The invention relates to a soft
rock tunnel grouting combined control excavation
system and a construction method. The soft
rock tunnel grouting combined control excavation
system comprises a concrete grouting stopping wall, a tunnel, a grouting stopping rock tray, a primary supporting type
steel frame, a small guide
pipe shaping support, a guiding construction platform, a temporary inverted arch, a grouting platform and a section steel transverse temporary supporting frame. The construction method has the beneficial effects that after the first round of advanced grouting, excavation is reserved, the
assembly type
grout stop wall is installed, the grouting
pipe is arranged, and advanced grouting is conducted; the influence of gushing water on a tunnel structure, an underground
water environment and surface
vegetation is effectively controlled; the lower
flange of the primary support profile steel is clamped between the inclined I-shaped steel and the
cushion block, and the primary support
steel frame fixing bolts are installed in a hole forming mode to complete installation of the small guide
pipe connecting device, so that the construction precision of small guide pipe installation is greatly improved, and the small guide pipe connecting device can be recycled.