Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

171results about How to "Reliable technical support" patented technology

Three-dimensional horizontal geological section map manufacturing method and applications thereof

ActiveCN103279986AThe concept of complete geological three-dimensional space distribution formAccurate geological three-dimensional space distribution form concept3D modellingTechnical standardEngineering geology
The invention discloses a three-dimensional horizontal geological section map manufacturing method and applications of the three-dimensional horizontal geological section map manufacturing method. The method comprises the steps of obtaining wild geological raw data according to relevant correlation technical standard requirements of energy mineral resource geology and engineering geology, wherein the wild geological raw data comprise but not limited to drilling geological data, drilling point three-dimensional position information, geophysical exploration information and relevant indoor and outdoor testing data. The total number of the steps is ten. The method is applied to engineering geological map manufacturing and energy mineral resource geological map manufacturing, and geological mapping result expressing in geological mapping in the engineering geology and the energy mineral resource geology, wherein the geological mapping result expressing comprises but not limited to relevant mapping result expressing in the links of engineering geological mapping, designing, analyzing, constructing, monitoring and running and relevant mapping result expressing in the links of energy mineral resource planning, mapping, designing, monitoring, exploiting, running and repairing.
Owner:陈超东

Station passenger flow monitoring system, station passenger flow monitoring method, station passenger flow control system and station passenger flow control method

The invention relates to a station passenger flow monitoring system, a station passenger flow monitoring method, a station passenger flow control system and a station passenger flow control method. The monitoring system comprises a data acquisition system and a data processing system, wherein the data acquisition system comprises multiple infrared mounting, video counting and gate counting equipment arranged in a station, and the equipment is respectively connected with the data processing system. The monitoring method comprises steps that, the station is divided into a non-charging zone, a charging zone and a platform zone, the three zones are further divided through setting security equipment and outgoing and incoming gates, acquired data is further transmitted through the infrared counting and gate counting equipment to the data processing system for processing, and outgoing and incoming two-directional passenger flows of the three zones are acquired. The station passenger flow control system is on the basis of a monitoring system added with a control decision making module; for the control method, a station passenger flow can be effectively controlled through the control decision making module.
Owner:CENT SOUTH UNIV

Ore concentration area scale area three-dimensional geological modeling method and system

ActiveCN106934858ARealize automatic fittingQuick conversion3D modellingGeological surveyFeature data
The invention discloses an ore concentration area scale area three-dimensional geological modeling method and system. The method comprises a step of obtaining geological survey data which comprises stratigraphic area feature data, tectonic line feature data, occurrence point feature data, drill hole feature data, exploration line feature data, and trenching feature and tunnel feature data, a step of defining the spatial and temporal relationship between stratums, the spatial and temporal relationship between faults, and the spatial and temporal relationship between the stratums and the faults, a step of using a Cokriging algorithm to carry out implicit spatial interpolation on the geological survey data and the spatial and temporal relationships, a step of constructing a virtual geological section according to an interpolation result, a step of editing the virtual geological section, and a step of determining an ore concentration area three-dimensional geological model according to the virtual geological section. The invention provides the ore concentration area scale area three-dimensional geological modeling method and system, and on the basis of ensuring low cost, the accurate modeling of the geology of an ore concentration area scale area can be carried out.
Owner:INST OF MINERAL RESOURCES CHINESE ACAD OF GEOLOGICAL SCI

Aquaculture water quality short-time combination forecast method on basis of multi-scale analysis

The invention discloses an aquaculture water quality short-time combination forecast method on the basis of multi-scale analysis. The method includes the steps that water quality time sequence data are acquired online and repaired; through empirical mode decomposition, the selected water quality time sequence sample set data are decomposed into IMF components and residual rn components, wherein the IMF components and the residual rn components are different in frequency scale; the IMF components and the rn components are classified, a manual bee colony optimization least square support vector regression machine, a BP neural network and an autoregressive sliding average model are respectively selected for forecast according to classifying features, and finally, all results are weighed and summed to obtain a water quality time sequence forecast result. According to the method, the original water quality time sequence data are decomposed into the components different in time frequency through the empirical mode decomposition, and change conditions in original water quality sequences can be mastered more accurately; advantages of the manual bee colony optimization least square support vector regression machine, advantages of the BP neural network and advantages of the autoregressive sliding average model are complemented and combined, and thus performance of a combined forecast model is effectively improved.
Owner:GUANGDONG OCEAN UNIVERSITY

High-speed train operation kinetic parameter detection method

The invention relates to a high-speed train operation kinetic parameter detection method which comprises the following steps: establishing a random vibration numerical simulation model of train kinetic state and finishing power spectrum response simulation calculation; optimally laying out a line test sensor, measuring dynamic response time-domain information of each test point during line operation of a train, and extracting vehicle part dynamic response characteristics after frequency-domain power spectrum analysis and processing of a test signal; establishing a basic equation of kinetic parameter detection by consistency between numerical simulation power spectrum and line test power spectrum; and solving the basic equation and obtaining and outputting vehicle kinetic detection parameters under the condition of power spectral density consistency. According to the invention, train kinetic parameters are used as monitoring objects, and by combining a field test technology and a dynamic simulation technology, the basic equation of dynamic parameter detection is established to finish the detection of high-speed train operation dynamic parameters. By the method, long-term behavior assessment of high-speed train operation kinetic parameters is achieved, and technical support is provided for train operation safety and reliability.
Owner:CRRC QINGDAO SIFANG CO LTD

Method and device for evaluating greenness of construction parts

The invention discloses a method for evaluating the greenness of construction parts and an evaluation device using the evaluation method. The method comprises the steps: performing market survey and information consultation, and classifying commonly used construction parts; decomposing evaluation indexes layer by layer by applying a WBS method, establishing a green construction part evaluation index system, collecting and calculating original data of typical construction parts, and establishing a construction part information base; entering data information of a construction part to be evaluated; adjusting and modifying index weight, namely judging whether the related content is adjusted according to industrial standard data, and determining the weight of evaluation indexes of the greenness of the construction part; establishing and calling an index utility function; evaluating the greenness of the construction part to be evaluated; and obtaining an evaluation result, and performing data saving on the evaluation result. The method starts from the whole life cycle of the construction parts, adopts the combination of quantitative analysis and qualitative analysis, and finally realizes the establishment of the method for evaluating the greenness of the construction parts.
Owner:XI'AN UNIVERSITY OF ARCHITECTURE AND TECHNOLOGY

Fracturing pulse sand filling system with ultrahigh flow conductivity and method for operating fracturing pulse sand filling system

The invention relates to a fracturing pulse sand filling system with ultrahigh flow conductivity. The fracturing pulse sand filling system comprises an external control unit, an internal controlled unit, an external fracturing pump truck unit, a sand mixing truck and a fluid storage tank. Fracturing sand-mixed fluid is accommodated in the sand mixing truck, fracturing base fluid is accommodated in the fluid storage tank, the external control unit controls the internal controlled unit, so that the sand-mixed fluid in the sand mixing truck and the base fluid in the fluid storage are alternately pumped into the external fracturing pump truck unit at intervals, and the sand-mixed fluid and the base fluid are finally alternately pumped into underground exploitation cracks at intervals by the external fracturing pump truck unit. The fracturing pulse sand filling system has the advantages that propping agent slugs added with fibers can be injected in a pulse manner under the control of the system, the flow conductivity of the prop cracks is greatly improved, a lag effect due to continuous opening and closing of an existing sand mixing truck is prevented, damage to the sand mixing truck is reduced, and pressure building during propping agent injection can be effectively prevented by the system.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA)

Same-direction forming mode based forming morphology control method for GMAW material increase manufacturing

InactiveCN105880808AHigh forming dimension accuracySuppression of height size differencesArc welding apparatusSize differenceQuality control
The invention provides a same-direction forming mode based forming morphology control method for GMAW material increase manufacturing. The control method includes the steps that arc starting and quenching movement I / O control and given electric signal D / A control of forming current and voltage are completed in the GMAW material increase manufacturing process, and when the forming process is close to the arc quenching end, the forming current, forming speed and forming voltage are gradually decreased within the length range of the arc quenching end; a GMAW welding gun is increased for one layer height and is controlled to return to the forming arc starting end; the upper surface temperature of a formed part is reduced to be 20-300 DEG C; forming of a residual layer is completed till the forming size of the whole structural part meets the requirements. The same-direction forming mode based forming morphology control method can effectively inhibit the height size difference produced by the part end in the same-direction forming process, decreases the defects produced in the forming process, ensures that higher forming size precision is obtained in GMAW material increase manufacturing in the same-direction forming mode and provides a reliable technical support for forming quality control of GMAW material increase manufacturing.
Owner:SOUTHWEST JIAOTONG UNIV

Power transmission line ice coating real-time distribution module calculation method

The invention discloses a power transmission line ice coating real-time distribution module calculation method, which comprises the steps of screening real-time meteorological data; recognizing the real-time meteorological data; building a real-time ice coating model; calculating the real-time ice coating thickness of each station; performing ice coating climate condition zoning; building an ice coating trend calculation model; determining a model recurrence period; correcting the ice coating thickness; building an ice coating real-time distribution model; and deducing a final ice coating real-time ice thickness distribution diagram by zone real-time ice thickness distribution features and ice coating real-time ice thickness. The method solves the technical problems that the power transmission line ice coating trend model in the prior art does not sufficiently consider the real-time weather, so that the model cannot reach the precision required for simulating the actual ice coating condition; the ice coating information of a power transmission line cannot be mastered in real time; and the guidance on the power transmission line anti-icing and disaster reduction work cannot be realized, and the like.
Owner:ELECTRIC POWER RESEARCH INSTITUTE, CHINA SOUTHERN POWER GRID CO LTD +1

Offshore multi-directional self-elevating petroleum drilling platform

The invention discloses an offshore multi-directional self-elevating petroleum drilling platform, which belongs to the field of machinery and comprises movable supporting rails, a reversing turntable, a spindle, a rotary shaft, driving motors and a moving device. The spindle is fixed in the middle of the self-elevating platform body, the rotary shaft is mounted outside the spindle, gear rings aremounted on the periphery of the upper portion of the rotary shaft, driving gears which are distributed uniformly mesh with the gear rings and are connected with the driving motor through couplers, the reversing turntable is fixedly mounted at the upper end of the rotary shaft and is kept on the same horizontal plane with an upper deck of the self-elevating platform body, the movable supporting rail is mounted on the reversing turntable, another movable supporting rail is mounted on the upper deck of the self-elevating platform body corresponding to the position on the reversing turntable where the movable supporting rail is mounted, a movable base is mounted on the movable supporting rails, and a drilling module is mounted on the movable base. The offshore multi-directional self-elevatingpetroleum drilling platform is capable of drilling in multiple directions within a required range on the periphery of the platform, and operating preparation cost can be reduced greatly.
Owner:CHINA UNIV OF PETROLEUM (EAST CHINA) +2

System and method for deciding power shedding load based on line breaking fault rate prediction

InactiveCN101923685AOptimizing Optimal Scheduling DecisionsAccurately optimize scheduling decisionsForecastingAc-dc network circuit arrangementsNetwork connectionData acquisition
The invention discloses a system for deciding the power shedding load based on line breaking fault rate prediction, which comprises an SCADA (Supervisory Control And Data Acquisition) system, a power meteorological on-line service system, a database server, an application server and a human-machine interconnected subsystem, wherein the SCADA system and the power meteorological on-line service system are accessed into the database server which is accessed into the human-machine interconnected subsystem through the application server; and finally, the human-machine interconnected subsystem is accessed into the SCADA system. The invention also discloses a load shedding method of a power system, which comprises the steps of on-line electric value data and real-time meteorological data acquisition, extreme value probability prediction of line breaking faults of a power transmission line, random optimizing, scheduling and modeling, sampling average approximate treatment of line transmission power chance constraint, differential evolution solving of a model and optimal load shedding capacity calculation. The invention has high calculation speed and high accuracy, thoroughly solves the technical problem of the random optimization scheduling of uncertain line breaking faults under extreme meteorological disaster and provides a reliable theoretical basis for a load shedding decision of the power system under the extreme meteorological disaster.
Owner:CHANGSHA UNIVERSITY OF SCIENCE AND TECHNOLOGY

Method and system for forecasting short-term wind speed of wind farm based on data driving

The invention relates to a method for forecasting short-term wind speed of a wind farm based on data driving. The method comprises the following steps: S1, determining an input variable and an output variable of a relevance vector machine forecasting model according to a preset forecasting time interval; S2, training the relevance vector machine forecasting model by use of a training sample set; and S3, forecasting the wind speed according to the trained relevance vector machine forecasting model to obtain corresponding wind speed forecasting value. The invention also relates to a system for forecasting short-term wind speed of the wind farm based on the data driving. The system comprises a variable determination module for determining the input variable and output variable of the relevance vector machine forecasting model according to the preset forecasting time interval; a training model for training the relevance vector machine forecasting model by use of the training sample set; and a forecasting module for forecasting the wind speed according to the trained relevance vector machine forecasting model to obtain the corresponding wind speed forecasting value. The method provided by the invention is established based on the relevance vector machine, and can accurately forecast the wind speed.
Owner:THE HONG KONG POLYTECHNIC UNIV

Three-dimensional geological raster body model construction method

ActiveCN105321204AThe concept of complete geological three-dimensional space distribution formAccurate geological three-dimensional space distribution form concept3D modellingTriangulationEarth surface
The present invention discloses a three-dimensional geological raster body model construction method, and belongs to the field of constructing three-dimensional geological body models. The three-dimensional geological raster body model construction method disclosed by the present invention has a particular procedure that comprises the following ten steps: determining a standard project plane range; rasterizing a standard rectangle region G; calculating an earth-surface triangulation net and an underground triangulation net of the standard rectangle region G; calculating a unit grid calculation line and a grid line of the standard rectangle region G; equidistantly dividing an auxiliary line and the calculation line; calculating geological attributes of discrete points; establishing a correspondence relationship between a calculation point and an auxiliary point; constructing three-dimensional geological raster unit bodies; classifying the unit bodies; and combining the unit bodies according to calculation information and position information of the unit bodies. A space is dispersed into a series of points, and the geological attributes of the points are calculated, and then association between the points is analyzed, and thus spatial geometrical bodies where the discrete points are located are combined, so that an overall geological distribution condition of the space is calculated, and the goals of high precision, little space limitation, high efficiency and strong applicability can be achieved.
Owner:马鞍山城智信息技术有限公司

Substation relay protection direct current monitoring system based on substation configuration description (SCD) modeling

The invention discloses a substation relay protection direct current monitoring system based on substation configuration description (SCD) modeling. Firstly, a primary standard SCD file is supplemented with a DC model, and the association relation between secondary equipment and the DC model is established; the SCD file supplemented with the DC model is downloaded to a relay protection state monitoring device, the corresponding relation between a relay protection system and the DC model in the SCD file is analyzed according to an SCL label search language, and DC signal match bases of an online monitoring device are formed; information of a direct current monitoring system is obtained through an MMS network, and DC state information in the direct current monitoring system is analyzed according to a preset DC signal configuration table and matched with the DC model corresponding to SCD; according to the corresponding relation between the relay protection system and the DC model in the SCD file, a relay protection system scope influenced by DC abnormity is displayed visually. Thus, relay protection system DC online monitoring based on the SCD model is achieved, and visual judgment technological means are provided for operation maintainers.
Owner:STATE GRID CORP OF CHINA +3

Coal mine distributed collaborative one map system and collaborative management method

The invention discloses a coal mine distributed collaborative one map system and a collaborative management method. The collaborative system comprises a service interface layer, a service collaboration layer and a data storage layer; the service interface layer comprises mine maps of different majors of coal mines and a service interface of attribute processing, the service collaboration layer corresponds to each professional service interface comprising a corresponding mine map and an interaction interface of attribute management, and comprises a user authentication module, a graphics and attribute processing cooperation module, a searching service module and a map service module; and the data storage layer is used for storing coal mine map data, and comprises an index database, a tile library, and a database. According to the technical scheme, a unified management platform for multi-major data stratification is established, dynamic real-time update and sharing of various types of data are realized, the consistency and timeliness of data in different majors and different users are insured, the digital efficiency and production efficiency of the mine are greatly improved, and a powerful and effective technical support for coal mine safety management is provided.
Owner:BEIZHING LONGRUAN TEKNOLODZHIS INK +1

A method for segmenting point cloud data of a shield tunnel surface

A method for segmenting point cloud data of a shield tunnel surface includes such step of projecting the point cloud of a shield tunnel, and converting three-dimensional point cloud to two-dimensionalpoint cloud according to the direction of the point cloud of shield tunnel; 2) extracting the boundary point, gridding the projected two-dimensional point cloud, and extracting the upper and lower boundary points of the point cloud by using the grid; 3) calculating the segmentation position of the tunnel point cloud, comprising a) calculation of tangent slope of extracted boundary point; and (b)subparagraph position calculation; 4) processing that segment positions of the shield tunnel point cloud on the two projection plane jointly to complete the segmentation of the whole tunnel point cloud data, so as to prepare for the modeling of the tunnel point cloud. The present invention has the advantages that 1) the segmentation method of point cloud on the surface of shield tunnels is studied, which provides technical support for the extraction of the central axis of shield tunnels based on TLS technology, section analysis and other point cloud processing methods. 2) the method can effectively improve the accuracy of the axis fitting and supplement the deformation monitoring technology of shield tunnels, and has the important practical value in the safety monitoring of shield tunnelsand the prevention of major accidents.
Owner:NANJING FORESTRY UNIV

Vertical dispatch method for double sub-elevator groups for energy saving

The invention discloses a vertical dispatch method for double sub-elevator groups for energy saving, and relates to a vertical dispatch method for double sub-elevator groups. The method aims to adapt to the dispatch of double sub elevators for meeting the requirement of passenger flow changing and different floors. The method comprises the following steps of: carrying out collection on an elevator calling signal of a passenger; according to the collected information of the elevator calling signal, a car operating status and the like, analyzing a current traffic mode; applying a genetic algorithm to realize a dynamic sub-region control strategy, and generating an initiate group; decoding an individual, and calculating an individual application degree value; judging whether the individual with the highest application degree satisfies the operation rule of double sub elevators or not, if yes, further judging whether a final condition is met, if no, abandoning the individual, and carrying out genetic operation; and selecting the next generation, carrying out crossing and variation, calculating the individual the individual application degree value of a new generation, repeatedly implementing the genetic operation until meeting the final condition, and responding to passenger calling with an elevator dispatch scheme of a final individual. The vertical dispatch method is applied to the vertical dispatch of the double sub-elevator groups.
Owner:HARBIN INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products