Port empty container dredging operation method
By integrating WeChat mini-programs, ICTMS, TOS, and ECS systems, and combining decision tree models and smart gates, the informatization and automation of empty container operations have been achieved, solving the problem of low efficiency in empty container handling at traditional container terminals and improving the efficiency of automated operations and user experience.
Patent Information
- Application Number
- CN202410922507.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-10
- Publication Date
- 2024-11-29
AI Technical Summary
The traditional empty container handling operation mode of container terminals is not well integrated with the automated operating system, which makes it difficult to improve the efficiency of operation, and the manual communication is frequent, while the automated system is unable to receive container picking instructions.
By connecting and integrating WeChat mini-programs, the Terminal Production Management System (ICTMS), the Terminal Operating System (TOS), and the Automated Rail-Mounted Crane System (ECS), the entire process of empty container operations is processed with information technology. The decision tree model is used to optimize the selection of empty container locations, and intelligent gates are used to achieve automated management of container trucks.
It improves the efficiency of empty container sorting, standardizes automated operation processes, enhances yard operation efficiency, provides a better user experience, and supports large-scale integrated control of various types of machinery.
Smart Images

Figure CN119047941A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of port empty container transportation, and in particular to a port empty container transportation operation method. Background Art
[0002] The container terminal is the same collection and storage place before and after the container is cleared for loading and unloading, transshipment, storage and handover of full or empty containers, and plays a vital role in container transportation. When the containers are stacked at the port or terminal, they are usually stacked neatly according to the freight ship number to facilitate unified loading. When the vehicles (container trucks) transporting the containers enter and leave the yard, they need to pass through the container terminal gate. The gate is an important part of the container terminal logistics system.
[0003] With the accelerated progress of the construction of smart ports and green ports, the automation upgrade and renovation projects of traditional container terminals are in full swing. The integrated development of the innovation of empty container handling operation mode and the automation technology transformation technology of rail cranes has achieved new breakthroughs and has the conditions for port application and promotion, providing new ideas for the automation upgrade and renovation of containers.
[0004] How to organically combine the traditional operation mode and the automated operation mode is a new issue that the entire terminal will soon face. The batch pick-up of empty containers is an important part of the terminal's rapid distribution of empty containers. With the advancement of automation upgrades and renovations, the standardization of automated rail crane operations has been continuously improved. However, due to the fact that manual communication is still used in actual business processing, the automated operating system is unable to receive container pick-up instructions, resulting in poor connection between the traditional operation process and the automated operation mode, and it is difficult to improve operating efficiency. Summary of the invention
[0005] The purpose of the present invention is to provide a port empty container evacuation operation method for solving the above technical problems.
[0006] In order to achieve the above object, the present invention provides the following technical solutions:
[0007] A method for transporting empty containers at a port, the method comprising the following steps:
[0008] S1: The user uploads the reservation information through the user interface and makes an online reservation for picking up the container. The reservation information is the vehicle number of the container truck that the user will use to pick up the container;
[0009] S2: The terminal production management system ICTMS receives the reservation information and determines whether the reservation conditions are met based on the reservation information. If it is determined that the reservation conditions are not met, the instruction is filtered. If it is determined that the reservation conditions are met, the reservation information is converted into a batch delivery instruction and sent to the terminal operating system TOS;
[0010] S3: After receiving the batch pick-up instruction, the terminal operating system TOS allocates a pick-up area with empty containers to the user under the corresponding vehicle number in the port, and sends the pick-up area to the user's user interface and the automated rail crane ECS system.
[0011] S4: After receiving the container picking area, the ECS system of the automated rail crane selects an empty container to be picked up for the user under the container picking area, and obtains the empty container position of the empty container to be picked up;
[0012] S5: The user receives the container pickup area through the user interface, and drives the container truck to the area corresponding to the container pickup area according to the received container pickup area;
[0013] S6: The automated rail crane ECS system retrieves the empty container at the empty container position and loads it onto the container truck for transportation by the user.
[0014] Further, in step S4, the empty container position includes the container pick-up area as well as the column and layer height.
[0015] Furthermore, in step S1, online reservation includes filling in reservation information through the WeChat applet.
[0016] Furthermore, in step S2, the terminal production management system ICTMS receives the reservation information and determines whether the reservation conditions are met based on the reservation information, including:
[0017] The terminal production management system ICTMS extracts the vehicle number from the received reservation information and checks whether there is any registration information for the vehicle number in the port. If there is no registration information, it is determined that the reservation conditions are not met. If there is registration information, it is determined that the reservation conditions are met.
[0018] Furthermore, in step S4, after the automated rail crane ECS system receives the box picking area, it collects the storage location of the empty box, and inputs the collected storage location of the empty box into a pre-trained decision tree model for calculation, and outputs the empty box location selected by the user.
[0019] Furthermore, the training method of the decision tree model includes:
[0020] S41: collecting and preprocessing the empty box size, storage location and placement order of the empty boxes, and removing invalid data to obtain a data set containing features of the empty box size, empty box storage location and empty box placement order;
[0021] S42: Divide the data set into training set and test set;
[0022] S43: Build a decision tree model using the training set and labels, where the labels are whether the scheduling is successful;
[0023] S44: Use the test set to evaluate and tune the constructed decision tree model.
[0024] Furthermore, in step S42, the training process of the decision tree model includes:
[0025] Collect and pre-process the size, storage location and placement order of empty boxes, perform data cleaning, and process missing values and outliers. The size of empty boxes includes the following features: length, width, and height; the storage location of empty boxes includes the following features: field area, sub-field area, bay position, column, and layer; the placement order of empty boxes includes the following features: the level of picking up boxes and the column level of picking up boxes;
[0026] The preprocessed data set is divided into a training set and a test set, with the training set accounting for 70% and the test set accounting for 30%;
[0027] For the training set data, Gini impurity and information gain are used as the criteria for feature selection to select the optimal split point. For the test set data, the training set is divided into multiple smaller subsets based on cross-validation, and k-1 subsets are used as training sets in turn, and the remaining subset is used as the validation set. For each parameter combination, cross-validation training and evaluation are performed, and the performance indicators of the model on the validation set are recorded, and the parameter combination with the minimum mean square error or the maximum determination coefficient is selected.
[0028] Visualize the decision tree model interpretation, evaluate the importance of each feature in the model, and determine whether to reprocess the data and construct feature data;
[0029] After deploying the above decision tree visualization, the decision tree model does not need to be modified and monitors the historical storage location and placement order data of the empty boxes.
[0030] Furthermore, the expression of Gini impurity is:
[0031] Gini(p)=1-Σ(pi^2)
[0032] In the formula, p is the sample ratio of each feature in the node, and Σ represents the sum of all features;
[0033] The expression of information gain is:
[0034] InformationGain(D,A)=H(D)-Σ(|D_v| / |D|)*H(D_v)
[0035] In the formula, D represents the training set of the current node, A represents the feature to be split, D_v represents the subsample set divided according to the value v of feature A, and H() represents entropy.
[0036] Furthermore, the method further comprises: intelligently exiting the container truck loaded with empty containers by building an intelligent gate;
[0037] Along the direction of the container truck exiting the gate, the intelligent gate is sequentially provided with: an inverted U-shaped shooting component, a first weighing mechanism, an inverted L-shaped shooting component and an electric gate;
[0038] The inverted U-shaped shooting assembly comprises a first vertical rod, a first horizontal rod, a second vertical rod, a first camera, a second camera and two third cameras, wherein two ends of the first horizontal rod are respectively connected to the first vertical rod and the second vertical rod; the first camera is installed at the middle of the first horizontal rod, the second camera is installed at the middle of the first horizontal rod, and the two third cameras are respectively installed at the middle of the first vertical rod and the second vertical rod;
[0039] The inverted L-shaped shooting assembly comprises a third vertical rod, a second horizontal rod, a fourth camera and a fifth camera, wherein the fourth camera is mounted on the upper portion of the second horizontal rod, and the camera head of the fourth camera is opposite to the camera head of the first camera, and the fifth camera is mounted in the middle portion of the third vertical rod;
[0040] The first weighing mechanism is arranged on the ground between the inverted U-shaped shooting assembly and the inverted L-shaped shooting assembly;
[0041] The intelligent gate is also equipped with an information processing module and a storage module, and the information processing module is respectively connected with the first camera, the second camera, two third cameras, the fourth camera, the fifth camera, the first weighing mechanism, the electric gate, the yard rail crane automation ECS system and the storage module;
[0042] The storage module is used to store the weight of the container truck without empty containers collected by the second weighing mechanism in the port when the container truck enters the port, and the vehicle number corresponding to the weight collected by the camera set in the port.
[0043] Furthermore, by building a smart gate, the container truck loaded with empty containers can exit the gate intelligently, including:
[0044] The information processing module collects the box number of the empty box through the first camera, and collects the vehicle number of the container truck through the fifth camera, and determines whether the box number and the vehicle number match;
[0045] The information processing module collects the weight of the container truck loaded with empty containers through the first weighing mechanism, collects the weight of the container truck without empty containers corresponding to the container truck through the storage module, and collects the container weight information through the first camera to determine whether the weight of the container truck loaded with empty containers is equal to the sum of the weight of the container truck and the weight of the empty containers;
[0046] If it is determined that the container number and the vehicle number match, and the weight of the container truck loaded with the empty container is equal to the sum of the weight of the container truck and the weight of the empty container, the information processing module controls the electric gate to open and the container truck exits;
[0047] At the same time, the first camera captures the image of the rear side wall of the empty container, the second camera captures the image of the top of the empty container from top to bottom, the two third cameras capture the images of the two side surfaces of the empty container, and the fourth camera captures the image of the front side surface of the empty container. The information processing module uploads the image of the rear side wall, the top image, the two side surfaces, the front side surface and the box number of the empty container to the yard rail crane automation ECS system.
[0048] Beneficial effects of the present invention:
[0049] The present invention realizes the information processing of the entire process of empty container operation from picking up the container to loading the container through the association and docking of the WeChat applet, the terminal production management system ICTMS, the terminal operating system TOS, and the automated rail crane ECS system.
[0050] The terminal production management system ICTMS pushes qualified container pick-up instructions to the rail crane automation ECS system through the terminal operating system TOS. The automation system can quickly bind batches of empty containers with incoming vehicles through its own automatic container delivery module, thereby improving yard operation efficiency.
[0051] These and other objects, features and advantages of the present invention will be fully reflected in the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0052] Figure 1 The schematic diagram of the process of the port empty container transportation operation method of the present invention is shown. DETAILED DESCRIPTION
[0053] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art can think of other obvious variations. The basic principles of the present invention defined in the following description can be applied to other embodiments, variations, improvements, equivalents, and other technical solutions that do not deviate from the spirit and scope of the present invention.
[0054] It should be understood by those skilled in the art that, in the disclosure of the specification, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices. Therefore, the above terms should not be understood as limiting the present invention.
[0055] refer to Figure 1 A method for handling empty containers at a port according to a preferred embodiment of the present invention will be described in detail below, wherein the method comprises the following steps S1-S6:
[0056] S1: The user uploads the reservation information through the user interface and makes an online reservation for picking up the container. The reservation information is the vehicle number of the container truck that the user will use to pick up the container;
[0057] S2: The terminal production management system ICTMS receives the reservation information, and determines whether the reservation conditions are met based on the reservation information. If it is determined that the reservation conditions are not met, the filter instruction is that the terminal production management system ICTMS does not convert the reservation information into a batch header instruction. If it is determined that the reservation conditions are met, the reservation information is converted into a batch pick-up instruction, and the batch pick-up instruction is sent to the terminal operating system TOS. The terminal operating system TOS selects a container pick-up area for the container truck corresponding to the vehicle number in the batch pick-up instruction according to the batch pick-up instruction. The container pick-up area may include a yard, a corresponding subdivided yard under the yard, and a corresponding bay under the subdivided yard. Step S2 specifically includes: After the terminal production management system ICTMS receives the reservation information, it extracts the vehicle number in the reservation information and inquires whether the vehicle number has filing information in this port. If there is no filing information, the reservation fails, and the reservation failure information is sent to the user interface of the user corresponding to the vehicle number. If there is filing information, the reservation information is converted into a batch pick-up instruction, and the batch pick-up instruction is sent to the terminal operating system TOS.
[0058] S3: After receiving the batch pick-up instruction, the terminal operating system TOS allocates a pick-up area with empty containers to the user under the corresponding vehicle number in the port, and sends the pick-up area to the user's user interface and the automated rail crane ECS system. The pick-up area may include a field area, a corresponding subdivided field area under the field area, and a corresponding bay under the subdivided field area. It can be understood that the terminal operating system TOS selects a pick-up area with empty containers and many empty containers according to the empty container situation in the port. In this embodiment, the pick-up area is such as: A0122, where A represents field area A, 01 represents a subdivided field area, A01 represents the 01 subdivided field area of field area A, and 22 represents the bay of the 01 subdivided field area of field area A. It can be understood that the first digit represents the field area, the second and third digits represent the subdivided field areas under the field area, and the third and fourth digits represent the bays under the subdivided field areas under the field area.
[0059] S4: After the automated rail crane ECS system receives the container pickup area, it selects an empty container to be picked up for the user under the container pickup area and obtains the empty container position of the empty container to be picked up.
[0060] S5: The user receives the container pickup area through the user interface, and drives the container truck to the area corresponding to the container pickup area according to the received container pickup area. Specifically, according to the received container pickup area including the field area, sub-field area and bay, the user drives the container truck corresponding to the vehicle number filled in the reservation information to the area corresponding to the container pickup area.
[0061] S6: The automated rail crane ECS system retrieves the empty container at the empty container position and loads it onto the container truck for transportation by the user.
[0062] The present invention realizes the information processing of empty container operations from picking up containers to loading through the association and docking of WeChat applet, terminal production management system ICTMS, terminal operating system TOS, and automated rail crane ECS system. Through the information transmission of the container picking instruction, the container picking information is made more accurate, the automatic distribution of empty containers is realized, the operation process of the automated rail crane ECS system is more standardized, the empty container distribution efficiency is more efficient, and the truck drivers coming to the port for operation have a better experience, solving the problem that the traditional operation mode cannot adapt to the automation and intelligent scenes in the digital transformation and upgrading of container terminals.
[0063] In step S4, the empty container position includes the container pickup area and the column and layer height. In this embodiment, the empty container position is such as: A0122B1, where A0122 is the number of the container pickup area, B represents the column under the container pickup area, and 1 represents the layer of the column under the container pickup area. It can be understood that the sixth digit represents the column under the container pickup area, and the seventh digit represents the layer under the column under the container pickup area. In step S1, the online reservation includes filling in the reservation information through the WeChat applet. The WeChat applet is a reservation applet provided for users, and users can add it through their mobile phone WeChat. When an online reservation is needed, the user can open the WeChat applet, upload the reservation information through the user interface on the WeChat applet, and make an online reservation for container pickup. Making an online reservation for container pickup helps the port to prepare for container pickup in advance, ensure the smooth progress of the container pickup process, and save time.
[0064] In step S4, after the automated rail crane ECS system receives the box picking area, it collects the storage location of the empty box, and inputs the collected storage location of the empty box into a pre-trained decision tree model for calculation, and outputs the empty box location selected by the user.
[0065] The training methods of decision tree models include:
[0066] S41: Collect and pre-process the empty box size, storage location and placement order of the empty boxes, and remove invalid data to obtain a data set containing features of the empty box size, empty box storage location and empty box placement order.
[0067] S42: Divide the dataset into training set and test set.
[0068] The training process of the decision tree model includes:
[0069] Collect and preprocess the size, storage location and placement order of empty boxes, perform data cleaning, and process missing values and outliers. The size of the empty boxes includes the following features: length, width, and height; the storage location of the empty boxes includes the following features: field area, sub-field area, bay position, column, and layer; the placement order of the empty boxes includes the following features: the level of the box picking up and the column level of the box picking up.
[0070] The preprocessed dataset is divided into a training set and a test set, with the training set accounting for 70% and the test set accounting for 30%.
[0071] For the training set data, Gini impurity and information gain are used as the criteria for feature selection to select the optimal split point.
[0072] The expression of Gini impurity is:
[0073] Gini(p)=1-Σ(pi^2)
[0074] In the formula, p is the sample ratio of each feature in the node, and ∑ represents the sum of all features.
[0075] The expression of information gain is:
[0076] InformationGain(D,A)=H(D)-∑(|D_v| / |D|)*H(D_v)
[0077] In the formula, D represents the training set of the current node, A represents the feature to be split, D_v represents the subsample set divided according to the value v of feature A, and H() represents entropy.
[0078] For the test set data, the training set is divided into multiple smaller subsets based on cross-validation, and k-1 subsets are used as training sets in turn, and the remaining subset is used as the validation set; for each parameter combination, cross-validation training and evaluation are performed, and the performance indicators of the model on the validation set are recorded, and the parameter combination with the minimum mean square error or the maximum determination coefficient is selected.
[0079] Visualize the interpretation of the decision tree model, evaluate the importance of each feature in the model, and determine whether to reprocess the data and construct feature data.
[0080] After deploying the above decision tree visualization, the decision tree model does not need to be modified and monitors the historical storage location and placement order data of the empty boxes.
[0081] S43: Build a decision tree model using the training set and labels, where the labels are whether the scheduling is successful;
[0082] S44: Use the test set to evaluate and tune the constructed decision tree model. It can be understood that if the evaluation passes, the decision tree model is the decision tree model constructed based on the training set. If the evaluation fails, the decision tree model is the decision tree model tuned based on the test set.
[0083] After the decision tree model is trained, it is used to predict new empty container situations, thereby making optimized scheduling decisions. By building a decision tree model, the operation can be completed efficiently with minimal tipping. By deploying hyper-convergence technology and server virtualization platforms, the storage, computing and network resources in the data center are pooled, and the multi-type businesses and corresponding data distributed in different systems are effectively reorganized, managed and resource scheduled. Resources are allocated on demand, which saves costs while improving the utilization efficiency of system equipment and the availability and disaster recovery performance of the port information system. The automatic scheduling of the yard rail crane automation ECS system supports more than 30 fusion models in terms of machine types and 150 large crane equipment in terms of the number of machines. The switching time of the operating console is greatly improved, and the yard operation efficiency is greatly improved. Large-scale integrated control of multiple machine types and multiple control systems is realized, and breakthroughs have been made in quality and operational efficiency.
[0084] Exemplarily, the method further includes: building a smart gate to enable container trucks loaded with empty containers to exit the gate intelligently.
[0085] Along the direction of the container truck exiting the gate, the intelligent gate is sequentially provided with: an inverted U-shaped shooting component, a first weighing mechanism, an inverted L-shaped shooting component and an electric gate.
[0086] The inverted U-shaped shooting assembly includes a first vertical rod, a first horizontal rod, a second vertical rod, a first camera, a second camera and two third cameras. The two ends of the first horizontal rod are respectively connected to the first vertical rod and the second vertical rod; the first camera is installed in the middle of the first horizontal rod, and the second camera is installed in the middle of the first horizontal rod, and is used to shoot the top image of the empty box from top to bottom. The two third cameras are respectively installed in the middle of the first vertical rod and the second vertical rod. The two third cameras are located on the same horizontal plane and are used to shoot the side image of the empty box.
[0087] The inverted L-shaped shooting assembly includes a third vertical pole, a second horizontal pole, a fourth camera and a fifth camera. The fourth camera is installed on the upper part of the second horizontal pole, and the camera of the fourth camera is opposite to the camera of the first camera, and is used to shoot the front and side images of the empty container. The fifth camera is installed in the middle of the third vertical pole, and is used to shoot the front of the container truck to collect the vehicle number of the container truck.
[0088] The first weighing mechanism is arranged on the ground between the inverted U-shaped shooting assembly and the inverted L-shaped shooting assembly, and is used to collect the weight of the container truck loaded with empty containers.
[0089] The intelligent gate is also equipped with an information processing module and a storage module. The information processing module is respectively connected to the first camera, the second camera, two third cameras, the fourth camera, the fifth camera, the first weighing mechanism, the electric gate, the yard rail crane automation ECS system and the storage module.
[0090] The storage module is used to store the weight of the container truck without empty containers collected by the second weighing mechanism in the port when the container truck enters the port, and the vehicle number corresponding to the weight collected by the camera set in the port.
[0091] By building a smart gate, the container trucks loaded with empty containers can exit the gate intelligently, including:
[0092] The information processing module collects the box number of the empty box through the first camera, and collects the vehicle number of the container truck through the fifth camera, and determines whether the box number and the vehicle number match.
[0093] The information processing module collects the weight of the container truck loaded with empty containers through the first weighing mechanism, collects the weight of the container truck without empty containers corresponding to the container truck through the storage module, and collects the container weight information through the first camera to determine whether the weight of the container truck loaded with empty containers is equal to the sum of the weight of the container truck and the weight of the empty containers.
[0094] If it is determined that the container number and the vehicle number match, and the weight of the container truck loaded with the empty container is equal to the sum of the weight of the container truck and the weight of the empty container, the information processing module controls the electric gate to open and the container truck to exit.
[0095] At the same time, the first camera captures the image of the rear side wall of the empty container, the second camera captures the image of the top of the empty container from top to bottom, the two third cameras capture the images of the two side surfaces of the empty container, and the fourth camera captures the image of the front side surface of the empty container. The information processing module uploads the image of the rear side wall, the top image, the two side surfaces, the front side surface and the box number of the empty container to the yard rail crane automation ECS system, and the yard rail crane automation ECS system updates the number of empty containers.
[0096] It should be understood by those skilled in the art that the embodiments of the present invention described above and shown in the accompanying drawings are only examples and do not limit the present invention. The advantages of the present invention have been fully and effectively achieved. The functional and structural principles of the present invention have been demonstrated and explained in the embodiments, and the embodiments of the present invention may be deformed or modified in any way without departing from the principles.
Claims
1. A port empty container evacuation operation method, characterized in that: The method comprises the following steps: S1: The user uploads the reservation information through the user interface and makes an online reservation for picking up the container. The reservation information is the vehicle number of the container truck that the user will use to pick up the container; S2: The terminal production management system ICTMS receives the reservation information and determines whether the reservation conditions are met based on the reservation information. If it is determined that the reservation conditions are not met, the instruction is filtered. If it is determined that the reservation conditions are met, the reservation information is converted into a batch delivery instruction and sent to the terminal operating system TOS; S3: After receiving the batch pick-up instruction, the terminal operating system TOS allocates a pick-up area with empty containers to the user under the corresponding vehicle number in the port, and sends the pick-up area to the user's user interface and the automated rail crane ECS system; S4: After receiving the container picking area, the ECS system of the automated rail crane selects an empty container to be picked up for the user under the container picking area, and obtains the empty container position of the empty container to be picked up; S5: The user receives the container pickup area through the user interface, and drives the container truck to the area corresponding to the container pickup area according to the received container pickup area; S6: The automated rail crane ECS system retrieves the empty container at the empty container position and loads it onto the container truck for transportation by the user.
2. The port empty container evacuation operation method according to claim 1, characterized in that: In step S4, the empty container location includes the container pick-up area as well as the row and layer heights.
3. The port empty container evacuation operation method according to claim 1, characterized in that: In step S1, online reservation includes filling in reservation information through the WeChat applet.
4. The port empty container evacuation operation method according to claim 3, characterized in that: In step S2, the terminal production management system ICTMS receives the reservation information and determines whether the reservation conditions are met based on the reservation information, including: The terminal production management system ICTMS extracts the vehicle number from the received reservation information and checks whether there is any registration information for the vehicle number in the port. If there is no registration information, it is determined that the reservation conditions are not met. If there is registration information, it is determined that the reservation conditions are met.
5. The port empty container evacuation operation method according to claim 4, characterized in that: In step S4, after the automated rail crane ECS system receives the box picking area, it collects the storage location of the empty box, and inputs the collected storage location of the empty box into a pre-trained decision tree model for calculation, and outputs the empty box location selected by the user.
6. The port empty container evacuation operation method according to claim 5, characterized in that: The training methods of decision tree models include: S41: collecting and preprocessing the empty box size, storage location and placement order of the empty boxes, and removing invalid data to obtain a data set containing features of the empty box size, empty box storage location and empty box placement order; S42: Divide the data set into training set and test set; S43: Build a decision tree model using the training set and labels, where the labels are whether the scheduling is successful; S44: Use the test set to evaluate and tune the constructed decision tree model.
7. The port empty container evacuation operation method according to claim 6, characterized in that: In step S42, the training process of the decision tree model includes: Collect and pre-process the size, storage location and placement order of empty boxes, perform data cleaning, and process missing values and outliers. The size of empty boxes includes the following features: length, width, and height; the storage location of empty boxes includes the following features: field area, sub-field area, bay position, column, and layer; the placement order of empty boxes includes the following features: the level of picking up boxes and the column level of picking up boxes; The preprocessed data set is divided into a training set and a test set, with the training set accounting for 70% and the test set accounting for 30%; For the training set data, Gini impurity and information gain are used as the criteria for feature selection to select the optimal split point; Test set data: divide the training set into multiple smaller subsets based on cross-validation, use k-1 subsets as training sets in turn, and use the remaining subset as validation set; perform cross-validation training and evaluation for each parameter combination, record the performance indicators of the model on the validation set, and select the parameter combination with the minimum mean square error or the maximum determination coefficient; Visualize the decision tree model interpretation, evaluate the importance of each feature in the model, and determine whether to reprocess the data and construct feature data; After deploying the above decision tree visualization, the decision tree model does not need to be modified and monitors the historical storage location and placement order data of the empty boxes.
8. The port empty container evacuation operation method according to claim 7, characterized in that: The expression of Gini impurity is: Gini(p)=1-Σ(pi∧2) In the formula, p is the sample ratio of each feature in the node, and Σ represents the sum of all features; The expression of information gain is: InformationGain(D,A)=H(D)-∑(|Dv| / |D|)*H(Dv) In the formula, D represents the training set of the current node, A represents the feature to be split, Dv represents the subsample set divided according to the value v of feature A, and H() represents entropy.
9. The port empty container evacuation operation method according to claim 1, characterized in that: The method further comprises: intelligently exiting the container truck loaded with empty containers by building an intelligent gate; Along the direction of the container truck exiting the gate, the intelligent gate is sequentially provided with: an inverted U-shaped shooting component, a first weighing mechanism, an inverted L-shaped shooting component and an electric gate; The inverted U-shaped shooting assembly comprises a first vertical rod, a first horizontal rod, a second vertical rod, a first camera, a second camera and two third cameras, wherein two ends of the first horizontal rod are respectively connected to the first vertical rod and the second vertical rod; the first camera is installed at the middle of the first horizontal rod, the second camera is installed at the middle of the first horizontal rod, and the two third cameras are respectively installed at the middle of the first vertical rod and the second vertical rod; The inverted L-shaped shooting assembly comprises a third vertical rod, a second horizontal rod, a fourth camera and a fifth camera, wherein the fourth camera is mounted on the upper portion of the second horizontal rod, and the camera head of the fourth camera is opposite to the camera head of the first camera, and the fifth camera is mounted in the middle portion of the third vertical rod; The first weighing mechanism is arranged on the ground between the inverted U-shaped shooting assembly and the inverted L-shaped shooting assembly; The intelligent gate is also equipped with an information processing module and a storage module, and the information processing module is respectively connected with the first camera, the second camera, two third cameras, the fourth camera, the fifth camera, the first weighing mechanism, the electric gate, the yard rail crane automation ECS system and the storage module; The storage module is used to store the weight of the container truck without empty containers collected by the second weighing mechanism in the port when the container truck enters the port, and the vehicle number corresponding to the weight collected by the camera set in the port.
10. The port empty container evacuation operation method according to claim 9, characterized in that: By building a smart gate, the container trucks loaded with empty containers can exit the gate intelligently, including: The information processing module collects the box number of the empty box through the first camera, and collects the vehicle number of the container truck through the fifth camera, and determines whether the box number and the vehicle number match; The information processing module collects the weight of the container truck loaded with empty containers through the first weighing mechanism, collects the weight of the container truck without empty containers corresponding to the container truck through the storage module, and collects the container weight information through the first camera to determine whether the weight of the container truck loaded with empty containers is equal to the sum of the weight of the container truck and the weight of the empty containers; If it is determined that the container number and the vehicle number match, and the weight of the container truck loaded with the empty container is equal to the sum of the weight of the container truck and the weight of the empty container, the information processing module controls the electric gate to open and the container truck exits; At the same time, the first camera captures the image of the rear side wall of the empty container, the second camera captures the image of the top of the empty container from top to bottom, the two third cameras capture the images of the two side surfaces of the empty container, and the fourth camera captures the image of the front side surface of the empty container. The information processing module uploads the image of the rear side wall, the top image, the two side surfaces, the front side surface and the box number of the empty container to the yard rail crane automation ECS system.
