Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Overhead method for existing railway in area with soft foundation and high water level

A technology with existing railways and high water levels, applied to roads, excavations, roads, etc., can solve the problems of difficult construction of bridge piers, large safety hazards of construction methods, and long construction period, so as to ensure safe operation, reduce land acquisition and demolition, The effect of saving engineering cost

Inactive Publication Date: 2010-07-07
KUNMING SURVEY DESIGN & RES INST OF CREEC
View PDF0 Cites 10 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the construction of railways, highways, and urban roads, there are more and more interferences between new roads, railways and existing railways. Basically, level crossing, overspan and undercrossing are used to solve the problem. Among them, level crossing has great potential safety hazards for railways and roads. , level crossing is basically not considered now, and the upper span mode has little impact on the operation of existing railways, but the lower span mode has a great impact on the operation of existing railways
[0003] For the construction of the existing railway under the city, due to the large area occupied by the construction line and the limited site, it is mostly difficult to implement. Generally, the method of overhead the existing railway is used for construction, but the construction of the bridge pier is under the condition of high water level and extremely poor geological conditions. It is extremely difficult, and there are many problems in the past construction methods, such as large safety hazards and long construction period

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Overhead method for existing railway in area with soft foundation and high water level
  • Overhead method for existing railway in area with soft foundation and high water level
  • Overhead method for existing railway in area with soft foundation and high water level

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] The present invention will be described in further detail below in conjunction with the construction illustration method and the specific implementation of the bridge pier abutment:

[0021] figure 1 Among them, simple buttresses 3 are first built on both sides of the existing railway, and the existing railway 2 is elevated by using the convenient beam 1.

[0022] figure 2 In the middle, the retaining wall 8 is constructed in sections, and the retaining wall 8 is used for support, the soil body 5 is manually excavated by job-hopping, and the sheet pile 7 is constructed. An I-beam 6 is added on the top of the two sheet piles 7 as a top support, and an angle steel is used to connect horizontally between the I-beams. Excavate the soil body 5 to the design elevation of the bottom of the sheet pile and pour the sheet pile.

[0023] image 3 During the excavation, the soil 5 between the two sheet piles is excavated, supported while excavating, until the space that can m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an overhead method for an existing railway in the area with soft foundation and high water level. A temporary bridge abutment is constructed by adopting columnar piers, rectangular bridge abutments and a bored pile foundation; and the existing railway is built in the air by adopting temporary beams before the construction of the temporary bridge abutment, sheet piles are manually dug by using retaining walls, and the sheet piles bear the pressure of soil on two sides so as to provide enough operation space for the construction of the temporary bridge abutment. Because of the adoption of overhead lines of the temporary bridge in the area with high water level, soft foundation and the like, the land acquisition removal is reduced, a little land is occupied, the project can be successfully implemented, and simultaneously, the safe operation of the existing railway can be effectively ensured. The construction method of the invention is suitable for the underpass existing railway of a new road, and has advantage in the existing railway of multi-railway operation in a railway station and the like.

Description

technical field [0001] The invention relates to a construction technology for erecting a temporary bridge on an existing railway with high water level, poor geological conditions and difficult lines, in particular to an overhead method for the existing railway in a section with soft ground and high water level. Background technique [0002] With the construction of railways, highways, and urban roads, there are more and more interferences between new roads, railways and existing railways. Basically, level crossing, overspan and undercrossing are used to solve the problem. Among them, level crossing has great potential safety hazards for railways and roads. , level crossing is basically not considered now, and the way of overspan has little impact on the operation of existing railways, but the way of underspan has a great impact on the operation of existing railways. [0003] For the construction of the existing railway under the city, due to the large area occupied by the co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01D21/00E01C1/04E02D17/02E02D5/34
Inventor 李传琳张敦宝罗云飞樊则飞李万雄邓开宇梁俊雄何海滨杨业新欧志峰苏翌高洪辉
Owner KUNMING SURVEY DESIGN & RES INST OF CREEC
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products