Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

82results about How to "Increase construction costs" patented technology

Quick dismounting, winding and deflating device for foundation pit air film

The invention discloses a foundation pit air film quick dismounting, rolling and deflating device, and belongs to the technical field of foundation pit air films, the foundation pit air film quick dismounting, rolling and deflating device comprises an air film and a rolling and deflating assembly, a deflating valve is arranged at one end of the air film, and the rolling and deflating assembly is provided with two vertical plates arranged in parallel. According to the quick dismounting, winding and deflating device for the foundation pit air film, the surface of the quick dismounting, winding and deflating device abuts against the upper end face and the lower end face of the air film in the opposite rotation process of the movable rolling wheel and the fixed rolling wheel; meanwhile, through stable transmission among a driven gear, an adapter gear and an adjusting gear, the extrusion gap between a movable roller and a fixed roller can still stably rotate in the opposite direction with the fixed roller after being adjusted, so that the air film can be matched with different thicknesses, and finally the deflation speed and the disassembly efficiency of the air film are improved; the situation that the construction cost and the time cost are increased due to the fact that the gas film stays on the construction site for a long time is avoided, stable proceeding of follow-up construction is guaranteed, the turnover use efficiency of the gas film is improved, and resource waste is avoided.
Owner:ZHONGWEI SPACE MEMBRANE BUILDING TECH (BEIJING) CO LTD

Precast hanging plate for pouring type asphalt concrete

The utility model provides a prefabricated hanging plate for pouring type asphalt concrete, and relates to the technical field of reservoir danger removing and reinforcing engineering, the prefabricated hanging plate comprises a concrete plate and structural steel bars arranged on the concrete plate, the structural steel bars are arranged on the concrete plate, and the dam body connecting ends of the structural steel bars extend out of the concrete plate to be connected with a reservoir dam body; the concrete slabs are fixedly assembled through the structural steel bars so that casting gaps can be formed between the concrete slabs and the reservoir dam body, the multiple concrete slabs are fixedly assembled through the structural steel bars to form a wall plate matched with the upstream face of the reservoir dam body, the multiple casting gaps between the wall plate and the reservoir dam body form an asphalt concrete pouring area, and asphalt concrete is poured into the asphalt concrete pouring area. Therefore, construction procedures are reduced, construction efficiency is improved, and construction cost is saved. And the concrete prefabricated hanging plate and the poured asphalt concrete are combined into a whole, so that the anti-seepage and reinforcing effects are improved, and various objects in the reservoir are also prevented from directly damaging the asphalt concrete anti-seepage layer.
Owner:SINOHYDRO BUREAU 6 CO LTD

Low-temperature liquid medium storage container and structure and arrangement method of metal film on inner wall of low-temperature liquid medium storage container

The invention relates to a low-temperature liquid medium storage container and a construction and arrangement method of a metal film on the inner wall of the low-temperature liquid medium storage container, and belongs to the technical field of low-temperature liquid medium storage. The structure of the metal film comprises a top surface film, a right side surface film, a bottom surface film, a left side surface film, four transition surface films, a front surface film and a back surface film which are respectively arranged on the top surface, the right side surface, the bottom surface, the left side surface, four transition surfaces, the front surface and the back surface of the annular side surface of the low-temperature liquid medium storage container, the top surface film, the right side surface film, the bottom surface film and the left side surface film are respectively connected with the four transition surface films to form an annular side surface film; and the front film and the back film are connected through the annular side film to form a totally-closed three-dimensional film.
Owner:CNOOC GAS & POWER GRP

Fabricated laminated slab supporting device and supporting method

The invention provides an assembly type laminated slab supporting device which comprises a supporting platform, lifting mechanisms and a driving mechanism, a plurality of supporting columns are evenly distributed at the bottom of the supporting platform, the driving mechanism is arranged in the center of the top of the supporting platform, the lifting mechanisms are symmetrically installed at the two ends of the top of the supporting platform, and the symmetrical lifting mechanisms are connected through a transmission shaft. The driving mechanism is used for driving the transmission shaft, a supporting assembly is arranged at the top end of the lifting mechanism and further connected with a fine adjustment device, the fine adjustment device comprises a mounting frame, a driving motor, a threaded rod and a driving piece, the mounting frame is fixedly connected with the supporting frame, the driving motor is fixedly mounted on the supporting frame, and the output end of the driving motor is fixedly connected with the threaded rod; and the driving piece is movably installed on the threaded rod and connected with an adjusting rod, the adjusting rod is movably installed in the lifting mechanism and fixedly connected with the connecting base, synchronous control ascending of the supporting assembly is facilitated, independent fine adjustment can also be achieved, and the flexibility is high.
Owner:CCFEB CIVIL ENG

Pipe cleaning, pressure testing and baseline detection combined construction method for deep sea composite pipe

The invention discloses a pipe cleaning, pressure testing and baseline detection combined construction method for a deep sea composite pipe, which comprises the following steps: injecting fresh water into the composite pipe, keeping the water pressure, and preliminarily cleaning the composite pipe; pipe cleaning operation is conducted, and the composite pipe is cleaned again; performing a pressure test, and checking the sealing performance of the composite pipe; and performing baseline detection to detect metal loss in the composite pipe. Pigging pressure test and baseline detection of original staged construction are integrated into combined construction, a set of efficient, economical and safe submarine pipeline pigging pressure test detection process is formed, meanwhile, the requirement for integrity management of submarine pipelines is met, the construction process is simplified, the construction period is shortened, the construction cost is saved, and the economical efficiency is improved.
Owner:CHINA NAT OFFSHORE OIL CORP +1

Vibration isolation structure and vibration isolation method for super-large-section shallow-buried excavation tunnel

The vibration isolation structure comprises a vibration isolation body and vibration isolation layers arranged on the two sides of the vibration isolation body, each vibration isolation layer is of a porous structure, the vibration isolation layers are arranged between the vibration isolation body and surrounding rock, and the thickness of each vibration isolation layer ranges from 5 cm to 10 cm. According to the design, when fluctuation enters the porous structure, pores in the vibration isolation layer can generate multiple scattering and reflection on incident waves, the scattering and reflection processes prolong the propagation path of the fluctuation, increase the interaction time between the fluctuation and the interior of the material, guide the fluctuation energy to be dissipated in the vibration isolation structure, and further reduce the impact on the surrounding environment; by absorbing and dispersing fluctuation energy, the vibration isolation structure remarkably reduces transmission of vibration waves to surrounding buildings, and therefore potential damage to the buildings is reduced.
Owner:中国水利水电第七工程局有限公司 +1

Pellet coating method and device for direct reduction

The invention provides a pellet coating method and device for direct reduction, and belongs to the technical field of direct iron reduction of oxidized pellets. Comprising the following steps: uniformly mixing a coating agent and water in a mass ratio of 1: (1.5-4), and uniformly spraying obtained coating agent slurry onto the surfaces of raw material pellets; the coating agent is one or more of calcium hydroxide, calcium carbonate and calcium aluminate. The coating agent is decomposed at high temperature to obtain CaO, and the pure CaO has a high-temperature-resistant effect, so that adhesion and caking of the pellet material after high-temperature reduction are blocked, smooth production rhythm is guaranteed, the temperature of the reduction process gas can be increased, and the production efficiency is improved. And when CaO is brought in for smelting in the later process, the addition of electric furnace steelmaking lime can be reduced (if calcium aluminate powder is used, the temperature of slag can be reduced, and the fluidity can be improved), so that the comprehensive cost is saved, and compared with the original process, the investment of a coating system is reduced by 60%.
Owner:SINOSTEEL EQUIP & ENG

Suspended pouring device of continuous steel structure bridge

The invention discloses a suspended pouring device of a continuous steel structure bridge. The suspended pouring device comprises a displacement base. The displacement base comprises a first base body, a second base body, a connecting device and a moving device, wherein the first base body and the second base body can be folded oppositely, the connecting device is arranged between the first base body and the second base body, and the moving device is arranged below the first base body and the second base body. The hanging basket frame body comprises a first frame body and a second frame body which can be folded relatively, and a reinforcing device arranged on the first frame body and the second frame body, and the first frame body and the second frame body are connected to the displacement base in a drivable and sliding mode; a driving device for driving the hanging basket frame body to move relative to the displacement base is arranged between the displacement base and the hanging basket frame body; limitations of a traditional track system are overcome, multi-direction, multi-angle and even trackless free movement is achieved, the construction efficiency and flexibility of a bridge are greatly improved, the preparation workload before construction is reduced, dependence on the terrain and the bridge structure is reduced, and the construction cost is saved.
Owner:POLY CHANGDA ENGINEERING CO LTD

In-plant electric power system of gas turbine power plant

The utility model belongs to the technical field of gas turbine power plants, and particularly relates to an in-plant electric power system of a gas turbine power plant, which comprises a gas turbine generator, a high-voltage plant transformer, a plant high-voltage loop, a connecting bus, an energy storage bus section and an energy storage unit. The gas turbine generator is connected with the high-voltage side of the high-voltage plant transformer, the low-voltage side of the high-voltage plant transformer is connected with the plant high-voltage loop, the connecting bus is connected between the plant high-voltage loop and the energy storage bus section, and the energy storage unit is connected with the energy storage bus section; the energy storage unit is used for storing surplus electric energy in the energy storage bus section, the energy storage unit and the station service high-voltage loop are used for supplying power to a station service electric load and a black-start load of the gas turbine power plant, and the energy storage unit is further used for auxiliary frequency modulation of the gas turbine power plant; the in-plant electric power system of the gas turbine power plant does not need to be externally connected with a standby electric power circuit, topological optimization of an AGC auxiliary frequency modulation system, an auxiliary power system and a black start system is achieved, the construction cost is reduced, and the energy efficiency level is improved.
Owner:CENT SOUTHERN CHINA ELECTRIC POWER DESIGN INST CHINA POWER ENG CONSULTING GROUP CORP

Energy-saving control method and system for lamplight in construction area

The invention belongs to the technical field of light control, and provides an energy-saving control method and system for light in a construction area. The method comprises the following steps: acquiring first scene data of a construction area, and determining a scene type of the construction area according to the first scene data; acquiring second scene data of the construction area, and determining a construction fineness level of the construction area according to the second scene data; and according to the scene type and the construction fineness level, determining and obtaining target illumination brightness, and according to the target illumination brightness and the real-time illumination brightness, determining and obtaining an energy-saving regulation and control scheme of the illumination lamp. According to the method, the scene type and the construction fineness level of the construction area are deeply analyzed, the target illumination brightness of the lamp in the construction area is obtained, the brightness of the lamp is regulated according to the target illumination brightness, and therefore the purpose of effectively reducing energy consumption under the condition that the construction illumination requirement is met is achieved; and the construction cost of a construction enterprise can be improved to a certain extent.
Owner:KASHGAR GUANGJIAN GRP CO LTD

Composite cable for heliostat control in photo-thermal power generation and tower type photo-thermal power station

The utility model discloses a composite cable for heliostat control in photo-thermal power generation and a tower type photo-thermal power station, and belongs to the field of cable equipment, the composite cable comprises a power line, an inner sheath, a steel tape armor, an outer sheath, a filler and a communication line; according to the composite cable, the outer sheath, the armor and the inner sheath are sequentially and annularly wrapped from outside to inside to form a hollow cavity, the power line, the communication line and the filler are arranged in the cavity, and the filler is located in the cavity and fills a gap between the power line and the communication line. A plurality of power line core units are arranged in the power line, and a plurality of communication line core units are arranged in the communication line; one end of the composite cable is connected with the heliostat, and the other end of the composite cable is connected with a local controller LOC of the heliostat. According to the technical scheme, the construction cost is saved, and the performance of the composite cable is improved.
Owner:HENGJI NENGMAI NEW ENERGY TECH CO LTD

A method for vibration sinking of a stone column pipe

ActiveCN116641382BIncreased penetrationIncrease vibration weightBulkheads/pilesSoil preservationCrushed stoneStructural engineering
The application discloses a method for vibrating and sinking a pile pipe of a gravel pile, and comprises the following steps: step one, using a vibration hammer on a gravel pile ship to sink the pile pipe into the soil; step two, when the bottom of the pile pipe meets the soil with a larger compactness, and the vibration hammer cannot continue to sink the pile pipe to the design elevation even after reaching the maximum power of the equipment, calculating the additional vibration mass F 额 , that is, calculating the weight of the gravel to be filled into the pile pipe in advance; step three, filling the gravel with the weight of the additional vibration mass F 额 into the pile pipe; step four, continuing to use the vibration hammer to sink the pile pipe until the pile pipe is sunk to the design bottom elevation; and step five, adding the remaining gravel M 桩管 -F 额 into the pile pipe, and then performing a subsequent pipe pulling process. The gravel filled into the pile pipe in advance increases the vibration mass, so that the purpose of improving the penetration of the pile pipe in the pile sinking process is achieved.
Owner:CCCC THIRD HARBOR ENGINEERING CO LTD

Construction method and system for quantitative early-warning rockburst grade of micro-seismic parameters of double-track tunnel

The invention belongs to the field of high-burial-depth underground space safety early warning and protection, and discloses a construction method and system for judging and distinguishing double-track tunnel micro-seismic parameter quantitative early warning rockburst grades, and the method comprises the steps: designing a micro-seismic monitoring system sensor arrangement method; wave velocity setting; judging the reliability of the monitoring effect of the same monitoring system on the double-track tunnel; comparing geological revelation conditions of the tunnel faces in the similar mileage sections of the double-track tunnel; determining rockburst grade classification and quantitative judgment criteria; distinguishing and establishing quantitative criteria of high-precision rockburst of each grade of the double-track tunnel; judging whether to distinguish and establish a rockburst early warning judgment standard; unifying tunnel early warning discrimination standard establishment methods; the reliability of the method is judged according to the occurrence condition of subsequent rockburst, and meanwhile the threshold value is perfected. According to the invention, two sections can be monitored at the same time through a set of microseismic monitoring system, so that half of manpower, material and financial investment is saved. The blank of establishing a quantitative criterion method for distinguishing micro-seismic monitoring and early-warning rockburst of the double-track tunnel under similar geological conditions in the same work area is filled, and the method has high practical value.
Owner:CHINA RAILWAY FIRST SURVEY & DESIGN INST GRP +1

Method for optimally controlling movement of ramming and leveling integrated ship trolley

The invention relates to the technical field of ramming and leveling integrated ship construction, in particular to a method for optimally controlling movement of a ramming and leveling integrated ship trolley. The ramming and flattening integrated ship trolley comprises a ramming platform trolley and a riprap trolley which are located on a C-shaped rail of a ship side on the same side of a ship, each trolley is driven by a traction winch to move, and when the ramming platform trolley moves to a short rail located at one end of the C-shaped rail, one traction winch can drive the whole ramming platform trolley to move into a ship main deck; and when the two traction winches drive the trolleys to move on the track through the cable ropes, one winch is used for traction, and the steel wire rope of the other winch can be released synchronously. The working length of the rail is increased, the construction distance of the trolley on the working section of the underwater foundation is increased, the material storage area of the ship main deck material surrounding bin is effectively increased, the production efficiency is greatly improved, and the construction and maintenance cost is remarkably saved.
Owner:NO 3 ENG COMPANY LTD OF CCCC FIRST HARBOR ENG COMPANY +1

A hoisting construction platform for pipe jacking construction

ActiveCN224411239UImprove stabilityGood turnover performanceVehicle frameArchitectural engineering
The utility model relates to a kind of hoisting construction platform for pipe jacking construction, including support frame, work platform, truss car frame, truss car beam, electric hoist lifting device and counterweight;Work platform is horizontally fixed at the top of support frame, and the edge of work platform is fixed with multiple groups of lifting rings;Truss car frame is fixed and erected at the front and rear ends of support frame, and the front and rear two groups of truss car frames are jointly erected with a truss car beam, the truss car beam is located at the middle of support frame, and the front and rear ends of truss car beam respectively extend out work platform towards front and rear direction;The front end of truss car beam is provided with electric hoist lifting device, and the rear end of truss car beam is provided with counterweight.Overall hoisting can be carried out on work platform by crane, pre-assembling outside construction site can be realized, the limitation of platform erection at construction site is avoided, temporary erection and removal are not needed on site, deployment efficiency and structural stability are significantly improved, and good turnover performance is obtained.
Owner:THE FOURTH OF CHINA CONSTR SEVENTH ENG

Commodity purchasing management system

The invention belongs to the field of management systems, and discloses a commodity purchasing management system which comprises an office computer, a smart phone and a cloud server. The smart phone is used for acquiring positioning information and biological characteristic information of a user and transmitting the information to the cloud server; the cloud server is used for generating an equipment identification code according to the positioning information and the biological characteristic information and sending the equipment identification code to the smart phone; the office computer is used for acquiring a login instruction of a user and sending the login instruction to the smart phone after receiving the login instruction; the smart phone is used for sending an equipment identification code to the office computer after receiving the login instruction; the office computer is used for sending the equipment identification code to the cloud server; the cloud server is used for returning an identity token to the office computer according to the equipment identification code sent by the office computer; and the office computer is used for communicating with the cloud server through the identity token. According to the invention, the security of the commodity purchasing management system is improved.
Owner:GUANGZHOU LACROSSE INFORMATION TECHNOLOGY CO LTD

Construction method for manufacturing and connecting fabricated concrete members

The invention provides a construction method for manufacturing and connecting fabricated concrete members, which comprises the following steps of: at the joint of a foundation member and a newly-added member, adopting reinforcing measures for steel bar connection, adopting welding connection, and adopting grouting material filling connection for concrete. The method has the advantages of shortening the construction period, saving the construction cost and improving the connection strength of the prefabricated parts.
Owner:朱长青

GRP pipeline connecting method

The invention relates to the technical field of GRP pipelines, in particular to a GRP pipeline connection method which comprises the following steps: firstly, judging the connection type of the GRP pipelines, and if the connection is straight pipe section connection of the GRP pipelines, adopting a socket and spigot joint type connection method; if the bent pipe sections of the GRP pipeline are connected, a winding type connecting method is adopted; if the GRP pipeline is connected with the water pump and the valve, a flange connection method is adopted. According to the GRP pipeline connecting method, the construction flexibility is improved, the construction period is shortened, the cost is reduced, meanwhile, the structure of a pipeline system is simplified, the GRP pipeline connecting method is particularly suitable for complex working conditions of large-diameter and large-weight GRP pipelines, and the problems that a traditional single connecting method is long in construction time consumption or large in cost consumption, high in labor cost consumption and the like are solved.
Owner:CCCC FOURTH HARBOR ENG CO LTD +1

Rapid installation device suitable for triangular hanging basket web steel bars

The utility model discloses a rapid installation device suitable for triangular hanging basket web steel bars. Comprising an electric hoist and a lifting hook body, and the lifting hook body is provided with a framework, a lifting hook end, reverse buckling wheels, a movable connecting end and a bottom plate; the framework and the bottom plate are welded into a whole, reverse buckling wheels are arranged on the two sides of the bottom plate, the lifting hook body is connected with the bottom of the front end of a triangular hanging basket main beam through the reverse buckling wheels, two sets of movable connecting ends are arranged in the middle of the bottom plate and used for being connected with an electric hoist through steel ropes, and an upwarp lifting hook end is formed at the front end of the framework. The problems that in the triangular hanging basket, web reinforcing steel bars conflict with a main beam in the hoisting and installing process are mainly solved, one-time in-place and rapid installation of the web reinforcing steel bars are achieved, and the working efficiency is improved are mainly solved.
Owner:SICHUAN ROAD & BRIDGE EAST CHINA CONSTRUCTION CO LTD

Underwater high-pressure rotary jet grouting water stop construction method for rock-socketed cofferdam

This invention discloses a method for underwater high-pressure jet grouting for sealing water in rock-embedded cofferdams. The method involves first driving a large-diameter steel casing, drilling holes to the bottom of the cofferdam using a rotary drilling rig, filling the holes with sand, removing the large-diameter steel casing, and then driving small-diameter interlocking steel pipe piles. High-pressure jet grouting is then applied to the outside of the interlocking steel pipe piles for curing. This process further enhances the water-stopping performance of the sand body through the grout, and the two components blend together to form a strong water-stopping curtain, effectively improving the bearing capacity of the cofferdam foundation and the water-stopping effect. This method avoids the difficulty of ensuring effectiveness with traditional underwater concrete sealing and eliminates the need for expensive concrete, thus saving significant construction costs.
Owner:THE 5TH ENG MBEC +1

Anchor cable failure state circuit monitoring device

The invention discloses an anchor cable failure state circuit monitoring device, and belongs to the technical field of geotechnical engineering.The anchor cable failure state circuit monitoring device comprises an embedded circuit and a signal monitoring system, the embedded circuit comprises a shell, a signal transmission point, a magnetic fixing point, an input line and an output line, and the shape of the shell is set according to the shape of an anchor cable to be detected; the shell is arranged on the outer side of the anchor cable to be detected, an opening is formed in the position, at a concrete pier pad of the anchor cable to be detected, of the shell, the input line penetrates through the opening to be connected with the shell, and the output line penetrates through the opening to be connected with the end, exposed out of the earth surface, of the anchor cable. According to the anchor cable failure state circuit monitoring device, input and output detection signals are compared, the evolution law of the detection signals along with time is described, information can be obtained in time before anchor cable failure, and the types of most anchor cable failure conditions can be obtained through the device.
Owner:RAILWAY CONSTR RES INST OF CHINA ACAD OF RAILWAY SCI CO LTD +1

An ultrasonic-based mud cake digestion system and method for a slurry shield cutter head

The present application relates to the technical field of shield construction, particularly to a slurry shield cutterhead mud cake digestion system based on ultrasonic waves, comprising an ultrasonic transducer assembly, a power module and a driving assembly, a plurality of ultrasonic transducer assemblies are respectively fixed at openings of cutterhead panels, each of the ultrasonic transducer assemblies comprises a protective shell cover and an ultrasonic transducer, a line protection tube is connected to the top of the protective shell cover, a waterproof joint is arranged in the protective shell cover and is plugged on a plug of the ultrasonic transducer, a connecting line is arranged in the line protection tube and extends into the protective shell and is connected to the waterproof joint. The cavitation effect of ultrasonic waves on the cutterhead mud cake in the circulating slurry is used to digest and peel off the cutterhead mud cake layer by layer, so that the cutterhead mud cake is removed.
Owner:STATE KEY LAB OF SHIELD & TUNNELING TECH +1

Tamping and leveling integrated ship with riprapping, tamping and leveling functions and construction technology

The invention relates to the technical field of ramming and leveling integrated ship construction, in particular to a ramming and leveling integrated ship with riprapping, ramming and leveling functions and a construction technology. Two C-shaped rails are arranged on one side of a main deck face of the ramming and flattening integrated ship in the length direction of the ship, a ramming platform car and a riprapping trolley are arranged on the C-shaped rails at the same time, and a material surrounding bin is arranged in the middle area of a main deck and used for storing stone; and the cable system is used for moving the tamping platform car and the riprap trolley on the track and rotating the tamping platform car towards the inner side of the main deck on the short track together. The safety of the tamping platform truck is improved, the construction cost is effectively saved, the material storage area of the material surrounding bin of the ship main deck is effectively increased, the production efficiency is greatly improved, and the construction and maintenance cost is remarkably saved.
Owner:NO 3 ENG COMPANY LTD OF CCCC FIRST HARBOR ENG COMPANY +1

A double-circuit tower split transposition device and installation method thereof

The present invention relates to a split transposition device for a double-circuit pole tower and an installation method thereof, comprising a main tower, wherein the main tower is provided with an upper cross arm, a middle cross arm and a lower cross arm, a middle phase-to-upper phase jumper is provided between the upper cross arm and the middle cross arm located at the same side end, a lower phase-to-middle phase jumper is provided between the middle cross arm and the lower cross arm located at the same side end, auxiliary towers are provided on both sides of the main tower, the auxiliary tower is provided with an upper cross arm and a lower cross arm near the main tower side, and an upper phase-to-lower phase jumper is provided between the upper cross arm and the lower cross arm. The device has simple wiring and controllable jumper gap; it reduces the height of the iron tower or the length of the cross arm, thereby reducing the torque and bending moment of the ground wire on the iron tower, improving the stress condition of the iron tower, and improving the reliability of the iron tower.
Owner:FUJIAN YONGFU POWER ENG

Folding line large-span delicate steel glass curtain wall

ActiveCN224647938UEasy to installStandardization and standardization of the installation process
The utility model discloses a polyline large-span exquisite steel glass curtain wall, including the back steel embedded plate, the back steel embedded plate is fixed on the building wall, the back steel embedded plate is welded with rectangular steel pipe through fixed connection frame, constitutes the support frame body structure, installs fixed steel pipe on the rectangular steel pipe, the utility model relates to glass curtain wall technical field, the beneficial effect of the case is: the existing glass curtain wall is mostly to adopt simple frame body type mounting structure, when the large-span curtain wall installation is carried out, the structural stability is poor, needs to use a large number of connecting components and installs fixed, not only will increase the construction cost, still can influence the use space and the aesthetic degree in the building interior, and the traditional glass curtain wall is single on the modelling, mostly is linear type design, is difficult to satisfy the pursuit of the modern building to the individualization, the unique appearance problem.
Owner:SHENYANG ZHENGXIANG DECORATION DESIGN CO LTD

Shield tail brush quick replacement method suitable for long-distance tunneling of super-large-diameter shield

The invention discloses a shield tail brush rapid replacement method suitable for long-distance tunneling of a super-large-diameter shield. An adopted shield tail sealing device comprises a plurality of common shield tail brushes distributed at intervals in the shield direction, and the shield tail sealing device further comprises a standby shield tail brush; the quick replacement method for the shield tail brush comprises the following steps: S1, reserving a mounting station of a standby shield tail brush; and S2, a shield tail brush for equipment is additionally arranged, and a common shield tail brush is replaced. On one hand, the reserved mounting station for the standby shield tail brush is arranged at the shield tail, rapid sealing is achieved through the shield tail brush for equipment after leakage occurs, rapid replacement of the abraded common shield tail brush is achieved on the basis that the standby shield tail brush and other common shield tail brushes bear water pressure, operation is easy and convenient, and the safety coefficient is high; on the other hand, a large amount of preparatory work is saved, the construction period is short, cost is low, and the requirement for replacing the shield tail brush during long-distance tunneling of a super-large-diameter shield is met.
Owner:CCCC TUNNEL ENG CO LTD +1

Low-rigidity rail groove sliding type spring energy absorption buffering type height limiting frame

The utility model discloses a low rigidity rail groove sliding type spring energy absorption buffer type height limiting frame which comprises a height limiting frame and a height limiting frame foundation, the height limiting frame comprises height limiting frame stand columns which are symmetrically arranged, height limiting rods are connected between the height limiting frame stand columns, and height limiting frame inclined struts are connected behind the height limiting frame stand columns. Height limiting frame connecting plates are arranged at the bottoms of the height limiting frame stand columns and the bottoms of the height limiting frame inclined struts; the height limiting frame foundation comprises a sliding rail groove integrally poured in foundation concrete, a sliding block connected in a sliding mode is arranged in the sliding rail groove, a first guide plate and a second guide plate are arranged at the upper end of the sliding block, and a foundation connecting plate is arranged and fixedly connected with height limiting frame connecting plates arranged at the bottoms of height limiting frame stand columns and height limiting frame inclined struts through bolts. A reset spring and an energy absorption spring are installed in the sliding rail groove and located in front of and behind the sliding block respectively. When an ultrahigh vehicle collides with the height limiting frame, the height limiting frame slides forwards, and the springs are compressed to absorb energy and buffer, so that the collision impact force is greatly reduced, the collision damage degree can be effectively reduced, and the economic loss is greatly reduced.
Owner:THE THIRD ENG OF CHINA RAILWAY 12TH BUREAU GROUP +1

Construction method of pipe jacking machine in narrow space

The invention provides a construction method of a pipe jacking machine in a narrow space, the pipe jacking machine comprises a split type pipe jacking machine composed of a plurality of shield bodies, and each shield body is formed by combining an upper shield body and a lower shield body which are oppositely arranged up and down. The split type pipe jacking machine is split into a plurality of units, hoisting work of the split type pipe jacking machine can be conveniently completed in a narrow space, meanwhile, through a pushing installation mode, installation and jacking construction can be combined, and therefore the construction period is effectively shortened, and the construction efficiency is improved. In addition, according to the method, the situation that in a traditional method, constructors conduct tunnel portal breaking construction operation in a crack between the tunnel portal and a pipe jacking machine is avoided, safety is effectively improved, after tunnel portal breaking is completed, the first shield body is jacked into the tunnel portal, beneficial support is formed, the collapse condition of the tunnel portal can be avoided, and in addition, the construction efficiency is improved. Due to the structure of the split type pipe jacking machine, the size of each part is smaller, the pipe jacking machine can be conveniently hoisted in a narrow receiving well, and the hoisting posture can be conveniently adjusted.
Owner:THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD +1

Bridge erecting machine with single-line and double-line bridging function and single-line and double-line bridging method

The invention provides a bridge erecting machine with a single-line and double-line bridging function and a single-line and double-line bridging method. The bridge erecting machine with the single-line and double-line bridge erecting function comprises a machine arm, a first column, a second column and a third column, wherein the first column, the second column and the third column are arranged in the longitudinal direction of the machine arm and used for supporting the machine arm to move. The column II comprises two groups of first walking parts supported on a bridge floor, two groups of first double-line mounting parts and two groups of first single-line mounting parts positioned between the two groups of first double-line mounting parts; the third column comprises two sets of second walking parts used for being supported on the bridge floor, two sets of second double-line installation parts and two sets of second single-line installation parts located between the two sets of second double-line installation parts. When the bridge girder erection machine is switched from double-line box girder erection to single-line box girder erection, each group of first walking parts is switched from the first double-line mounting part to the first single-line mounting part, and each group of second walking parts is switched from the second double-line mounting part to the second single-line mounting part, so that the bridge girder erection machine can adapt to various types of box girders.
Owner:CHINA RAILWAY SHISIJU GROUP CORP +1