Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

120 results about "Adit" patented technology

An adit (from Latin aditus, entrance) is an entrance to an underground mine which is horizontal or nearly horizontal, by which the mine can be entered, drained of water, ventilated, and minerals extracted at the lowest convenient level. Adits are also used to explore for mineral veins.

Filling fully-mechanized mining recycling method for compressed coal on end side of opencast coal mine

The invention discloses a filling fully-mechanized mining recycling method for compressed coal on the end side of an opencast coal mine. An adit is driven from the side, close to the end side and close to lower steps of the inner row, at the bottom of the opencast mine to the earth surface boundary line in the direction that a coal bed is perpendicular to the end side, meanwhile, an air shaft is driven; and then a main air return roadway is driven from the bottom of the air shaft and the innermost end of the adit in the direction that the coal bed is parallel to the end side respectively and communicate at the bottom of the air shaft, and thus a complete ventilation system is formed. The driven adit serves as a fully-mechanized working face, and operation is conducted through matching of a filling hydraulic support, a coal mining machine and a scraper conveyer. Mining and filling are conducted simultaneously up to the final boundary in the direction of the working slope of the opencast mine, so that the compressed coal on the end side is mined to the maximum extent, the coal loss is reduced, and the mining rate of the opencast coal mine is increased; and meanwhile, stripped waste of the opencast coal mine can be fully utilized for filling, so that the waste discharge amount is decreased, and environmental-friendly mining of the coal is achieved.
Owner:CHINA UNIV OF MINING & TECH

Mine underground tailing water in-situ processing method and retaining wall capable of being filled by osmotic response

The invention discloses a mine underground tailing water in-situ processing method and a retaining wall capable of being filled by osmotic response. When stoping is finished in a stope, before filling, a flexibly closed water filtering retaining wall is built at an access adit which needs to be sealed at the bottom of the stope; a retaining wall framework is formed by rock bolts and two layers ofreinforced steel nets in a welded mode; an inner layer reinforced steel net is bonded with a metal net; a water filtering material is arranged between the metal net and the reinforced steel net and covers the whole cross section of the access adit; bellow PRB reaction units with through holes are arranged between the two layers of the reinforced steel nets in vertical-parallel-arrangement mode; afunctional active filler is arranged in the bellow PRB reaction units in a filling mode; and the bellow PRB reaction units are fixed to the inner layer reinforced steel net. Jet concrete is arranged for filling the reinforced steel nets and forming a retaining wall with a certain thickness. The construction of the retaining wall body is convenient, under-stress performance is good, the water blocking and filtering effect is good, and operation and maintenance cost is low; an active reaction area is formed in the retaining wall, and pollutants in the tailing water can be caught and removed effectively; and underground water pollution is prevented.
Owner:CENT SOUTH UNIV

Open-cast side shrouded beneficial mineral open well combined mining method

InactiveCN101338675ASave the amount of excavationSave the amount of support engineeringUnderground miningSurface miningAditEarth surface
The present invention provides a combined exploitation method for a beneficial mineral open well is covered under a strip mine boundary slope. The problems to be solved by the combined exploitation method are as follows: firstly, a spiral drill is used for recovering, a stable is required to be reserved between two drills due to the restriction of the length of a drill rod, so the percentage extraction is very low; secondly, a slope mine is excavated from the proper position on the surface of ground, a roadway is extended to a ledge for arranging a mining area, and underground mining is realized. The slope mine construction and support project quantity is large, which is expense-wasting and time-consuming. In the key points of the combined exploitation method, the ledge section at the boundary slope of the goaf of the strip mine is used, a main adit and a secondary adit are excavated in the ledge directly and are extended into the boundary slope for arranging the mining area to realize the underground exploitation and recovery of the beneficial mineral in the strip mine boundary slope. Then the mineral is transported to the ground by a transportation channel or a haulage plant which is formed in a strip mine stope. The combined exploitation method has the advantages of saving a great deal of slope mine construction project quantity and support project quantity, avoiding the unsafe factor of the slope mine during the processes of construction and operation and improving the production system safety of the mine.
Owner:中煤科工集团沈阳设计研究院有限公司

Continuous miner drilling-type paste filling mining method for end slope coal

The invention discloses a continuous miner drilling-type paste filling mining method for end slope coal, and belongs to the field of coal mining methods. The problems of the poor filling rate and topfilling effect, the low resource recovery rate, destruction of the ecological environment of a mining area, poor slope stability and the like when people enter an adit to pave filling pipelines duringexisting mining of end slope coal are solved. The end slope coal of an open-pit coal mine is divided into several sections, a plurality of mining adits are planned in the sections, and inter-mining-adit coal pillars are reserved among the mining adits; and initial skip-mining is carried out in the sections, at the same time, a plurality of filling holes are formed in the upper earth surfaces of the middles of the mining adits, a steel sleeve sleeving wall is adopted, after a high-concentration filling body is injected into the mining adits for mining, a goaf is formed, the filling operation is completed in two times, and the secondary mining is carried out after the initial mining is completed in the sections until the mining and filling of the mining adits in all sections are completed.The safety during mining and filling can be improved, and personnel are not needed to enter a roadway; and the filling process is simplified, and the filling cost is reduced.
Owner:TAIYUAN INST OF CHINA COAL TECH & ENG GROUP +1

Advanced adit hole-by-hole delayed blasting network in tunnel blasting

ActiveCN103557756AReduce the total charge of blastingReduce the impact of vibrationBlastingAditDetonation
The invention discloses an advanced adit hole-by-hole delayed blasting network in tunnel blasting. The network is characterized in that blasting excavation is performed by using a three-step method for an underground excavated metro interval tunnel; longitudinal excavation is performed along the tunnel to form an upper step, a middle step and a lower step in sequence; the excavation of the upper step is performed by prearranging each external contour overhead hole at equal intervals along the upper arch of an excavation contour line of the upper step; an advanced adit is arranged at the bottom; a central blast hole is positioned in the geometric center of the advanced adit; four central overhead holes are prearranged at the positions of four vertexes of a square ring with the central blast hole as the center; the advanced adit and an upper step expanded excavation region are blasted at two steps; the advanced adit hole-by-hole delayed blasting network is arranged in the way that each layer of expanded slot blast holes is arranged at the periphery of the central blast hole at intervals from near to far away from the central blast hole; the first layer of expanded slot blast holes are crosswise distributed at the periphery of the central blast hole and form the square ring together with four central overhead holes. The detonation explosive load of the same section is greatly reduced by using hole-by-hole delayed blasting.
Owner:CHINA TIESIJU CIVIL ENG GRP CO LTD

Method for forming escaping-rescuing transverse channel in road tunnel

The invention relates to a method for forming an escaping-rescuing transverse channel in a road tunnel, and belongs to the technical field of road engineering. Specific to medium, long and extra-long tunnels with overlarge single-hole or double-hole distances or overlarge altitude differences on roads, an escaping-rescuing transverse channel straight to the ground is formed according to the relationships between the tunnel position and peripheral mountains under the situation that a double-hole transverse channel cannot be formed. The transverse channel comprises a main hole intersection, a channel hole body segment and a ground outlet, wherein the channel hole segment can be set in a climbing type, a flat slope type and a downhill type; the ground outlet is connected with a traffic instrument or flat ground according to the ground outlet appearance and a building situation; an isolation fence needs to be arranged at the outlet. Compared with the conventional disaster prevention and rescue scheme of forming a transverse channel between two holes of a separate tunnel and forming an emergency parking lot or a parallel adit, a bomb shelter and the like in a single-hole tunnel, the escaping-rescuing transverse channel setting method has the advantages of adaptation to local conditions, flexible arrangement, realization of rapid escape or rescue of personnel trapped in the tunnel to a safety belt outside the holes through the transverse channel.
Owner:BROADVISION ENG CONSULTANTS

Large-section steep hill long inclined shaft high-precision pilot shaft excavating construction method and system and application

InactiveCN111441718AAdvanced excavation construction technologyConstruction stabilityWater-power plantsDirectional drillingAditPilot hole
The invention belongs to the technical filed of water conservancy and hydropower underground projects, and discloses a large-section steep hill long inclined shaft high-precision pilot shaft excavating construction method and system and application. A full-section drilling and blasting method is adopted for excavating to form an upper adit and a lower adit, and the upper adit and the lower adit serve as a construction channel; after the upper adit is formed, the upper adit is used as the construction channel, and a directional drilling machine is mounted and debugged, and carries out forward drilling to excavate a high-precision pilot hole with the diameter of 216 mm; after the high-precision pilot hole with the diameter of 216 mm is formed in the second step, a hole is drilled in a directional manner and connects with the lower adit, a drill pipe is pulled out, a drill bit is replaced to process the pilot hole into a hole of the diameter of 250 mm in a brushing manner, and the directional drilling machine is dismounted; the above work is finished, a raise boring machine is mounted and debugged, and forward drilling is carried out to excavate a drill hole of the diameter of 270 mm;and after work in the fourth step is finished, the lower portion of the raise boring machine is provided with an expanding excavation drill bit, and the pilot hole is subjected to expanding excavation from bottom to top to form a pilot shaft with the diameter of 2.2 m. The mechanization level is high, and the construction efficiency is high.
Owner:SINOHYDRO BUREAU 1 CO LTD

Mine adit fire separation device

A mine adit fire separation device provided with an automatic roller shutter door, a controller, sprinkler heads, sensors, a water tank, an injection pump, a recycling pump and a water trough. The sensors are in communication connection with the controller. The automatic roller shutter door, the injection pump and the recycling pump are controlled through the controller. The injection pump and the recycling pump are respectively connected with a water tank pipe, the water tank is connected with a fire-fight pipeline, a cooling device and an electronic liquid level meter are arranged in the water tank, the injection pump is connected with a sprinkler head pipe, and the recycling pump is further connected with a water outlet below the end of the water trough through a hose. Canvas strips are sequentially arranged to form a door curtain, the canvas strips at the edges on two sides of the door curtain are fixed in the middle of the water trough through rivets, the width of the water trough is 1-1.4m, and the height of the water trough is 30-50cm. The electronic liquid level meter, the controller, the sensors, the injection pump and the recycling pump are electrically connected with a control panel of a remote control chamber, the running conditions of the mine adit fire separation device can be monitored, and water can be supplemented to the water tank at any time.
Owner:宋英明

Method for exploiting two layers of coal seam gas

ActiveCN106869875AFluid removalAditCoal
The invention provides a method for exploiting two layers of coal seam gas. The method comprises the following steps that a near vertical well and a far vertical well are drilled in the distance at a preset distance with a main roadway; a ground horizontal well is drilled, directional angle building is conducted on the ground horizontal well to a lower coal seam, a horizontal section of the ground horizontal well penetrates through the far vertical well firstly and then penetrates through the near vertical well in the lower coal seam; directional angle building is conducted on the ground horizontal well to an upper coal seam, the horizontal section of the ground horizontal well penetrates through the far vertical well firstly and then penetrates through the near vertical well in the upper coal seam; an adit horizontal well is drilled along the upper coal seam in the main roadway; two layers of coal mine seam sections of the near vertical well and the far vertical well are subjected to broaching, and the ground horizontal well is made to communicate with the adit horizontal well and the vertical wells; and coal gas exploiting is conducted through the near vertical well and/or the far vertical well and/or the ground horizontal well and/or the adit horizontal well. According to the technical scheme, the problem that in the prior art, simultaneous exploiting of the upper and lower coal seam gas cannot be conducted on the coal seam gas in the two coal mine seams which do not communicate mutually is solved.
Owner:CHINA SHENHUA ENERGY CO LTD +1

Plateau long tunnel multi-dead end ventilation construction method

The present invention discloses a plateau long tunnel multi-dead end ventilation construction method. A tunnel inclined shaft is disposed at one side of a main cave of a plateau long tunnel, a middle connection section of the main cave is an inclined shaft auxiliary construction section which is divided into an inclined shaft auxiliary construction entrance section and an inclined shaft auxiliary construction exit section, and the inclined shaft auxiliary construction exit section has a sudden surging point and intersects with derious parallel adits. The construction method comprises a first step of ventilator installation; and a second step of tunnel excavation construction, carrying out excavation construction on the inclined shaft auxiliary construction entrance section and the inclined shaft auxiliary construction exit section through the tunnel inclined shaft while carrying out excavation construction on a tunnel entrance section and a tunnel exit section, and assisting the excavation construction through the derious parallel adits while carrying out excavation construction on the inclined shaft auxiliary construction exit section. The method provided by the present invention is simple in procedure, reasonable in design, convenient to construct, excellent in ventilation effect, and capable of solving problems of a large amount of roadways requiring ventilation during a tunnel construction process, long ventilation distance and large difficulties in ventilation construction.
Owner:CHINA RAILWAY 20 BUREAU GRP

Accurate excavation method for gentle slope inclined shaft

The invention discloses an accurate excavation method for a gentle slope inclined shaft. The accurate excavation method comprises the steps that expanding excavation is carried out on a lower adit andan upper adit; a hole guiding and drilling are carried out by a directional drilling machine; a MWD inclinometer and an RMRS rotating magnetic field distance measuring system are adopted for drill bit positioning; hole guiding forward reaming is carried out by a raise boring machine; and then the raise boring machine is used for reverse expanding excavation of a pilot shaft, the pilot shaft is used for slag sliding and is parallel to the bottom of a designed contour line of an inclined shaft bottom plate, forward control of blasting excavation is carried out after the pilot shaft is communicated, and finally, slag sliding is completed. According to the accurate excavation method for the gentle slope inclined shaft, the method of directional drilling, inverse shaft expanding and forward blasting excavation is adopted for the 30-45-degree gentle slope inclined shaft, the pilot shaft is arranged on the inclined shaft bottom plate, the slagging-off efficiency is effectively improved, an included angle between an excavation tunnel face and the horizontal plane is 20-30 degrees, and blasting rock ballast is conveniently accumulated to the bottom and slides to the lower adit along the pilot shaft; the maximum blasting work amount is reduced through segmented blasting, and the rock ballast shaft blocking risk is reduced; forward one-time blasting excavation is carried out, and the blasting procedure construction time is shortened; and the construction efficiency is effectively improved, and the construction safety risk is reduced.
Owner:SINOHYDRO BUREAU 7 CO LTD +1

Construction method and structure of dam toe hydropower station workshop retaining wall

The invention discloses a construction method and structure of a dam toe hydropower station workshop retaining wall. The method is characterized in that after a foundation pit of a workshop is excavated, firstly, the workshop retaining wall is constructed at the side, close to an earth and rockfill dam, of the foundation pit, an obstruction barrier is formed between the workshop and the earth and rockfill dam, and therefore the phenomenon that large construction rocks of the earth and rockfill dam roll into the foundation pit of the workshop, so that safety of the workshop structure and construction personnel is endangered is prevented. The workshop retaining wall is constructed according to the following steps: A, concrete construction of a balance weight platform is performed; B, sloping core concrete construction is performed on the balance weight platform; and C, rock ballast backfilling is performed on the upper portion of the balance weight platform and the outer side of the sloping core. The construction method and structure are set in combination with the retaining wall of the end of the workshop, the construction structure can be used as a permanent retention wall structure of the workshop, and engineering investment is saved; a transportation channel is arranged in the wall and is connected with a construction adit of a pressure steel pipe, and construction of the pressure steel pipe is facilitated; and rock ballast backfilling is performed on the outer side of the wall, and therefore the wall can be connected with a workshop entering roadway, and the transportation problem for entering the workshop is solved. The construction method and structure have the prominent advantage that multiple purposes of one wall are achieved, water diversion lines are shortened, and project investment is saved.
Owner:CHINA POWER CONSRTUCTION GRP GUIYANG SURVEY & DESIGN INST CO LTD

Coal mining adit ending roadway or dead region supporting support and hydraulic support withdrawing method

The invention relates to a coal mining adit ending roadway or dead region supporting support and a hydraulic support withdrawing method and discloses a coal mining adit ending roadway supporting support. The support comprises a plurality of hydraulic supports which are arranged in an ending roadway or a dead region for supporting the ending roadway or dead region roofs. The hydraulic supports are close to one side of an ending roadway caving region and are vertically and parallelly arranged on the back goaf coal wall side arranged in the ending roadway or the dead region. A plurality of rows of hydraulic single props are further arranged in the ending roadway and are arranged along the ending roadway vertically and form a withdraw channel with one side coal wall of the ending roadway, which is away from the hydraulic supports, and the tops of the hydraulic single props support the roadway air channel. The invention further discloses a coal mining adit supporting support hydraulic support withdrawing method. By means of the supporting support and the method, recyclable support material hydraulic supports and hydraulic single props are withdrawn, and accordingly, the hydraulic support safety withdrawing is guaranteed, and potential safety hazards of withdrawing of the hydraulic supports are prevented.
Owner:CHINA COAL XINJI ENERGY CO LTD

Strip mine end slope thin coal seam dendritic reverse type underground mining method

The invention discloses a strip mine end slope thin coal seam dendritic reverse type underground mining method. The method includes the specific steps that S1, a continuous coal mining machine is adopted to excavate a main adit in the boundary direction of a strip mine along a coal seam bottom plate; S2, secondary adits start to be tunneled from the two sides of the main adit in the inclined front direction of the main adit, and the secondary adits are in lap joint with a plurality of sets of self-moving belt conveyors in the main adit; S3, the continuous coal mining machine is remotely controlled to be responsible for coal mining, and the self-moving belt conveyors transport excavated coal out of the main adit; S4, after excavation of one secondary adit is stopped, the continuous coal mining machine and the self-moving belt conveyors in the secondary adit are withdrawn, and subsequent secondary adits are arranged in sequence in the same way; S5, the secondary adit is filled, and a goaf of the main adit is filled; and S6, a project is circulated. According to the strip mine end slope thin coal seam dendritic reverse type underground mining method, end slope coal mining is achieved in a dendritic adit arrangement mode, so that the coal output is improved, meanwhile, coal retaining pillars and filling bodies are fully utilized to keep a roof stable, and the difficulty and the cost of construction and equipment moving are reduced.
Owner:CHINA UNIV OF MINING & TECH

Construction method of excavating outsized-section subway underground excavation station by utilizing main layered adit and auxiliary layered adit

ActiveCN108222945AEasy to operateIncrease the number of excavation facesUnderground chambersTunnel liningAditAssembly line
The invention relates to the technical field of tunnel construction, and provides a construction method of constructing an outsized-section subway underground excavation station by utilizing layered auxiliary adits. The construction method comprises the steps that a main adit enters a station hall layer, an auxiliary adit is branched to enter a platform layer, and the two adits are arranged for asuper-large section tunnel and enter the upper portion and the lower portion of the tunnel correspondingly; and the main adit provides a channel for excavation construction of the upper portion of thetunnel, and the auxiliary adit provides a channel for excavation construction of the lower portion of the tunnel. By utilizing the contact channel formed by a door-type arch frame, the number of excavation faces is greatly increased, muck removing and material conveying are not mutually interfered, operation of all machines is facilitated, and quick and safe assembly-line operation is formed; during later construction of an inverted arch, an arch wall lining and a platrform layer structure, goods and materials can directly be transported and enter through the auxiliary adit; and during construction of the station hall layer structure and a wind pavilion group and an exit and entrance structure, goods and materials can directly be transported and enter through the main adit, the working efficiency is improved, and the construction progress is greatly accelerated.
Owner:CHINA TIESIJU CIVIL ENG GRP CO LTD +1

Pressure steel pipe overhaul access passage structure of high-water head hydropower station and construction method thereof

The invention relates to a pressure steel pipe overhaul access passage structure of a high-water head hydropower station and a construction method thereof. The invention aims at realizing the purposes of being capable of arranging overhaul access passages on two or more parallel pressure steel pipes and simultaneously reducing the excavation of an overhaul access hole with single function, further facilitating the reduction of the hole chamber excavation engineering quantity and the shortening of the construction period and simultaneously creating convenience for daily management and maintenance. In the technical scheme of the invention, a construction adit and a pressure steel pipe at the tail end are in T-shaped arrangement, the construction adit and other pressure steel pipes are in cross arrangement and a steel climbing ladder is erected at the upper parts of the other pressure steel pipes; and the overhaul access passage is arranged on the boundary of each pressure steel pipe andthe construction adit and at the inlet end, and an access door is arranged on the outer side of the passage.The invention is applicable to water diversion buildings of the hydropower stations.
Owner:POWERCHINA HUADONG ENG COPORATION LTD

Construction method for tunnel double adit roof ripping

The invention discloses a construction method for tunnel double adit roof ripping. The construction method for the tunnel double adit roof ripping comprises the following steps that construction is prepared, specifically, the excavation and support of an upper adit (2) and a lower adit (3) is conducted in a staggered mode, a door-shaped steel frame is erected on the intersection port of the lower adit (3) and a positive cave (4), and the upper adit (2) enters the upper portion of the positive cave (4) in a roof ripping mode; a preliminary-stage support steel frame on the upper portion of the positive cave (4) is erected, concrete is sprayed to conduct sealing, and backfill is conducted on the portion between the roof ripping top of the upper adit (2) and the preliminary-stage support steel frame on the upper portion of the positive cave (4); a shape steel frame of the positive cave (4) is erected, an anchor rod is struck to conduct locking, concrete is sprayed to conduct sealing, and the lower adit (3) enters the lower portion of the positive cave (4); the positive cave (4) is excavated from the upper portion to the portion where the lower adit (3) penetrates through the positive cave (4), a circumferential direction steel frame support is formed, and the construction of large section weak surrounding rocks is finished. The collapse risk of a large section tunnel in a weak surrounding rock geological section is lowered.
Owner:NO 4 ENG CO LTD OF CHINA RAILWAY 11 BUREAU GRP +1

Crisscross water mist fire shield system

The invention discloses a crisscross water mist fire shield system. The crisscross water mist fire shield system comprises a high-level water tank, a high-pressure fire pump, a high pressure resistant metal hose and a water mist jet device which are sequentially connected through a water delivery steel pipe. The high-level water tank is provided with a make-up water supply and a water level gauge. High pressure resistant locking adapters are arranged at the two ends of the metal hose. The water mist jet device comprises four arc-shaped metal pipes which are distributed in a crisscross mode, supporting anchors installed below the tail ends of the metal pipes, a high-pressure water uniform distributor arranged at the junction of the four metal pipes, and upper and lower reinforcing ribs connected with the four metal pipes. Upper ports of the four metal pipes communicate with the high-pressure water uniform distributor. The tail ends of the four metal pipes are closed and form a concentric circle. A plurality of water mist nozzles with openings facing downwards are arranged in the circumferential direction of the metal pipe. The crisscross water mist fire shield system is simple in structure, good in stability and large in coverage area of fire extinguishing, can rapidly and effectively extinguish fires caused by flammable liquid or gas leakage of underground pipelines as well as fires at underground adit entrances, and further has a cooling effect.
Owner:湖南南一昌洪都消防设备有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products