Building intelligent sensing big data analysis management and control system and method based on multi-dimensional data

Through the multi-dimensional data monitoring and analysis system, the problem of humidity and spraying time control during concrete steaming is solved, the pass rate and management ability of concrete steaming is improved, and the quality and strength of the building are ensured.

CN119048286APending Publication Date: 2024-11-29CHONGQING INTERNATIONAL CONSTRUCTION CORPORATION
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202411142939.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-20
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

During the concrete steaming process of buildings, there is a lack of multi-angle data monitoring, which makes it difficult to ensure that the hydration of concrete is fully carried out, and the strength and quality of concrete cannot be guaranteed, and the humidity control is inconvenient, which affects the passing rate of steaming.

Method used

Adopt a building intelligent perception big data analysis and control system based on multi-dimensional data. By monitoring the humidity and spraying time of concrete surface, adjusting the humidity environment and detection frequency, generating corresponding signals and impact values, and calculating detection frequency adjustment values ​​to improve the passing rate of steaming and raising .

Benefits of technology

By monitoring and adjusting the humidity and spraying time in real time, we can reduce the quality decline caused by abnormal humidity and spraying time, improve the pass rate and control effect of concrete steaming, and provide accurate analysis for building construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119048286A_ABST
    Figure CN119048286A_ABST
Patent Text Reader

Abstract

The invention relates to the field of buildings, in particular to a building intelligent sensing big data analysis management and control system and method based on multi-dimensional data, and the method comprises the steps: in a concrete steam curing process, obtaining the surface data of concrete, judging the steam curing state of the concrete, and generating a steam curing state signal; on the basis of the steam curing process state abnormal signal, abnormal detection time period data is obtained, a humidity influence value is obtained through calculation, and a concrete surface humidity signal is generated; based on the humidity abnormal signal, obtaining spraying data, calculating to obtain a spraying duration influence value, judging the humidity state of the spraying duration on the concrete surface, and generating a spraying duration signal; based on the spraying duration abnormal signal, concrete data and spraying duration data are obtained, and a detection frequency adjustment value is obtained through calculation; by adjusting the detection frequency of the concrete humidity, the abnormal phenomenon of the concrete in the steam curing process is reduced, the qualified rate of concrete steam curing is improved, the management and control capability of construction in the construction process is improved, and effective and accurate analysis is provided for construction of buildings.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of building technology, and in particular to a building intelligent perception big data analysis management and control system and method based on multi-dimensional data. Background Art

[0002] The construction process of a building is roughly divided into the reinforcement stage, concrete filling stage and maintenance stage. If the quality of any one of these stages is difficult to ensure, it will affect the construction quality of the entire building.

[0003] Concrete steaming process is a technology that improves the performance of concrete by heating concrete to a certain temperature and maintaining it for a certain period of time, and then cooling it. Concrete steaming process is mainly divided into high-temperature steaming and room-temperature steaming. It aims to accelerate the cement hydration reaction by controlling the temperature and humidity of concrete, thereby improving the strength, density and durability of concrete.

[0004] During the concrete curing process, there are certain requirements for the humidity of the concrete. Too high or too low humidity will lead to reduced quality of the concrete, or even cause the concrete to fail the curing process. Therefore, controlling the humidity of the concrete is one of the most important tasks.

[0005] During the concrete steaming process of a building and the concrete pouring process, there are few monitoring surfaces for the concrete, and the building concrete cannot be analyzed based on multi-angle data. It is difficult to ensure the correctness and scientificity of the building maintenance cycle analysis, and thus it is difficult to ensure that the hydration of the concrete is fully carried out and the strength of the concrete cannot be guaranteed. It is not convenient for the analysis and control of the building maintenance process. Summary of the invention

[0006] The purpose of the present invention is to provide a building intelligent perception big data analysis and control system and method based on multidimensional data, which monitors the surface humidity of concrete, judges the curing process state, adjusts the surface humidity value of concrete in time, improves the humidity environment during the curing process of concrete, and then monitors the spraying time to judge the influence of the spraying time on the humidity, thereby improving the curing qualified rate of concrete; based on the humidity abnormality degree value and the spraying time difference degree value, calculates the detection frequency adjustment time, and improves the concrete curing qualified rate by adjusting the detection frequency of concrete.

[0007] The purpose of the present invention can be achieved through the following technical solutions:

[0008] The building intelligent perception big data analysis and control method based on multi-dimensional data includes the following steps:

[0009] Step 1: Acquire surface data of concrete, determine the curing state of concrete, and generate a curing state signal; wherein the surface data includes the surface humidity value of concrete;

[0010] Step 2: Based on the abnormal signal of the steaming process state, obtain the abnormal detection period data and calculate the humidity impact value; wherein the abnormal detection period data includes the number of abnormal detection periods;

[0011] Step 3: Generate a concrete surface humidity signal according to the humidity impact value; wherein the concrete surface humidity signal includes a concrete surface humidity normal signal and a concrete surface humidity abnormal signal;

[0012] Step 4: Based on the humidity abnormality signal, obtain the spray data and calculate the spray duration impact value; wherein the spray data includes the spray duration;

[0013] Step 5: judging the humidity state of the concrete surface according to the spraying duration impact value, and generating a spraying duration signal; wherein the spraying duration signal includes an abnormal spraying duration signal and a normal spraying duration signal;

[0014] Step 6: Based on the spraying duration abnormal signal, obtain the concrete data and the spraying duration data, and calculate the detection frequency adjustment value; wherein the concrete data includes the moisture abnormality degree value, and the spraying duration data includes the spraying duration difference degree value.

[0015] As a further solution of the present invention: in step 1, a detection cycle is set, the detection cycle is divided into n detection time periods, and the surface humidity value of the concrete in the detection time period is obtained and marked as the humidity value H;

[0016] Preset a threshold interval [HY1, HY2] of surface humidity of concrete in the concrete steam curing process, and compare the humidity value H with the threshold interval [HY1, HY2] of surface humidity of concrete in the concrete steam curing process;

[0017] If H is less than HY1 or H is greater than HY2, it means that the surface humidity value of the concrete is not within the standard humidity requirement range of the concrete steam curing process, and a concrete steam curing state abnormal signal is generated;

[0018] If H is greater than or equal to HY1 and H is less than or equal to HY2, it means that the surface humidity value of the concrete is within the standard humidity requirement range of the concrete steam curing process, and a normal concrete steam curing state signal is generated.

[0019] As a further solution of the present invention: in step 2, the detection period in which the abnormal signal of the steaming process state is generated is marked as an abnormal period, and the number D of the abnormal periods is obtained;

[0020] By formula The duration ratio B of humidity anomaly is calculated; T represents the duration of the detection period;

[0021] Furthermore, the humidity value of the concrete during the abnormal period is calculated by subtracting the humidity value from the average humidity value in the humidity threshold interval to obtain a humidity difference value HX;

[0022] The humidity difference value HX is calculated by ratio with the humidity threshold value to obtain the humidity abnormality value HJ; wherein the humidity threshold value represents the average value of the standard humidity range;

[0023] By formula The humidity influence value HY is calculated, where a and b are correction coefficients.

[0024] As a further solution of the present invention: in step three, a humidity influence value HY is obtained, and the humidity influence value HY is compared with a humidity influence threshold value; if the humidity influence value HY is greater than or equal to the humidity influence threshold value, a concrete surface humidity abnormality signal is generated;

[0025] If the humidity impact value HY is less than the humidity impact threshold, a concrete surface humidity normal signal is generated.

[0026] As a further solution of the present invention: in step 4, the spraying duration of the detection period is obtained, and the spraying duration is compared with the preset spraying duration;

[0027] If the spraying time is longer or shorter than the preset spraying time, the detection period is marked as an abnormal period;

[0028] If the spraying time is equal to the preset spraying time, the detection period is marked as a normal detection period;

[0029] Obtain the number of occurrences of the abnormal period, calculate the ratio of the number of occurrences of the abnormal period to the number of all detection periods, and obtain the frequency of occurrence of the abnormal period;

[0030] Further, the difference between the spraying time in the detection period and the preset spraying time is calculated to obtain a spraying time difference value, and the spraying time difference value is compared with a spraying time difference threshold;

[0031] If the spraying duration difference value is greater than the spraying duration difference threshold, it is marked as spraying lag duration;

[0032] If the spraying duration difference value is less than the spraying duration difference threshold, it is marked as the spraying ahead of time;

[0033] The average value of the spray delay time within the detection period is calculated to obtain the average spray delay time, and the ratio of the average spray delay time to the preset spray time is calculated to obtain the average spray delay time degree value;

[0034] The average of the spray advance time within the detection period is calculated to obtain the average spray advance time, and the ratio of the average spray advance time to the preset spray time is calculated to obtain the average spray advance time degree value;

[0035] The spraying time over-lag degree value is calculated by the formula CZ=ZH*α+CQ*β; wherein, ZH represents the average spraying lag degree value, and CQ represents the average spraying advance degree value; α and β are both proportional coefficients, and α+β=1.

[0036] As a further solution of the present invention: in step 4, the occurrence frequency of the abnormal period and the over-hysteresis value of the spraying duration are weighted and summed to obtain the spraying duration impact value;

[0037] Exemplarily, the spray duration impact value is calculated by the formula PL=TC*γ+CB*θ; wherein TC represents the frequency of occurrence of abnormal time periods, CB represents the spray duration overhysteresis value, and γ and θ are both proportional coefficients.

[0038] As a further solution of the present invention: in step 5, the spraying duration influence value PL is obtained, and the spraying duration influence value PL is compared with the spraying duration influence threshold; if the spraying duration influence value PL is greater than or equal to the spraying duration influence threshold, a spraying duration abnormal signal is generated;

[0039] If the spraying duration impact value PL is less than the spraying duration impact threshold, a normal spraying duration signal is generated.

[0040] As a further solution of the present invention: in step six, the humidity abnormality value and the spraying time over-hysteresis value are obtained;

[0041] The detection frequency adjustment value ZY1 affected by the abnormal humidity is calculated by the formula ZY1 = (1-HJ) * YT; wherein YT represents the preset concrete surface humidity detection frequency;

[0042] The detection frequency adjustment value ZY2 affected by the spraying duration difference is calculated through the formula ZY2=CZ*YT; wherein YT represents the preset concrete surface humidity detection frequency.

[0043] As a further solution of the present invention: in step 6, the detection frequency adjustment value ZY1 affected by the humidity abnormality and the detection frequency adjustment value ZY2 affected by the spraying duration difference are weightedly summed to calculate the detection frequency adjustment value ZT;

[0044] Exemplarily, the detection frequency adjustment value ZT is calculated by the formula ZT=ZY1*α+ZY2*β; wherein α and β are both proportional coefficients.

[0045] Building intelligent perception big data analysis and control system based on multi-dimensional data. The inspection and control system includes:

[0046] Acquisition module: obtains the surface data of concrete, determines the curing state of concrete, and generates a curing state signal; wherein the surface data includes the surface humidity value of concrete;

[0047] Humidity impact value calculation module: based on the abnormal signal of the steaming process state, obtain the abnormal detection period data and calculate the humidity impact value; wherein the abnormal detection period data includes the number of abnormal detection periods;

[0048] Concrete surface humidity judgment module: generates a concrete surface humidity signal according to the humidity influence value; wherein the concrete surface humidity signal includes a concrete surface humidity normal signal and a concrete surface humidity abnormal signal;

[0049] Spraying duration impact value calculation module: based on the humidity abnormality signal, obtains the spraying data and calculates the spraying duration impact value; wherein the spraying data includes the spraying duration;

[0050] Spraying duration judgment module: judges the humidity state of the concrete surface according to the spraying duration impact value and generates a spraying duration signal;

[0051] Detection frequency calculation module: Based on the spraying duration abnormal signal, obtain the concrete data and the spraying duration data, and calculate the detection frequency adjustment value; wherein the concrete data includes the humidity abnormality value, and the spraying duration data includes the spraying duration overhysteresis value.

[0052] Beneficial effects of the present invention:

[0053] The present invention monitors the humidity during the construction process, determines whether the concrete is abnormal during the steam curing process according to the change of humidity, promptly handles the abnormal situation during the steam curing process, reduces the phenomenon of concrete quality degradation caused by abnormal humidity during the steam curing process, improves the humidity environment of concrete during the steam curing process, and improves the control effect during the construction process; monitors the spraying time, determines whether the spraying time of concrete is abnormal during the steam curing process according to the change of the spraying time, promptly regulates the abnormal spraying time, and reduces the phenomenon of abnormal humidity on the surface of concrete due to abnormal spraying time during the steam curing process;

[0054] The present invention timely adjusts the detection frequency of the humidity on the concrete surface according to the abnormal degree of humidity and the abnormal degree of spraying time, so as to obtain the fluctuation of humidity value more clearly, adjust the humidity abnormality more quickly, and improve the qualified rate of concrete steaming; through real-time monitoring and analysis of various data in the construction process, the abnormalities occurring in the construction process are timely and effectively adjusted, the control ability of the construction in the construction process is improved, and effective and accurate analysis is provided for the construction of the building. BRIEF DESCRIPTION OF THE DRAWINGS

[0055] The present invention will be further described below in conjunction with the accompanying drawings.

[0056] Figure 1 is a flowchart of Embodiment 1 of the present invention;

[0057] Figure 2 is a flowchart of Embodiment 2 of the present invention;

[0058] Figure 3 is a flowchart of Embodiment 3 of the present invention;

[0059] Figure 4 It is a flowchart of embodiment 4 of the present invention. DETAILED DESCRIPTION

[0060] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0061] Example 1

[0062] See also Figure 1 As shown, the present invention is a building intelligent perception big data analysis and control method based on multidimensional data, comprising the following steps:

[0063] Step 1: Obtaining surface data of concrete, determining the curing state of concrete, and generating a curing state signal;

[0064] Among them, the surface data includes the concrete surface humidity value;

[0065] In some embodiments, a detection cycle is set, the detection cycle is divided into n detection periods, and the surface humidity value of the concrete in the detection period is obtained and marked as humidity value H;

[0066] How to obtain humidity value: During the concrete curing process, several humidity sensors are evenly distributed on the concrete to measure the surface humidity of the concrete. The results measured by all humidity sensors are averaged to obtain the average value, which is marked as the humidity value.

[0067] Preset a threshold interval [HY1, HY2] of surface humidity of concrete in the concrete steam curing process, and compare the humidity value H with the threshold interval [HY1, HY2] of surface humidity of concrete in the concrete steam curing process;

[0068] It should be noted that HY1 represents the lowest value of the standard concrete surface humidity range in the concrete steam curing process, and HY2 represents the highest value of the standard concrete surface humidity range in the concrete steam curing process;

[0069] If H is less than HY1 or H is greater than HY2, it means that the surface humidity value of the concrete is not within the standard humidity requirement range of the concrete steam curing process, and a concrete steam curing state abnormal signal is generated;

[0070] If H is greater than or equal to HY1 and H is less than or equal to HY2, it means that the surface humidity value of the concrete is within the standard humidity requirement range of the concrete steam curing process, and a normal concrete steam curing state signal is generated;

[0071] It should be noted that the concrete surface humidity threshold interval in the concrete steam curing process is the standard humidity range in the concrete steam curing process. This step is only to determine whether the surface humidity of the concrete is within the standard humidity range required by the steam curing process.

[0072] Step 2: Based on the abnormal signal of the steaming process state, obtain the data of the abnormal detection period and calculate the humidity impact value;

[0073] The anomaly detection period data includes the number of anomaly detection periods;

[0074] In some embodiments, the detection period in which the steaming process state abnormal signal is generated is marked as an abnormal period, and the number D of the abnormal periods is obtained;

[0075] By formula The duration ratio B of humidity anomaly is calculated; where T represents the duration of the detection period;

[0076] Furthermore, the humidity value of the concrete during the abnormal period is calculated by subtracting the endpoint value of the closest surface humidity threshold interval to obtain a humidity difference value HX;

[0077] The humidity difference value HX is calculated by ratio with the midpoint value of the surface humidity threshold interval to obtain the humidity anomaly degree value HJ;

[0078] By formula The humidity influence value HY is calculated; where a and b are correction coefficients;

[0079] Step 3: Generate concrete surface humidity signal according to humidity impact value;

[0080] The concrete surface humidity signal includes a normal concrete surface humidity signal and an abnormal concrete surface humidity signal;

[0081] In some embodiments, a humidity impact value HY is obtained, and the humidity impact value HY is compared with a humidity impact threshold value;

[0082] If the humidity impact value HY is greater than or equal to the humidity impact threshold, a concrete surface humidity abnormality signal is generated;

[0083] If the humidity impact value HY is less than the humidity impact threshold, a normal concrete surface humidity signal is generated;

[0084] It should be noted that: when an abnormal concrete surface humidity signal is received, it means that during the concrete steaming process, the concrete surface humidity does not meet the humidity requirements of the concrete steaming process, and it is necessary to analyze the impact of the concrete surface humidity to keep the concrete surface humidity within the concrete steaming requirement range; when a normal concrete surface humidity signal is received, it means that during the concrete steaming process, the concrete surface humidity meets the humidity requirements of the concrete steaming process, and it is not necessary to analyze the impact of the concrete surface humidity.

[0085] The technical solution of the present invention is as follows: the present invention obtains surface data of concrete, determines the curing process state, and generates a curing process state signal; based on the curing process state signal, calculates a humidity influence value; and generates a concrete surface humidity signal according to the humidity influence value; the present invention monitors the humidity and determines whether an abnormality occurs in the curing process of concrete according to the change of humidity, and promptly handles the abnormality occurring in the curing process of concrete, thereby reducing the phenomenon of concrete quality degradation caused by abnormal humidity in the curing process, and improving the humidity environment of concrete in the curing process.

[0086] Example 2

[0087] See also Figure 2 As shown, the present invention is a building intelligent perception big data analysis and control method based on multidimensional data, which also includes the following steps:

[0088] Step 4: Based on the humidity abnormality signal, obtain the spraying data and calculate the impact value of the spraying time;

[0089] Among them, the spraying data includes the spraying duration;

[0090] In some embodiments, the spraying duration of the detection period is obtained, and the spraying duration is compared with a preset spraying duration; wherein the preset spraying duration represents the spraying duration within the preset detection period;

[0091] If the spraying time is longer or shorter than the preset spraying time, the detection period is marked as an abnormal detection period;

[0092] If the spraying time is equal to the preset spraying time, the detection period is marked as a normal detection period;

[0093] Obtain the number of occurrences of the anomaly detection period, calculate the ratio of the number of occurrences of the anomaly detection period to the number of all detection periods, and obtain the frequency of occurrence of the anomaly detection period;

[0094] Further, the difference between the spraying time in the detection period and the preset spraying time is calculated to obtain a spraying time difference value, and the spraying time difference value is compared with a spraying time difference threshold; the spraying time difference threshold is 0;

[0095] If the spraying duration difference value is greater than the spraying duration difference threshold, it is marked as spraying lag duration;

[0096] If the spraying duration difference value is less than the spraying duration difference threshold, it is marked as the spraying ahead of time;

[0097] The average value of the spray delay time within the detection period is calculated to obtain the average spray delay time, and the ratio of the average spray delay time to the preset spray time is calculated to obtain the average spray delay time degree value;

[0098] The average of the spray advance time within the detection period is calculated to obtain the average spray advance time, and the ratio of the average spray advance time to the preset spray time is calculated to obtain the average spray advance time degree value;

[0099] The spraying time over-hysteresis value CZ is calculated by the formula CZ=ZH*α+CQ*β; wherein ZH represents the average spraying lag time value, and CQ represents the average spraying advance time value; α and β are both proportional coefficients, and α+β=1;

[0100] It should be noted that: the spray advance time means that the spray time is too short, the spray volume is reduced compared with the preset, and the moisture on the concrete surface is also reduced; the spray lag time means that the spray time is too long, the spray volume is increased compared with the preset, and the moisture on the concrete surface is also increased; although both the spray advance time and the spray lag time will affect the surface humidity of the concrete, the degree of their influence on the surface humidity of the concrete will be different;

[0101] The frequency of occurrence of abnormal time periods and the over-hysteresis value of the spraying duration are weighted and summed to obtain the spraying duration impact value;

[0102] Exemplarily, the spraying duration impact value PL is calculated by the formula PL=TC*γ+CB*θ; wherein TC represents the frequency of occurrence of abnormal time periods, CB represents the spraying duration overhysteresis value, and γ and θ are both proportional coefficients;

[0103] Step 5: According to the spraying duration impact value, determine the humidity state of the concrete surface and generate a spraying duration signal;

[0104] The spraying duration signal includes an abnormal spraying duration signal and a normal spraying duration signal;

[0105] In some embodiments, the spraying duration impact value PL is obtained, and the spraying duration impact value PL is compared with the spraying duration impact threshold;

[0106] If the spraying duration impact value PL is greater than or equal to the spraying duration impact threshold, a spraying duration abnormal signal is generated;

[0107] If the spraying duration impact value PL is less than the spraying duration impact threshold, a normal spraying duration signal is generated;

[0108] It should be noted that: when an abnormal spraying time signal is received, it means that during the steam curing process, the spraying time has abnormal fluctuations compared with the standard, which has a greater impact on the humidity of the concrete surface, and will cause abnormalities in the current spraying treatment of the concrete, which does not meet the requirements of the steam curing process, and the humidity of the concrete surface does not meet the requirements of the steam curing process; when a normal spraying time signal is received, it means that during the steam curing process, the spraying time does not have abnormal fluctuations compared with the standard, which has a small impact on the humidity of the concrete surface, and will not cause abnormalities in the current spraying treatment of the concrete, which meets the requirements of the steam curing process, and the concrete steam curing environment can be tested;

[0109] The technical solution of the present invention is as follows: based on the humidity abnormality signal, the present invention obtains the spraying data and calculates the spraying time influence value; according to the spraying time influence value, the humidity state of the concrete surface is judged and the spraying time signal is generated; the present invention judges whether the spraying time is abnormal during the steaming process of the concrete by monitoring the spraying time, and timely regulates the abnormal spraying time, thereby reducing the phenomenon that the humidity of the concrete surface is abnormal due to the abnormal spraying time during the steaming process of the concrete.

[0110] Example 3

[0111] See also Figure 3 As shown, the present invention is a building intelligent perception big data analysis and control method based on multidimensional data, which also includes the following steps:

[0112] Step 6: Based on the abnormal signal of spraying duration, obtain the concrete data and spraying duration data, and calculate the detection frequency adjustment value;

[0113] Among them, the concrete data includes the moisture abnormality value, and the spraying time data includes the spraying time over-hysteresis value;

[0114] In some embodiments, the humidity abnormality level value HJ and the spray duration over-hysteresis level value CZ are obtained;

[0115] The detection frequency adjustment value ZY1 affected by the abnormal humidity is calculated by the formula ZY1 = (1-HJ) * YT; wherein YT represents the preset concrete surface humidity detection frequency;

[0116] The detection frequency adjustment value ZY2 affected by the spraying duration difference is calculated by the formula ZY2=CZ*YT; wherein YT represents the preset concrete surface humidity detection frequency;

[0117] The detection frequency adjustment value ZY1 affected by the humidity abnormality and the detection frequency adjustment value ZY2 affected by the spraying duration difference are weightedly summed to calculate the detection frequency adjustment value ZT;

[0118] Exemplarily, the detection frequency adjustment value ZT is calculated by the formula ZT=ZY1*α+ZY2*β; wherein α and β are both proportional coefficients, and α+β=1;

[0119] When the detection frequency adjustment value ZT is reached, the detection frequency adjustment value ZT is sent to the detection control end to adjust the detection frequency of humidity detection. By adjusting the detection frequency of the humidity on the concrete surface, the quality of the concrete steaming process is optimized and the qualified rate of concrete steaming is improved.

[0120] It should be noted that different detection frequencies of concrete surface humidity will lead to different fluctuations in the humidity values ​​detected, thus causing different spraying times. By adjusting the detection frequency of concrete surface humidity, the fluctuation of humidity values ​​can be obtained more clearly, and humidity anomalies can be adjusted more quickly, thereby improving the qualified rate of concrete steam curing.

[0121] The technical solution of the present invention is as follows: the present invention obtains a humidity abnormality value, calculates a detection frequency adjustment value affected by the humidity abnormality, then obtains a spraying duration difference value, calculates a detection frequency adjustment value affected by the spraying duration difference value, and performs weighted summation on the two to calculate the detection frequency adjustment value; the present invention timely adjusts the detection frequency of the surface humidity of the concrete according to the humidity abnormality and the spraying duration abnormality, can more clearly obtain the fluctuation of the humidity value, more quickly adjust the humidity abnormality, and improve the qualified rate of concrete steam curing.

[0122] Through real-time monitoring and analysis of various data during the construction process, abnormalities that occur during the construction process can be adjusted in a timely and effective manner, the ability to control the construction during the construction process can be improved, and effective and accurate analysis can be provided for the construction of the building.

[0123] Example 4

[0124] See also Figure 4 As shown, the present invention is a building intelligent perception big data analysis and control system based on multi-dimensional data, comprising:

[0125] Acquisition module: obtains the surface data of concrete, determines the curing state of concrete, and generates a curing state signal; wherein the surface data includes the surface humidity value of concrete;

[0126] Humidity impact value calculation module: based on the abnormal signal of the steaming process state, obtain the abnormal detection period data and calculate the humidity impact value; wherein the abnormal detection period data includes the number of abnormal detection periods;

[0127] Concrete surface humidity judgment module: generates a concrete surface humidity signal according to the humidity influence value; wherein the concrete surface humidity signal includes a concrete surface humidity normal signal and a concrete surface humidity abnormal signal;

[0128] Spraying duration impact value calculation module: based on the humidity abnormality signal, obtains the spraying data and calculates the spraying duration impact value; wherein the spraying data includes the spraying duration;

[0129] Spraying duration judgment module: judges the humidity state of the concrete surface according to the spraying duration impact value and generates a spraying duration signal;

[0130] Detection frequency calculation module: based on the spraying duration abnormal signal, obtains concrete data and spraying duration data, and calculates the detection frequency adjustment value; wherein, the concrete data includes the humidity abnormality degree value, and the spraying duration data includes the spraying duration overhysteresis degree value.

[0131] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. A building intelligent perception big data analysis and control method based on multidimensional data, characterized in that: The following steps are involved: Step 1: Acquire surface data of concrete, determine the curing state of concrete, and generate a curing state signal; wherein the surface data includes the surface humidity value of concrete; Step 2: Based on the abnormal signal of the steaming process state, obtain the abnormal detection period data and calculate the humidity impact value; wherein the abnormal detection period data includes the number of abnormal detection periods; Step 3: Generate a concrete surface humidity signal according to the humidity impact value; wherein the concrete surface humidity signal includes a concrete surface humidity normal signal and a concrete surface humidity abnormal signal; Step 4: Based on the humidity abnormality signal, obtain the spray data and calculate the spray duration impact value; wherein the spray data includes the spray duration; Step 5: judging the humidity state of the concrete surface according to the spraying duration impact value, and generating a spraying duration signal; wherein the spraying duration signal includes an abnormal spraying duration signal and a normal spraying duration signal; Step six: Based on the spraying duration abnormal signal, obtain the concrete data and the spraying duration data, and calculate the detection frequency adjustment value; wherein the concrete data includes the moisture abnormality value, and the spraying duration data includes the spraying duration overhysteresis value.

2. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 1 is characterized in that: In step 1, a detection cycle is set, the detection cycle is divided into n detection periods, and the surface humidity value of the concrete in the detection period is obtained and marked as humidity value H; Preset a threshold interval [HY1, HY2] of surface humidity of concrete in the concrete steam curing process, and compare the humidity value H with the threshold interval [HY1, HY2] of surface humidity of concrete in the concrete steam curing process; If H is less than HY1 or H is greater than HY2, it means that the surface humidity value of the concrete is not within the standard humidity requirement range of the concrete steam curing process, and a concrete steam curing state abnormal signal is generated; If H is greater than or equal to HY1 and H is less than or equal to HY2, it means that the surface humidity value of the concrete is within the standard humidity requirement range of the concrete steam curing process, and a normal concrete steam curing state signal is generated.

3. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 2 is characterized in that: In step 2, the detection period in which the steaming process state abnormal signal is generated is marked as an abnormal period, and the number D of abnormal periods is obtained; By formula The duration ratio B of humidity anomaly is calculated; T represents the duration of the detection period; Furthermore, the humidity value of the concrete during the abnormal period is calculated by subtracting the humidity value from the average humidity value in the humidity threshold interval to obtain a humidity difference value HX; The humidity difference value HX is calculated by ratio with the humidity threshold value to obtain the humidity abnormality value HJ; wherein the humidity threshold value represents the average value of the standard humidity range; By formula The humidity influence value HY is calculated, where a and b are correction coefficients.

4. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 3 is characterized in that: In step three, a humidity influence value HY is obtained, and the humidity influence value HY is compared with a humidity influence threshold value; if the humidity influence value HY is greater than or equal to the humidity influence threshold value, a concrete surface humidity abnormality signal is generated; If the humidity impact value HY is less than the humidity impact threshold, a concrete surface humidity normal signal is generated.

5. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 1 is characterized in that: In step 4, the spraying duration of the detection period is obtained, and the spraying duration is compared with the preset spraying duration; If the spraying time is longer or shorter than the preset spraying time, the detection period is marked as an abnormal period; If the spraying time is equal to the preset spraying time, the detection period is marked as a normal detection period; Obtain the number of occurrences of the abnormal period, calculate the ratio of the number of occurrences of the abnormal period to the number of all detection periods, and obtain the frequency of occurrence of the abnormal period; Further, the difference between the spraying time in the detection period and the preset spraying time is calculated to obtain a spraying time difference value, and the spraying time difference value is compared with a spraying time difference threshold; If the spraying duration difference value is greater than the spraying duration difference threshold, it is marked as spraying lag duration; If the spraying duration difference value is less than the spraying duration difference threshold, it is marked as the spraying ahead of time; The average value of the spray delay time within the detection period is calculated to obtain the average spray delay time, and the ratio of the average spray delay time to the preset spray time is calculated to obtain the average spray delay time degree value; The average of the spray advance time within the detection period is calculated to obtain the average spray advance time, and the ratio of the average spray advance time to the preset spray time is calculated to obtain the average spray advance time degree value; The spraying time over-lag degree value is calculated by the formula CZ=ZH*α+CQ*β; wherein, ZH represents the average spraying lag degree value, and CQ represents the average spraying advance degree value; α and β are both proportional coefficients, and α+β=1.

6. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 1 is characterized in that: In step 4, the occurrence frequency of the abnormal period and the over-hysteresis value of the spraying duration are weighted and summed to obtain the spraying duration impact value; Exemplarily, the spraying duration impact value PL is calculated by the formula PL=TC*γ+CB*θ; wherein TC represents the frequency of occurrence of abnormal time periods, CB represents the spraying duration overhysteresis value, and γ and θ are both proportional coefficients.

7. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 6 is characterized in that: In step 5, the spraying duration influence value PL is obtained, and the spraying duration influence value PL is compared with the spraying duration influence threshold; if the spraying duration influence value PL is greater than or equal to the spraying duration influence threshold, a spraying duration abnormal signal is generated; If the spraying duration impact value PL is less than the spraying duration impact threshold, a normal spraying duration signal is generated.

8. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 1 is characterized in that: In step 6, the humidity abnormality value HJ and the spraying time over-hysteresis value CZ are obtained; The detection frequency adjustment value ZY1 affected by the abnormal humidity is calculated by the formula ZY1 = (1-HJ) * YT; wherein YT represents the preset concrete surface humidity detection frequency; The detection frequency adjustment value ZY2 affected by the spraying duration difference is calculated through the formula ZY2=CZ*YT; wherein YT represents the preset concrete surface humidity detection frequency.

9. The method for analyzing and controlling building intelligent perception big data based on multidimensional data according to claim 8 is characterized in that: In step 6, the detection frequency adjustment value ZY1 affected by the humidity abnormality and the detection frequency adjustment value ZY2 affected by the spraying duration difference are weightedly summed to calculate the detection frequency adjustment value ZT; Exemplarily, the detection frequency adjustment value ZT is calculated by the formula ZT=ZY1*α+ZY2*β; wherein α and β are both proportional coefficients.

10. The building intelligent perception big data analysis and control system based on multi-dimensional data is characterized by: The monitoring system is used to execute the method described in any one of claims 1 to 9, and the prosecution system comprises: Acquisition module: obtains the surface data of concrete, determines the curing state of concrete, and generates a curing state signal; wherein the surface data includes the surface humidity value of concrete; Humidity impact value calculation module: based on the abnormal signal of the steaming process state, obtain the abnormal detection period data and calculate the humidity impact value; wherein the abnormal detection period data includes the number of abnormal detection periods; Concrete surface humidity judgment module: generates a concrete surface humidity signal according to the humidity influence value; wherein the concrete surface humidity signal includes a concrete surface humidity normal signal and a concrete surface humidity abnormal signal; Spraying duration impact value calculation module: based on the humidity abnormality signal, obtains the spraying data and calculates the spraying duration impact value; wherein the spraying data includes the spraying duration; Spraying duration judgment module: judges the humidity state of the concrete surface according to the spraying duration impact value and generates a spraying duration signal; Detection frequency calculation module: based on the spraying duration abnormal signal, obtains concrete data and spraying duration data, and calculates the detection frequency adjustment value; wherein, the concrete data includes the humidity abnormality degree value, and the spraying duration data includes the spraying duration overhysteresis degree value.

Citation Information

Cited By

  • Steam curing detection system applied to intelligent beam field

    CN119610367A

  • Monitoring system and method for maintenance effect of wind power mixed tower bottom

    CN121208314A

  • A wind power mixed tower bottom maintenance effect monitoring system and method

    CN121208314B

  • Data management and control system based on concrete curing

    CN121501063A