Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

134 results about "Land acquisition" patented technology

Land acquisition is the process by which the government forcibly acquires private property for public purpose without the consent of the land-owner. It is thus different from a land purchase, in which the sale is made by a willing seller.

Direct prestack time migration method for three-dimensional seismic data acquired from irregular surfaces

The invention discloses a direct prestack time migration method for three-dimensional seismic data acquired from irregular surfaces, and the method is applied to the processing on reflected seismic information in seismic exploration. The method can be used for directly carrying out three-dimensional seismic data migration imaging (at different elevations) on shot points and geophone points acquired from irregular surfaces without statically correcting a processing process. In the method, no vertical emergence and incidence assumption is performed on nearsurface seismic wave propagation, therefore, the method can adapt to the situations which have no obvious low velocity region and velocity-reduction region such as high-velocity rock outcropping, and the like. In the method, the seismic wave propagation in near surfaces or stratums is described by using two equivalent speed parameters; and the two equivalent speed parameters can be determined according to the straightness of lineups inmigrated gathers, thereby avoiding the difficulties in near-surface velocity modeling. By using the method disclosed by the invention, the gathers subjected to migration can be subjected to remainingstatic correction, thereby effectively compensating the inherent errors existing in a land acquisition technology. The method has important application value in oil, gas and mineral resource exploration in complex surface areas.
Owner:INST OF GEOLOGY & GEOPHYSICS CHINESE ACAD OF SCI

Combined mixed-discharge technology for mining barren rock soil and solidified tailings

The invention discloses a combined mixed-discharge technology for mining barren rock soil and solidified tailings, which is capable of systematically researching burying characteristics, hydrogeologic conditions, mining process and discharged refuse materials of natural geology and foundation rock layers of the areas with a refuse dump and physico-mechanical properties of the foundation, analyzing and calculating relative parameters of the refuse dump, then analyzing bearing capacity of the refuse dump and respectively calculating settlement capacity and heaving floor of the foundation of the refuse dump according to limiting equilibrium principle, designing the solidified tailings (7) into a trapezoidal structural body with upper wide and bottom narrow and distributing the solidified tailings in various platforms of the refuse dump at certain intervals to form a mining barren rock soil and solidified tailing combined mixed-discharge refuse dump. The mining barren rock soil and solidified tailing combined mixed-discharge refuse dump is subjected to elastoplasticity finite-element analysis, ground water transfusion field analysis and stability and reliability analysis, and finally soil discharge technology and soil discharge parameters of the mining barren rock soil and solidified tailing combined mixed-discharge refuse dump are optimized. By the aid of the combined mixed-discharge technology for the mining barren rock soil and solidified tailings, safety potential hazards existing in tailing warehouses are eliminated, the problem of difficulty in land acquisition for construction of the tailing warehouses is solved, normal production of mines can be guaranteed, and foundation construction cost of the tailing warehouse and long-distance transporting cost of the tailings and operation cost are all saved.
Owner:SINOSTEEL MAANSHAN INST OF MINING RES

Oxidation ditch guide oxygen increasing device

The invention relates to an improvement on an oxidation ditch guide flow device, which is characterized in that: the upper end of a flow deflector is movably arranged on the pond wall of an oxidation ditch, while the lower end can be adjusted according to swing angles of the upper end; and the flow deflector also can move forward and backward. Firstly, an adjustable flow deflector can play a roleof the flow deflector to the maximum extent and avoid the defects caused by fixing and non-adjustment of the flow deflector; moreover, when the flow deflector is not needed, the flow deflector can belifted, so that the flow deflector does not become a burden because of the setting; secondly, the depth and the width of the oxidation ditch can be increased, so that the floor area of the oxidation ditch is reduced, and the land acquisition cost and the floor area are saved; thirdly, by matching of the flow deflector, the number of started aeration equipment can be reduced as required, and the operating energy consumption is lowered; and finally, the oxidation ditch is always ensured to operate in the best working state, and by the setting of meters such as an on-line current meter, a dissolved oxygen meter and the like and the automatic control of a computer, the oxidation ditch can fully automatically operate in the best working state.
Owner:LINGZHI ENVIRONMENTAL PROTECTION CO LTD +3

Full tailing filling method in large goafs

The invention discloses a full tailing filling method in large goafs, which is realized by the technical scheme with the following steps: dividing the combination of relatively independent and adjacent single or a plurality of goafs (6) into a filling unit; building a sealed wall (8) on a tunnel (7) at the periphery of the goafs (6) of the filling unit, arranging a drain pipe (9) in the wall body of the sealed wall (8), and arranging an ore pulp valve (10) on the drain pipe (9); laying a tailing conveying main pipe (3) above the filling unit through an adit (2) above the goafs (6); connecting each upper opening of the filling unit to one or a plurality of hydraulic sand filling pipes (4) through the tailing conveying main pipe (3); and discharging sand at high levels, discharging water in different middle sections, and filling alternately. In the invention, full tailings are used for filling the existing goafs, thereby eliminating the potential safety hazards of the goafs, ensuring the normal production of large deep well mines, saving the treatment cost, the tailing stockpiling and land acquisition cost and the drainage cost of the goafs, realizing the purpose of less-waste and no-waste exploitation, and taking an demonstration effect on constructing ecological mines.
Owner:HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NAT ENG RES CENT CO LTD

Desilting canal

The invention discloses a desilting canal, and belongs to the technical field of sediment treatment in hydraulic engineering. The desilting canal comprises a water inlet canal, a bend, a sediment transport corridor, a rotational flow desilting basin and a water outlet canal, wherein the upstream part of the bend is connected with the water inlet canal; the downstream part of the bend is connected with the water outlet canal; a central angle of the bend is 270 degrees; the water outlet canal passes through the lower side of the water inlet canal; a circular-arc-shaped overflow baffle is arranged in the bend; the bottom position of an inner side wall of the bend is provided with a narrow slit; the sediment transport corridor is positioned below the bend, and is communicated with the bend through the narrow slit; the tail end of the sediment transport corridor is connected with the rotational flow desilting basin. The desilting canal occupies a small area, can be arranged close to a canal head, and can be used for effectively remove coarse silt, so that the problems of difficulty in land acquisition for building the desilting basin at a position far away from the canal head in an irrigated area, easiness of siltation in long-distance transport of coarse silt, and the like are solved.
Owner:TAICANG DENASEN MECHANICAL & ELECTRICAL ENG CO LTD

Truss for lifting power transmission line tower connecting leg and erection method

ActiveCN103132766ASolve sizeSolve the problem of distanceTowersLand acquisitionElectric power system
The invention relates to a truss, in particular to a truss for lifting a power transmission line tower connecting leg and an erection method, and belongs to the field of electric power system devices. The truss comprises an installation base table, and is characterized by further comprising four supporting transverse materials, the four supporting transverse materials are connected into a square structure in a head-to-tail manner, a supporting base is installed at the intersection point of each two adjacent supporting transverse materials, main material angle steel is installed at the lower end of each supporting base, and a fixing base is installed at the lower end of the main material angle steel and installed on the installation base table. The problem of distance limitation in operation of an original power transmission line in-channel tower is solved, safety operation of a line is ensured, the pile position of the original power transmission line tower is lifted and heightened, land acquisition, path change, additional cost adding and production of a new power transmission line tower are omitted, the truss is convenient, time-saving and labor-saving in erection and can realize safety operation, the erection method is simply and reliably implemented, and the truss is low in erection difficulty, fine in flexibility and high in practicability.
Owner:STATE GRID CORP OF CHINA +1

Calculator for measuring and calculating operating land acquisition cost and control method thereof

The invention discloses a calculator for measuring and calculating operating land acquisition cost and a control method thereof, belonging to the 3S technical field. The calculator comprises a PDA (Personal Digital Assistant), a wireless communication module, a transmitting module, a calculating module and a receiving module. The PDA is used for carrying out reconnaissance rout tracking to obtain a land acquisition range, and the land acquisition range is transmitted to the calculating module through the wireless communication module and the transmitting module; the calculating module receives the land acquisition range and performs calculation to generate a detailed statement of total land acquisition expense and each operating land acquisition charge, the PDA receives the detailed statement of total land acquisition expense and each operating land acquisition charge, which is sent by the calculating module, through the wireless communication module and the receiving module and displays the detailed statement of total land acquisition expense and each operating land acquisition charge on a display screen. The calculator and the control method thereof can be used for quickly and automatically calculating land acquisition cost in real time on a reconnaissance site, thereby avoiding lots of office computation; and the working intensity of on-site reconnaissance is obviously reduced and the accuracy of calculated results is improved.
Owner:星际空间(天津)科技发展有限公司

Multifunctional intelligent station integrating transformation, charging and conversion

The invention belongs to the electric power equipment technology field and especially relates to a multifunctional intelligent station integrating transformation, charging and conversion. And specifically, the invention relates to an intelligent transformer station and an electric automobile charging station, and the integrated multifunctional intelligent station possessing transformation, charging and conversion functions. The multifunctional intelligent station of the invention mainly comprises: a transformer substation system, a charging system and a communication monitoring system. The transformer substation system is connected with the charging system. The communication monitoring system constructs Ethernet through a fiber to realize communication with the transformer substation system and the charging system and monitoring the transformer substation system and the charging system. By using the multifunctional intelligent station of the invention, construction and investment costs of an electric automobile charging station distribution transformer can be directly saved. The construction and investment costs are small. A whole construction area of the transformer station and the electric automobile charging station can be directly reduced. Building land acquisition demands can be directly reduced. Information sharing in the intelligent station can be realized. Levels of automation, informatization and intellectualization of the intelligent station are high. The multifunctional intelligent station is suitable for dense population areas in cities and the areas where land expropriation is difficult, and has a good application prospect.
Owner:NORTHEAST POWER SCI RES INSTITUTION +3

Traction system and method for lifting power transmission line tower

The invention discloses a traction system and method for lifting a power transmission line tower. The system and method are suitable for various construction terrains and conditions. The traction system comprises a servo winch, a traction inhaul cable, a tension sensor, a tower material connecting member and the like. In the lifting process of the power transmission line tower, the tower can be stably protected, the situation that the tower tilts excessively due to severe weather such as strong wind and other human factors is prevented, and the safety in the tower lifting process is guaranteed. In-situ lifting transformation is achieved, the range of a line protection area does not need to be changed, complex procedures such as land acquisition and removal, foundation rebuilding and towererecting and stringing construction are avoided, a new tower position is not needed, and the influence on the environment is small. The method effectively solves the problem of safety guarantee in thetower lifting process, solves the problems of low efficiency and low reliability of an existing manual operation mode and method, and has the advantages of being high in controllability, stable and convenient to operate.
Owner:GUANGZHOU POWER SUPPLY BUREAU GUANGDONG POWER GRID CO LTD

Method for increasing single lane by utilizing roadbed

The invention discloses a method for increasing a single lane by utilizing a roadbed. The method for increasing the single lane by utilizing the roadbed comprises the steps that (a) the position of a roadbed ramp is worked out according to the length of the lane added on an original road and through the method of the right triangle in mathematics, a spread foundation is constructed at the position, the foundation is made of concrete, the width of the foundation is 1-2m, and the thickness of the foundation is 0.5-1m; (b) a wall body is constructed on the spread foundation, the wall body is made of concrete, the width of the wall body is 30-80cm, drain holes are formed in the wall body, and the drain holes are formed with the interval of 20-50m; (c) a covering plate is arranged between the original road and the wall body and is made of reinforced concrete, and the thickness of the covering plate is 30-80cm; (d) road surface processing is carried out on the covering plate and the construction process is finished. By means of the method for increasing the single lane by utilizing the roadbed, the space in the range of an original bank slope is fully utilized, additional land acquisition is not needed in the process of widening, working procedures are simplified, construction period is shortened, and construction cost is lowered.
Owner:CRCC HARBOR & CHANNEL ENG BUREAU GRP

Substation grounding grid in frozen earth area and design method thereof

The invention relates to a substation grounding grid in frozen earth area and a design method thereof and belongs to the technical field of substation construction. The grounding grid is a mesh structure in which a plurality of horizontal trunk lines and longitudinal trunk lines are connected, and the grounding grid includes a horizontal grounding grid and a sinking grounding grid where the edge of the horizontal grounding grid is bent downwards. The horizontal grounding grid is located in a frozen earth layer. The lowermost end of the sinking grounding grid is located below the frozen earth layer; and the intersections of the horizontal trunk lines and the longitudinal trunk lines are connected with grounding resistors in the downward directions, and the lowermost ends of the grounding resistors extend below the frozen earth layer. The invention optimizes the structure of the grounding grid, and reduces the stepping voltage and the contact potential of the grounding grid, thereby meeting the safety performance requirements of the grounding grid in areas with high soil resistivity and deep seasonal frozen earth. The invention does not need to increase the amount of material of thegrounding grid, does not need to expand the land acquisition area of the grounding grid and does not use additional chemical resistance-reducing substances, and reduces the investment of the project.
Owner:POWERCHINA HEBEI ELECTRIC POWER SURVEY & DESIGN INST CO LTD

Mountainous area high-speed foam light soil roadbed structure

The invention discloses a mountainous area high-speed foam light soil roadbed structure and belongs to the technical field of roadbed slope construction. The roadbed structure comprises a step, wherein a retaining wall extending downwards is arranged at an end of a lowest stage of the step, a concrete base is arranged on the retaining wall, a prefabricated panel is arranged on the concrete base, foam light soil is poured between the prefabricated panel and the step, the prefabricated panel comprises a plurality of concrete panels, a plurality of concrete panels are piled up to form a wall surface, embedded rings are arranged on every two adjacent concrete panels respectively, ends, away from the concrete panels, of every two adjacent embedded rings are connected through a connecting steelbar, one end of a pull rod is fixedly connected with one connecting steel bar, and the other end of the pull rod is fixedly connected with the other adjacent connecting steel bar. The roadbed structure is advantaged in that an angle steel stand column penetrates through the concrete base and the retaining wall and is vertically arranged on a slope roadbed, an inner wall of the bent position of thepull rod is fixedly connected with the angle steel stand column, land occupation due to road sloping can be reduced, a demolition project is effectively reduced, and land acquisition and demolition cost is reduced.
Owner:GUANGXI ROAD & BRIDGE ENG GRP CO LTD

Novel gallery bridge

The invention relates to the field of bridges, and particularly relates to a novel gallery bridge. The novel gallery bridge comprises a bridge body and buildings located on the bridge body, wherein the bridge body comprises at least two layers of bridge surfaces, at least one upper layer of bridge surface is provided with a two-way roadway, and at least one lower layer of bridge surface is provided with parking garages and emergency lanes. According to the novel gallery bridge, the upper layer of bridge surface is provided with the two-way roadway which enables vehicles to cross the bridge, besides, the lower layer of bridge surface is provided with the parking garages and the emergency lanes, when tourists take sightseeing trips by car, the tourists can park the cars at the parking garages below, and convenience is brought to car parking for the tourists. The novel gallery bridge not only has the function of sightseeing tours, but also has the functions of parking and emergency passing, and is multifunctional. The novel gallery bridge does not use local government land acquisition and construction land indexes, can help the government to perfect city traffic bridges due to appropriate comprehensive utilization, does not need government investment, saves construction land, and achieves the multi-win purpose, namely the government, the society and enterprises achieve the multi-win purpose.
Owner:方运平

Municipal road land acquisition house statistical method

The invention relates to a municipal road land acquisition house statistical method which comprises the following steps: S1, selecting and determining a land acquisition demolition area according to an actually measured topographic map provided by a survey bureau; S2, cleaning the topographic map, removing unassociated layers, and reserving house layers and annotations thereof; S3, performing format conversion on the cleaned topographic map, and importing the topographic map into GIS software; s4, in GIS software, detecting the house contour line, removing isolated line segments, and then performing topology analysis to form a zone file; according to the previously imported house annotation, performing attribute assignment on the area file, and establishing an attribute structure for judging whether the house is expropriated or not in the area file; and S5, importing the land expropriation and demolition area and the area file into a spatial analysis module together, performing intersection analysis to form an intersection file, and superposing the original house area file according to the attributes of the intersection file to obtain a result drawing of the house in the land expropriation and demolition area. And land acquisition and house demolition statistics becomes faster.
Owner:成都市市政工程设计研究院有限公司

Temporary bridge device

The invention discloses a temporary bridge device used for a temporarily-erected simple bridge. The temporary bridge device comprises multiple Bailey beams (8) perpendicular to a carriageway and longitudinally arranged at intervals, wherein pavement distribution beams (9) made from I-steel are laid on the Bailey beams (8), bamboo plywoods (10) are laid on the pavement distribution beams (9), and concrete bridge deck slabs (11) are cast on the bamboo plywoods (10) on site to form a pavement. U-shaped bolts (16) connected with the Bailey beams (8) are embedded into the concrete bridge deck slabs (11). End bridge piles are arranged at two ends of each of the Bailey beams (8), middle bridge piles are arranged in the middles, and the end bridge piles and the middle bridge piles support the Bailey beams (8). The whole carriageway is arranged above a riverway, an arrangement form in the bridge direction is reasonable compared with traditional girders, the space above the riverway is fully utilized, a large amount of land acquisition is avoided, and greened both sides are effectively protected. In addition, the number of pile foundations in a river is deceased by arranging a transverse riverway, the construction difficulty is reduced, and meanwhile the water blocking area can be effectively decreased.
Owner:CHINA RAILWAY FIFTH SURVEY & DESIGN INST GRP

Garbage compressor

The invention relates to a garbage compressor, which comprises a compression mechanism and a feeding mechanism, wherein the compression mechanism comprises a box body, the bottom of the box body is provided with a material inlet, the feeding mechanism comprises a bottom scraper which is arranged at the bottom of the box body, and the bottom scraper is corresponding to the material inlet, and the size of the material inlet is consistent with the bottom scraper, one end of the bottom scraper is hinged with the bottom of the box body, when the garbage is unloaded into the bottom of the box body, the bottom scraper rotates around the hinging part with the box body, the other end of the bottom scraper scraps garbage and scrapes the garbage into the box body from the material inlet, and simultaneously, the material inlet is sealed by the bottom scraper. The garbage compressor adopts the bottom scraper arranged at the bottom of the box body for feeding from the bottom of the box body, and the whole body has the characteristics that the structure is compact, the feeding is convenient, no odor exists, the secondary fly dust and the secondary pollution are avoided, the occupied area is small, the civil engineering cost is low, the flexibility is realized, and the like. The garbage compressor is particularly applicable to old station modification and new transfer station construction under the conditions of difficult urban area land acquisition and small sites.
Owner:ZOOMLION ENVIRONMENTAL IND CO LTD

Large-capacity wind field box transformer structure

The invention discloses a large-capacity wind field box transformer structure. The large-capacity wind field box transformer structure includes a box transformer shell, a transformer, a gas filling switch assembly, a high voltage cable, a transformer outlet bushing and a current transformer, wherein the gas filling switch assembly, the high voltage cable, the transformer outlet bushing and the current transformer are disposed in the box transformer shell, the transformer is located outside the box transformer shell, and the current transformer, the gas filling switch assembly and the high voltage cable are electrically connected in sequence. The large-capacity wind field box transformer structure is advantaged in that a charging switch assembly including a vacuum circuit breaker and a three-station isolated grounding switch is utilized, the space can be saved, the floor space is reduced by 25-30% compared with a split vacuum circuit breaker+an upper isolation switch+a lower grounding switch, the land acquisition and civil construction area is saved, and transport and hoisting are facilitated; an inflatable switch assembly adopts SF6 insulation, high reliability and low operating cost of inflatable products are integrated; through integrated mechanical interlock design between the vacuum circuit breaker and the isolated grounding three-station switch, misuse can be effectively prevented.
Owner:GUANGDONG MINGYANG ELECTRIC CO LTD

Bridge and tunnel co-construction structure and construction method thereof

PendingCN111074707AIncrease lateral stiffnessSolve the problem of difficult land acquisition and demolitionArtificial islandsRoadwaysLand acquisitionRiver routing
The invention belongs to the technical field of municipal engineering, and provides a bridge and tunnel co-construction structure and a construction method thereof. The bridge and tunnel co-construction structure comprises a bridge girder, bridge piers, a frame type tunnel structure, bridge pile foundations and deformation coordination piles. The tunnel structure is located under the bridge girder, and the center lines of the tunnel structure and the bridge girder on the plane are aligned. The bridge pile foundations serve as the anti-floating piles of the tunnel structure, the closed frame type tunnel structure also increases the transverse rigidity of the bridge pier, and land is saved in space through a mode of an upper bridge and a lower tunnel, so the problem that land acquisition andremoval in cities are difficult is solved; and stress components of the bridge pile foundations and the tunnel structure are fully utilized in a structural system, so the total engineering investmentis reduced from multiple angles. Meanwhile, the construction method of the bridge and tunnel co-construction structure has less influence on the flood discharge function of riverway, and is high in feasibility and low in construction cost.
Owner:深圳市综合交通与市政工程设计研究总院有限公司

Intelligent collection and management system and method for migration data

The invention provides an intelligent collection and management system for migration data. The system comprises a land house collection and settlement business module, a land house agreement and contract signing management module, a land house collection and settlement house resource management module, a land house collection online house selection module, a land house collection and migration bigdata application and analysis platform, an on-site lottery module, a fund and cost estimation management module, a migration work mobile terminal, an intelligent collection and transfer data statistical summary module, a collection and query mobile terminal, a collection and transfer service intelligent all-in-one machine, a collection and query module, an on-site monitoring platform, a remote scheduling command module and a land collection and transfer red line one-picture module. According to the invention, collection and removal data is taken as a core, the business process integration isrealized, and the comprehensive informatization management is carried out on daily office work. Leaders can master the working conditions of all functional departments and grass-roots units at any time and make scientific decisions, and therefore the administrative capacity and level of all the departments are enhanced.
Owner:浙江省自然资源征收中心

Construction method and structure of poured anti-seepage core earth-rock dam

The invention discloses a construction method and structure of a poured anti-seepage core earth-rock dam. The method comprises an underwater dam body filling and dam foundation treatment method, a poured anti-seepage core wall formation method, and a dam material selection and control method. The dam structure is divided into an upper dam body, a lower dam body and an anti-seepage system. The lower dam body is directly completed by vibrating and densifying the underwater dumping and filling dam material. The upper dam body is completed by layered compaction of sand gravel, soft rock, gravel soil, weathered materials and excavation slag in a reservoir area, and compaction control is carried out by a comprehensive method of test, calculation and analysis, filling indicators and constructionparameters. The anti-seepage system is composed of the connection of anti-seepage core walls formed in the dam bodies and overburden through a pulsating grouting technology and a bedrock curtain. Themethod and structure expands the application scope of earth-rock dams, direct underwater dumping and filling construction is achieved, the construction period is effectively shortened, cofferdam filling, weir seepage prevention, foundation pit excavation, foundation pit pumping are saved, and material yard, slag yard land acquisition and related water conservation and environmental protection measures are saved.
Owner:CHINA WATER RESOURCES PEARL RIVER PLANNING SURVERYING & DESIGNING +1

Construction method and structure of balance weight retaining wall

PendingCN110056000AGuarantee stabilityAvoid overturning and other quality accidentsArtificial islandsUnderwater structuresSocial benefitsLand acquisition
The invention discloses a construction method and structure of a balance weight retaining wall. The construction method of the balance weight retaining wall comprises the following construction stepsthat measuring and positioning are carried out; a foundation pit is excavated; a foundation bearing capacity test is carried out; a foundation is constructed; a lower wall is constructed; an upper wall is constructed; balance weight platform formwork is erected; balance weight platform concrete is poured; a roadbed is backfilled; and mortar flag stone is adopted to construct the lower wall, required pre-buried connecting rebars are arranged when the lower wall is constructed, and the sides, close to the balance weight platform, of the rebars extend into the balance weight platform. According to the construction method and the structure of the balance weight retaining wall, the reliability of the connection of the balance weight platform and the retaining wall is greatly improved, and quality accidents such as overall overturn of the retaining wall are avoided; the construction difficulty is reduced, the flatness degree of the appearance of the retaining wall is ensured, and the aesthetic degree is improved; meanwhile, the discard amount is reduced, no additional land acquisition is needed for constructing a waste slag field, and the construction cost is reduced; environment-friendly highway construction is facilitated, and high economic and social benefits are achieved; and the structure is simple, the construction is convenient, safety and reliability are realized, economic and environmental benefits are remarkable, and the construction method and the structure of the balance weight retaining wall can be widely popularized and applied in the technical field of retaining walls.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products