeder between the distribution network and the main grid. is the reactive power transmitted on the feeder between the distribution network and the main grid, is the minimum reactive power transmitted on the feeder between the distribution network and the main grid, is the maximum reactive power transmitted on the feeder between the distribution network and the main grid. is the predicted value of renewable energy output, is the actual output of renewable energy. is the actual value of the reactive power output of renewable energy, is the maximum reactive power output of renewable energy, It is the upper limit of the apparent power of renewable energy generators.
[0009] Optionally, determining the objective function with the goal of minimizing network loss and voltage deviation includes: determining the objective function with the goal of minimizing network loss and voltage deviation as Among them, F loss represents the network loss, F vol represents the voltage deviation, γ1 represents the weight of the network loss, γ2 represents the weight of the voltage deviation, F represents the objective function value, is the square value of the node reference voltage, N represents the total number of nodes, T represents a time period, V i,t =(v i,t ) 2 , vi,t is the voltage of node i during period t, Iij,t=(iij,t) 2 , iij,t is the branch current from node i to node j during period t, r ij represents the resistance from node i to node j, and α(i) represents the set of branches whose head end is node i.
[0010] Optionally, solving the voltage control strategy model includes: solving the voltage control strategy model using a multiplier adaptive alternating direction method based on residual balance; using an adaptive adjustment mechanism The iteration step size is optimized and corrected to Among them, r k is the original residual, d k is the dual residual, ζ is the first correction coefficient, β is the second correction coefficient, ω k is the penalty coefficient for the kth iteration, ω k+1 is the penalty coefficient for the k+1th iteration, is the value of the variable on the coupled circuit in the first region calculated at the kth iteration, is the value of the variable on the coupled line in the second region calculated at the kth iteration, is the value of the variable on the coupled line in the first region calculated at the k-1th iteration.
[0011] Optionally, before obtaining the load parameters of the flexible resource load in the distribution network, the method also includes: establishing a first-level control framework, wherein the first-level control framework is composed of multiple electrical components; establishing a second-level control framework, wherein the second-level control framework generates and sends a first control instruction to the first-level control framework, and receives a first control instruction feedback value sent by the first-level control framework, wherein the first control instruction is a local control instruction for the voltage; establishing a third-level control framework, wherein the third-level control framework sends a second control instruction to the second-level control framework, so that the second-level control framework calculates according to the second control instruction and the first control instruction feedback value to obtain the first control instruction, and the second control instruction is a global control instruction for the voltage.
[0012] According to another aspect of the present application, a voltage control device taking into account the flexibility resources on the load side is provided, including: a first determination unit, used to obtain the load parameters of the flexibility resource load in the distribution network, and determine the load regulation model according to the load parameters, and determine the power flow model and the power supply model of the distribution network, wherein the load parameters are the electrical parameters of the flexibility resource load; a first determination unit, used to determine the objective function with the goal of minimizing network loss and voltage deviation, with the load regulation model, the power flow model and the power supply model as constraints, and determine the voltage control strategy model according to the objective function and the constraints; a control unit, used to solve the voltage control strategy model, obtain the voltage control scheme of the flexibility resource load, and control the operation of the flexibility resource load in the distribution network according to the voltage control scheme.
[0013] According to another aspect of the present application, a computer-readable storage medium is provided, wherein the computer-readable storage medium includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the voltage control methods considering load-side flexibility resources.
[0014] According to another aspect of the present application, an electronic device is provided, comprising: one or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include methods for executing any one of the voltage control methods considering load-side flexibility resources.
[0015] Apply the technical solution of the present application to obtain the load parameters of the flexible resource load in the distribution network, and determine the load regulation model according to the load parameters, and determine the flow model and power supply model of the distribution network, wherein the load parameters are the electrical parameters of the flexible resource load; determine the objective function with the goal of minimizing network loss and voltage deviation, and determine the voltage control strategy model according to the objective function and the constraints with the load regulation model, flow model and power supply model as constraints; solve the voltage control strategy model to obtain the voltage control scheme of the flexible resource load, and control the operation of the flexible resource load according to the voltage control scheme. Compared with the prior art, when the power grid control system introduces flexible resources, the existing control substation cannot meet the control requirements of various resources. The present application can perform distributed control of the voltage while considering the flexible resources on the load side, obtain the daily operation plan of various controllable resources in the distribution network, and optimize the voltage regulation performance of the entire power system. Therefore, it can solve the problem of not being able to meet the control requirements of flexible resources. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The drawings constituting part of the present application are used to provide a further understanding of the present application. The exemplary embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0017] Figure 1 A hardware structure block diagram of a mobile terminal for executing a voltage control method considering load-side flexibility resources provided in an embodiment of the present application is shown;
[0018] Figure 2 A schematic flow chart of a voltage control method considering load-side flexibility resources provided in an embodiment of the present application is shown;
[0019] Figure 3 A structural block diagram of a voltage control device taking into account load-side flexibility resources provided in an embodiment of the present application is shown.
[0020] The above drawings include the following reference numerals:
[0021] 102, processor; 104, memory; 106, transmission device; 108, input and output devices. DETAILED DESCRIPTION
[0022] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0023] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0025] For the convenience of description, some nouns or terms involved in the embodiments of the present application are explained below:
[0026] Flexibility resources: refers to resources that can increase the flexibility, elasticity and flexibility of the energy supply and demand system, and serve the dynamic supply and demand balance of the energy consumption system.
[0027] As introduced in the background technology, in the prior art, after various flexible resources are introduced, the control substation based on the plant station may not be able to meet the control requirements of various resources. In order to solve the problem of not being able to meet the control requirements of flexible resources, the embodiments of the present application provide a voltage control method considering the flexible resources on the load side, a voltage control device considering the flexible resources on the load side, a computer-readable storage medium and an electronic device.
[0028] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.
[0029] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal of a voltage control method considering load-side flexibility resources according to an embodiment of the present invention. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations shown.
[0030] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as the computer program corresponding to the voltage control method considering load-side flexibility resources in the embodiment of the present invention. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, the above method is implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories can be connected to the mobile terminal via a network. Examples of the above network include but are not limited to the Internet, an intranet, a local area network, a mobile communication network, and a combination thereof. The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 may be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.
[0031] In this embodiment, a voltage control method considering load-side flexibility resources is provided and runs on a mobile terminal, a computer terminal or a similar computing device. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and, although the logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0032] Figure 2 is a flow chart of a voltage control method considering load-side flexibility resources according to an embodiment of the present application. Figure 2As shown, the method comprises the following steps:
[0033] Step S201, obtaining load parameters of the flexible resource load in the distribution network, and determining a load regulation model according to the load parameters, and determining a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexible resource load;
[0034] Specifically, a three-layer framework is established to cover various load-side resources participating in reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this application builds a three-layer control framework, and the content of the framework will be described later. First, a load regulation model for the participation of load-side flexible resources in reactive power optimization and voltage control is established, which may include the following: a model in which conventional flexible loads that can provide demand response participate in voltage regulation, a model in which electric vehicle charging stations participate in voltage regulation, and a model in which electrolytic hydrogen production equipment participates in voltage regulation. After that, a distributed voltage regulation scheme considering the flexible resources on the load side is established, and the volatility and regulation capacity of renewable energy and load-side resources are comprehensively considered, and a multi-objective reactive power optimization scheme for the distribution network is proposed. By flexibly calling the adjustable capacity and reactive power support capacity of the load-side resources, the output of renewable energy and the fluctuation of the system load are balanced, including the distribution network flow model and the power supply model of the distribution network. The load parameters mainly include active power, reactive power, etc.
[0035] Step S202, determining an objective function with the goal of minimizing network loss and voltage deviation, taking the load regulation model, the power flow model and the power supply model as constraints, and determining a voltage control strategy model according to the objective function and the constraints;
[0036] Specifically, after establishing the above model, it is necessary to establish the objective function of the model. The objective function is to minimize the network loss and voltage deviation of the system. The constraints are the models established above. Therefore, the above model and constraints constitute the voltage control strategy model, which is convenient for subsequent solution to obtain the most suitable active power and reactive power under the constraints, and based on this, the voltage is adjusted and controlled.
[0037] Step S203, solving the voltage control strategy model to obtain the voltage control scheme of the flexible resource load, and controlling the operation of the flexible resource load in the distribution network according to the voltage control scheme.
[0038] Specifically, the above models are then solved under constraints. The above construction is a mixed integer second-order cone programming problem, and the complexity of its solution gradually increases with the increase of distributed resources in the system. The massive controllable resources significantly increase the computational burden of the central controller. The high dependence on the central controller also makes the system's fault tolerance low. Distributed control can share computing requirements through regional controllers. In addition, it can also protect the information privacy of distributed resources and improve the robustness of the system. Therefore, a distributed voltage control strategy can be adopted, and the ADMM (improved alternating direction method of multipliers, ADMM) distributed solution algorithm can be used to solve the model.
[0039] Through this embodiment, the load parameters of the flexible resource load in the distribution network can be obtained, and the load regulation model can be determined according to the load parameters, and the flow model and power supply model of the distribution network can be determined, wherein the load parameters are the electrical parameters of the flexible resource load; the objective function is determined with the minimum network loss and voltage deviation as the goal, and the load regulation model, flow model and power supply model are used as constraints, and the voltage control strategy model is determined according to the objective function and the constraints; the voltage control strategy model is solved to obtain the voltage control scheme of the flexible resource load, and the operation of the flexible resource load is controlled according to the voltage control scheme. Compared with the prior art, when the power grid control system introduces flexible resources, the existing control substation cannot meet the control requirements of various resources. The present application can perform distributed control of the voltage while considering the flexible resources on the load side, obtain the daily operation plan of various controllable resources in the distribution network, and optimize the voltage regulation performance of the entire power system. Therefore, it can solve the problem of not being able to meet the control requirements of flexible resources.
[0040] In the specific implementation process, the above step S201 obtains the load parameters of the flexible resource load in the distribution network, and determines the load regulation model according to the above load parameters, which can be achieved by the following steps: obtaining the load parameters of the conventional flexible resource load, determining the load regulation model of the conventional flexible resource load as The conventional flexible resource load is the load that provides demand response. is the active power of the original load of node i in period t, is the actual load active power of node i after participating in demand response in period t, is the load demand response active power regulation capacity, is the reactive power of the original load of node i in period t, is the reactive power of the actual load of node i after participating in demand response in period t, is the load demand response reactive power regulation capacity, is the upper limit of active power regulation capacity, is the power factor angle of the load, T represents a time period; obtain the load parameters of the electric vehicle, and determine the load regulation model of the above electric vehicle as in, is the original active power load of the electric vehicle charging station at node i during period t, is the active power actually consumed by the electric vehicle charging station at node i during period t, is the active power provided by the electric vehicle charging station at node i to the grid during period t, is the additional active power absorbed by the electric vehicle charging station at node i from the grid during period t, is the reactive power injected into the electric vehicle charging station during period t, is the power factor of the electric vehicle charging station, represents the maximum value of active power provided by the electric vehicle charging station at node i to the grid during period t, represents the maximum value of the additional active power absorbed by the electric vehicle charging station at node i from the power grid during time period t, where T represents a time period; the load parameters of hydrogen production by electrolysis are obtained, and the load regulation model of hydrogen production by electrolysis is determined as follows: in, represents the amount of hydrogen produced, η is the energy conversion efficiency of hydrogen production by electrolysis, is the active power consumed by the electrolytic hydrogen production equipment, is the reactive power consumed by the above-mentioned electrolytic hydrogen production equipment, H CV is the calorific value of hydrogen, P EZ,min is the minimum operating power of the electrolytic hydrogen production equipment, P EZ,max is the maximum operating power of the electrolytic hydrogen production equipment, H D,min is the minimum hydrogen demand, is the power factor angle of the electrolytic hydrogen production equipment, H D,min Indicates the minimum value of hydrogen production. The method determines the load regulation model through the above steps, so that the flexibility parameters in the actual application process can be fully considered.
[0041] Specifically, (1) conventional flexible load refers to the load that can provide demand response, mainly including conventional loads such as residential loads and industrial and commercial loads. This type of load can only adjust reactive power by adjusting active power, thereby establishing a load regulation model for conventional flexible resource loads. The first and second formulas (from top to bottom) in the load regulation model for conventional flexible resource loads describe the response mechanism of the load. The active power and reactive power consumed by the load can be adjusted by the dispatcher. The third formula describes the limitation of the regulation capacity. The fourth formula shows that the regulation capacity of reactive power is determined by the active power. The fifth formula shows that demand response needs to ensure that the total load remains unchanged throughout the day. (2) In the traditional reactive power optimization process of the power system, electric vehicles are generally considered as loads of the power system. However, with the development of battery technology and electric vehicle charging stations, electric vehicles can now achieve bidirectional charging, that is, electric vehicles can reversely supply power to the power system during peak load periods or when there is demand in the power grid. On the other hand, with the breakthrough of converter technology, electric vehicle chargers can achieve four-quadrant operation. In other words, whether the electric vehicle is in the charging or discharging state, it can provide reactive support to the power grid. Therefore, considering the flexibility and reactive power support of electric vehicles, the load of electric vehicle charging stations is modeled, and the load regulation model of electric vehicles is obtained as shown above. (From top to bottom) The first formula shows that the charging station can adjust the charging and discharging status of electric vehicles in the station according to demand. The second formula shows that the reactive power output of the charging station is limited by the overall operating power at that time. The third and fourth formulas limit the scale of the charging and discharging status adjustment of electric vehicles in the station according to a certain proportion. The third formula requires that the active power consumed by the charging station in a day remains unchanged to meet the charging needs of electric vehicles. Electric vehicle charging stations can provide power to the grid or increase local loads in appropriate time periods according to the needs of the power system, providing certain flexibility for grid operation. At the same time, during the charging of electric vehicles, they can also provide reactive power support to the grid and participate in the voltage control of the grid. (3) Electrolytic hydrogen production equipment is an emerging flexible load with flexible regulation capabilities and renewable energy absorption potential. Unlike other flexible resources, electrolytic hydrogen production equipment is generally installed near renewable energy and responds directly to renewable energy. While increasing the renewable energy consumption rate, hydrogen production by electrolysis can also help solve the voltage crossing problem caused by photovoltaic power generation, thereby helping to release the reactive power supply potential of renewable energy. Load regulation model for hydrogen production by electrolysis (from top to bottom) The first formula describes the energy conversion process of hydrogen production by electrolysis. The first formula shows that the operating power of hydrogen production equipment by electrolysis needs to be controlled within a certain range. The third formula describes the relationship between the reactive power and active power consumed by the equipment. The third formula shows that although the power of hydrogen production by electrolysis can be flexibly adjusted, the amount of hydrogen produced needs to meet the minimum supply demand of hydrogen.
[0042] In some optional implementations, the above step S201 determines the power flow model of the above distribution network, which can be implemented by the following steps: determining the power flow model of the above distribution network as Among them, P ij,t is the active power transmitted from node i to node j in period t, Q ij,t is the reactive power transmitted from node i to node j during period t, P jk,t is the active power transmitted from node j to node k in period t, Q jk,t is the reactive power transmitted from node j to node k in period t, α(j) represents the set of branches whose head end is node j, P j,t is the active power injected into node j during period t, Q j,t is the reactive power injected into node j during period t, I ij,t =(i ij,t ) 2 ,i ij,t is the branch current from node i to node j during period t, V i,t =(v i,t ) 2 , v i,t is the voltage at node i during period t and represents the minimum voltage of node i during period t, represents the maximum voltage of node i during period t, represents the maximum value of the branch current from node i to node j, r ij represents the resistance from node i to node j, x ij represents the reactance from node i to node j, V j,t Represents the voltage of node j in time period t. The method determines the power flow model of the distribution network through the above steps, so that the output of renewable energy and the fluctuation of system load can be balanced by flexibly calling the adjustable capacity and reactive power support capacity of load-side resources.
[0043] In the specific implementation process, the voltage control scheme is mainly aimed at reactive power optimization and voltage control of the distribution network, so the power flow model of the distribution network is first constructed. Due to the presence of complex quadratic terms in the standard power flow constraint equation, the optimization problem will be non-convex and difficult to solve directly. The DistFlow model is used here as the power flow equation of the power system. As shown above, (from top to bottom) the first and second formulas are constraint equations for line transmission power. The third formula describes the voltage drop between adjacent nodes. The fourth and fifth formulas introduce the square of the node voltage and the line current as variables to simplify the formula. The sixth formula shows that the node voltage and line current need to be controlled within the specified range. The seventh formula describes the relationship between the power and current transmitted in the line and the node voltage.
[0044] In some optional implementations, the above step S201 determines the power supply model of the above distribution network, which can be implemented by the following steps: determining the power supply model of the above distribution network as in, is the active power transmitted on the feeder between the distribution network and the main grid, is the minimum value of active power transmitted on the feeder between the distribution network and the main grid, is the maximum value of active power transmitted on the feeder between the distribution network and the main grid. is the reactive power transmitted on the feeder between the distribution network and the main grid, is the minimum reactive power transmitted on the feeder between the distribution network and the main grid, is the maximum reactive power transmitted on the feeder between the distribution network and the main grid. is the predicted value of renewable energy output, is the actual output of renewable energy. is the actual value of the reactive power output of renewable energy, is the maximum reactive power output of renewable energy, is the upper limit of the apparent power of the renewable energy generator. The method determines the power model of the distribution network through the above steps, so that the power resource conditions in the power grid can be fully considered.
[0045] In the specific implementation process, in the distribution network, electric energy mainly comes from the upper main grid and the distributed power sources in the local distribution network. The power supply model of the distribution network (from top to bottom) The first and second formulas specify the upper and lower limits of the main grid transmission power, and the third, fourth and fifth formulas are the power supply models of distributed renewable energy units such as photovoltaic and wind power.
[0046] In some optional implementations, the above step S202 determines the objective function with the goal of minimizing network loss and voltage deviation, which can be achieved by the following steps: Determining the objective function with the goal of minimizing network loss and voltage deviation is Among them, F loss represents the above network loss, F vol represents the voltage deviation, γ1 represents the weight of the network loss, γ2 represents the weight of the voltage deviation, F represents the objective function value, is the square value of the node reference voltage, N represents the total number of nodes, T represents a time period, V i,t =(v i,t ) 2 , v i,t is the voltage of node i during period t, I ij,t =(i ij,t ) 2 ,i ij,t is the branch current from node i to node j during period t, r ij represents the resistance from node i to node j, and α(i) represents the set of branches whose first end is node i. The method determines the objective function through the above steps, so that the objective function can be determined to solve and obtain the most suitable control scheme.
[0047] In the specific implementation process, the objective function is determined with the goal of minimizing network loss and voltage deviation, and the constraints are as shown in the various model formulas above.
[0048] In some optional implementations, the step S203 of solving the voltage control strategy model can be implemented by the following steps: using a multiplier adaptive alternating direction method based on residual balance to solve the voltage control strategy model; using an adaptive adjustment mechanism The iteration step size is optimized and the above iteration step size is corrected to Among them, r k is the original residual, d k is the dual residual, ζ is the first correction coefficient, β is the second correction coefficient, ω k is the penalty coefficient for the kth iteration, ω k+1 is the penalty coefficient for the k+1th iteration, is the value of the variable on the coupled circuit in the first region calculated at the kth iteration, is the value of the variable on the coupled line in the second region calculated at the kth iteration, is the value calculated by the variable on the coupling line of the first region at the k-1th iteration. The method is solved by the above steps, so that a more accurate control solution can be obtained.
[0049] Specifically, before performing distributed solution on the region, it is necessary to first partition the power grid and decompose the optimization model into several sub-problems that can be solved independently. The key step is to deal with the coupling constraints between regions. Assume that the system consists of 4 nodes {a, b, c, d} and has branches {Lab, Lbc, Lcd}. Among them, nodes a and b belong to sub-region 1, and nodes b and c belong to sub-region 2. Adjacent sub-regions 1 and 2 are connected via line Lbc. By introducing virtual nodes b' and c', they replace sub-region 1 and sub-region 2 respectively. After the split, the node set of region 1 is {a, b, c'}, and the node set of region 2 is {b', c, d}. The variables on the coupling line of region 1 can be expressed as a vector At this point, the subproblem in each region can be expressed in the following form: Where X1 represents all decision variables in region 1. The equations h1(X1) = 0 and g1(X1) ≤ 0 represent the equality constraint and inequality constraint in region 1, respectively. In order to ensure that the results of the distributed solution are consistent with those of the centralized solution, the distributed calculation results require that the values of the variables on the coupled circuits are equal, that is, Variables on tie lines and This is the information exchanged during the iteration process. During the iteration process, the variable values on the tie line will converge to be equal, and eventually reach the global optimum. Based on the standard ADMM algorithm, the iterative calculation steps are as follows: Where k is the number of iterations, is the result of the (k+1)th iteration of the subproblem in subregion 1; λ is the augmented Lagrangian multiplier; ω is the penalty coefficient. In the iterative calculation process of the standard ADMM algorithm, the penalty parameter ω is generally set as a constant based on experience. By continuously updating the Lagrangian multiplier λ, the coupling variables are gradually approached during the iteration process. However, it is not difficult to find that in the augmented Lagrangian function, both λ and ω have an impact on the convergence process. ω is similar to the growth step of the penalty coefficient during the iteration process. The standard ADMM algorithm sets ω to a fixed value, which limits the convergence effect and convergence speed of the algorithm. Therefore, this paper adopts the residual balancing based adaptive alternating direction method of multipliers (RBA-ADMM) for solution. An adaptive adjustment mechanism is introduced to dynamically optimize the iteration step to speed up the convergence speed of the distributed algorithm. The above formula shows the convergence index in the ADMM algorithm, which can reflect the convergence of the iteration. k is the original residual, which indicates the deviation between the coupled variables between adjacent regions and describes the degree of convergence between regions; d kis the dual residual, which describes the closeness of the connection variables before and after the kth iteration of the sub-region and characterizes the convergence degree of the sub-region. k and d k Together they reflect the convergence of the iteration. In the final convergence result, both will be close to 0. However, in general, the convergence speeds of the two are often inconsistent, which can easily cause the iteration to deviate from the optimal gradient. It may even cause oscillation and lead to non-convergence of the iteration. Therefore, the improved RBA-ADMM algorithm is used here. In the process of iteration, the algorithm will k and d k The size of the step size ω is modified. This mechanism can promote r k and d k During the iteration, the size is close to avoid excessive gradient deviation. The step size ω correction formula is as follows: ζ>0,β>1,ω k ≤ω max , where ζ and β are related correction coefficients. ω max is the upper limit of ω. Under this correction mechanism, when r k >d k When , the step size ω will increase, which will increase λ. This will increase the penalty term weight in the augmented Lagrangian function and accelerate the convergence between regions. k <d k When , the step size ω will be reduced to prevent λ from increasing too fast, avoid oscillation, and promote local convergence. At the same time, the above formula limits the maximum value of the step size to avoid excessive correction of λ due to excessive step size. The RBA-ADMM algorithm can control the iterative step size and Lagrange multiplier within a reasonable range, improving the convergence and calculation speed of the algorithm. According to the final model after transformation, the daily operation plan of various controllable resources in the distribution network can be obtained to optimize the voltage regulation performance of the entire power system. The dispatching center of the power system sends dispatching instructions to the controllable resources in the system through AVC. These instructions contain the operation plan of the controllable resources within a day, including what power to operate at what time period, and in which time periods to increase or decrease power. Then, the coordinated control of new energy on the power generation side and flexible resources on the load side in the region is realized, the power flow distribution of the system is optimized, and the network loss and node voltage deviation of the system are reduced. In addition, we also proposed a distributed control method to partition the network and use regional controllers to share the computational burden of the central controller, while protecting the information privacy of distributed resources and improving the robustness of the system. The RBA-ADMM-based distributed algorithm can also effectively improve the convergence and solution speed of distributed computing.
[0050] In some optional embodiments, before obtaining the load parameters of the flexible resource load in the distribution network, the method further includes the following steps: establishing a primary control framework, wherein the primary control framework is composed of multiple electrical components; establishing a secondary control framework, wherein the secondary control framework generates and sends a first control instruction to the primary control framework, and receives a feedback value of the first control instruction sent by the primary control framework, wherein the first control instruction is a local control instruction for voltage; establishing a tertiary control framework, wherein the third-level control framework sends a second control instruction to the secondary control framework, so that the secondary control framework calculates the first control instruction according to the second control instruction and the feedback value of the first control instruction, and the second control instruction is a global control instruction for voltage. The method establishes a three-level framework through the above steps, so that a three-layer framework covering multiple load-side resources participating in reactive power optimization and voltage control of the power system can be established.
[0051] In the specific implementation process, a three-layer framework is established to cover various load-side resources participating in the reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this patent has built a three-layer control framework, which specifically includes: three-level voltage control: the top-level global control, which analyzes the real-time voltage data to regulate the voltage of each regional substation, so as to achieve the safety and stability of the global voltage. Secondary voltage control: It is at the middle level, receiving the control instructions from the third-level voltage control and the feedback value of the first-level control, and then calculating through the internal control strategy, and issuing instructions in real time to control the first-level voltage control system (PID-based follow-up control). First-level voltage control: the lowest-level unit control, including the excitation regulator of the generator, photovoltaic inverter, fan, capacitor and reactive compensation device, etc., can quickly respond to instructions in a short time to adjust the voltage (droop response). The main difference between this control framework and the traditional control framework is that in the traditional hierarchical control, the first-level control unit does not include the distributed energy units and the flexible resources on the load side. The second-level control is the AVC substation control system, which is mainly responsible for controlling the reactive power regulation resources in the plant. When we introduce various flexible resources, the control substation based on the plant may not be able to meet the control requirements of various resources. Therefore, the second-level control system here is equivalent to setting up a new control level above the original plant level to achieve the control of controllable resources in the region, while the third-level control is responsible for achieving coordination between various regions. This control system framework is also the basis for the subsequent distributed control.
[0052] In order to enable those skilled in the art to more clearly understand the technical solution of the present application, the implementation process of the voltage control method considering the load-side flexibility resources of the present application will be described in detail below in combination with specific embodiments.
[0053] This embodiment relates to a specific voltage control method considering load-side flexibility resources, including the following steps:
[0054] Step S1: Establish a three-layer framework covering multiple load-side resources participating in power system reactive power optimization and voltage control;
[0055] Step S2: Establish a model for load-side flexibility resources to participate in reactive power optimization and voltage control;
[0056] Step S3: establishing a distributed voltage regulation scheme taking into account load-side flexibility resources;
[0057] Step S4: a distributed solution algorithm based on an improved alternating direction method of multipliers (ADMM);
[0058] Step S5: By optimizing the final model after conversion, the daily operation plan of various controllable resources in the distribution network can be obtained, thereby optimizing the voltage regulation performance of the entire power system.
[0059] The embodiment of the present application also provides a voltage control device that takes into account the flexibility resources on the load side. It should be noted that the voltage control device that takes into account the flexibility resources on the load side in the embodiment of the present application can be used to execute the voltage control method for taking into account the flexibility resources on the load side provided in the embodiment of the present application. The device is used to implement the above-mentioned embodiments and preferred implementation modes, and those that have been explained will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0060] The following introduces a voltage control device that takes into account load-side flexibility resources provided in an embodiment of the present application.
[0061] Figure 3 is a schematic diagram of a voltage control device considering load-side flexibility resources according to an embodiment of the present application. Figure 3 As shown, the device comprises:
[0062] The first determination unit 10 is used to obtain load parameters of the flexible resource load in the distribution network, and determine a load regulation model according to the load parameters, and determine a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexible resource load;
[0063] Specifically, a three-layer framework is established to cover various load-side resources participating in reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this application builds a three-layer control framework, and the content of the framework will be described later. First, a load regulation model for the participation of load-side flexible resources in reactive power optimization and voltage control is established, which may include the following: a model in which conventional flexible loads that can provide demand response participate in voltage regulation, a model in which electric vehicle charging stations participate in voltage regulation, and a model in which electrolytic hydrogen production equipment participates in voltage regulation. After that, a distributed voltage regulation scheme considering the flexible resources on the load side is established, and the volatility and regulation capacity of renewable energy and load-side resources are comprehensively considered, and a multi-objective reactive power optimization scheme for the distribution network is proposed. By flexibly calling the adjustable capacity and reactive power support capacity of the load-side resources, the output of renewable energy and the fluctuation of the system load are balanced, including the distribution network flow model and the power supply model of the distribution network. The load parameters mainly include active power, reactive power, etc.
[0064] The second determination unit 20 is used to determine the objective function with the goal of minimizing network loss and voltage deviation, and to determine the voltage control strategy model according to the objective function and the constraints, taking the load regulation model, the power flow model and the power supply model as constraints;
[0065] Specifically, after establishing the above model, it is necessary to establish the objective function of the model. The objective function is to minimize the network loss and voltage deviation of the system. The constraints are the models established above. Therefore, the above model and constraints constitute the voltage control strategy model, which is convenient for subsequent solution to obtain the most suitable active power and reactive power under the constraints, and based on this, the voltage is adjusted and controlled.
[0066] The control unit 30 is used to solve the above-mentioned voltage control strategy model, obtain the voltage control scheme of the above-mentioned flexible resource load, and control the operation of the above-mentioned flexible resource load in the above-mentioned distribution network according to the above-mentioned voltage control scheme.
[0067] Specifically, the above models are then solved under constraints. The above construction is a mixed integer second-order cone programming problem, and the complexity of its solution gradually increases with the increase of distributed resources in the system. The massive controllable resources significantly increase the computational burden of the central controller. The high dependence on the central controller also makes the system's fault tolerance low. Distributed control can share computing requirements through regional controllers. In addition, it can also protect the information privacy of distributed resources and improve the robustness of the system. Therefore, a distributed voltage control strategy can be adopted, and the ADMM (improved alternating direction method of multipliers, ADMM) distributed solution algorithm can be used to solve the model.
[0068] Through this embodiment, the load parameters of the flexible resource load in the distribution network can be obtained, and the load regulation model can be determined according to the load parameters, and the flow model and power supply model of the distribution network can be determined, wherein the load parameters are the electrical parameters of the flexible resource load; the objective function is determined with the minimum network loss and voltage deviation as the goal, and the load regulation model, flow model and power supply model are used as constraints, and the voltage control strategy model is determined according to the objective function and the constraints; the voltage control strategy model is solved to obtain the voltage control scheme of the flexible resource load, and the operation of the flexible resource load is controlled according to the voltage control scheme. Compared with the prior art, when the power grid control system introduces flexible resources, the existing control substation cannot meet the control requirements of various resources. The present application can perform distributed control of the voltage while considering the flexible resources on the load side, obtain the daily operation plan of various controllable resources in the distribution network, and optimize the voltage regulation performance of the entire power system. Therefore, it can solve the problem of not being able to meet the control requirements of flexible resources.
[0069] In the specific implementation process, the first determination unit includes a first determination module, a second determination module and a third determination module. The first determination module is used to obtain the load parameters of the conventional flexibility resource load and determine the load adjustment model of the conventional flexibility resource load as The conventional flexible resource load is the load that provides demand response. is the active power of the original load of node i in period t, is the actual load active power of node i after participating in demand response in period t, is the load demand response active power regulation capacity, is the reactive power of the original load of node i in period t, is the reactive power of the actual load of node i after participating in demand response in period t, is the load demand response reactive power regulation capacity, is the upper limit of active power regulation capacity, is the power factor angle of the load, and T represents a time period; the second determination module is used to obtain the load parameters of the electric vehicle and determine the load regulation model of the electric vehicle as follows: in, is the original active power load of the electric vehicle charging station at node i during period t, is the active power actually consumed by the electric vehicle charging station at node i during period t, is the active power provided by the electric vehicle charging station at node i to the grid during period t, is the additional active power absorbed by the electric vehicle charging station at node i from the grid during period t, is the reactive power injected into the electric vehicle charging station during period t, is the power factor of the electric vehicle charging station, represents the maximum value of active power provided by the electric vehicle charging station at node i to the grid during period t, represents the maximum value of the additional active power absorbed by the electric vehicle charging station at node i from the power grid during the period t, where T represents a time period; the third determination module is used to obtain the load parameters of hydrogen production by electrolysis, and determine the load regulation model of the above hydrogen production by electrolysis as in, represents the amount of hydrogen produced, η is the energy conversion efficiency of hydrogen production by electrolysis, is the active power consumed by the electrolytic hydrogen production equipment, is the reactive power consumed by the above-mentioned electrolytic hydrogen production equipment, H CV is the calorific value of hydrogen, P EZ,min is the minimum operating power of the electrolytic hydrogen production equipment, P EZ,max is the maximum operating power of the electrolytic hydrogen production equipment, H D,min is the minimum hydrogen demand, is the power factor angle of the electrolytic hydrogen production equipment, H D,min Indicates the minimum value of hydrogen production. The device determines the load regulation model through the above steps, so that the flexibility parameters in the actual application process can be fully considered.
[0070] Specifically, (1) conventional flexible load refers to the load that can provide demand response, mainly including conventional loads such as residential loads and industrial and commercial loads. This type of load can only adjust reactive power by adjusting active power, thereby establishing a load regulation model for conventional flexible resource loads. The first and second formulas (from top to bottom) in the load regulation model for conventional flexible resource loads describe the response mechanism of the load. The active power and reactive power consumed by the load can be adjusted by the dispatcher. The third formula describes the limitation of the regulation capacity. The fourth formula shows that the regulation capacity of reactive power is determined by the active power. The fifth formula shows that demand response needs to ensure that the total load remains unchanged throughout the day. (2) In the traditional reactive power optimization process of the power system, electric vehicles are generally considered as loads of the power system. However, with the development of battery technology and electric vehicle charging stations, electric vehicles can now achieve bidirectional charging, that is, electric vehicles can reversely supply power to the power system during peak load periods or when there is demand in the power grid. On the other hand, with the breakthrough of converter technology, electric vehicle chargers can achieve four-quadrant operation. In other words, whether the electric vehicle is in the charging or discharging state, it can provide reactive support to the power grid. Therefore, considering the flexibility and reactive power support of electric vehicles, the load of electric vehicle charging stations is modeled, and the load regulation model of electric vehicles is obtained as shown above. (From top to bottom) The first formula shows that the charging station can adjust the charging and discharging status of electric vehicles in the station according to demand. The second formula shows that the reactive power output of the charging station is limited by the overall operating power at that time. The third and fourth formulas limit the scale of the charging and discharging status adjustment of electric vehicles in the station according to a certain proportion. The third formula requires that the active power consumed by the charging station in a day remains unchanged to meet the charging needs of electric vehicles. Electric vehicle charging stations can provide power to the grid or increase local loads in appropriate time periods according to the needs of the power system, providing certain flexibility for grid operation. At the same time, during the charging of electric vehicles, they can also provide reactive power support to the grid and participate in the voltage control of the grid. (3) Electrolytic hydrogen production equipment is an emerging flexible load with flexible regulation capabilities and renewable energy absorption potential. Unlike other flexible resources, electrolytic hydrogen production equipment is generally installed near renewable energy and responds directly to renewable energy. While increasing the renewable energy consumption rate, hydrogen production by electrolysis can also help solve the voltage crossing problem caused by photovoltaic power generation, thereby helping to release the reactive power supply potential of renewable energy. Load regulation model for hydrogen production by electrolysis (from top to bottom) The first formula describes the energy conversion process of hydrogen production by electrolysis. The first formula shows that the operating power of hydrogen production equipment by electrolysis needs to be controlled within a certain range. The third formula describes the relationship between the reactive power and active power consumed by the equipment. The third formula shows that although the power of hydrogen production by electrolysis can be flexibly adjusted, the amount of hydrogen produced needs to meet the minimum supply demand of hydrogen.
[0071] In some optional implementations, the first determining unit further includes a fourth determining module, configured to determine that the power flow model of the distribution network is Among them, P ij,t is the active power transmitted from node i to node j in period t, Q ij,t is the reactive power transmitted from node i to node j during period t, P jk,t is the active power transmitted from node j to node k in period t, Q jk,t is the reactive power transmitted from node j to node k in period t, α(j) represents the set of branches whose head end is node j, P j,t is the active power injected into node j during period t, Q j,t is the reactive power injected into node j during period t, Iij,t=(iij,t) 2 , iij,t is the branch current from node i to node j during period t, V i,t =(v i,t ) 2 , v i,t is the voltage at node i during period t and represents the minimum voltage of node i during period t, represents the maximum voltage of node i during period t, represents the maximum value of the branch current from node i to node j, r ij represents the resistance from node i to node j, x ij represents the reactance from node i to node j, V j,t Represents the voltage of node j in time period t. The device determines the power flow model of the distribution network through the above steps, so that the output of renewable energy and the fluctuation of system load can be balanced by flexibly calling the adjustable capacity and reactive power support capacity of load-side resources.
[0072] In the specific implementation process, the voltage control scheme is mainly aimed at reactive power optimization and voltage control of the distribution network, so the power flow model of the distribution network is first constructed. Due to the presence of complex quadratic terms in the standard power flow constraint equation, the optimization problem will be non-convex and difficult to solve directly. The DistFlow model is used here as the power flow equation of the power system. As shown above, (from top to bottom) the first and second formulas are the constraint equations for line transmission power. The third formula describes the voltage drop between adjacent nodes. The fourth and fifth formulas introduce the square of the node voltage and the line current as variables to simplify the formula. The sixth formula shows that the node voltage and line current need to be controlled within the specified range. The seventh formula describes the relationship between the power and current transmitted in the line and the node voltage.
[0073] In some optional implementations, the first determining unit further includes a fifth determining module, which can be implemented by the following steps: determining that the power supply model of the distribution network is in, is the active power transmitted on the feeder between the distribution network and the main grid, is the minimum value of active power transmitted on the feeder between the distribution network and the main grid, is the maximum value of active power transmitted on the feeder between the distribution network and the main grid. is the reactive power transmitted on the feeder between the distribution network and the main grid, is the minimum reactive power transmitted on the feeder between the distribution network and the main grid, is the maximum reactive power transmitted on the feeder between the distribution network and the main grid. is the predicted value of renewable energy output, is the actual output of renewable energy. is the actual value of the reactive power output of renewable energy, is the maximum reactive power output of renewable energy, It is the upper limit of the apparent power of the renewable energy generator. The device determines the power model of the distribution network through the above steps, so that the power resource conditions in the power grid can be fully considered.
[0074] In the specific implementation process, in the distribution network, electric energy mainly comes from the upper main grid and the distributed power sources in the local distribution network. The power supply model of the distribution network (from top to bottom) The first and second formulas specify the upper and lower limits of the main grid transmission power, and the third, fourth and fifth formulas are the power supply models of distributed renewable energy units such as photovoltaic and wind power.
[0075] In some optional implementations, the second determination unit includes a sixth determination module, which is used to determine the objective function as follows: Among them, F loss represents the above network loss, F vol represents the voltage deviation, γ1 represents the weight of the network loss, γ2 represents the weight of the voltage deviation, F represents the objective function value, V i ref is the square value of the node reference voltage, N represents the total number of nodes, T represents a time period, V i,t =(v i,t ) 2 , v i,t is the voltage of node i during period t, I ij,t =(i ij,t ) 2 ,i ij,t is the branch current from node i to node j during period t, ri j represents the resistance from node i to node j, and α(i) represents the set of branches whose first end is node i. The device determines the objective function through the above steps, so that the objective function can be determined to solve and obtain the most suitable control scheme.
[0076] In the specific implementation process, the objective function is determined with the goal of minimizing network loss and voltage deviation, and the constraints are as shown in the various model formulas above.
[0077] In some optional embodiments, the control unit includes a solution module and a correction module. The solution module is used to solve the voltage control strategy model by using a multiplier adaptive alternating direction method based on residual balance; the correction module is used to use an adaptive adjustment mechanism The iteration step size is optimized and the above iteration step size is corrected to Among them, r k is the original residual, d k is the dual residual, ζ is the first correction coefficient, β is the second correction coefficient, ω k is the penalty coefficient for the kth iteration, ω k+1 is the penalty coefficient for the k+1th iteration, is the value of the variable on the coupled circuit in the first region calculated at the kth iteration, is the value of the variable on the coupled line in the second region calculated at the kth iteration, is the value of the variable on the first region coupling line calculated at the k-1th iteration. The device is solved through the above steps, so that a more accurate control solution can be obtained.
[0078] Specifically, before performing distributed solution on the region, it is necessary to first partition the power grid and decompose the optimization model into several sub-problems that can be solved independently. The key step is to deal with the coupling constraints between regions. Assume that the system consists of 4 nodes {a, b, c, d} and has branches {Lab, Lbc, Lcd}. Among them, nodes a and b belong to sub-region 1, and nodes b and c belong to sub-region 2. Adjacent sub-regions 1 and 2 are connected via line Lbc. By introducing virtual nodes b' and c', they replace sub-region 1 and sub-region 2 respectively. After the split, the node set of region 1 is {a, b, c'}, and the node set of region 2 is {b', c, d}. The variables on the coupling line of region 1 can be expressed as a vector At this point, the subproblem in each region can be expressed in the following form: Where X1 represents all decision variables in region 1. The equations h1(X1) = 0 and g1(X1) ≤ 0 represent the equality constraint and inequality constraint in region 1, respectively. In order to ensure that the results of the distributed solution are consistent with those of the centralized solution, the distributed calculation results require that the values of the variables on the coupled circuits are equal, that is, Variables on tie lines and This is the information exchanged during the iteration process. During the iteration process, the variable values on the tie line will converge to be equal, and eventually reach the global optimum. Based on the standard ADMM algorithm, the iterative calculation steps are as follows: Where k is the number of iterations, is the result of the (k+1)th iteration of the subproblem in subregion 1; λ is the augmented Lagrangian multiplier; ω is the penalty coefficient. In the iterative calculation process of the standard ADMM algorithm, the penalty parameter ω is generally set as a constant based on experience. By continuously updating the Lagrangian multiplier λ, the coupling variables are gradually approached during the iteration process. However, it is not difficult to find that in the augmented Lagrangian function, both λ and ω have an impact on the convergence process. ω is similar to the growth step of the penalty coefficient during the iteration process. The standard ADMM algorithm sets ω to a fixed value, which limits the convergence effect and convergence speed of the algorithm. Therefore, this paper adopts the residual balancing based adaptive alternating direction method of multipliers (RBA-ADMM) for solution. An adaptive adjustment mechanism is introduced to dynamically optimize the iteration step to speed up the convergence speed of the distributed algorithm. The above formula shows the convergence index in the ADMM algorithm, which can reflect the convergence of the iteration. k is the original residual, which indicates the deviation between the coupled variables between adjacent regions and describes the degree of convergence between regions; d k is the dual residual, which describes the closeness of the connection variables before and after the kth iteration of the sub-region and characterizes the convergence degree of the sub-region. k and d k Together they reflect the convergence of the iteration. In the final convergence result, both will be close to 0. However, in general, the convergence speeds of the two are often inconsistent, which can easily cause the iteration to deviate from the optimal gradient. It may even cause oscillation and lead to non-convergence of the iteration. Therefore, the improved RBA-ADMM algorithm is used here. In the process of iteration, the algorithm will k and d k The size of the step size ω is modified. This mechanism can promote r k and d k During the iteration, the size is close to avoid excessive gradient deviation. The step size ω correction formula is as follows: ζ>0,β>1,ω k ≤ω max , where ζ and β are related correction coefficients. ω max is the upper limit of ω. Under this correction mechanism, when rk >d k When , the step size ω will increase, which will increase λ. This will increase the penalty term weight in the augmented Lagrangian function and accelerate the convergence between regions. k <d k When , the step size ω will be reduced to prevent λ from increasing too fast, avoid oscillation, and promote local convergence. At the same time, the above formula limits the maximum value of the step size to avoid excessive correction of λ due to excessive step size. The RBA-ADMM algorithm can control the iterative step size and Lagrange multiplier within a reasonable range, improving the convergence and calculation speed of the algorithm. According to the final model after transformation, the daily operation plan of various controllable resources in the distribution network can be obtained to optimize the voltage regulation performance of the entire power system. The dispatching center of the power system sends dispatching instructions to the controllable resources in the system through AVC. These instructions contain the operation plan of the controllable resources within a day, including what power to operate at what time period, and in which time periods to increase or decrease power. Then, the coordinated control of new energy on the power generation side and flexible resources on the load side in the region is realized, the power flow distribution of the system is optimized, and the network loss and node voltage deviation of the system are reduced. In addition, we also proposed a distributed control device to partition the network and use regional controllers to share the computational burden of the central controller, while protecting the information privacy of distributed resources and improving the robustness of the system. The RBA-ADMM-based distributed algorithm can also effectively improve the convergence and solution speed of distributed computing.
[0079] In some optional embodiments, before obtaining the load parameters of the flexible resource load in the distribution network, the device further includes a first establishing unit, a second establishing unit and a third establishing unit, wherein the first establishing unit is used to establish a primary control framework, wherein the primary control framework is composed of a plurality of electrical components; the second establishing unit is used to establish a secondary control framework, wherein the secondary control framework generates and sends a first control instruction to the primary control framework, and receives a feedback value of the first control instruction sent by the primary control framework, wherein the first control instruction is a local control instruction of the voltage; the third establishing unit is used to establish a third-level control framework, wherein the third-level control framework sends a second control instruction to the secondary control framework, so that the secondary control framework calculates according to the second control instruction and the feedback value of the first control instruction to obtain the first control instruction, wherein the second control instruction is a global control instruction of the voltage. The device establishes a three-level framework through the above steps, so that a three-layer framework covering multiple load-side resources participating in reactive power optimization and voltage control of the power system can be established.
[0080] In the specific implementation process, a three-layer framework is established to cover various load-side resources participating in the reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this patent has built a three-layer control framework, which specifically includes: three-level voltage control: the top-level global control, which analyzes the real-time voltage data to regulate the voltage of each regional substation, so as to achieve the safety and stability of the global voltage. Secondary voltage control: It is at the middle level, receiving the control instructions from the third-level voltage control and the feedback value of the first-level control, and then calculating through the internal control strategy, and issuing instructions in real time to control the first-level voltage control system (PID-based follow-up control). First-level voltage control: the lowest-level unit control, including the excitation regulator of the generator, photovoltaic inverter, fan, capacitor and reactive compensation device, etc., can quickly respond to instructions in a short time to adjust the voltage (droop response). The main difference between this control framework and the traditional control framework is that in the traditional hierarchical control, the first-level control unit does not include the distributed energy units and the flexible resources on the load side. The second-level control is the AVC substation control system, which is mainly responsible for controlling the reactive power regulation resources in the plant. When we introduce various flexible resources, the control substation based on the plant may not be able to meet the control requirements of various resources. Therefore, the second-level control system here is equivalent to setting up a new control level above the original plant level to achieve the control of controllable resources in the region, while the third-level control is responsible for achieving coordination between various regions. This control system framework is also the basis for the subsequent distributed control.
[0081] The voltage control device considering the load-side flexibility resources comprises a processor and a memory, wherein the first determination unit, the second determination unit and the control unit are stored in the memory as program units, and the processor executes the program units stored in the memory to implement corresponding functions. The modules are all located in the same processor; or, the modules are located in different processors in any combination.
[0082] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the problem that the control requirements of flexible resources cannot be met in the prior art can be solved by adjusting kernel parameters.
[0083] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0084] An embodiment of the present invention provides a computer-readable storage medium, which includes a stored program, wherein when the program is running, the device where the computer-readable storage medium is located is controlled to execute the voltage control method considering the load-side flexibility resources.
[0085] Specifically, the voltage control method considering the load-side flexibility resources includes:
[0086] Step S201, obtaining load parameters of the flexible resource load in the distribution network, and determining a load regulation model according to the load parameters, and determining a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexible resource load;
[0087] Specifically, a three-layer framework is established to cover various load-side resources participating in reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this application builds a three-layer control framework, and the content of the framework will be described later. First, a load regulation model for the participation of load-side flexible resources in reactive power optimization and voltage control is established, which may include the following: a model in which conventional flexible loads that can provide demand response participate in voltage regulation, a model in which electric vehicle charging stations participate in voltage regulation, and a model in which electrolytic hydrogen production equipment participates in voltage regulation. After that, a distributed voltage regulation scheme considering the flexible resources on the load side is established, and the volatility and regulation capacity of renewable energy and load-side resources are comprehensively considered, and a multi-objective reactive power optimization scheme for the distribution network is proposed. By flexibly calling the adjustable capacity and reactive power support capacity of the load-side resources, the output of renewable energy and the fluctuation of the system load are balanced, including the distribution network flow model and the power supply model of the distribution network. The load parameters mainly include active power, reactive power, etc.
[0088] Step S202, determining an objective function with the goal of minimizing network loss and voltage deviation, taking the load regulation model, the power flow model and the power supply model as constraints, and determining a voltage control strategy model according to the objective function and the constraints;
[0089] Specifically, after establishing the above model, it is necessary to establish the objective function of the model. The objective function is to minimize the network loss and voltage deviation of the system. The constraints are the models established above. Therefore, the above model and constraints constitute the voltage control strategy model, which is convenient for subsequent solution to obtain the most suitable active power and reactive power under the constraints, and based on this, the voltage is adjusted and controlled.
[0090] Step S203, solving the voltage control strategy model to obtain the voltage control scheme of the flexible resource load, and controlling the operation of the flexible resource load in the distribution network according to the voltage control scheme.
[0091] Specifically, the above models are then solved under constraints. The above construction is a mixed integer second-order cone programming problem, and the complexity of its solution gradually increases with the increase of distributed resources in the system. The massive controllable resources significantly increase the computational burden of the central controller. The high dependence on the central controller also makes the system's fault tolerance low. Distributed control can share computing requirements through regional controllers. In addition, it can also protect the information privacy of distributed resources and improve the robustness of the system. Therefore, a distributed voltage control strategy can be adopted, and the ADMM (improved alternating direction method of multipliers, ADMM) distributed solution algorithm can be used to solve the model.
[0092] An embodiment of the present invention provides an electronic device, including a processor, a memory, and a program stored in the memory and executable on the processor, wherein when the processor executes the program, at least the following steps are implemented:
[0093] Step S201, obtaining load parameters of the flexible resource load in the distribution network, and determining a load regulation model according to the load parameters, and determining a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexible resource load;
[0094] Specifically, a three-layer framework is established to cover various load-side resources participating in reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this application builds a three-layer control framework, and the content of the framework will be described later. First, a load regulation model for the participation of load-side flexible resources in reactive power optimization and voltage control is established, which may include the following: a model in which conventional flexible loads that can provide demand response participate in voltage regulation, a model in which electric vehicle charging stations participate in voltage regulation, and a model in which electrolytic hydrogen production equipment participates in voltage regulation. After that, a distributed voltage regulation scheme considering the flexible resources on the load side is established, and the volatility and regulation capacity of renewable energy and load-side resources are comprehensively considered, and a multi-objective reactive power optimization scheme for the distribution network is proposed. By flexibly calling the adjustable capacity and reactive power support capacity of the load-side resources, the output of renewable energy and the fluctuation of the system load are balanced, including the distribution network flow model and the power supply model of the distribution network. The load parameters mainly include active power, reactive power, etc.
[0095] Step S202, determining an objective function with the goal of minimizing network loss and voltage deviation, taking the load regulation model, the power flow model and the power supply model as constraints, and determining a voltage control strategy model according to the objective function and the constraints;
[0096] Specifically, after establishing the above model, it is necessary to establish the objective function of the model. The objective function is to minimize the network loss and voltage deviation of the system. The constraints are the models established above. Therefore, the above model and constraints constitute the voltage control strategy model, which is convenient for subsequent solution to obtain the most suitable active power and reactive power under the constraints, and based on this, the voltage is adjusted and controlled.
[0097] Step S203, solving the voltage control strategy model to obtain the voltage control scheme of the flexible resource load, and controlling the operation of the flexible resource load in the distribution network according to the voltage control scheme.
[0098] Specifically, the above models are then solved under constraints. The above construction is a mixed integer second-order cone programming problem, and the complexity of its solution gradually increases with the increase of distributed resources in the system. The massive controllable resources significantly increase the computational burden of the central controller. The high dependence on the central controller also makes the system's fault tolerance low. Distributed control can share computing requirements through regional controllers. In addition, it can also protect the information privacy of distributed resources and improve the robustness of the system. Therefore, a distributed voltage control strategy can be adopted, and the ADMM (improved alternating direction method of multipliers, ADMM) distributed solution algorithm can be used to solve the model.
[0099] The devices in this article can be servers, PCs, PADs, mobile phones, etc.
[0100] The present application also provides a computer program product, including a computer program. When the computer program is executed by a processor, the steps of the above method in each embodiment of the present application are implemented:
[0101] Step S201, obtaining load parameters of the flexible resource load in the distribution network, and determining a load regulation model according to the load parameters, and determining a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexible resource load;
[0102] Specifically, a three-layer framework is established to cover various load-side resources participating in reactive power optimization and voltage control of the power system. At present, the domestic automatic voltage control (AVC) system generally adopts a three-level voltage control mode. Based on the traditional domestic voltage control mode, this application builds a three-layer control framework, and the content of the framework will be described later. First, a load regulation model for the participation of load-side flexible resources in reactive power optimization and voltage control is established, which may include the following: a model in which conventional flexible loads that can provide demand response participate in voltage regulation, a model in which electric vehicle charging stations participate in voltage regulation, and a model in which electrolytic hydrogen production equipment participates in voltage regulation. After that, a distributed voltage regulation scheme considering the flexible resources on the load side is established, and the volatility and regulation capacity of renewable energy and load-side resources are comprehensively considered, and a multi-objective reactive power optimization scheme for the distribution network is proposed. By flexibly calling the adjustable capacity and reactive power support capacity of the load-side resources, the output of renewable energy and the fluctuation of the system load are balanced, including the distribution network flow model and the power supply model of the distribution network. The load parameters mainly include active power, reactive power, etc.
[0103] Step S202, determining an objective function with the goal of minimizing network loss and voltage deviation, taking the load regulation model, the power flow model and the power supply model as constraints, and determining a voltage control strategy model according to the objective function and the constraints;
[0104] Specifically, after establishing the above model, it is necessary to establish the objective function of the model. The objective function is to minimize the network loss and voltage deviation of the system. The constraints are the models established above. Therefore, the above model and constraints constitute the voltage control strategy model, which is convenient for subsequent solution to obtain the most suitable active power and reactive power under the constraints, and based on this, the voltage is adjusted and controlled.
[0105] Step S203, solving the voltage control strategy model to obtain the voltage control scheme of the flexible resource load, and controlling the operation of the flexible resource load in the distribution network according to the voltage control scheme.
[0106] Specifically, the above models are then solved under constraints. The above construction is a mixed integer second-order cone programming problem, and the complexity of its solution gradually increases with the increase of distributed resources in the system. The massive controllable resources significantly increase the computational burden of the central controller. The high dependence on the central controller also makes the system's fault tolerance low. Distributed control can share computing requirements through regional controllers. In addition, it can also protect the information privacy of distributed resources and improve the robustness of the system. Therefore, a distributed voltage control strategy can be adopted, and the ADMM (improved alternating direction method of multipliers, ADMM) distributed solution algorithm can be used to solve the model.
[0107] Obviously, those skilled in the art should understand that the above modules or steps of the present invention can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order than here, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present invention is not limited to any specific combination of hardware and software.
[0108] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0109] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0110] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0111] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0112] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0113] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0114] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0115] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0116] From the above description, it can be seen that the above embodiments of the present application achieve the following technical effects:
[0117] 1) In the voltage control method considering the flexible resources on the load side of the present application, the load parameters of the flexible resource load in the distribution network can be obtained, and the load regulation model can be determined according to the load parameters, and the flow model and power supply model of the distribution network can be determined, wherein the load parameters are the electrical parameters of the flexible resource load; the objective function is determined with the minimum network loss and voltage deviation as the goal, and the load regulation model, flow model and power supply model are used as constraints, and the voltage control strategy model is determined according to the objective function and the constraints; the voltage control strategy model is solved to obtain the voltage control scheme of the flexible resource load, and the operation of the flexible resource load is controlled according to the voltage control scheme. Compared with the prior art, when the power grid control system introduces flexible resources, the existing control substation cannot meet the control requirements of various resources. The present application can perform distributed control of the voltage while considering the flexible resources on the load side, obtain the daily operation plan of various controllable resources in the distribution network, and optimize the voltage regulation performance of the entire power system. Therefore, it can solve the problem of not being able to meet the control requirements of flexible resources.
[0118] 2) In the voltage control device considering the flexible resources on the load side of the present application, the load parameters of the flexible resource load in the distribution network can be obtained, and the load regulation model can be determined according to the load parameters, and the flow model and power supply model of the distribution network can be determined, wherein the load parameters are the electrical parameters of the flexible resource load; the objective function is determined with the minimum network loss and voltage deviation as the goal, and the load regulation model, flow model and power supply model are used as constraints, and the voltage control strategy model is determined according to the objective function and the constraints; the voltage control strategy model is solved to obtain the voltage control scheme of the flexible resource load, and the operation of the flexible resource load is controlled according to the voltage control scheme. Compared with the prior art, when the power grid control system introduces flexible resources, the existing control substation cannot meet the control requirements of various resources. The present application can perform distributed control of the voltage while considering the flexible resources on the load side, obtain the daily operation plan of various controllable resources in the distribution network, and optimize the voltage regulation performance of the entire power system. Therefore, it can solve the problem of not being able to meet the control requirements of flexible resources.
[0119] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A voltage control method considering load-side flexibility resources, It is characterized in that include: Obtaining load parameters of the flexible resource load in the distribution network, and determining a load regulation model according to the load parameters, and determining a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexible resource load; Determine an objective function with the goal of minimizing network loss and voltage deviation, take the load regulation model, the power flow model and the power supply model as constraints, and determine a voltage control strategy model according to the objective function and the constraints; The voltage control strategy model is solved to obtain a voltage control scheme for the flexible resource load, and the operation of the flexible resource load in the distribution network is controlled according to the voltage control scheme.
2. The voltage control method according to claim 1, It is characterized in that Obtaining load parameters of the flexible resource load in the distribution network, and determining a load regulation model according to the load parameters, including: Obtain the load parameters of the conventional flexible resource load, and determine the load regulation model of the conventional flexible resource load as follows: The conventional flexibility resource load is a load that provides demand response. is the active power of the original load of node i in period t, is the actual active power of the load after node i participates in demand response in period t, is the load demand response active power regulation capacity, is the reactive power of the original load of node i in period t, is the reactive power of the actual load of node i after participating in demand response in period t, is the load demand response reactive power regulation capacity, ΔP i DR,max is the upper limit of active power regulation capacity, is the power factor angle of the load, and T represents a time period; Obtain the load parameters of the electric vehicle and determine the load regulation model of the electric vehicle as follows: in, is the original active power load of the electric vehicle charging station at node i during period t, is the active power actually consumed by the electric vehicle charging station at node i during period t, is the active power provided by the electric vehicle charging station at node i to the grid during period t, is the additional active power absorbed by the electric vehicle charging station at node i from the grid during period t, is the reactive power injected into the electric vehicle charging station during period t, is the power factor of the electric vehicle charging station, represents the maximum value of active power provided by the electric vehicle charging station at node i to the grid during period t, represents the maximum value of the additional active power absorbed by the electric vehicle charging station at node i from the grid during time period t, where T represents a time period; Obtain the load parameters of hydrogen production by electrolysis, and determine the load regulation model of hydrogen production by electrolysis as follows: in, represents the amount of hydrogen produced, η is the energy conversion efficiency of hydrogen production by electrolysis, is the active power consumed by the electrolytic hydrogen production equipment, is the reactive power consumed by the electrolytic hydrogen production equipment, H CV is the calorific value of hydrogen, P EZ,min is the minimum operating power of the electrolytic hydrogen production equipment, P EZ,max is the maximum operating power of the electrolytic hydrogen production equipment, H D,min is the minimum hydrogen demand, is the power factor angle of the electrolytic hydrogen production equipment, H D,min Indicates the minimum amount of hydrogen produced.
3. The voltage control method according to claim 1, It is characterized in that Determining a power flow model of the distribution network includes: Determine the power flow model of the distribution network as Among them, P ij,t is the active power transmitted from node i to node j in period t, Q ij,t is the reactive power transmitted from node i to node j during period t, P jk,t is the active power transmitted from node j to node k in period t, Q jk,t is the reactive power transmitted from node j to node k in period t, α(j) represents the set of branches whose head end is node j, P j,t is the active power injected into node j during period t, Q j,t is the reactive power injected into node j during period t, I ij,t =(i ij,t ) 2 ,i ij,t is the branch current from node i to node j during period t, V i,t =(v i,t ) 2 , v i,t is the voltage at node i during period t and represents the minimum voltage of node i during period t, represents the maximum voltage of node i during period t, represents the maximum value of the branch current from node i to node j, r ij represents the resistance from node i to node j, x ij represents the reactance from node i to node j, V j,t represents the voltage of node j during period t.
4. The voltage control method according to claim 1, It is characterized in that Determining a power supply model of the distribution network includes: Determine the power supply model of the distribution network as Among them, P t G is the active power transmitted on the feeder between the distribution network and the main grid, is the minimum value of active power transmitted on the feeder between the distribution network and the main grid, is the maximum active power transmitted on the feeder between the distribution network and the main grid, Q t G is the reactive power transmitted on the feeder between the distribution network and the main grid, is the minimum reactive power transmitted on the feeder between the distribution network and the main grid, is the maximum reactive power transmitted on the feeder between the distribution network and the main grid, P i RE,PRE is the predicted value of renewable energy output, is the actual output of renewable energy. is the actual value of the reactive power output of renewable energy, is the maximum reactive power output of renewable energy, It is the upper limit of the apparent power of renewable energy generators.
5. The voltage control method according to claim 1, It is characterized in that The objective function is determined with the goal of minimizing network loss and voltage deviation, including: Taking the network loss and voltage deviation as the minimum as the goal, the objective function is determined as follows: Among them, F loss represents the network loss, F vol represents the voltage deviation, γ 1 represents the weight of the network loss, γ 2 represents the weight of the voltage deviation, F represents the objective function value, V i ref is the square value of the node reference voltage, N represents the total number of nodes, T represents a time period, V i,t =(v i,t ) 2 , v i,t is the voltage of node i during period t, I ij,t =(i ij,t ) 2 ,i ij,t is the branch current from node i to node j during period t, r ij represents the resistance from node i to node j, and α(i) represents the set of branches whose head end is node i.
6. The voltage control method according to claim 1, It is characterized in that Solving the voltage control strategy model includes: The voltage control strategy model is solved by using a multiplier adaptive alternating direction method based on residual balance; Adopting adaptive adjustment mechanism The iteration step size is optimized and corrected to Among them, r k is the original residual, d k is the dual residual, ζ is the first correction coefficient, β is the second correction coefficient, ω k is the penalty coefficient for the kth iteration, ω k+1 is the penalty coefficient for the k+1th iteration, is the value of the variable on the coupled circuit in the first region calculated at the kth iteration, is the value of the variable on the coupled line in the second region calculated at the kth iteration, is the value of the variable on the coupled line in the first region calculated at the k-1th iteration.
7. The voltage control method according to claim 1, It is characterized in that Before obtaining the load parameters of the flexible resource load in the distribution network, the method further includes: Establishing a primary control framework, wherein the primary control framework is composed of a plurality of electrical components; Establishing a secondary control framework, wherein the secondary control framework generates and sends a first control instruction to the primary control framework, and receives a first control instruction feedback value sent by the primary control framework, wherein the first control instruction is a local control instruction of voltage; A three-level control framework is established, wherein the three-level control framework sends a second control instruction to the secondary control framework, so that the secondary control framework calculates according to the second control instruction and the first control instruction feedback value to obtain the first control instruction, and the second control instruction is a global control instruction for voltage.
8. A voltage control device considering load-side flexibility resources, It is characterized in that include: A first determination unit is used to obtain load parameters of the flexibility resource load in the distribution network, and determine a load regulation model according to the load parameters, and determine a power flow model and a power supply model of the distribution network, wherein the load parameters are electrical parameters of the flexibility resource load; A second determination unit is used to determine an objective function with the goal of minimizing network loss and voltage deviation, and to determine a voltage control strategy model according to the objective function and the constraints, with the load regulation model, the power flow model and the power supply model as constraints; A control unit is used to solve the voltage control strategy model to obtain the voltage control scheme of the flexible resource load, and control the operation of the flexible resource load in the distribution network according to the voltage control scheme.
9. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the voltage control method considering load-side flexibility resources as described in any one of claims 1 to 7.
10. An electronic device, It is characterized in that include: One or more processors, a memory, and one or more programs, wherein the one or more programs are stored in the memory and are configured to be executed by the one or more processors, and the one or more programs include a method for executing the voltage control method considering load-side flexibility resources as described in any one of claims 1 to 7.
Citation Information
Cited By
Power distribution network regulation method based on multi-modal intention perception and light-weight large model
CN122890433A