Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

916results about How to "Economically reasonable" patented technology

Power grid optimal planning method of large-scale grid-connected wind farm

The invention discloses a power grid optimal planning method of a large-scale grid-connected wind farm, comprising the following steps of: step 1, obtaining net rack planning data, system operation predication data and wind power planning data; step 2, constructing a calculation model comprising a target function and a constraint condition of the model; step 3, setting calculation parameters; and step 4, inputting the net rack planning data, the system operation predication data and the wind power planning data, which are obtained by the step 1, and three parameters set by the step 3 into the calculation model constructed in the step 2; utilizing optimization algorithms including a Benders decomposition method, a branch and bound method and the like to solve through a computer. According to the method provided by the invention, a 'peak property' of wind power output is considered and the economic rationality of a power grid optimal planning scheme is ensured through allowing a wind power output peak value with a smaller probability; and the method provided by the invention comprehensively considers two aspects on newly-constructed line investment and wind power comprehensive benefits, and simultaneously ensures the line utilization rate and the wind power comprehensive benefits.
Owner:XI AN JIAOTONG UNIV

Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks

The invention discloses a preliminary bracing construction method for a tunnel with surrounding rocks containing collapsible loess and soft rocks. The method includes the following steps that a plurality of layers of advanced pipe sheds are arranged on a collapsible loess layer, and a single layer of advanced pipe shed is arranged on a soft rock layer; after the advanced pipe shed is set up, a working face is closed through sprayed concrete, a system anchor bolt is arranged on the soft rock layer, a foot locking small guide pipe is arranged at the arch springing position of the tunnel, and grouting is conducted on the rocks through permeation of the system anchor bolt and the foot locking small guide pipe; a pre-fabricated reinforcing mesh is paved on a concrete initial spraying layer formed by concrete initial spraying in a fluctuation mode, and a reinforcing mesh arranged at the collapsible loess layer is encrypted; a steel arch support is set on the collapsible loess layer, a reinforcing steel bar grid is set up at the soft rock layer, and the connecting position of the reinforcing steel bar grid and the steel arch support is welded; repeated spraying is conducted by adopting concrete spraying, and construction of tunnel preliminary bracing is finished. By means of the method, stress releasing and deformation coordination of two layers of surrounding rocks can be well controlled, operability is good, construction cost is low, and the safety is good.
Owner:CENT SOUTH UNIV

Drip irrigation under film of fruit tree and root field microenvironment regulation and controlling integrated method

The invention relates to a drip irrigation under a film of a fruit tree and root field microenvironment regulation and controlling integrated method. The method comrpsies: firstly opening a regulation and control delve on the anterior limb projected on the fruit tree canopy ground, laying a seeding raising film on the lateral surface and the bottom part of the regulation and controlling delve, and placing filling materials on the seeding raising film; then disposing a drip irrigation pipe along the fruit tree row according to duplex tubes or three tubes; and laying the ground film along both sides of the tree row, covering the drip irrigation pipe and the regulation and controlling delve, and compacting with soil. Through the invention, the water and fertilizer integration drip irrigated under the film, watering and manuring automation as well as the water and fertilizer slow release and growth control and flower promotion regulated and controlled at the root field microenvironment are combined together, the root system range of the fruit tree is controlled at a certain volume, the nutrient is released in the delve through regulating and controlling the soil moisture percentage, ground temperature, fertilizer and the like of the root field, the growing development of hair root is promoted, vegetative growth and reproductive growth process above the ground part is regulated, and the hair root is regulated and controlled within the range of the delve to reach the function of coronal controlling and flower promotion. The method is simple, practical, economic and reasonable, and is a fruit tree root field microenvironment regulation and controlling integrated method with ecological environment protection and water and fertilizer conservation.
Owner:XINJIANG AGRI UNIV

Method for spraying calcium and devulcanizing in circulating fluid-bed boiler using PLC control system

The invention discloses a method which applies in a PLC control system to implement calcium spraying and desulfurization inside a circulating fluidized bed boiler, comprising the steps that outsourcing desulfurizer is transported and stored; a star unloader is used for feeding, a solid flowmeter is used for measuring, and a helicoidal pump is used for transporting; powder lot is blown into the boiler for calcination and desulfurization by a lobe fan; a flue gas SO2 sampling device is arranged on a chimney, the concentration value of SO2 which is measured by a monitor is uploaded to the monitoring network of environment protecting department in a wireless way by a data collecting instrument, at the same time, the concentration value of SO2 is transmitted to the PLC control system by the on-line monitor of the SO2; the frequency conversion rotating speed of a motor of the unloader in controlled by the PLC, so that the desulfurizer can be automatically added; wherein, the instantaneous and integrated flow of the solid flowmeter is transmitted to the monitoring network of environment protecting department by the PLC for being referred in real time. The method realizes the automatic control of a desulfurization system and on-line monitoring of the usage of limestone powder in real time, at the same time, the desulfurization efficiency is improved, thus remarkably saving the usage of limestone powder, reducing the running cost, and simultaneously lightening the labor intensity of operating staffs.
Owner:碧水蓝天环保集团有限公司

Method for testing and monitoring cable force of PC steel strand stay cable

The invention discloses a method for testing the cable force of a PC steel strand stay cable, which is used for testing steel strands individually stretched by the equal tension method. The method comprises the following steps of: obtaining the actual effective tension force of each steel strand based on the actual extension amount and the actual anchorage tension force before anchoring the steel strands; obtaining the linear regression equation of the steel strands according to the actual tension sequence number and the actual effective tension force of the steel strands; obtaining the effective tension force representative value of each anchored steel strand; and multiplying the effective tension representative value of the last stretched steel strand by the number of the steel strands to obtain the cable force of the stay cable. The invention also provides a method for monitoring the cable force of a PC steel strand stay cable in the construction process based on the testing method. On the basis of reasonably using the linear regression analytical method, the invention establishes a method for evaluating the stretching state of the PC steel strand stay cable, thereby effectively solving the problem that the cable force state of a stretched PC steel strand stay cable can not be evaluated by only the traditional testing method.
Owner:CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD

Method for extracting germanium from high-impurity low-grade complex zinc oxide powder

The invention provides a method for extracting germanium from high-impurity low-grade complex zinc oxide powder, and belongs to the technical field of hydrometallurgical processes. The method comprises the following steps of: under the process conditions that the PH value is 0.5 to 1.5 and the temperature is 55 to 75 DEG C, adding sulfite into aqueous solution of zinc sulfate which contains 8,000to 15,000mg/L iron, 300 to 1,000mg/L Fe<3>, and 30 to 135mg/L germanium so as to convert Fe<3> into Fe<2>, complexing and precipitating the germanium by adopting tannic acid to ensure that the germanium in the aqueous solution of zinc sulfate is subjected to a phase change reaction to form [GeO(C75H52O46)2<2>], pretreating, and calcining in a calcining kiln to obtain a germanium concentrate with the germanium content of between 8 and 22.36 percent which is used for producing germanium series products; and removing iron from solution of zinc sulfate obtained after the separation, and feeding into the conventional electrolytic zinc production system to recover valuable metals such as zinc, cadmium, indium and the like. By the method, the interference of the Fe<3> to a multi-metal recovery system can be effectively avoided, the production cost is reduced, and the smooth production process flow is ensured. The method has great significance for comprehensively recovering and recycling the valuable metals in low-grade high-impurity complex zinc oxide raw materials.
Owner:NANHUA MAOSEN REGENERATION TECH CO LTD

Slant grouting control steel anchor pipe frame and construction method thereof

Provided are a slant grouting control steel anchor pipe frame and a construction method thereof. A primary grouting body is poured to the peripheral space of a steel anchor pipe through a primary grouting pipe; after the primary grouting body is solidified, a secondary grouting body is poured to the outside through a secondary grouting hole in the steel anchor pipe wall in a compression mode, the secondary grouting body splits the primary grouting body through the secondary grouting hole and is diffused to a peripheral rock and earth mass and forms a mixed grouting body with the primary grouting body. A concrete beam is poured along a slope to wrap the top of the steel anchor pipe in the beam. The slant grouting control steel anchor pipe frame combines the advantages of an anchor rod frame and a grouting control technology, the steel anchor pipe is used as a protection measure and a secondary grouting channel, and by means of improvement of the strength of the peripheral rock and earth mass through the secondary grouting, a steel pipe and the peripheral rock and earth mass form a whole body to defend a slope together. A slant grouting control steel anchor pipe frame structure has the advantages of being advanced in technology, reasonable in economy, fast in construction and the like and is a novel slope reinforcing technology with good developing prospects.
Owner:铁科检测有限公司 +1

Suspended support arch shell structure

InactiveCN101906815AImprove leaping abilityOvercome the disadvantage of difficult handling of horizontal thrustArched structuresVaulted structuresEllipseEngineering
The invention relates to a suspended support arch shell structure comprising a net shell, an arch, a stay bar, a radial pull rod and an annular pull cable. The arch is replaced by a part of rod members of the net shell, and the lower part of the net shell structure is provided with a vertical stay bar, the radial pull rod and the annular pull cable to form the suspended support arch shell structure. The net shell adopts a single layer of spherical net shell, a single layer of ellipse spherical shell, double layers of spherical net shell and double layers of ellipse spherical shell. The invention has the advantages of overcoming the defects of poor stability of the single layer of net shell or the double layers of net shell with thinner thickness and small spanning capability and the defects of difficult processing of horizontal push force of an arch springing support base of an arch structure by fully utilizing matured installation technology of the net shell, strong spanning capability of the arch structure and high intensity tension performance of a cable material, thereby a structure system with large spanning capability, favorable stability, reasonable economy and convenient construction is formed, and the invention is universally suitable for common industry and civil architecture, in particular to large-spanning space structure systems, such as convention centers, stadiums and the like.
Owner:TIANJIN UNIV

Temperature gradient energy storage heat exchanger

The invention discloses a temperature gradient energy storage heat exchanger. The temperature gradient energy storage heat exchanger comprises a front clamping plate, a rear clamping plate and at least two sets of plates overlapped between the front clamping plate and the rear clamping plate to form fluid channels in a sealed mode in sequence. The four corners of the front clamping plate, the fourcorners of the rear clamping plate and the four corners of the plates are provided with circular fluid through holes correspondingly. The spaces inside the at least sets of the plates are filled withthe same phase change materials. The phase change temperatures of the phase change materials in the different sets of the plates decrease progressively in the fluid flowing direction. The temperaturegradient energy storage heat exchanger gives full play to the advantages of a plate heat exchanger such as high heat transfer coefficient, small occupied space, light weight and convenient manufacturing and achieves the purpose of improving the energy utilization efficiency through combination with the phase change materials with the characteristics of large heat storage capacity, environmental protection and selection diversity. The operational suitability is improved through independent cold and hot fluid channels. The temperature gradient energy storage heat exchanger has the advantages ofbeing large in energy storage density, convenient to operate and high in adaptability and can be applied to the fields of solar thermal collectors, heat pump heat collectors and industrial waste heatrecovery.
Owner:SOUTH CHINA UNIV OF TECH

Method for building tailings dam through adoption of mine dumping

The invention relates to a method for building a tailings dam, in particular to a method for building a tailings dam through adoption of mine dumping. The method comprises the following steps that: a mine dumping yard and a tailings dam of a concentrating mill are combined; the mine dumping is adopted for directly building the tailings dam; a layered damming method or a strip damming method is implemented; after the tailings dam is formed, the inner side of the tailings dam is a tailings warehouse; and the outer side is a dumping yard. As mine dumping technology and damming technology of the tailings dam of the concentrating mill are combined, the method can greatly reduce the area occupation of the dumping yard, enlarge the utilization coefficient of the tailings warehouse and overcome the disadvantages of the prior damming construction method of the tailings warehouse and the difficult problems of sand lifting of tailings sand and the like; and meanwhile, after a mine stops production, under the condition that the mine dumping cannot be used for building the tailings dam, the concentrating mill can also utilize waste stone of the dumping yard to continue building the tailings dam. The process is suitable for the tailings warehouses of a valley type, mountain-surrounding type, flat type, cut-off river type and other types, is also suitable for building the tailings dam of the concentrating mill of other industries, is also suitable for newly building the tailings dam of the concentrating mill and is also suitable for building the tailings dam of the concentrating mill in course of production.
Owner:ANSTEEL GRP MINING CO LTD

Correction and reinforcement method for precast pile foundation of high-rise building

InactiveCN104975622ASolve the problem of correction and reinforcementRestricted tilted developmentFoundation engineeringHigh riseBearing capacity
The invention discloses a correction and reinforcement method for a precast pile foundation of a high-rise building. The correction and reinforcement method for the precast pile foundation of the high-rise building comprises the steps that 1, the reason for settlement and inclination is analyzed; 2, a correction and reinforcement plan is made; 3, construction for reinforcement is conducted; and 4, construction for correction is conducted. The process for analyzing the reason for settlement and inclination comprises the steps that (1), settlement and inclination are monitored; (2), supplementary investigation is conducted; (3), the pile foundation is tested; and (4), the reason for settlement and inclination is analyzed. The process of making the correction and reinforcement plan comprises the steps that (1), the reinforcement and correction thought is determined; (2), a reinforcement and correction target is determined; (3), the characteristic value of the bearing capacity of an original single pile is determined; (4), a pile supplementing principle is determined; and (5), raft supplement is calculated. The process of conducting construction for reinforcement comprises the steps that (1), the foundation is dug; (2), an original soil body is compacted; (3), the position of a supplemented pile is determined; (4), a raft foundation is constructed; (5), column (wall) legs are reinforced; (6), a static pressure pile is constructed; (7), the quality is detected; and (8), pile sealing is conducted in a reinforcement area. The process of conducting construction for correction comprises the steps that (1), a limiting stopper is machined; (2), the limiting stopper is mounted; (3), seductive correction is conducted; (4), pile sealing is conducted in a seducing area; and (5), a seductive drilled portion is repaired, and correction and reinforcement are completed.
Owner:LANZHOU UNIVERSITY OF TECHNOLOGY

Process and equipment for flue gas roasting, adsorption desulfurization, dust removal and purification by adopting combination process

InactiveCN105195008AExcellent discharge concentrationSimple processCombination devicesAir quality improvementTarSpray tower
The invention relates to a process and equipment for flue gas roasting, adsorption desulfurization, dust removal and purification by adopting a combination process. Tar and dust in flue gas are gathered by a spraying tower having a cooling function and an electrical tar precipitator, and fluorine, SO2, NOX, dust and harmful substances, such as tar and dust which are not electrically gathered, in flue gas are adsorbed by using calcium hydroxide. The process disclosed by the invention has the advantages of simple process flow, small occupied area, low investment and low energy consumption; the equipment for comprehensive adsorption desulfurization, dust removal and purification by adopting a set of electric trapping dry process can be used for simultaneously removing multiple harmful substances from the flue gas, thoroughly purifying the flue gas at one step, and effectively overcoming the technical difficulty that multiple harmful substances in the flue gas cannot be removed until multiple sets of purification equipment are simultaneously used; the harmful substances in the flue gas can be removed at a distinct gradation and a high efficiency, and the emission concentration of the flue gas is superior to a national emission standard.
Owner:HEBEI JINKE ENVIRONMENTAL PROTECTION EQUIP CO LTD

Application and remediation method of calcium polysulfide in chromium-contaminated soil or underground water remediation

The invention discloses application and a remediation method of calcium polysulfide in chromium-contaminated soil or underground water remediation. Calcium polysulfide is adopted for chromium contamination remediation, and two remediation methods are particularly related. The method for remediating chromium-contaminated soil by calcium polysulfide comprises the following steps: investigating the chromium contamination degree of soil, preparing a calcium polysulfide water agent, determining the adding ratio of the calcium polysulfide water agent, adding the calcium polysulfide water agent, supplying water, carrying out remediation reaction, maintaining soil and adjusting the nature of the remediated soil. The method for remediating chromium-contaminated underground water by calcium polysulfide comprises the following steps: arranging injection points, determining the amount of a remediation agent, preparing the remediation agent, positioning the injection points, injecting the calcium polysulfide remediation agent, adjusting the positions and amounts of the injection points and the like. According to the invention, the operation process is simple; the agents are stable in source; the reaction speed is high; the remediation effect is good; the chromium-contaminated soil or underground water can be stable for a long time after remediation; the remediation method can be applied to large-scale implementation, is economic and reasonable, and is a relatively ideal chromium-contaminated soil or underground water remediation technique.
Owner:BCEG ENVIRONMENTAL REMEDIATION CO LTD

Preparation method for concrete silane paste impregnation waterproof agent

The invention provides a preparation method for a concrete silane paste impregnation waterproof agent, relates to a preparation method for an impregnation waterproof agent, and aims to solve the problems that the adhesion of existing liquid silane and silane emulsion is poor. The preparation method comprises the following steps: 1, weighing; 2, mixing to obtain a mixed solution; 3, performing initial reaction to obtain a reactant; 4, emulsifying to obtain the concrete silane paste impregnation waterproof agent. The preparation method has the advantages that the shortcoming of poor adhesion of liquid silane and silane emulsion is overcome, the construction is convenient, and multiple construction manners such as spraying, brushing and roll coating can be adopted for coating of vertical surfaces, so that the loss of active substances is reduced; the permeability of a pore structure of the material per se can be maintained; the waterproofness and permeability of the concrete silane paste impregnation waterproof agent are better than those of liquid silane and silane emulsion, the water absorption of a concrete structure can be reduced by 90% or above, the penetration depth of silane is increased, and silane can penetrate into the concrete surface at 3-4 mm. The method is mainly used for preparation of the concrete silane paste impregnation waterproof agent.
Owner:HARBIN INST OF TECH

Reconstructed bearing layer control technology of large-deformation roadway surrounding rock

The invention discloses a reconstructed bearing layer control technology of large-deformation roadway surrounding rock. The method comprises the following steps of (1) performing the construction of a basic support system action zone of the roadway surrounding rock; (2) performing the construction of upper drill holes and lower drill holes in the lower portions of both sides of the roadway and enabling the horizontal depths of the upper drill holes and the lower drill holes to be lapped with the rock of elastic zones deep in both sides of the roadway; (3) laying a grouting liquid conveying system; (4) mounting upper grouting steel pipes, lower grouting steel pipes, supporting boards, fasteners and perforated seal plugs; (5) starting a grouting pump and enabling superfine cement grouting fluid or other grouting materials to be pressed around the upper drill holes and the lower drill holes in the lower portions of both sides of the road way and into the gaps between the basic support system action zone and a plastic (crack) zone of the surrounding rock through grouting hosepipes and the grout inlet holes and the liquid-flow holes of the grouting steel pipes; (6) when the grouting pressure and the grouting time both reach preset values, closing the grouting pump to stop grouting; (7) removing the grouting hosepipes and the perforated seal plugs from the external end portions of the upper grouting steel pipes and the lower grouting steel pipes and sealing up the grout inlet holes of the grouting steel pipes with solid seal plugs; and (8) performing the construction of an upper-lower reconstructed bearing layer zone on the lower portions of both sides of a next group of roadway in the same manner.
Owner:HENAN POLYTECHNIC UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products