5results about How to "Save setup time" patented technology

Middle partition wall construction tunnel primary support deformation limit invasion treatment method

The invention discloses a median septum method construction tunnel primary support deformation invasion treatment method which is characterized by comprising the following steps: S1, measuring the section of a treated section of a left pilot tunnel and / or a right pilot tunnel where invasion deformation occurs in a tunnel to obtain primary support deformation invasion data of each treated section; s2, according to the initial support deformation limit invasion data obtained in the step S1, deformation limit invasion treatment construction is sequentially carried out on all treatment sections forwards section by section from outside of the tunnel to inside of the tunnel; and S3, quality detection and later maintenance are carried out on all treatment sections subjected to primary support deformation limit invasion treatment. The jump section construction treatment is adopted for all treatment sections, the treatment sections are subjected to deformation invasion treatment through split type trolley supporting and staggered arch changing combined construction, the construction efficiency is high, a supporting vacuum period does not exist in construction, surrounding rock secondary deformation can be effectively restrained, construction safety is guaranteed, and the construction period is shortened. Meanwhile, disturbance to surrounding rock, anchor rods of an original system and a constructed treatment section is small, and the deformation control effect is better.
Owner:CCFEB CIVIL ENG +2

Introducer assembly

An introducer assembly (10) includes a catheter (12) having a proximal end (14), a distal end (16) extending to a distal tip of the introducer assembly (10), and an outer catheter wall. The catheter (12) includes a medical device holding portion (34) proximate the distal end, a guide wire lumen (100) extending between the proximal and distal ends, and a side opening (50) extending through the outer wall to the guide wire lumen. The side opening (50) and the guide wire lumen (100) are simultaneously open and the guide wire lumen and side opening are able to receive a guide wire (28) therethrough. The catheter (12) is flexible at least in the location of the side opening, such that a guide wire (28) fed from the distal end (16) can pass through to the proximal end (14) when the catheter is substantially straight and can pass from the distal end through the side opening (50) when the catheter is curved at the location of the side opening. The catheter (12) also includes a plurality of stiffening mandrel lumens (104, 106) extending from the proximal end (14) and a plurality of stiffening mandrels sized to fit within the stiffening mandrel lumens (104, 106) and in some forms able to slide therewithin and in other forms enclosed within the stiffening mandrel lumens (104, 106). The mandrels have different lengths disposed along the length of the catheter (12) and can be of substantially uniform diameter.
Owner:COOK MEDICAL TECHNOLOGIES LLC

High slope spillway slope safety protection structure and construction method thereof

The invention provides a high slope spillway side slope safety protection structure and a construction method thereof.The high slope spillway side slope safety protection structure comprises a driving track, a concrete pouring mold and two supporting pouring modules; the travelling crane rail is arranged in the slope direction parallel to the high slope; the concrete pouring mold is arranged on the surface of the high slope and used for forming concrete poured in the concrete pouring mold into a slope concrete layer. The two support pouring modules are slidably connected to the traveling crane rail. Supporting and concrete pouring of the high slope spillway can be achieved, the construction period can be greatly shortened, and the safety protection effect is good.
Owner:SINOHYDRO ENG BUREAU 4

Construction linear and anti-overturning control construction method of a type cable tower

PendingCN122280075AImprove overturning abilityReduce the risk of working at heightsControl systemPre stress
This invention discloses a construction method for controlling the construction alignment and overturning resistance of a type A cable tower, comprising the following steps: preliminary preparation; design, verification, and evaluation of the cable tower's anti-overturning combined control system, which includes a cable tower hollow column construction alignment combined control system formed by connecting the tower column stiffening frame system and the anti-overturning system, a multi-level horizontal active cross bracing system, and a prestressed concrete upper crossbeam system. This system resists the overturning force generated by the upward suspended construction of the hollow tower column through the cable tower hollow column construction alignment combined control system. Combined with the synergistic effect of the horizontal active cross bracing system and the prestressed concrete upper crossbeam system, it jointly offsets the inward tilting force generated by the self-weight and construction load of the two limb tower columns during construction, thereby balancing the tower column overturning moment and ensuring that the cable tower alignment, inward tilting force, and tilt angle meet design requirements. The method also includes the following steps: dynamic control analysis of the spatial position of the cable tower column construction segments; construction and dismantling of the cable tower anti-overturning combined control system.
Owner:CCFEB CIVIL ENG

Large transformer lifting maintenance platform

The utility model relates to the technical field of transformer maintenance, and particularly discloses a lifting maintenance platform for a large transformer. The maintenance platform comprises two sets of stand columns arranged in parallel in the Z-axis direction, a folding supporting platform which is in sliding fit with the stand columns and ascends and descends in the Z-axis direction, a lifting mechanism installed on the stand columns and used for controlling the folding platform to ascend and descend in the Z-axis direction, and a non-return mechanism installed on the stand columns and used in cooperation with the folding supporting platform. According to the utility model, the problem that power-assisted lifting equipment such as electric or hydraulic lifting equipment cannot be erected during overhaul and maintenance operation of a large transformer in a narrow space is effectively solved, and the overhaul efficiency is greatly improved.
Owner:THREE GORGES JINSHAJIANG CHUANYUN HYDROPOWER DEV CO LTD