Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1165results about How to "Simple calculation" patented technology

Method for quickly establishing three-dimensional near-seafloor speed model in shallow sea area

ActiveCN109188527AEliminate the effects ofOvercome the effects of ray propagationSeismic signal processingSeismology for water-covered areasOffset distanceShallow sea
The invention provides a method for quickly establishing a three-dimensional near-seafloor speed model in a shallow sea area; the method comprises the following steps of extracting initial informationand extracting a common-center-point gather; calculating the slope of the initial travel time in the common-center-point gather; judging whether a shot point is located in the seawater layer or not,and if yes, correcting the shot point to the seafloor; calculating the speed and the depth of inflection points corresponding to respective offset distances; performing linear interpolation on the speed at each depth to obtain a one-dimensional speed model of the common center point; after all the common-center point domain gathers are processed, adopting the linear interpolation method, calculating the speed values of the rest grid points by utilizing the one-dimensional speed model of all common center points, and a speed model is output. By adoption of the method for quickly establishing the three-dimensional near-seafloor speed model in the shallow sea area, the influence of the seawater layer on ray propagation is overcome, and the influence of multiple excitation receiving modes on an inversion result is eliminated, and the problem that the conventional method needs to carry out multi-ray tracing forward modeling is avoided.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

Active support design method for tunnel early-high-strength rock anchoring and shotcreting synergistic effect bearing arch

The invention relates to the technical field of civil engineering, and particularly discloses a tunnel early-high-strength rock anchoring and shotcreting synergistic effect bearing arch active support design method which comprises the following steps: determining a rock anchor bearing arch acting load and establishing a rock anchor bearing arch calculation model; calculating to obtain the most unfavorable section displacement and stress of the rock anchor bearing arch; verifying whether the displacement of the rock anchor bearing arch meets the requirement; a safety evaluation method of the pre-stressed anchor rods is provided, and the safety of the pre-stressed anchor rods is evaluated according to a rock anchor bearing arch calculation result; establishing a sprayed concrete calculation model; calculating to obtain the most unfavorable section displacement and stress of the sprayed concrete; a sprayed concrete safety and durability evaluation method is provided; active support parameters are determined according to the calculation result of the rock anchor bearing arch and the calculation result of the sprayed concrete. By means of the method, the safety and durability of rock-anchor-shotcrete active supporting under different supporting parameters can be simply, rapidly and accurately calculated, reference is provided for tunnel engineering design adopting active supporting, and good engineering value is achieved.
Owner:SOUTHWEST JIAOTONG UNIV +1

Cable fault positioning method and system based on reflected wave decomposition and kurtosis sorting

The invention discloses a cable fault positioning method and system based on reflected wave decomposition and kurtosis sorting, and aims to solve the problem that a cable fault is difficult to detect under a low impedance change rate. The method comprises the steps of transmitting an incident excitation signal to a cable to obtain a first reflection signal in the cable; an improved VMD algorithm is adopted for decomposition to obtain K IMF components, and the IMF with the maximum kurtosis is selected as a second reflection signal; acquiring a time-frequency distribution curve of the second reflected signal by using short-time Fourier transform and frequency spectrum redistribution technologies; and constructing a two-dimensional energy-time curve by extracting an energy value and time under the frequency of the maximum energy amplitude point, and determining a fault position. The system is composed of an incident excitation module, a decomposition module, an STFT-RSP module and a fault positioning output module, and the positioning method is achieved. According to the method, the limitation of a traditional spread spectrum time domain reflection positioning method in cable fault detection is effectively overcome, and an efficient and accurate instructive technology is provided for cable fault positioning and detection.
Owner:SHANGHAI JIAOTONG UNIV

Energy output optimization scheduling method and system considering random source load virtual power plant

The invention relates to the field of short-term load prediction and power dispatching control of a power system, in particular to an energy output optimization dispatching method and system considering a random source load virtual power plant, and designs a virtual power plant double-layer optimization dispatching model. The lower-layer model constructs a user load prediction model of an improved Transform, and then a renewable energy output model is established by using a scene generation method; the upper layer model takes the power generation cost minimization of the wind-light storage and combustion virtual power plant as a target, considers constraint conditions such as gas turbine output power, ramp rate, energy storage charging and discharging power, electricity storage quantity and power balance, and proposes a single guide target function comparison algorithm considering random source load to carry out optimization solution on a virtual power plant optimization scheduling target function; and planning and deciding the output of each energy source in the next 24 hours. Experiments show that the new energy consumption level can be remarkably improved under the random source load condition, and better economic benefits are obtained while stable operation of a power distribution system is promoted.
Owner:NANTONG ELECTRIC POWER DESIGN INST CO LTD +1

Three-dimensional finite element simulation method for complex slope excavation unloading process

The invention discloses a three-dimensional finite element simulation method for a complex slope excavation unloading process, which comprises the following steps of: 1) constructing a three-dimensional model of a complex slope, and establishing a finite element grid; 2) inputting boundary conditions of the model and material parameter information of each stratum; 3) calculating and simulating an initial stress field of the slope before excavation; (4) according to the initial stress field, the unloading load of the slope excavation part is calculated; (5) finite element calculation is conducted on stress deformation of the excavated slope; according to the method, the high-precision three-dimensional finite element model is established, various material parameters and actual boundary conditions are combined, the stress change and the unloading effect of the slope in the excavation process are simulated, the stress redistribution in the unloading process is accurately reproduced, the prediction precision of local instability and stress concentration areas is improved, and the prediction accuracy of the slope is improved. Therefore, a scientific basis is provided for safety assessment of slope excavation.
Owner:CHINA THREE GORGES UNIV

Method for evaluating quality of cultivated land in sandstorm saline-alkali area

The invention discloses a sand-blown saline-alkali area cultivated land quality evaluation method, relates to the technical field of computer agriculture, and aims to solve the problem that an existing cultivated land quality evaluation method is inaccurate in a sand-blown saline-alkali area cultivated land evaluation result. The method comprises the following steps: 1, collecting research area data of cultivated land in a sand-blown saline-alkali area, wherein the data comprises field survey data, remote sensing image data and other auxiliary data; 2, calculating a remote sensing index; 3, constructing a farmland quality evaluation system in the sandstorm saline-alkali area; 4, determining the weight of each evaluation index of the index layer by adopting a consistent matrix method; 5, carrying out membership degree assignment on each evaluation index based on a membership function and a Delphi method; 6, adopting an accumulation method to obtain a cultivated land quality comprehensive index P; and 7, dividing the distribution interval of the cultivated land quality comprehensive index P into ten grades by adopting an equidistant method. The method is high in speed, good in stability, low in cost and capable of achieving large-area and long-time-sequence cultivated land quality evaluation in the sandstorm and saline-alkali area.
Owner:NORTHEAST INST OF GEOGRAPHY & AGRIECOLOGY C A S

Unmanned aerial vehicle conflict-free route planning method and system applied to low-altitude airspace

The invention relates to the technical field of air traffic management, in particular to an unmanned aerial vehicle conflict-free route planning method and system applied to a low-altitude airspace, and the method comprises the steps: obtaining the starting point and terminal point information of the flight of an unmanned aerial vehicle in an airspace unit when detecting that a new unmanned aerial vehicle enters the airspace unit; acquiring information about whether the grids of the airspace units have conflicts or not; obtaining reachable grids and feasible grids of the unmanned aerial vehicle; obtaining alternative nodes based on the feasible grids of the unmanned aerial vehicle; based on the alternative nodes, a preset constraint condition and the power consumption, obtaining a directed weighted graph; a path in the directed weighted graph represents a conflict-free track; searching the directed weighted graph by adopting an A-star algorithm to obtain an optimal conflict-free track, and controlling the unmanned aerial vehicle to execute the optimal conflict-free track; according to the invention, the optimal conflict-free flight path of the unmanned aerial vehicle can be efficiently and rapidly planned.
Owner:BEIHANG UNIV

Power balance method for power system source-grid-load-storage coordination

The present invention relates to the technical field of distribution network planning and construction, and discloses a power balancing method for power system source-grid-load-storage coordination, including the following steps: S10: superimpose total load, the total load includes conventional load and electric energy substitution load, perform superimposition calculation on them, adopt a method combining natural growth and special load when predicting electric energy substitution load, and fit the total load curve after the total load is superimposed; S20: net load curve; S30: curve after natural peak shaving; S40: curve after grid side peak regulation; S50, balance curve; S60, power demand. The present invention establishes a clear and highly operable power balancing process for new power system source-grid-load-storage coordination, clarifies the relationship between the source-grid-load-storage interaction after a large number of new energy sources are connected to the power grid, and can improve the utilization efficiency of the power grid on the basis of ensuring the security of the power grid while fully absorbing a large number of new energy sources.
Owner:FUZHOU POWER SUPPLY COMPANY OF STATE GRID FUJIAN ELECTRIC POWER +1

Traditional Chinese medicine tongue diagnosis auxiliary diagnosis method and system fusing multiple characteristics of tongue body

The invention relates to a traditional Chinese medicine tongue diagnosis auxiliary diagnosis method and system fusing multiple characteristics of a tongue body, and belongs to the technical field of medical information and health data processing. Firstly, a BlendMask network is utilized to carry out tongue segmentation model training, an obtained tongue segmentation model is utilized to complete data segmentation, tongue shape analysis is carried out on a segmented tongue data set, whether the shape is normal or not is judged by calculating a tongue skew index, and a data set with the normal shape is utilized to input a feature extraction network to carry out classification training. And classifying the tongue body image by using a tongue body identification and classification model, carrying out further regional tongue color analysis on the tongue body with abnormal tongue color, and outputting the comprehensive health state of the patient by combining the tongue body form skew feature, the tongue body identification and classification and the regional tongue color analysis. According to the invention, comprehensive analysis is carried out from the aspects of tongue body morphology, color and regional tongue color, the accuracy of tongue diagnosis analysis is improved, and efficient diagnosis of organs is realized.
Owner:SHANDONG FENGSHI INFORMATION TECH CO LTD

Automatic processing method and device and electronic equipment

The invention discloses an automatic processing method and device and electronic equipment, and relates to the field of data processing. The method comprises the following steps: acquiring an invoice image; performing feature extraction on the invoice image to obtain layout features corresponding to the invoice image; matching a corresponding target invoice template according to the layout characteristics; determining region segmentation parameters for the invoice image, and performing key information extraction on the invoice image according to the region segmentation parameters to obtain a plurality of key information regions; performing OCR (Optical Character Recognition) on each key information area to obtain an invoice information text corresponding to each key information area; if it is determined that the invoice information text is correct, key field extraction is conducted on the invoice information text, invoice keywords are obtained, and structured invoice information data are constructed according to the invoice keywords; and associating the invoice image with the invoice information data, and generating an invoice identification code. By implementing the technical scheme provided by the invention, the workload of manual input and verification is reduced, and the efficiency is improved.
Owner:SHUZU TECHNOLOGY (NANJING) CO LTD

Residue soil volume measuring method, system and device for shield tunnel construction

The invention discloses a muck volume measurement method, system and device for shield tunnel construction, and the method comprises the steps: obtaining first data corresponding to muck to be measured in the shield tunnel construction in real time based on a self-adaptive window; in combination with a triangle cumulative sectional area method and an AE-FPFH-ICP algorithm, performing parallel processing to generate second data and third data corresponding to the to-be-measured muck; according to the first data, in combination with the second data and the third data, fourth data corresponding to the muck to be measured is generated in real time; the invention discloses a muck volume measuring system, a corresponding system and a corresponding device, the muck volume can be accurately calculated in real time under the condition of high-frequency data acquisition, the calculation process is simplified, the section measurement precision is improved, and the high automation of the measurement process is realized by automatically calculating the running speed of a conveyor belt; and numerical integration is carried out in combination with a Simpson method, so that the accuracy of volume calculation is ensured, and a more reliable and efficient solution is provided for muck volume measurement in tunnel construction.
Owner:THE THIRD ENG CO LTD OF CHINA RAILWAY SEVENTH GRP +2

Pile-soil nonlinear interaction rigidity-damping cooperative matching interface displacement model calculation method

According to the method, a brand-new Naggar-Iwan interface model is established between a pile body and a deformed soil body, so that the synergistic effect between a soil disaster body and a pile disaster-bearing body is simulated. Based on a pile-soil co-working principle and an elastic theory, an elastic-plastic model is adopted to represent and establish a relationship between pile-soil interface frictional resistance and relative displacement, a pile is divided into a plurality of micro-segment units according to a transfer principle, a micro-element is taken for stress analysis, and soil displacement outside the pile-soil interface is calculated by combining boundary conditions and adopting a shear displacement method; according to the generalized Hooke's law strength theory, stress analysis is carried out on each mass point, a generalized structural force-displacement transfer function is constructed by utilizing the basic principle of dynamics, then a complex matrix operation principle in a complex variable function domain is utilized to carry out simplified calculation on a stiffness matrix [K] and a damping matrix [C], and horizontal and vertical displacements of a Naggar-Iwan interface model are obtained; and finally, according to the pile-soil displacement continuous boundary condition, the pile is completely attached to the soil body, and the displacement of the pile can be solved through superposition of the displacement of the soil body and the displacement of the interface Naggar-Iwan model.
Owner:LANZHOU JIAOTONG UNIV +2

Drug molecule optimization method based on hidden space diffusion model

The invention discloses a drug molecule optimization method based on a hidden space diffusion model. The method comprises the steps of 1, constructing drug molecule data sets for different tasks; 2, constructing and pre-training a molecular SMILES auto-encoder; 4, constructing and training a molecular optimization model based on the hidden space diffusion model; according to the method, new molecules which have relatively high similarity with original molecules, have better attributes and are more diversified can be generated, so that the optimization efficiency of multiple attributes of drug molecules is improved.
Owner:ANHUI UNIV

Enterprise park meteorological fire risk assessment method based on adaptive random forest model

The invention relates to an enterprise park meteorological fire risk assessment method based on an adaptive random forest model, and the method comprises the steps: building a risk assessment model and a visual early warning platform, enabling the risk assessment model to collect alarm data, meteorological data, enterprise data and park division data, and forming a risk assessment data set, and integrating internal characteristics and external data of the park into a data set, inputting new data into the self-adaptive random forest model by means of a real-time data flow technology, updating and evaluating a fire risk index value of the park in real time, and optimizing a model decision tree to automatically adjust a risk evaluation model and adapt to changes of environment and operation. Accurate early warning information is provided for a visual early warning platform, the risk level of the park is displayed in real time, and a risk alarm is given out in time.
Owner:温州市气象防灾减灾预警中心 +2

Joint beam forming optimization method for RIS-assisted low-altitude communication system

The invention discloses a joint beam forming optimization method for an RIS auxiliary low-altitude communication system. The problem of performance bottleneck caused by interaction of active beam forming and passive beam forming is solved by adopting a genetic algorithm based on a dynamic adaptive theory. Aiming at the limitation of a standard optimization method, a hybrid strategy of genetic algorithm optimization and a full-connection neural network is explored, and intelligent collaborative setting of system parameters is realized. Simulation results show that the hybrid algorithm not only simplifies the calculation process to obtain the optimal network parameters, but also effectively optimizes the system structure by dynamically adjusting the RIS reflection configuration. On the basis, the signal transmission quality is improved, interference is reduced, and it is guaranteed that the RIS-assisted low-altitude unmanned aerial vehicle intelligent communication system stably and efficiently operates in a complex wireless transmission environment.
Owner:NANJING CHINA SPACENET SATELLITE TELECOM CO LTD

Routing path determination method and device, medium and product

The invention discloses a routing path determination method and device, a medium and a product, and relates to the technical field of communication. On the basis of a triangular prism network structure, when a source routing node and a target routing node are located on the same layer, the source routing node and the target routing node are determined by adopting a triangular prism side edge routing rule, a triangular prism surface routing rule and a relation of actual exclusive or results of the two routing nodes. According to the triangular prism side edge routing rule, side edge routing is preferentially carried out under the condition that the two routing nodes are not located on the same triangular prism face, the routing path is made to be short, and finally the two routing nodes move to the same triangular prism face. The routing rule of the triangular prism surface is based on the routing rule of routing along the triangular prism surface under the condition of the same surface, the flexibility and diversity of the routing path are determined according to different rules, and deadlock is avoided. And when in different layers, the system needs to jump to the same layer for routing planning, so that the reliability of communication is ensured.
Owner:SHANDONG YUNHAI GUOCHUANG CLOUD COMPUTING EQUIP IND INNOVATION CENT CO LTD

Mouth shape generation method and device for voice driving

The invention provides a mouth shape generation method and device for voice driving, and relates to the technical field of natural language processing. The method comprises the following steps: based on an ffmpeg tool, carrying out image processing according to original video data to obtain spliced frame image data and facial feature points; according to the original audio data, performing feature extraction through a deep audio feature extractor to obtain audio features; performing feature fusion through an audio-video sequence feature fusion device to obtain fusion features; performing video generation through a lip action generator according to the facial feature points and the fusion features to obtain synthesized video data; optimizing a lip action generator according to the original video data and the synthesized video data; and performing video generation based on the depth audio feature extractor, the audio-video sequence feature fusion device and the optimized lip action generator to obtain target synthesized video data. The invention relates to a mouth shape generation method aiming at voice driving, which is high in video resolution and sufficient in facial texture detail reservation.
Owner:BEIJING LANGUAGE AND CULTURE UNIVERSITY

Epoxy resin alcoholysis model-based degradation conversion rate calculation method and system

The invention discloses a degradation conversion rate calculation method and system based on an epoxy resin alcoholysis model, and belongs to the technical field of thermosetting epoxy resin degradation and recovery. The method comprises the following steps: pouring epoxy resin to cure and mold, carrying out an epoxy resin alcoholysis degradation experiment at different temperatures, and recording degradation conversion rates at different moments; constructing an epoxy resin geometric model, and analyzing to obtain a degradation conversion rate differential expression containing reaction rate constants and geometric parameters; solving the differential equation to obtain a reaction rate constant, and fitting by using an Arrhenius formula to obtain degradation activation energy; analyzing a transesterification process of the epoxy resin and the alcohol solvent and a diffusion process of the alcohol solvent in the epoxy resin, and establishing a degradation conversion rate expression which does not contain geometric dimension parameters; and substituting degradation reaction activation energy, and fitting to determine a degradation conversion rate expression which does not contain geometric dimension parameters. The invention aims to provide a reference for the degradation process analysis of the large-size epoxy resin with a complex shape.
Owner:XI AN JIAOTONG UNIV

Thermal simulation method and system of circuit board and circuit board

The invention relates to the technical field of thermal simulation, in particular to a thermal simulation method and system of a circuit board and the circuit board. The method comprises the following steps: acquiring circuit board design data and modeling to obtain a circuit board three-dimensional structure model; performing precision estimation according to the circuit board design data to obtain circuit board thermal simulation precision data; dividing the circuit board three-dimensional structure model according to the circuit board thermal simulation precision data to obtain circuit board assembly grid data; performing physical attribute assignment on the circuit board assembly grid data according to the circuit board design data to obtain physical grid unit data; performing circuit board thermal simulation according to the physical grid unit data to obtain circuit board thermal simulation data; and visualizing the thermal simulation data of the circuit board to obtain a thermal stress distribution diagram, and performing circuit board assembly design optimization on the three-dimensional structure model of the circuit board according to the thermal stress distribution diagram to obtain an optimized three-dimensional structure model of the circuit board. The heat management capability of the circuit board can be effectively improved.
Owner:SHENZHEN SANDEYING ELECTRONICS CO LTD

Junction temperature estimation method and device of power semiconductor and vehicle

The invention discloses a junction temperature estimation method and device for a power semiconductor and a vehicle, and the method comprises the steps: obtaining the loss, temperature rise data and environment temperature of the power semiconductor in an electric period, the temperature rise data comprises temperature rise values of the temperatures of the power semiconductor under different operation conditions relative to the environment temperature; determining thermal impedance according to the loss and temperature rise data; and determining the junction temperature according to the loss, the thermal impedance and the environment temperature. According to the method, the load rate of the vehicle-mounted software can be reduced, additional hardware does not need to be added, so that test resources are simple, the accuracy is high, the practicability is high, the junction temperature calculation efficiency is improved, and the calculation time is saved.
Owner:HYCET TRANSMISSION SYST (JIANGSU) CO LTD

Vehicle transverse motion control method and system

The invention provides a vehicle transverse motion control method and a vehicle transverse motion control system. The vehicle transverse motion control method comprises the steps that a feedback rotation angle is calculated based on an LQR algorithm; calculating a feed-forward rotation angle based on preview tracking control; and adding the feedback rotation angle and the feedforward rotation angle to obtain a front wheel rotation angle original value which is used for participating in vehicle transverse motion control. Through the configuration, on one hand, the advantages of simple calculation and less calculation resource occupation of the LQR algorithm and the preview tracking control algorithm can be played, and on the other hand, the control effect can be effectively improved by combining the calculation results of the LQR algorithm and the preview tracking control algorithm. The vehicle transverse motion control system is hardware for operating the control method. Both of the two can solve the problem that in the prior art, a vehicle transverse movement online control method cannot meet the requirements of actual application scenes.
Owner:UNITED AUTOMOTIVE ELECTRONICS SYST

Metadata blood relationship analysis method, device and equipment based on Neo4j and medium

The invention discloses a Neo4j-based metadata blood relationship analysis method and device, equipment and a medium, and relates to the technical field of computers, and the method comprises the following steps: carrying out relationship graph construction on metadata of an obtained data source in a Neo4j library according to metadata entity information, entity attribute information and a metadata association relationship of a preset blood relationship graph, obtaining a metadata blood relationship graph; when a data analysis task is obtained, querying an association node and a target edge associated with a target node where target metadata is located in a metadata blood relationship graph of a Neo4j library through target metadata entity attribute information of a to-be-analyzed metadata blood relationship in the data analysis task and a preset query statement; and analyzing a transmission process and a conversion process of the target metadata corresponding to the target node through the association node and the target edge. The efficiency of metadata blood relationship analysis is improved, complex data relationship calculation is simplified, the increase of data scales and data source types can be coped with, and expansibility is achieved.
Owner:SHANDONG CVICSE MIDDLEWARE CO LTD

DFT precoding FBMC system carrier synchronization method for air-ground communication

The invention provides a DFT precoding FBMC system carrier synchronization method oriented to air-ground communication. The method comprises the following steps: acquiring FBMC symbol data to be transmitted; a special CAZAC sequence with the length of M / 4 is constructed, four synchronous sequence symbols are constructed, and corresponding sending signals of a time domain are output after the four synchronous sequence symbols and other data symbols are subjected to conjugate symmetry module, pre-FFT, IFFT subcarrier modulation and PPN multi-phase filtering; the method comprises the following steps: constructing a local sequence at a receiver end, respectively taking two continuous parts with the length of M / 4 from a received special time domain sequence signal, and respectively correlating the two continuous parts with corresponding parts of the local sequence to obtain a correlation result; and conjugating the correlation result of the first part of sequence, multiplying the conjugate with the correlation result of the second part of sequence to obtain a frequency offset measurement function, obtaining decimal frequency offset estimation according to the frequency offset measurement function, and carrying out carrier frequency offset compensation by using a frequency offset estimation value. According to the method, a synchronous training sequence design method is provided, and carrier frequency offset is estimated and corrected by using time domain signal construction characteristics of a training sequence.
Owner:ZHONGKE NINGBO (BEILUN) SYSTEMS ENGINEERING APPLICATION RESEARCH INSTITUTE +1

Lake remote sensing image algae bloom coverage degree inversion method based on machine learning

The invention relates to a lake remote sensing image algae bloom coverage degree inversion method based on machine learning. Compared with the prior art, the defect that algae bloom coverage degree inversion is difficult to carry out on lake remote sensing images is overcome. The method comprises the following steps: acquiring and preprocessing a remote sensing data source; carrying out algae bloom extraction and processing on the Sentinel-2 multispectral image to obtain a coverage sample set; performing feature selection and combination on the MODIS multispectral image to obtain a feature index data set; constructing a lake algae bloom coverage degree data set; constructing a model and training based on machine learning; and obtaining an inversion result of the algae bloom coverage. According to the method, the algae bloom coverage degree of the MODIS pixel scale can be obtained by utilizing Sentinel-2 data with high spatial resolution, and the quantitative estimation model is constructed by combining MODIS spectral characteristics, so that high-temporal-spatial-precision monitoring and change analysis of the lake algae bloom are realized.
Owner:ANHUI UNIV

Vehicle visual relay tracking method based on spatial-temporal feature fusion

The invention discloses a vehicle visual relay tracking method based on spatial-temporal feature fusion, and belongs to the technical field of intelligent traffic. After a multi-target tracking trajectory of each camera on a road is obtained, the method comprises the following steps: establishing a camera space-time constraint based on a topological relation between the cameras and the road, performing trajectory compatibility judgment based on the camera space-time constraint, and filtering out incompatible trajectory pairs; modeling the trajectory of the target vehicle into a graph, and calculating the similarity of compatible trajectory pairs based on a graph convolutional neural network; based on the trajectory similarity, the multi-camera trajectory association problem is decomposed, hierarchical clustering is performed on the trajectory by using a heap data structure, and the global association trajectory of each target vehicle is obtained step by step. According to the method, the efficiency and accuracy of track association are improved, the calculation efficiency is optimized, and vehicle tracking in a complex scene and under multiple cameras can be dealt with.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Train formation distributed cooperative control method based on model predictive control

The invention discloses a model predictive control-based train formation distributed cooperative control method, which comprises the following steps of: acquiring a train tracking speed running curve, train speed limiting information and a train running resistance coefficient, and establishing a train formation model; according to a preset model predictive control algorithm, in a set predictive control time domain, according to a train formation model, a control target and constraint conditions, state variables of positions and running speeds of all trains in a train formation and control variables of control forces of all the trains in the train formation are used to predict the train formation according to state variables of the positions and running speeds of all the trains in the train formation. Respectively generating optimization control problems of the leading train and the following train in the train formation; and based on a synchronization theory, solving an optimization control problem of each train to obtain a control force of each train in the formation, and inputting the control force into a train operation control system to realize distributed control of each train in the train formation. The method is based on a model predictive control algorithm, uses a synchronization theory, and reduces the use of computing resources and communication resources in practice.
Owner:BEIJING JIAOTONG UNIV

Lightweight electrical equipment multi-target detection method and system

The invention relates to a lightweight electrical equipment multi-target detection method and system, and the method comprises the steps: collecting multi-angle images of different types of electrical equipment, obtaining an experiment data set, constructing a Ghostnet lightweight network structure, introducing a CBAM attention mechanism and an SPPFCSPC convolution structure to improve a YOLOv8 model, and obtaining a multi-target detection model based on the improved YOLOv8 model. And training, verifying and evaluating the multi-target detection model based on the improved YOLOv8 model to obtain a multi-target detection optimal model for electrical equipment multi-target detection. According to the method and the system, the model complexity and the calculation amount can be reduced while the detection precision is ensured, and an effective solution is provided for multi-target identification detection of lightweight electrical equipment.
Owner:QUANZHOU ELECTRIC POWER TECH INST OF FUJIAN ELECTRIC POWER +2

Method for detecting broadband transmission characteristics of capacitor voltage transformer

The invention discloses a method for detecting broadband transmission characteristics of a capacitor voltage transformer (CVT), which comprises the following steps of: inputting a uniform white noise signal into a test system without a tested CVT, and calculating a transfer function H (f) of the test system and a corresponding compensation function A (f); a reference test voltage is constructed by superimposing multiple harmonic waves on the fundamental wave voltage, a reference spectrum Y (f) is obtained through Fourier transform, and a driving spectrum X (f) and a driving signal x (t) are obtained by combining the compensation function A (f); a driving signal x (t) is applied to a test system provided with a tested CVT, a test voltage ui (t) applied between a primary side medium voltage end of the tested CVT and the ground is collected, a response signal measurement spectrum Ui (f) of the test system is obtained through Fourier transform, and then the driving signal x (t) is corrected according to an error spectrum of the response signal measurement spectrum Ui (f) and a reference spectrum Y (f), so that the voltage signal ui (t) meets design requirements; and collecting the test voltage uo (t) output by the secondary side of the tested CVT at the moment, and calculating the transmission characteristic parameters of the tested CVT by combining the test voltage ui (t) and the test current ii (t) of the medium-voltage end of the tested CVT at the moment.
Owner:MAINTENANCE & TEST CENTRE CSG EHV POWER TRANSMISSION CO

Quantitative characterization method for high-speed remote landslide motion path roughness

The invention discloses a quantitative characterization method for the roughness degree of a high-speed remote landslide motion path, and belongs to the technical field of geological disasters, and the method comprises the steps: firstly obtaining remote sensing image data of a target landslide, DEM digital elevation data of the target landslide and landslide boundary data of the target landslide, and obtaining elevation data of the motion path of the target landslide through processing; carrying out detrending to obtain elevation data of the landslide motion path microtopography; and according to the elevation data of the landslide motion path microtopography, performing calculation based on a joint contour line fractal dimension calculation method to obtain the fractal dimension of the target landslide motion path after detrending, and performing calculation to obtain the path roughness coefficient of the target landslide. According to the method, the calculation process is simple, the application range is wide, the roughness degree of the high-speed remote landslide motion path can be quantified under different spatial scales, the influence of the microtopography in the landslide motion process is fully revealed, and more comprehensive roughness characterization is provided.
Owner:SOUTHWEST JIAOTONG UNIV