The present application relates to the technical field of
supervisory control and
data acquisition system, specifically to a mutual aid scheduling control method based on
virtual power plant, comprising the following steps: collecting actual and target power calculation deviation,
processing deviation level to generate
label table, configuring
timer to generate trigger
label, acquiring state parameters to calculate resource boundary and adjustment direction, distributing adjustment power to generate
instruction sequence, issuing instructions to collect execution deviation correction error, and updating boundary to generate correction configuration set. In the present application, the grid-connected point power deviation is collected to establish a level
label, the closed-loop cycle balance response and load are dynamically matched, the high-
delay data is filtered combined with time stamp
verification, the strategy is ensured to be based on real-time effective information, communication congestion misjudgment is avoided, the adjustment boundary is calculated according to the resource state and the ordered instruction is generated, the safety of collaborative adjustment is guaranteed, the correction amount is calculated based on the execution feedback, the response error is compensated in a bidirectional
closed loop, and the target power tracking accuracy and
system robustness are improved.