Construction method for anchorage of pile foundation bearing platform of steel pipe arch buckling and hanging system in mountainous area

By designing and implementing the anchor construction method of pile foundation bearings in mountainous steel pipe arch bridges, and using the guide bridge pile foundation bearings as anchor cable anchors, the problems of high construction costs and site limitations of steel pipe arch bridges have been solved, and the combination of permanent direction has been achieved and the reduction of Construction costs and improve construction efficiency.

CN119061773APending Publication Date: 2024-12-03CHINA FIRST HIGHWAY ENGINEERING CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411038370.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The construction cost of existing pile foundation anchors is high and cannot cooperate with the guide bridge structure as the anchor cable anchor of the buckle system, resulting in high construction cost of steel pipe arch bridges in mountainous areas and limited site.

Method used

Design a construction method for pile foundation bearing anchoring of steel pipe arch buckle system in mountainous areas. By designing anchors, calculating bearing capacity and carrying out construction, using guide bridge pile foundation bearing as anchor cable anchors, realizing permanent integration and reducing construction costs . Specific steps include anchor design, bearing capacity calculation and construction implementation, the use of the pier bearing of the guide bridge to resist load, reduce temporary facilities and material costs, and complete the construction through embedded cable pipes, anchor seat installation and anchor cable tensioning.

Benefits of technology

The permanent integration of steel pipe arch bridges has been achieved, which reduces construction costs, saves material and site excavation, improves construction efficiency, shortens construction period, and provides a safe and efficient construction method for large-span steel pipe arch bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061773A_ABST
    Figure CN119061773A_ABST
Patent Text Reader

Abstract

The invention provides a mountainous area steel pipe arch buckling and hanging system pile foundation bearing platform anchorage construction method, and belongs to the technical field of pile foundation bearing platform anchorage construction, and the method comprises the following steps: step 1, designing an anchorage of a buckling and hanging system, step 2, calculating the bearing capacity of a permanent and temporary combined pile foundation bearing platform anchorage, and step 3, constructing the permanent and temporary combined pile foundation bearing platform anchorage. The approach bridge pile foundation bearing platform is used as the anchor cable anchorage of the steel pipe arch buckling and hanging system, permanent and temporary combination is achieved, the technical problem that the large-span steel pipe concrete construction site in the mountainous area is limited is solved, large-size masonry materials are saved, the construction cost is greatly reduced, and the construction period is shortened. The method has the advantages that extra land acquisition and massive excavation damage to the original-state ground are avoided, the construction efficiency of the buckling and hanging anchorage is improved, the construction period is shortened, and a new thought is provided for buckling and hanging anchorage arrangement in steel pipe arch section cantilever assembly construction.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of pile foundation cap anchoring construction, in particular to a pile foundation cap anchoring construction method of a steel pipe arch buckle hanging system in mountainous areas. Background Art

[0002] The cable-stayed buckle system of the steel tube concrete arch bridge consists of buckle cables, anchor cables, buckle towers, and anchors. The function of the anchor is to balance the cable force of the anchor cables and ensure the safety of the cantilever assembly construction process of the arch rib segments of the steel tube concrete arch bridge. The anchor is a multi-directional force structure, and its bearing capacity is affected by the load of the structure itself and factors such as geology and topography. Common structural forms include gravity anchors, rock anchors, pile anchors, etc. In the buckle system, it is often necessary to build anchors separately, which adds to the construction cost and land acquisition cost of the steel tube concrete arch bridge construction. Especially in mountainous conditions, facing practical difficulties such as limited construction sites, how to effectively use the approach bridge structure as the anchor cable of the buckle system, reduce construction costs, and realize the permanent and temporary combination of steel tube arch large temporary structure construction is one of the key issues in the safe and efficient construction of large-span steel tube concrete arch bridges. Therefore, it is necessary to design a construction method for pile foundation cap anchor of the buckle system of steel tube arch in mountainous areas. Summary of the invention

[0003] The purpose of the present invention is to provide a method for anchoring a pile foundation pedestal of a steel pipe arch buckle system in mountainous areas, so as to solve the technical problems that the existing pile foundation pedestal anchoring construction cost is high and the anchoring cannot be coordinated with the approach bridge structure as an anchor cable anchoring of the buckle system.

[0004] In order to achieve the above object, the technical solution adopted by the present invention is as follows:

[0005] A method for anchoring a pile foundation cap of a steel pipe arch buckle hanging system in a mountainous area, the method comprising the following steps:

[0006] Step 1: Design the anchorage of the hook system;

[0007] Step 2: Calculate the bearing capacity of the anchorage of the permanent and temporary combined pile foundation cap;

[0008] Step 3: Construct the anchor of the Yonglin combined pile foundation cap.

[0009] Furthermore, in step 1,

[0010] The cable-stayed buckle tower is a temporary support for the assembled arch ribs during the process of assembling the main arch cantilever of the arch bridge into an arch. The buckle tower and the cable tower are set separately to provide conditions for lifting the arch columns and steel beams on the bridge deck, while reducing the external load on the high piers of the approach bridge and improving the safety of the buckle system. The buckle tower adopts a steel structure tower frame and is set on the cap beam of the 25# and 26# intersection piers, and together with the intersection piers, it constitutes a load transfer structure between the buckle anchor cables.

[0011] Furthermore, in step 1,

[0012] Anchored on the corresponding approach bridge cap or independent anchorage nearby, the whole bridge is designed with 12 hook system anchorages, 6 anchorages on the north and south banks, including 4 gravity anchorages and 8 pile foundation cap anchorages. The pile foundation cap anchorages use the 20# left and right span caps on one end of the approach bridge and the 28# left and right span caps and 29# left and right span caps on the other end of the approach bridge, relying on the pier caps of the approach bridge to resist horizontal and vertical loads. After structural verification to ensure that the permanent structure is not damaged and the construction is safe, the permanent structure of the project is achieved. The cost of temporary facilities and materials is saved. The anchorage of the 28# and 29# caps bears an anchorage force greater than the set value, so the load transmitted by the anchorage can be resisted by directly using the original design cap structure as the anchorage. The anchorage of the 20# and 29# caps bear an anchorage force greater than the set value, so the original design pile foundation caps need to be modified before use. The volume of the caps and the number of piles are increased to ensure the safety of the structure. The cap anchors between the 30# and 31# caps are set separately.

[0013] Furthermore, in step 2,

[0014] According to the calculation results of the cable force of the buckling system, the resultant force T of the anchor acting on the right cap anchor, the inclination angle of the anchor chord θ, the vertical downward pressure load N transmitted to the pile foundation by the cap, pier and superstructure, and the vertical upward pull force caused by the anchor is several times less than the vertical downward pressure load borne by the pile foundation. Therefore, the vertical pull-out bearing capacity of the cap anchor can meet the requirements, and only its horizontal bearing capacity needs to be verified. The distance between the pile foundation axis perpendicular to the T direction is L, and the distance between the axis of the T resultant force and the axis of the nearby pile foundation is l1. According to the relationship between the load resultant force and the position of the pile foundation, the horizontal force on the most unfavorable pile foundation is obtained.

[0015] Furthermore, in step 2,

[0016] For the proportional coefficient m of the horizontal resistance coefficient of the foundation, when the side of the pile is composed of several soil layers, the m value within the range of the impact depth hm = 2 (d + 1) meters is used as the calculation value. m When there are two different soil layers within the depth, calculate according to the following formula:

[0017]

[0018] Among them, h1 and h2 are the thickness of the first and second layers of rock and soil, respectively; m1 and m2 are the horizontal resistance coefficients of the first and second layers of rock and soil, respectively; below the bottom of the cap are silty clay, fully to strongly weathered limestone, and moderately weathered limestone;

[0019] For circular cross-sections, the section modulus of the tensile edge of the pile conversion section is:

[0020]

[0021] Where d is the pile diameter, d0 is the pile diameter after deducting the concrete cover; α E is the ratio of the elastic modulus of steel and concrete; ρ g is the reinforcement ratio of the pile body. For reinforced concrete piles, the bending stiffness of the pile body is For circular piles, when the diameter d>1m, the calculated width of the pile body b0=0.9(d+1), then the horizontal deformation coefficient α of the pile is:

[0022]

[0023] According to the pile foundation specification, two estimation formulas for the characteristic value of the horizontal bearing capacity of a single pile are obtained. g For cast-in-place piles with a load of less than 0.65%, the horizontal bearing capacity of a single pile is mainly controlled by the pile body strength and can be estimated according to the following formula:

[0024]

[0025] In the formula, the ± sign is determined according to the nature of the vertical force N at the top of the pile, the tension is -, the pressure is +, and γ m is the plasticity coefficient of the pile section modulus, f t is the design value of pile concrete tensile strength, ν M is the maximum bending moment coefficient of the pile body, A n is the converted cross-sectional area of ​​the pile body, ζ N is the influence coefficient of the vertical force on the pile top, N is the vertical force on the pile top under the standard combination of load effects, for steel piles, precast piles and pile bodies ρ g For cast-in-place piles with a load of ≥0.65%, the horizontal bearing capacity of a single pile is mainly controlled by the horizontal displacement and can be estimated as follows:

[0026]

[0027] Where: 0a is the allowable horizontal displacement of the pile top. For buildings sensitive to horizontal displacement, 0a =6mm; ν x is the horizontal displacement coefficient of pile top;

[0028] The reinforcement ratio of the pile body of the cap anchor pile foundation is ρ g The horizontal bearing capacity of the pile is controlled by the horizontal displacement and is calculated according to formula (5). Since the anchor pile foundation of the cap is a rock-embedded pile, according to the pile foundation specification, the horizontal displacement coefficient of the pile top is ν x The value is based on the pile bottom being supported in non-rock soil or on the supporting bedrock surface. The horizontal displacement x0 has the following relationship with the pile top bending moment and horizontal force:

[0029] x0=H0δ HH +M0δ HM (6)

[0030] Where: HH is the horizontal displacement generated at the top of the pile when a unit horizontal force acts on it, δ HM is the horizontal displacement generated at the top of the pile when the unit bending moment acts on it. When the bending moment at the top of the pile M0 = 0, it degenerates into formula (5), where the reduction factor of 0.75 is considered when calculating the characteristic value of the horizontal bearing capacity in formula (5). When the pile bottom is embedded in the bedrock,

[0031]

[0032] Combining equations (5), (6), and (7), we can know that when the pile bottom is embedded in the bedrock, The converted buried depth of the pile is αh, taking αh = 4. According to the specification, ν x =2.40074, substituting into formula (5) we can get the characteristic value of horizontal bearing capacity of single pile R ha ;

[0033] The anchor cable force is considered as permanent load. When calculating the horizontal bearing capacity of pile foundation controlled by permanent load according to the specification, the characteristic value of single pile horizontal bearing capacity is multiplied by the adjustment coefficient 0.80. Therefore, the adjusted characteristic value of single pile horizontal bearing capacity is R ha For several pile foundations, the pile group effect caused by the interaction between pile group, cap and soil should be considered when calculating the characteristic value of horizontal bearing capacity. According to Article 5.7.3 of the pile foundation specification, it can be multiplied by the comprehensive coefficient of pile group effect η h Correction, i.e. R h =η h R ha , comprehensive coefficient of pile group effect η h It is necessary to consider the mutual influence of pile groups, the constraint effect of pile top, the lateral soil resistance effect of the cap and the friction effect of the cap bottom. a / d, so there is no need to consider the friction effect at the bottom of the cap, so the comprehensive coefficient of pile group effect is:

[0034] η h =η i η r +η l (8)

[0035] Where: η i is the mutual influence effect coefficient of piles; η r is the pile top constraint effect coefficient, which is taken as 2.05; η l is the lateral soil resistance effect coefficient of the cap. Since the side of the cap is newly backfilled soil with relatively loose soil, η is taken l =0, the mutual influence effect coefficient of piles η i It can be calculated as follows:

[0036]

[0037] Where n1 and n2 are the number of piles in each row along the horizontal load direction and the vertical horizontal load direction, respectively, and both are 2. The mutual influence effect coefficient of the piles, so the comprehensive coefficient of the pile group effect is

[0038] η h =η i η r +η l (10)

[0039] Thus, R h =η h R ha , which is greater than the horizontal force H=470.89kN of the pile foundation with the most unfavorable stress, so the bearing capacity meets the requirements;

[0040] Since the bearing structure of the pile foundation cap anchor takes into account the elastic resistance of the rock and soil in front of the anchor, for steeper slopes or slopes with the risk of collapse, it is still necessary to verify the stability of the slope soil to ensure the normal bearing capacity of the cap anchor.

[0041] Furthermore, in step 3,

[0042] Step 3.1: Pre-embed the cableway pipe, and carry out the construction of the pile foundation, pedestal and pier of the approach bridge in sequence. During the construction process, the cableway pipe should be pre-embedded at the place where the anchor cable passes through the pier and pedestal. Since the anchor cable steel strand of the hook system is a flexible cable, it will produce a fixed sag under its own gravity, and the sag size is nonlinearly related to the anchor cable force. The longer the length, the more obvious the sag effect. When pre-embedding the cableway pipe, the sag effect of the steel strand should be considered. The shape of the anchor cable steel strand should actually be a catenary. For the case where the sag is very small or the cable length is less than 300m, it can be approximately calculated according to the parabola;

[0043] Assuming that the anchor cable is only subjected to axial tension and no pressure, it can be determined that the bending moment at any position is zero, and we can get:

[0044]

[0045] Where: l is the length of the anchor cable, f m is the sag value of the anchor cable at the mid-span, T is the anchor cable force, α is the angle between the line connecting the two anchor ends of the anchor cable and the horizontal plane, and q is the unit uniform weight of the anchor cable;

[0046] Take point m at the maximum sag in the mid-span as the origin of coordinates, the straight line connecting the two anchor ends of the anchor cable as the x-axis, and the sag direction as the y-axis, to establish a parabolic coordinate system;

[0047] Coordinate point (-l / 2, f m ) Substitute into the parabola equation y = ax 2 , the parabolic equation of the anchor cable is solved as follows:

[0048]

[0049] The construction coordinate system of the bridge takes the direction of increasing mileage in the longitudinal direction of the bridge as the positive direction of the x-axis, the right direction perpendicular to the x-axis as the positive direction of the y-axis, and the upward direction of the z-axis as the positive direction. Since the through-pier anchor cables are in the same vertical plane in the longitudinal direction of the bridge, the y-axis coordinate can be directly used. Only the x- and z-axis coordinates are solved. Assuming that the coordinates of the anchor points at both ends of the anchor cable are (x1′, z1′) and (x′2, z′2), the coordinates of point m in the on-site construction coordinate system x′o′z′ are According to the coordinate transformation formula:

[0050]

[0051] Substituting into (13) we get:

[0052]

[0053] If the coordinates of the two anchor ends of the anchor cable and the deadweight and cable force of the anchor cable are known, the coordinates of the entrance and exit of the cableway pipe of any anchor cable through the pier can be calculated by formulas (12) and (14). When the cableway pipe through the pier column is pre-buried, precise positioning control measures should be taken, and a high-precision total station should be used for measurement and layout, and the deviation should be controlled within 3 mm. When the pre-buried cableway pipe is temporarily fixed with an angle steel welding bracket, the bracket should have sufficient rigidity to prevent displacement during concrete pouring, and attention should be paid to symmetrical welding and fixing of the pre-buried cableway pipe to reduce the interference of welding deformation. When the pre-buried steel pipe conflicts with the pier column steel bar, in order to ensure the accuracy of the pre-buried channel, the position of the steel bar can be adjusted with the consent of the designer;

[0054] Step 3.2: Anchor seat installation. The anchor seat at the anchor end of one side of the anchor is welded with a 2cm thick steel plate. When designing the anchor seat, the anchor seat angle should be consistent with the anchor cable chord inclination to ensure a smooth force transmission path for the anchor cable. The anchor seat embedded plate is buried with the embedded cableway pipe during the anchor pouring process. 3 to 5 layers of steel mesh should be installed under the embedded pad to enhance local compressive strength and prevent concrete cracking.

[0055] Step 3.3: Anchor cable installation and tensioning. Before threading the cable, the end of the pre-buried cableway pipe of the pier or the cap needs to be polished smooth, or a rubber sheet needs to be added to prevent the sharp edge from cutting the steel strand. The fixed end of the anchor cable is anchored on the back of the cap in the form of a P anchor. After the P anchor extrusion sleeve is extruded, the extrusion spring should be completely embedded between the extrusion sleeve and the steel strand. The outer diameter and length of the extrusion sleeve after extrusion should meet the requirements of the instruction manual, and the outer surface should be smooth and free of cracks.

[0056] Since the pile foundation cap anchor needs to rely on the rock and soil on the side of the pile to provide lateral resistance, and the rock and soil are not ideal elastic materials, the actual deformation after being subjected to force is relatively complex. Therefore, during the staged tensioning process of the anchor cable and after the tensioning is completed, the stress and deformation of the anchor should be continuously monitored to ensure the safety of the structure. When calculating the bearing capacity of the cap anchor, the horizontal displacement is considered as 6mm. During construction, 6mm is the control value. The monitoring alarm value is recommended to be 70% to 80% of the control value. It is also necessary to regularly inspect whether the soil in front of the cap anchor has bulging or cracking, and whether the cap anchor itself has cracks. Once the above abnormal conditions occur, timely technical analysis should be carried out and reliable remedial and reinforcement measures should be taken.

[0057] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0058] The present invention utilizes the pile foundation pedestal of the approach bridge as the anchor cable anchor of the steel tube arch hanging system, realizing the combination of permanent and temporary, which not only solves the technical problem of limited construction site for large-span steel tube concrete construction in mountainous areas, but also saves large volumes of masonry materials, greatly reduces construction costs, avoids additional land acquisition and large-scale excavation and damage to the original ground, improves the construction efficiency of the hanging anchor, shortens the construction period, and provides a new idea for the setting of the hanging anchor in the cantilever assembly construction of steel tube arch segments. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 This is a schematic elevation diagram of the Wujiang Extra Large Bridge according to an embodiment of the present invention;

[0060] Figure 2 This is a vertical layout diagram of the buckling and hanging system of the Wujiang Bridge according to an embodiment of the present invention;

[0061] Figure 3 This is a plan view of the hook and hook system of the Wujiang Bridge according to an embodiment of the present invention;

[0062] Figure 4 This is the plan layout of the anchorage of the right cap 28# of the embodiment of the present invention;

[0063] Figure 5 This is the elevation layout of the anchorage of the right side cap 28# of the embodiment of the present invention;

[0064] Figure 6 This is a schematic diagram of the horizontal force of a pile foundation according to an embodiment of the present invention;

[0065] Figure 7 This is a schematic diagram of the anchor cable force in an embodiment of the present invention;

[0066] Figure 8 It is a simplified diagram of parabola calculation in an embodiment of the present invention; DETAILED DESCRIPTION

[0067] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and preferred embodiments. However, it should be noted that many details listed in the specification are only for the purpose of enabling the reader to have a thorough understanding of one or more aspects of the present invention, and these aspects of the present invention can be implemented even without these specific details.

[0068] like Figure 1 As shown, the embodiment takes the Wujiang Bridge as an example of the controlling project of the Dejiang (Hexing) to Yuqing Expressway, with a total length of 1834m and a span combination of 3×(3×40)m+4×(4×40)m+504m+2×(4×40)m. The approach bridges on both sides adopt prestressed concrete first simply supported and then structural continuous T-beams, and the main bridge adopts a 475m calculated span top-supported steel tube concrete variable cross-section truss arch bridge, spanning the "U-shaped" river valley in the middle and lower reaches of the Wujiang River. The main bridge adopts a cable hoisting + inclined buckle hanging non-bracket construction process. The entire arch ring is divided into 60 arch rib hoisting segments, which are hoisted in left and right sections. During the hoisting of the arch rib segments, a diagonal buckle hanging system needs to be set up to ensure the temporary fixation of the arch ring structure during the segment suspension construction process.

[0069] The bridge site is located in a low mountain landform area of ​​karst erosion, with a slope angle of 20-35°. The terrain on the Dejiang bank is relatively flat, with no obvious outward-dipping structural surface and good overall stability. It is covered with silty clay (layer thickness 0.6m~1m) and underlying strongly weathered to moderately weathered limestone. The terrain on the Yuqing bank is slightly steep, with moderately weathered layers developing cracks parallel and perpendicular to the main line. The overall stability is slightly poor, with silty clay (layer thickness 3m~8m) and underlying bedrock limestone.

[0070] The Wujiang Bridge is a top-supported steel tube concrete arch bridge with a calculated span of 475m. It adopts the construction technology of cable hoisting + inclined-stayed buckle hanging. The buckle hanging system uses the approach bridge pile foundation cap as the anchor cable anchor, cleverly realizing the combination of permanent and temporary. This paper proposes a calculation method for the horizontal bearing capacity of the cap anchor and the precise lofting coordinates of the cableway pipe through the pier, and based on this method, the key construction technical points of the permanent and temporary combination of pile foundation cap anchor are discussed in detail. The results show that in the cantilever assembly construction of large-span steel tube arch bridges in mountainous areas, the use of the approach bridge pile foundation cap as the anchor cable anchor is not only structurally safe and reliable, but also greatly saves construction costs and shortens construction period compared to the construction of anchors alone, which can provide a reference for similar projects.

[0071] The method is as follows:

[0072] Step 1: Design of anchoring system

[0073] The cable-stayed buckle is a way to temporarily support the assembled arch ribs during the process of assembling the main arch cantilever of the arch bridge. In this project, the buckle tower and the cable tower are set separately to provide conditions for the lifting of the arch columns, steel beams and other components on the bridge deck, while reducing the external load of the high piers of the approach bridge and improving the safety of the buckle system. The buckle tower adopts a steel structure tower frame, which is set on the cap beam of the 25# and 26# intersection piers, and together with the intersection piers, it constitutes a load transfer structure between the buckle anchor cables.

[0074] like Figure 2-3 As shown in the figure, combined with the topographic and geological conditions at the bridge site, and after considering the locations of existing lines, walkways, wires, poles and other existing structures, the bridge is anchored nearby on the corresponding approach bridge pedestal or on independent anchors. The entire bridge is designed to have a total of 12 anchors for the hook and hook system, with 6 anchors on the north and south banks each, including 4 gravity anchors and 8 pile foundation pedestal anchors. The pile foundation cap anchorage utilized the 20# left and right span caps of the Dejiang bank approach bridge and the 28# left and right span caps and 29# left and right span caps of the Yuqing bank approach bridge, and relied on the pier caps of the approach bridge to resist horizontal and vertical loads. After structural verification to ensure that the permanent structure is not damaged and the construction is safe, the project has achieved a combination of permanent and temporary, saving temporary facilities and material costs, and has good economy. Among them, the 28# left and right span cap anchorage bears a smaller anchor cable force, and the original design cap structure can be directly used as an anchorage to resist the load transmitted by the anchor cable. The 20# left and right span cap anchorage and the 29# left and right span cap anchorage bear a larger anchor cable force, so the original design pile foundation cap needs to be modified before use, and the structural force safety is ensured by appropriately increasing the cap volume and the number of pile foundations. The anchorages between 30# and 31# caps are set separately. The main reason is that the terrain is steep, the covering layer is thick (more than 10m), and the free surface is close to the cap. Directly using the approach bridge cap may cause damage to the permanent structure of the approach bridge, which is risky. In addition, since the stratum is mainly soft silty clay, the bearing capacity of the foundation does not meet the requirements, so gravity anchorages cannot be used. Considering that the bonding strength of silty clay is low, there are many caves in the bottom layer, and the geology is complex, it is difficult to ensure its reliability. Rock anchors were not used, so it was finally decided to set up independent pile foundation cap anchorages.

[0075] Step 2: Calculation of bearing capacity of pile foundation anchorage combined with permanent and temporary

[0076] The key to the calculation of pile foundation cap anchor structure is the horizontal bearing capacity of pile foundation. At present, the analysis methods of pile foundation horizontal bearing capacity include elastic foundation reaction method, limit equilibrium method, py curve method and numerical analysis method. Among them, the foundation reaction method solves the foundation reaction of elastic long pile based on the differential equation of elastic foundation perturbation. The foundation reaction is determined by the product of foundation reaction coefficient and pile displacement. According to the distribution form of foundation reaction coefficient along the pile depth z, it is divided into constant method, K method, c method and m method. The foundation reaction method adopted by pile foundation specification is m method, that is, it is assumed that the foundation coefficient changes linearly with depth. In order to facilitate engineering application, the pile foundation horizontal bearing capacity of cap anchor adopts the calculation method of pile foundation specification. This method assumes that the pile top is free when calculating the horizontal bearing capacity of single pile. However, in actual engineering, the pile top is constrained by the cap, and the constraint relationship is between fixed connection and hinged connection. Under the condition of cap constraint, the horizontal bearing capacity of single pile is greater than the bearing capacity under the condition of free pile head. Therefore, considering the free pile top, the bearing capacity is also relatively safe. Figure 4-5 shown.

[0077] The following takes the 28# right cap anchor of the hook system as an example to conduct a structural review and calculation of the cap anchor. According to the calculation results of the hook system cable force, the resultant force of the anchor cable acting on the 28# right cap anchor is T=1315.8kN, and the inclination angle of the anchor cable chord is θ=19.65°. According to statistics, the vertical downward compressive load transmitted to the pile foundation by the cap, pier and superstructure is 47787.60kN, while the vertical pull-out force caused by the anchor cable is only 1315.8×sin19.65°=442.5kN, which is much smaller than the vertical downward compressive load borne by the pile foundation. Therefore, the vertical pull-out bearing capacity of the cap anchor can meet the requirements, and only its horizontal bearing capacity needs to be verified. The distance between the pile foundation axes perpendicular to the T direction is L=5.5m, and the distance between the T resultant force action axis and the closer pile foundation axis is l1=1.32m. According to the relationship between the load resultant force and the pile foundation position, as follows Figure 6 As shown in the figure, the horizontal force on the pile foundation with the most unfavorable stress is obtained.

[0078] For the proportional coefficient m of the foundation horizontal resistance coefficient, when the pile side is composed of several soil layers, the main influence depth h m =2(d+1)=2×(2.2+1)=6.4 m. The m value in the range is taken as the calculated value. When h m When there are two different soil layers within the depth, calculate according to the following formula:

[0079]

[0080] Among them, h1 and h2 are the thickness of the first and second layers of rock and soil, respectively, and m1 and m2 are the horizontal resistance coefficients of the first and second layers of rock and soil, respectively. Below the bottom of the pedestal are silty clay (2.7m thick), fully to strongly weathered limestone (2.2m thick), and moderately weathered limestone. According to the survey report, the corresponding m values ​​are 18MN / m 4 、100MN / m 4 , substituting the numerical value, we get the main influence depth m = 44MN / m 4 .

[0081] For circular cross-sections, the section modulus of the tensile edge of the pile conversion section is:

[0082]

[0083] Where d is the pile diameter, d0 is the pile diameter after deducting the concrete cover; α E is the ratio of the elastic modulus of steel and concrete; ρ g is the reinforcement ratio of the pile body. Substituting the numerical value, we get W0 = 1.362m 3 For reinforced concrete piles, the bending stiffness of the pile body is Substituting the numerical value, EI = 3 × 10 7 kN·m 2 For circular piles, when the diameter d>1m, the calculated width of the pile body is b0=0.9(d+1)=0.9×(2.2+1)

[0084] =2.88m, then the horizontal deformation coefficient of the pile α(1 / m) is

[0085]

[0086] Substituting the numerical value, we get α = 0.335. The Pile Foundation Code [3] gives two estimation formulas for the characteristic value of the horizontal bearing capacity of a single pile. For the pile body ρ g For cast-in-place piles with a load of less than 0.65%, the horizontal bearing capacity of a single pile is mainly controlled by the pile body strength and can be estimated according to the following formula:

[0087]

[0088] In the formula, the ± sign is determined according to the nature of the vertical force N at the top of the pile, the tension is “-” and the pressure is “+”; γ m is the plasticity coefficient of pile section modulus; f t is the design value of the tensile strength of the pile concrete; ν M A is the maximum bending moment coefficient of the pile body; n is the converted cross-sectional area of ​​the pile body; N is the influence coefficient of the vertical force at the pile top; N is the vertical force at the pile top under the standard combination of load effects. For steel piles, precast piles and pile bodies, ρ gFor cast-in-place piles with a load of ≥0.65%, the horizontal bearing capacity of a single pile is mainly controlled by the horizontal displacement and can be estimated as follows:

[0089]

[0090] Where: 0a is the allowable horizontal displacement of the pile top, usually taken as 0a =10mm, for buildings sensitive to horizontal displacement, take χ 0a =6mm; ν x is the horizontal displacement coefficient of the pile top.

[0091] 28# Right side cap anchor pile foundation pile body positive section reinforcement ratio ρ g =2.85%>0.65%, the horizontal bearing capacity of the pile is controlled by the horizontal displacement and is calculated according to formula (5). Since the pile foundation of the cap is a rock-embedded pile, the horizontal displacement coefficient of the pile top in Table 5.7.2 of the pile foundation specification is ν x The value is based on the pile bottom being supported in non-rock soil or on the supporting bedrock surface, so it cannot be directly taken from Table 5.7.2. From Appendix C.0.3-1, it can be seen that the horizontal displacement x0 has the following relationship with the pile top bending moment and horizontal force:

[0092] x0=H0δ HH +M0δ HM (6)

[0093] Where: HH is the horizontal displacement generated at the top of the pile when a unit horizontal force acts on it, δ HM is the horizontal displacement generated at the top of the pile when the unit bending moment acts on it. When the bending moment at the top of the pile M0 = 0, it degenerates into equation (5), where equation (5) considers a reduction factor of 0.75 when calculating the characteristic value of the horizontal bearing capacity. It can be seen from Note ② of Appendix C.0.3-1 that when the pile bottom is embedded in the bedrock,

[0094]

[0095] Combining equations (5), (6), and (7), we can know that when the pile bottom is embedded in the bedrock, The converted buried depth of the pile is αh=0.335×16=5.36>4, take αh=4, refer to Appendix C.0.3-4, at this time, ν x =2.40074, substituting into (5) we can get the characteristic value of the horizontal bearing capacity of a single pile

[0096]

[0097] The anchor cable force is considered as permanent load. When calculating the horizontal bearing capacity of pile foundation controlled by permanent load according to the specification, the characteristic value of single pile horizontal bearing capacity is multiplied by the adjustment coefficient 0.80. Therefore, the adjusted characteristic value of single pile horizontal bearing capacity is Rha =0.8×2114.1=1691.3kN. For multi-pile foundations, the pile group effect caused by the interaction between pile group, cap and soil should be considered when calculating the characteristic value of horizontal bearing capacity. According to Article 5.7.3 of the pile foundation specification, it can be multiplied by the comprehensive coefficient of pile group effect η h Correction, i.e. R h =η h R ha , comprehensive coefficient of pile group effect η h It is necessary to consider the mutual influence of pile groups, the constraint effect of pile top, the lateral soil resistance effect of the cap and the friction effect of the cap bottom. a / d=5.5 / 2.2=2.5<6, so there is no need to consider the friction effect at the bottom of the cap. Therefore, the comprehensive coefficient of pile group effect is:

[0098] η h =η i η r +η l (8)

[0099] Where: η i is the mutual influence effect coefficient of piles; η r is the pile top constraint effect coefficient, refer to Table 5.7.3-1 and take 2.05; η l is the lateral soil resistance effect coefficient of the cap. Since the side of the cap is newly backfilled soil with relatively loose soil, η is taken l = 0. The mutual influence coefficient of piles η i It can be calculated as follows:

[0100]

[0101] Where n1 and n2 are the number of piles in each row along the horizontal load direction and the vertical horizontal load direction, respectively, and both are 2. Then the mutual influence effect coefficient of the piles is substituted into the data to obtain η i =0.647. Therefore, the comprehensive coefficient of pile group effect is

[0102] η h =η i η r +η l =0.647×2.05+0=1.33 (10)

[0103] Thus, R h =η h R ha =1.33×2114.1=2811.7kN, which is greater than the horizontal force H=470.89kN on the pile foundation with the most unfavorable stress, so the bearing capacity meets the requirements.

[0104] Since the bearing structure of the pile foundation cap anchor takes into account the elastic resistance of the rock and soil in front of the anchor, for steeper slopes or slopes with the risk of collapse, it is still necessary to verify the stability of the slope soil to ensure the normal bearing capacity of the cap anchor.

[0105] Step 3: Key points of Yonglin combined pile foundation cap anchorage construction technology

[0106] Overall construction process: construction of the lower structure of the approach bridge (pre-buried cableway pipe) → installation of anchor seats → installation and tensioning of anchor cables.

[0107] Step 3.1 Pre-buried cableway pipe

[0108] The pile foundation, cap and pier of the approach bridge are constructed in sequence. During the construction process, the cableway pipe should be pre-buried at the place where the anchor cable passes through the pier and cap. Since the anchor cable strand of the hook system is a flexible cable, it will produce a certain sag under the action of its own gravity, and the sag size is nonlinearly related to the anchor cable force. The longer the length, the more obvious the sag effect. The sag effect of the strand should be considered when the cableway pipe is pre-buried [4]. The shape of the anchor cable strand should actually be a catenary, but the calculation of the catenary is relatively complicated. For the case where the sag is very small or the cable length is less than 300m, it can be approximately calculated according to the parabola. [5] The result accuracy can also meet the needs of most conventional projects, and the anchor cable is simple to bear. Figure 7 shown.

[0109] Assuming that the anchor cable is only subjected to axial tension and no pressure, it can be determined that the bending moment at any position is zero, and we can get:

[0110]

[0111] Where: l is the length of the anchor cable; f m is the sag value of the anchor cable at the mid-span; T is the anchor cable force; α is the angle between the line connecting the two anchor ends of the anchor cable and the horizontal plane; q is the unit uniformly distributed weight of the anchor cable.

[0112] Take point m at the maximum sag in the mid-span as the origin of the coordinate system, the straight line connecting the two anchor ends of the anchor cable as the x-axis, and the sag direction as the y-axis, and establish a parabolic coordinate system as follows: Figure 8 .

[0113] Coordinate point (-l / 2, f m ) Substitute into the parabola equation y = ax 2 , the parabolic equation of the anchor cable is solved as follows:

[0114]

[0115] For the convenience of application, the bridge construction coordinate system generally takes the direction of increasing mileage in the longitudinal bridge direction as the positive direction of the x-axis, the right direction perpendicular to the x-axis as the positive direction of the y-axis, and the upward direction of the z-axis as the positive direction. Since the through-pier anchor cables are in the same longitudinal vertical plane, the y-axis coordinate can be directly used. Only the x- and z-axis coordinates are solved. Assuming that the coordinates of the anchor points at both ends of the anchor cable are (x1′, z1′) and (x′2, z′2), the coordinates of the aforementioned point m in the on-site construction coordinate system x′o′z′ are According to the coordinate transformation formula:

[0116]

[0117] Substituting into (13) we get:

[0118]

[0119] If the coordinates of the two anchor ends of the anchor cable and the deadweight and cable force of the anchor cable are known, the coordinates of the entrance and exit of the cableway pipe of any anchor cable through the pier can be calculated by equations (12) and (14). When pre-embedded cableway pipes through pier columns, precise positioning control measures should be taken, and high-precision total stations should be used for measurement and layout, with the deviation controlled within 3 mm. When using angle steel welded brackets to temporarily fix the pre-embedded cableway pipes, the brackets should have sufficient rigidity to prevent displacement during concrete pouring, and attention should be paid to symmetrical welding and fixing of the pre-embedded cableway pipes to reduce interference from welding deformation. When the pre-embedded steel pipes conflict with the pier column steel bars, in order to ensure the accuracy of the pre-embedded channels, the position of the steel bars can be appropriately adjusted with the consent of the designer.

[0120] Step 3.2: Anchor Installation

[0121] The anchor seat at the anchor end of one side of the anchor is welded from a 2cm thick steel plate. When designing the anchor seat, the anchor seat angle should be consistent with the anchor cable chord inclination to ensure a smooth force transmission path for the anchor cable. The anchor seat embedded plate is buried along with the embedded cableway pipe during the anchor pouring process. 3 to 5 layers of steel mesh should be installed under the embedded pad to enhance local compressive strength and prevent concrete cracking.

[0122] Step 3.3: Anchor cable installation and tensioning

[0123] Before threading the cable, the end of the pre-buried cableway pipe of the pier or the cap needs to be polished smooth, or a rubber sheet needs to be added to prevent the sharp edge from cutting the steel strand. The fixed end of the anchor cable is anchored on the back of the cap in the form of a P anchor. After the P anchor extrusion sleeve is extruded, the extrusion spring should be completely embedded between the extrusion sleeve and the steel strand. The outer diameter and length of the extrusion sleeve after extrusion should meet the requirements of the instruction manual, and the outer surface should be smooth and free of cracks.

[0124] Since the pile foundation cap anchor needs to rely on the rock and soil on the side of the pile to provide lateral resistance, and the rock and soil is not an ideal elastic material, the actual deformation after stress is relatively complicated, but the calculation is based on certain assumptions and experience, and there is a certain gap with the actual deformation and stress state. Therefore, during the process of graded tensioning of the anchor cable and after the tensioning is completed, the stress and deformation of the anchor should be continuously monitored to ensure the safety of the structure. When calculating the bearing capacity of the cap anchor, the horizontal displacement is considered to be 6mm. It is recommended to use this as the control value during construction, and the monitoring alarm value is recommended to be 70% to 80% of the control value. In addition, it is necessary to regularly inspect whether the soil in front of the cap anchor has bulging or cracking, and whether the cap anchor itself has cracks. Once the above abnormal conditions occur, timely technical analysis and reliable remedial and reinforcement measures should be taken.

[0125] The Wujiang Bridge innovatively uses the approach bridge pile foundation pedestal as the anchor cable of the steel tube arch hanging system, realizing a combination of permanent and temporary. It not only solves the technical problem of limited construction site for large-span steel tube concrete construction in mountainous areas, but also saves large volumes of masonry materials, greatly reduces construction costs, avoids additional land acquisition and large-scale excavation and damage to the original ground, improves the construction efficiency of the hanging anchor, shortens the construction period, and provides new ideas for the setting of hanging anchors in the cantilever assembly construction of steel tube arch segments.

[0126] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. The construction method of pile foundation cap anchorage of steel pipe arch buckle hanging system in mountainous area is characterized by: The method comprises the following steps: Step 1: Design the anchorage of the hook system; Step 2: Calculate the bearing capacity of the anchorage of the permanent and temporary combined pile foundation cap; Step 3: Construct the anchor of the Yonglin combined pile foundation cap.

2. The method for anchoring a pile foundation cap of a steel pipe arch buckle hanging system in a mountainous area according to claim 1 is characterized by: In step 1, The cable-stayed buckle tower is a temporary support for the assembled arch ribs during the process of assembling the main arch cantilever of the arch bridge into an arch. The buckle tower and the cable tower are set separately to provide conditions for lifting the arch columns and steel beams on the bridge deck, while reducing the external load on the high piers of the approach bridge and improving the safety of the buckle system. The buckle tower adopts a steel structure tower frame and is set on the cap beam of the 25# and 26# intersection piers, and together with the intersection piers, it constitutes a load transfer structure between the buckle anchor cables.

3. The method for anchoring a pile foundation cap of a steel pipe arch buckle hanging system in a mountainous area according to claim 1 is characterized by: In step 1, Anchored on the corresponding approach bridge cap or independent anchorage nearby, the whole bridge is designed with 12 hook system anchorages, 6 anchorages on the north and south banks, including 4 gravity anchorages and 8 pile foundation cap anchorages. The pile foundation cap anchorages use the 20# left and right span caps on one end of the approach bridge and the 28# left and right span caps and 29# left and right span caps on the other end of the approach bridge, relying on the pier caps of the approach bridge to resist horizontal and vertical loads. After structural verification to ensure that the permanent structure is not damaged and the construction is safe, the permanent structure of the project is achieved. The cost of temporary facilities and materials is saved. The anchorage of the 28# and 29# caps bears an anchorage force greater than the set value, so the load transmitted by the anchorage can be resisted by directly using the original design cap structure as the anchorage. The anchorage of the 20# and 29# caps bear an anchorage force greater than the set value, so the original design pile foundation caps need to be modified before use. The volume of the caps and the number of piles are increased to ensure the safety of the structure. The cap anchors between the 30# and 31# caps are set separately.

4. The method for anchoring a pile foundation cap of a steel pipe arch buckle hanging system in a mountainous area according to claim 1 is characterized by: In step 2, According to the calculation results of the cable force of the buckling system, the resultant force T of the anchor acting on the right cap anchor, the inclination angle of the anchor chord θ, the vertical downward pressure load N transmitted to the pile foundation by the cap, pier and superstructure, and the vertical upward pull force caused by the anchor is several times less than the vertical downward pressure load borne by the pile foundation. Therefore, the vertical pull-out bearing capacity of the cap anchor can meet the requirements, and only its horizontal bearing capacity needs to be verified. The distance between the pile foundation axis perpendicular to the T direction is L, and the distance between the axis of the T resultant force and the axis of the nearby pile foundation is l1. According to the relationship between the load resultant force and the position of the pile foundation, the horizontal force on the most unfavorable pile foundation is obtained.

5. The method for anchoring a pile foundation cap of a steel pipe arch buckle hanging system in a mountainous area according to claim 1 is characterized by: In step 2, For the proportional coefficient m of the horizontal resistance coefficient of the foundation, when the side of the pile is composed of several soil layers, the m value within the range of the impact depth hm = 2 (d + 1) meters is used as the calculation value. m When there are two different soil layers within the depth, calculate according to the following formula: Among them, h1 and h2 are the thickness of the first and second layers of rock and soil, respectively; m1 and m2 are the horizontal resistance coefficients of the first and second layers of rock and soil, respectively; below the bottom of the cap are silty clay, fully to strongly weathered limestone, and moderately weathered limestone; For circular cross-sections, the section modulus of the tensile edge of the pile conversion section is: Where d is the pile diameter, d0 is the pile diameter after deducting the concrete cover; α E is the ratio of the elastic modulus of steel and concrete; ρ g is the reinforcement ratio of the pile body. For reinforced concrete piles, the bending stiffness of the pile body is For circular piles, when the diameter d>1m, the calculated width of the pile body b0=0.9(d+1), then the horizontal deformation coefficient α of the pile is: According to the pile foundation specification, two estimation formulas for the characteristic value of the horizontal bearing capacity of a single pile are obtained. g For cast-in-place piles with a load of less than 0.65%, the horizontal bearing capacity of a single pile is mainly controlled by the pile body strength and can be estimated according to the following formula: In the formula, the ± sign is determined according to the nature of the vertical force N at the top of the pile, the tension is -, the pressure is +, and γ m is the plasticity coefficient of the pile section modulus, f t is the design value of the tensile strength of the pile concrete, ν M is the maximum bending moment coefficient of the pile body, A n is the converted cross-sectional area of ​​the pile body, ζ N is the influence coefficient of the vertical force on the pile top, N is the vertical force on the pile top under the standard combination of load effects, for steel piles, precast piles and pile bodies ρ g For cast-in-place piles with a load of ≥0.65%, the horizontal bearing capacity of a single pile is mainly controlled by the horizontal displacement and can be estimated as follows: Where: 0a is the allowable horizontal displacement of the pile top. For buildings sensitive to horizontal displacement, 0a =6mm; ν x is the horizontal displacement coefficient of pile top; The reinforcement ratio of the pile body of the cap anchor pile foundation is ρ g The horizontal bearing capacity of the pile is controlled by the horizontal displacement and is calculated according to formula (5). Since the anchor pile foundation of the cap is a rock-embedded pile, according to the pile foundation specification, the horizontal displacement coefficient of the pile top is ν x The value is based on the pile bottom being supported in non-rock soil or on the supporting bedrock surface. The horizontal displacement x0 has the following relationship with the pile top bending moment and horizontal force: x0=H0δ HH +M0δ HM (6) Where: HH is the horizontal displacement generated at the top of the pile when a unit horizontal force acts on it, δ HM is the horizontal displacement generated at the top of the pile when the unit bending moment acts on it. When the bending moment at the top of the pile M0 = 0, it degenerates into formula (5), where the reduction factor of 0.75 is considered when calculating the characteristic value of the horizontal bearing capacity in formula (5). When the pile bottom is embedded in the bedrock, Combining equations (5), (6), and (7), we can know that when the pile bottom is embedded in the bedrock, The converted buried depth of the pile is αh, taking αh = 4. According to the specification, ν x =2.40074, substituting into formula (5) we can get the characteristic value of horizontal bearing capacity of single pile R ha ; The anchor cable force is considered as permanent load. When calculating the horizontal bearing capacity of pile foundation controlled by permanent load according to the specification, the characteristic value of single pile horizontal bearing capacity is multiplied by the adjustment coefficient 0.

80. Therefore, the adjusted characteristic value of single pile horizontal bearing capacity is R ha For several pile foundations, the pile group effect caused by the interaction between pile group, cap and soil should be considered when calculating the characteristic value of horizontal bearing capacity. According to Article 5.7.3 of the pile foundation specification, it can be multiplied by the comprehensive coefficient of pile group effect η h Correction, i.e. R h =η h R ha , comprehensive coefficient of pile group effect η h It is necessary to consider the mutual influence of pile groups, the constraint effect of pile top, the lateral soil resistance effect of the cap and the friction effect of the cap bottom. a / d, so there is no need to consider the friction effect at the bottom of the cap, so the comprehensive coefficient of pile group effect is: or h =the i or r +n l (8) Where: η i is the mutual influence effect coefficient of piles; η r is the pile top constraint effect coefficient, which is taken as 2.05; η l is the lateral soil resistance effect coefficient of the cap. Since the side of the cap is newly backfilled soil with relatively loose soil, η is taken l =0, the mutual influence effect coefficient of piles η i It can be calculated as follows: Where n1 and n2 are the number of piles in each row along the horizontal load direction and the vertical horizontal load direction, respectively, and both are 2. The mutual influence effect coefficient of the piles, so the comprehensive coefficient of the pile group effect is or h =the i or r +n l (10) Thus, R h =η h R ha , which is greater than the horizontal force H=470.89kN of the pile foundation with the most unfavorable stress, so the bearing capacity meets the requirements; Since the bearing structure of the pile foundation cap anchor takes into account the elastic resistance of the rock and soil in front of the anchor, for steeper slopes or slopes with the risk of collapse, it is still necessary to verify the stability of the slope soil to ensure the normal bearing capacity of the cap anchor.

6. The method for anchoring a pile foundation cap of a steel pipe arch buckle hanging system in a mountainous area according to claim 1 is characterized by: In step 3, Step 3.1: Pre-embed the cableway pipe, and carry out the construction of the pile foundation, pedestal and pier of the approach bridge in sequence. During the construction process, the cableway pipe should be pre-embedded at the place where the anchor cable passes through the pier and pedestal. Since the anchor cable steel strand of the hook system is a flexible cable, it will produce a fixed sag under its own gravity, and the sag size is nonlinearly related to the anchor cable force. The longer the length, the more obvious the sag effect. When pre-embedding the cableway pipe, the sag effect of the steel strand should be considered. The shape of the anchor cable steel strand should actually be a catenary. For the case where the sag is very small or the cable length is less than 300m, it can be approximately calculated according to the parabola; Assuming that the anchor cable is only subjected to axial tension and no pressure, it can be determined that the bending moment at any position is zero, and we can get: Where: l is the length of the anchor cable, f m is the sag value of the anchor cable at the mid-span, T is the anchor cable force, α is the angle between the line connecting the two anchor ends of the anchor cable and the horizontal plane, and q is the unit uniform weight of the anchor cable; Take point m at the maximum sag in the mid-span as the origin of coordinates, the straight line connecting the two anchor ends of the anchor cable as the x-axis, and the sag direction as the y-axis, to establish a parabolic coordinate system; Coordinate point (-l / 2, f m ) Substitute into the parabola equation y = ax 2 , the parabolic equation of the anchor cable is solved as follows: The construction coordinate system of the bridge takes the direction of increasing mileage in the longitudinal direction of the bridge as the positive direction of the x-axis, the right direction perpendicular to the x-axis as the positive direction of the y-axis, and the upward direction of the z-axis as the positive direction. Since the through-pier anchor cables are in the same vertical plane in the longitudinal direction of the bridge, the y-axis coordinate can be directly used. Only the x- and z-axis coordinates are solved. Assuming that the coordinates of the anchor points at both ends of the anchor cable are (x1′, z1′) and (x′2, z′2), the coordinates of point m in the on-site construction coordinate system x′o′z′ are According to the coordinate transformation formula: Substituting into (13) we get: If the coordinates of the two anchor ends of the anchor cable and the deadweight and cable force of the anchor cable are known, the coordinates of the entrance and exit of the cableway pipe of any anchor cable through the pier can be calculated by formulas (12) and (14). When the cableway pipe through the pier column is pre-buried, precise positioning control measures should be taken, and a high-precision total station should be used for measurement and layout, and the deviation should be controlled within 3 mm. When the pre-buried cableway pipe is temporarily fixed with an angle steel welding bracket, the bracket should have sufficient rigidity to prevent displacement during concrete pouring, and attention should be paid to symmetrical welding and fixing of the pre-buried cableway pipe to reduce the interference of welding deformation. When the pre-buried steel pipe conflicts with the pier column steel bar, in order to ensure the accuracy of the pre-buried channel, the position of the steel bar can be adjusted with the consent of the designer; Step 3.2: Anchor seat installation. The anchor seat at the anchor end of one side of the anchor is welded with a 2cm thick steel plate. When designing the anchor seat, the anchor seat angle should be consistent with the anchor cable chord inclination to ensure a smooth force transmission path for the anchor cable. The anchor seat embedded plate is buried with the embedded cableway pipe during the anchor pouring process. 3 to 5 layers of steel mesh should be installed under the embedded pad to enhance local compressive strength and prevent concrete cracking. Step 3.3: Anchor cable installation and tensioning. Before threading the cable, the end of the pre-buried cableway pipe of the pier or the cap needs to be polished smooth, or a rubber sheet needs to be added to prevent the sharp edge from cutting the steel strand. The fixed end of the anchor cable is anchored on the back of the cap in the form of a P anchor. After the P anchor extrusion sleeve is extruded, the extrusion spring should be completely embedded between the extrusion sleeve and the steel strand. The outer diameter and length of the extrusion sleeve after extrusion should meet the requirements of the instruction manual, and the outer surface should be smooth and free of cracks. Since the pile foundation cap anchor needs to rely on the rock and soil on the side of the pile to provide lateral resistance, and the rock and soil are not ideal elastic materials, the actual deformation after being subjected to force is relatively complex. Therefore, during the staged tensioning process of the anchor cable and after the tensioning is completed, the stress and deformation of the anchor should be continuously monitored to ensure the safety of the structure. When calculating the bearing capacity of the cap anchor, the horizontal displacement is considered as 6mm. During construction, 6mm is the control value. The monitoring alarm value is recommended to be 70% to 80% of the control value. It is also necessary to regularly inspect whether the soil in front of the cap anchor has bulging or cracking, and whether the cap anchor itself has cracks. Once the above abnormal conditions occur, timely technical analysis should be carried out and reliable remedial and reinforcement measures should be taken.

Citation Information

Cited By

  • Main bridge raking pile body inclination control system and method based on multi-sensor fusion

    CN120781440A