Plateau long tunnel multi-dead end ventilation construction method

A construction method and multi-lane technology, which is applied in mine/tunnel ventilation, earthwork drilling, mining equipment, etc., can solve problems such as blocked construction, difficult construction, and a large number of roadways

Active Publication Date: 2016-02-24
CHINA RAILWAY 20 BUREAU GRP
View PDF6 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During the construction of Daliang Tunnel, there have been many major hydrogeological changes such as water inrush and rock inrush, especially in the direction of the exit of the tunnel, there have been many large-scale water inrush and rock inrush incidents that have hindered the construction. Therefore, it is necessary to carry out pre-designed construction Adjust the plan and add a horizontal guide (that is, a parallel guide tunnel parallel to the main tunnel 2), so that the number of tunnels that need to be ventilated during tunnel construction is large and the ventilation distance is long, making the construction difficult. Currently, there are very few reference materials

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Plateau long tunnel multi-dead end ventilation construction method
  • Plateau long tunnel multi-dead end ventilation construction method
  • Plateau long tunnel multi-dead end ventilation construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0064] Such as Figure 4 Shown, a kind of plateau long tunnel single head multi-lane ventilation construction method of the present invention, the plateau long tunnel of construction is positioned on the plateau and length is greater than the tunnel of 5km; image 3, one side of the main tunnel 2 of the constructed plateau long tunnel is provided with a tunnel inclined shaft 1; The middle connection section between the outlet sections 2-2, the tunnel inclined shaft 1 intersects with the middle connection section and the intersection between them is the intersection of the inclined shaft, and the middle connection section is the auxiliary construction section of the inclined shaft And it is divided into the inclined shaft auxiliary construction entrance section 2-3 and the inclined shaft auxiliary construction exit section 2-4 with the inclined shaft intersection as the boundary, the tunnel entrance section 2-1, the inclined shaft auxiliary construction entrance section 2- 3. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

PropertyMeasurementUnit
Lengthaaaaaaaaaa
Widthaaaaaaaaaa
Heightaaaaaaaaaa
Login to View More

Abstract

The present invention discloses a plateau long tunnel multi-dead end ventilation construction method. A tunnel inclined shaft is disposed at one side of a main cave of a plateau long tunnel, a middle connection section of the main cave is an inclined shaft auxiliary construction section which is divided into an inclined shaft auxiliary construction entrance section and an inclined shaft auxiliary construction exit section, and the inclined shaft auxiliary construction exit section has a sudden surging point and intersects with derious parallel adits. The construction method comprises a first step of ventilator installation; and a second step of tunnel excavation construction, carrying out excavation construction on the inclined shaft auxiliary construction entrance section and the inclined shaft auxiliary construction exit section through the tunnel inclined shaft while carrying out excavation construction on a tunnel entrance section and a tunnel exit section, and assisting the excavation construction through the derious parallel adits while carrying out excavation construction on the inclined shaft auxiliary construction exit section. The method provided by the present invention is simple in procedure, reasonable in design, convenient to construct, excellent in ventilation effect, and capable of solving problems of a large amount of roadways requiring ventilation during a tunnel construction process, long ventilation distance and large difficulties in ventilation construction.

Description

technical field [0001] The invention belongs to the technical field of tunnel ventilation construction, and in particular relates to a single-head multi-lane ventilation construction method for a plateau long tunnel. Background technique [0002] A plateau usually refers to a relatively complete large-scale uplifted area with an altitude of more than 1,000 meters, a vast area, open terrain, and the surrounding area is bounded by obvious steep slopes. The track surface of Daliang Tunnel in the middle and high mountainous area of ​​Qilian Mountains is 3607m above sea level, and the total length of Daliang Tunnel is 6550 double extension meters. It is located in Menyuan County, Qinghai Province. It is 3607.4 meters; the normal water inflow is 15,300 cubic meters, and the maximum water inflow is 45,800 cubic meters; the cave body passes through sandstone, slate and F5 fault fracture zone. Such as figure 1 As shown, in the actual construction of Daliang Tunnel, in order to impr...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21F1/00
CPCE21F1/003
Inventor 王平安崔文镇任少强冀胜利谢江胜杨文宣杨星智
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products