Permeable pile structure for reinforcing bridge abutment and construction method thereof
By setting up permeable pile structures around the abutment to form drainage channels and rigid constraints, the problem of difficulty in strengthening the abutment in the existing technology is solved, and the stability of the abutment structure is improved and the construction simplified is achieved.
Patent Information
- Application Number
- CN202411182460.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
AI Technical Summary
The prior art is difficult to reliably reinforce the abutment structure that has been built and in use, especially when liquefaction of foundation soil and settlement of post-stage fills lead to damage to the abutment structure during earthquake disasters.
Adopt a permeable pile structure, by setting up multiple pile structures and permeable pipes around the abutment, a drainage channel is formed, the dissipation path of water pressure is increased, the probability of liquefaction of foundation soil is slowed down, and the foundation soil is rigidly constrained through the pile structure. Improve the stability of the abutment.
Effectively accelerate the consolidation of foundation soil, reduce the probability of liquefaction, improve the stability of the abutment structure, and simplify the construction process.
Smart Images

Figure CN119061812A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of existing bridge abutment reinforcement, and in particular to a permeable pile structure for reinforcing a bridge abutment and a construction method thereof. Background Art
[0002] A large number of earthquake disaster cases have shown that the liquefaction of foundation soil, lateral flow and settlement of fill behind the abutment are the main causes of damage to bridge abutment structures. In related technologies, methods such as foundation densification and crushed stone pile drainage are often used to accelerate the consolidation of foundation soil and improve the anti-liquefaction strength of the soil. However, for abutment structures that have been built and in use, these foundation improvement technologies are often difficult to construct, and there is currently no facility that can reliably reinforce existing abutment structures. Summary of the invention
[0003] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one purpose of the present invention is to propose a permeable pile structure for reinforcing abutments, which can perform anti-liquefaction reinforcement on existing abutments, increase the dissipation path of water pressure, reduce the probability of liquefaction of foundation soil, and help improve the stability of existing abutment structures.
[0004] The present invention further provides a construction method for reinforcing a permeable pile structure of a bridge abutment.
[0005] According to an embodiment of the present invention, the permeable pile structure includes: a plurality of pile structures, the plurality of pile structures are suitable for being arranged around the abutment, and the plurality of pile structures are connected and arranged in sequence; a plurality of permeable pipes, the plurality of permeable pipes are respectively passed through the plurality of pile structures, the pile structure defines a first cavity, the permeable pipe defines a second cavity, the pipe wall of the permeable pipe has a plurality of connecting holes, and some of the connecting holes are located in the corresponding first cavity to connect the corresponding first cavity and the second cavity.
[0006] According to the permeable pile structure of the embodiment of the present invention, by setting up a permeable pile structure including multiple pile structures and multiple permeable pipes, the existing abutment can be reinforced against liquefaction. The first cavity, the multiple connecting holes, and the second cavity can form a drainage channel, which can increase the dissipation path of the water pressure to accelerate the consolidation of the foundation soil, and can effectively slow down the accumulation of excess pore water pressure and reduce the probability of liquefaction of the foundation soil. In addition, since the abutment is surrounded by the permeable pile structure, the lateral expansion of the foundation soil can be rigidly constrained to reduce the shear strain of the foundation soil, which is beneficial to improving the stability of the existing abutment structure.
[0007] In some embodiments of the present invention, the pile structure is configured as a sheet pile.
[0008] In some embodiments of the present invention, both ends of the water-permeable pipe are exposed outside the pile structure, and both ends of the water-permeable pipe exposed outside the pile structure have the communicating holes.
[0009] In some embodiments of the present invention, each of the pile structures has connecting parts on two opposite sides, and among the multiple pile structures arranged in the same direction, two adjacent pile structures are connected by the connecting parts.
[0010] In some embodiments of the present invention, the connecting portion includes: a first sub-portion, a second sub-portion and a third sub-portion, the second sub-portion is connected between the first sub-portion and the third sub-portion, the first sub-portion, the second sub-portion and the third sub-portion jointly define a snap-in space, and among the two connected connecting portions, at least a portion of the third sub-portion of one of the connecting portions is snap-into the snap-in space of the other connecting portion.
[0011] In some embodiments of the present invention, the permeable pile structure also includes: a connecting member, wherein the plurality of pile structures are constructed into three rows of piles, the plurality of pile structures in the first row of piles are arranged along a first direction, the plurality of pile structures in the second row and the third row of piles are arranged along a second direction, and the pile structures at both ends of the first row of piles are respectively connected to the pile structures at the end portions of the second row and the third row of piles through the connecting member, and the first direction is perpendicular to the second direction.
[0012] In some embodiments of the present invention, the connecting member includes two matching parts, and the two matching parts are respectively engaged with the connecting parts of the corresponding two pile structures.
[0013] In some embodiments of the present invention, the water-permeable pipe has a clamping groove, and a portion of the pile structure is located in the clamping groove so that the water-permeable pipe is clamped to the pile structure.
[0014] According to the construction method of a permeable pile structure for reinforcing a bridge abutment according to an embodiment of the present invention, the permeable pile structure for reinforcing a bridge abutment is the above-mentioned permeable pile structure for reinforcing a bridge abutment, and the construction method comprises: conducting a drilling survey on the foundation around the existing abutment to determine the buried depth, thickness and liquefaction index of the liquefied layer, determining the underlying solid soil layer and using it as the bearing layer of the pile structure with the permeable pipe; inserting the pile structure with the permeable pipe into the foundation one by one in the order of the surrounding purlin pile insertion method, and inserting the pile structure into the bearing layer.
[0015] In some embodiments of the present invention, a plurality of the pile structures are constructed as three rows of piles, and the inserting of the pile structures with the permeable pipes into the foundation one by one in the order of the purlin pile insertion method includes: starting from the space between two adjacent rows, and driving each side in turn, first driving some of the pile structures with the permeable pipes into place one by one, and then driving some of the pile structures with the permeable pipes in a stepped manner, and then arranging a preset number of the pile structures with the permeable pipes by first inserting and closing them and then driving them.
[0016] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:
[0018] Figure 1 is a schematic cross-sectional view of a water-permeable pile structure according to an embodiment of the present invention after being inserted into a foundation;
[0019] Figure 2 is a top view of the permeable pile structure according to an embodiment of the present invention after being inserted into the foundation;
[0020] Figure 3 Schematic diagram of the coordination of the pile structure and the water-permeable pipe according to an embodiment of the present invention Figure 1 ;
[0021] Figure 4 Schematic diagram of the coordination of the pile structure and the water-permeable pipe according to an embodiment of the present invention Figure 2 ;
[0022] Figure 5 Schematic diagram of the coordination of the pile structure and the water-permeable pipe according to an embodiment of the present invention Figure 3 (Cross-section view);
[0023] Figure 6 is a cross-sectional view of a partial structure of a water-permeable pile structure according to an embodiment of the present invention;
[0024] Figure 7 is a cross-sectional view of a connector according to an embodiment of the present invention;
[0025] Figure 8 is a schematic diagram of a water permeable pipe according to an embodiment of the present invention;
[0026] Fig. 9 It is a flow chart of a construction method of a permeable pile structure for reinforcing a bridge abutment according to an embodiment of the present invention.
[0027] Reference numerals:
[0028] Pile structure 1; first cavity 11; connecting portion 12; first sub-portion 121; second sub-portion 122; third sub-portion 123; clamping space 13;
[0029] Water permeable pipe 2; communicating hole 21; card slot 22;
[0030] Connecting member 3; matching portion 31;
[0031] Abutment 4; Foundation soil 5;
[0032] Permeable pile structure 100 ; first row of piles 101 ; second row of piles 102 ; third row of piles 103 . DETAILED DESCRIPTION
[0033] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0034] Reference below Figure 1-Figure 9 A permeable pile structure 100 according to an embodiment of the present invention is described. The permeable pile structure 100 can be used to reinforce an existing bridge abutment 4 .
[0035] like Figure 1-Figure 4 As shown, the permeable pile structure 100 according to an embodiment of the present invention includes: a plurality of pile structures 1 and a plurality of permeable pipes 2, the plurality of pile structures 1 are suitable for being arranged around the abutment 4, and the plurality of pile structures 1 are connected and arranged in sequence, the plurality of permeable pipes 2 are respectively penetrated through the plurality of pile structures 1, the pile structure 1 defines a first cavity 11, the permeable pipes 2 define a second cavity, the pipe wall of the permeable pipe 2 has a plurality of connecting holes 21, and some of the connecting holes 21 are located in the corresponding first cavity 11 to connect the corresponding first cavity 11 with the second cavity.
[0036] Among them, the permeable pile structure 100 includes multiple pile structures 1, the pile structure 1 can be constructed in a long strip shape, the length of the pile structure 1 can be reasonably prefabricated according to the depth of the liquefied soil at the abutment 4 to be reinforced, the pile structure 1 can be vertically or approximately vertically inserted into the foundation soil 5, multiple pile structures 1 can be connected in sequence, and multiple pile structures 1 connected in sequence can form a row structure, and multiple pile structures 1 in the row structure can be arranged around the abutment 4, thereby achieving the effect of anti-liquefaction reinforcement of the existing abutment 4.
[0037] Each pile structure 1 is fixedly connected with a plurality of permeable pipes 2, which are passed through the pile structure 1. The pipe wall of the permeable pipe 2 has a plurality of connecting holes 21. The pile structure 1 can be constructed as a hollow structure. The pile structure 1 can define a first cavity 11, and the permeable pipe 2 defines a second cavity. Some of the connecting holes 21 are located in the corresponding first cavity 11 to connect the corresponding first cavity 11 and the second cavity. The first cavity 11, the plurality of connecting holes 21, and the second cavity can form a drainage channel so that the permeable pile structure 100 has a dissipation path for water pressure.
[0038] In the above embodiment, by setting a permeable pile structure 100 including a plurality of pile structures 1 and a plurality of permeable pipes 2, the existing abutment 4 can be reinforced against liquefaction. The first cavity 11, the plurality of connecting holes 21, and the second cavity can form a drainage channel, which can increase the dissipation path of the water pressure to accelerate the consolidation of the foundation soil 5, and can effectively slow down the accumulation of excess pore water pressure and reduce the probability of liquefaction of the foundation soil 5. Moreover, since the abutment 4 is surrounded by the permeable pile structure 100, the lateral expansion of the foundation soil 5 can be rigidly constrained to reduce the shear strain of the foundation soil 5, which is beneficial to improving the stability of the existing abutment 4 structure. In addition, the permeable pile structure 100 proposed in the present invention is simple to construct and easy to implement.
[0039] In some embodiments of the present invention, Figure 3-Figure 5 As shown, the pile structure 1 is designed as a sheet pile.
[0040] Among them, multiple pile structures 1 can be constructed as sheet piles. The cross-section of the sheet pile can be rectangular, the width of the sheet pile is A, the thickness of the sheet pile is B, and the wall thickness of the sheet pile is C. The sheet pile has the advantages of high strength, strong adaptability, and easy construction.
[0041] As some embodiments of the present application, Figure 3 As shown, the width A of the pile structure 1 can be any value between 1.90m and 2.00m. For example, the width of the pile structure 1 can be, but is not limited to, 1.90m, 1.95m or 2.00m. Figure 3 As shown, the thickness B of the pile structure 1 can be any value between 0.55m-0.60m. For example, the thickness of the pile structure 1 can be, but is not limited to, 0.55m, 0.58m or 0.60m. Figure 3 As shown, the wall thickness C of the pile structure 1 can be any value between 0.10m-0.12m. For example, the wall thickness of the pile structure 1 can be but not limited to 0.10m, 0.11m or 0.12m, etc. This setting can make the pile structure 1 reasonable in size, which is conducive to accelerating the consolidation of the foundation soil.
[0042] As some embodiments of the present application, the structures of a plurality of pile structures 1 may be completely identical, so as to reduce the difficulty of designing and processing the pile structures 1 .
[0043] As some embodiments of the present application, the pile structure 1 can be made of Q235 steel. Q235 steel has the advantages of good plasticity, high strength, excellent ductility, easy processing, strong corrosion resistance, etc., which is beneficial to improving the reliability of the pile structure 1.
[0044] In some embodiments of the present invention, Figure 1 , Figure 4 and Figure 5 As shown, both ends of the water-permeable pipe 2 are exposed outside the pile structure 1 , and both ends of the water-permeable pipe 2 exposed outside the pile structure 1 have communication holes 21 .
[0045] Among them, the permeable pipe 2 can be penetrated into the pile structure 1, the extension direction of the permeable pipe 2 is consistent with the thickness direction of the pile structure 1, and the length of the permeable pipe 2 is greater than the thickness of the pile structure 1, so that both ends of the permeable pipe 2 can be exposed outside the pile structure 1, and both ends of the permeable pipe 2 exposed outside the pile structure 1 have at least one connecting hole 21, so as to further increase the dissipation path of the water pressure, so as to accelerate the consolidation of the foundation soil 5, thereby effectively slowing down the accumulation of excess pore water pressure and reducing the probability of liquefaction of the foundation soil 5.
[0046] As a specific embodiment of the present application, Figure 5 As shown, 16 communication holes 21 are distributed on the water permeable pipe 2, of which 8 communication holes 21 are located in the first cavity 11, and the other 8 communication holes 21 are located outside the first cavity 11, that is, the other 8 communication holes 21 are located outside the pile structure 1, of which 4 communication holes 21 are located on one side of the outside of the pile structure 1, and the other 4 communication holes 21 are located on the other side of the outside of the pile structure 1, so that the two ends of the water permeable pipe 2 exposed outside the pile structure 1 are symmetrical. This arrangement can make the structure of the water permeable pipe 2 reasonable, which is conducive to further increasing the dissipation path of water pressure.
[0047] As some embodiments of the present application, the water-permeable pipe 2 can be made of Q235 steel. Q235 steel has the advantages of good plasticity, high strength, excellent ductility, easy processing, and strong corrosion resistance, which is beneficial to improving the reliability of the water-permeable pipe 2.
[0048] As some embodiments of the present application, Figure 3 As shown, the diameter D of the water permeable pipe 2 can be any value between 0.18m and 0.20m. For example, the diameter of the water permeable pipe 2 can be, but is not limited to, 0.18m, 0.19m or 0.20m, etc. Figure 4 and Figure 7 As shown, the length E of the water permeable pipe 2 can be any value between 0.95m and 1.00m. For example, the length of the water permeable pipe 2 can be, but is not limited to, 0.95m, 0.98m or 1.00m, etc. Figure 3As shown, the wall thickness of the water-permeable pipe 2 can be any value between 0.02m-0.04m. For example, the wall thickness of the water-permeable pipe 2 can be but not limited to 0.02m, 0.03m or 0.04m, etc. This setting can make the size of the water-permeable pipe 2 reasonable.
[0049] In some embodiments of the present invention, Figure 5 and Figure 6 As shown, each pile structure 1 has connecting parts 12 on two opposite sides. Among the multiple pile structures 1 arranged in the same direction, two adjacent pile structures 1 are connected by the connecting parts 12 .
[0050] Among them, along the width direction of the pile structure 1, the two opposite sides of the pile structure 1 are provided with connecting parts 12. Among the multiple pile structures 1 arranged in the same direction, two adjacent pile structures 1 are connected by the connecting parts 12 to form a row of permeable pile structures 100, so that the multiple pile structures 1 are connected into a whole, so that the permeable pile structure 100 can surround the abutment 4 to achieve the effect of anti-liquefaction reinforcement of the existing abutment 4.
[0051] In some embodiments of the present invention, Figure 5 and Figure 6 As shown, the connecting portion 12 includes: a first sub-portion 121, a second sub-portion 122 and a third sub-portion 123, the second sub-portion 122 is connected between the first sub-portion 121 and the third sub-portion 123, the first sub-portion 121, the second sub-portion 122 and the third sub-portion 123 jointly define a snap-in space 13, and among the two connected connecting portions 12, at least a portion of the third sub-portion 123 of one connecting portion 12 is snap-in to the snap-in space 13 of the other connecting portion 12.
[0052] Among them, the connecting portion 12 of the pile structure 1 includes a first sub-portion 121, a second sub-portion 122 and a third sub-portion 123. As some embodiments of the present application, the extension directions of the first sub-portion 121, the second sub-portion 122 and the third sub-portion 123 are the same as the extension direction of the pile structure 1. The first sub-section 121, the second sub-section 122 and the third sub-section 123 can be connected in sequence, the second sub-section 122 is connected between the first sub-section 121 and the third sub-section 123, the first sub-section 121, the second sub-section 122 and the third sub-section 123 jointly define a snap-in space 13, and the snap-in space 13 can be used to accommodate at least a portion of the third sub-section 123 of another connecting section 12 connected to the connecting section 12. From another perspective, the snap-in space 13 of another connecting section 12 can be used to accommodate at least a portion of the third sub-section 123 of the connecting section 12, so that a plurality of pile structures 1 can be connected in sequence through the connecting section 12 to form a permeable pile structure 100, so that the plurality of pile structures 1 are connected into a whole, so that the permeable pile structure 100 can surround the abutment 4 to achieve the effect of anti-liquefaction reinforcement of the existing abutment 4.
[0053] As some embodiments of the present application, along the thickness direction of the pile structure 1, the size of the snap-fit space 13 may be slightly larger than the size of the third sub-portion 123, so that the third sub-portion 123 can be connected with the snap-fit space 13 with a clearance fit, so as to fix two adjacent pile structures 1 in connection.
[0054] As some embodiments of the present application, Figure 5 As shown, the first sub-section 121 and the third sub-section 123 can be arranged in parallel, and the second sub-section 122 and the first sub-section 121 can be arranged vertically, so that the cross-section of the snap-fit space 13 defined by the first sub-section 121, the second sub-section 122 and the third sub-section 123 can be rectangular, and the third sub-section 123 can be constructed as a rectangle, so that the rectangular snap-fit space 13 can be matched and connected with the rectangular third sub-section 123, and the contact area when the snap-fit space 13 and the third sub-section 123 are matched and connected can be increased, so that the third sub-section 123 and the snap-fit space 13 are more closely matched and connected, and the connection firmness between the snap-fit space 13 and the third sub-section 123 can be increased to increase the structural stability of the permeable pile structure 100.
[0055] In some embodiments of the present invention, Figure 2 , Figure 6 and Figure 7 As shown, the permeable pile structure 100 also includes: a connecting member 3, a plurality of pile structures 1 are constructed into three rows of piles, a plurality of pile structures 1 of the first row of piles 101 are arranged along a first direction, a plurality of pile structures 1 of the second row and the third row of piles 103 are arranged along a second direction, and the pile structures 1 at both ends of the first row of piles 101 are respectively connected to the pile structures 1 at the end portions of the second row and the third row of piles 103 through the connecting members 3, and the first direction is perpendicular to the second direction.
[0056] Among them, the permeable pile structure 100 can include three rows of piles, the first row of piles 101 is arranged along the first direction, the second row and the third row of piles 103 are arranged along the second direction, and the first direction is perpendicular to the second direction, that is, the first row of piles 101 is perpendicular to the second row of piles 102, and the first row of piles 101 is perpendicular to the third row of piles 103, so that the permeable pile structure 100 defines a rectangular space, which can accommodate the existing abutment 4 to be reinforced.
[0057] The pile structure 1 at the edge of the first row of piles 101 can be connected to the pile structure 1 at the edge of the second row of piles 102 by a connecting piece 3, and the pile structure 1 at the edge of the first row of piles 101 can be connected to the pile structure 1 at the edge of the third row of piles 103 by a connecting piece 3. The connecting piece 3 can connect the two rows of piles with an included angle into a whole, and then connect the first row of piles 101, the second row of piles 102 and the third row of piles 103 into a whole, so as to enhance the structural stability of the permeable pile structure 100.
[0058] As some embodiments of the present application, the connector 3 can be made of Q235 steel, which has the advantages of good plasticity, high strength, excellent ductility, easy processing, and strong corrosion resistance, so as to improve the reliability of the connector 3.
[0059] In some embodiments of the present invention, Figure 6 and Figure 7 As shown, the connecting member 3 includes two matching portions 31 , and the two matching portions 31 are respectively engaged with the connecting portions 12 of the two corresponding pile structures 1 .
[0060] Among them, the connecting member 3 includes two matching parts 31, and the two matching parts 31 can be respectively engaged with the connecting parts 12 of the corresponding two pile structures 1. The two matching parts 31 can connect two perpendicular rows of piles into a whole. By setting the matching parts 31, it is convenient to connect the permeable pile structure 100 at a turning or corner through the connecting member 3, so that the permeable pile structure 100 has installation flexibility and construction feasibility, so that the permeable pile structure 100 has a wider range of usage scenarios.
[0061] In some embodiments of the present invention, Figure 8 As shown, the water-permeable pipe 2 has a clamping groove 22 , and a portion of the pile structure 1 is located in the clamping groove 22 so that the water-permeable pipe 2 is clamped to the pile structure 1 .
[0062] Among them, the water-permeable pipe 2 can be provided with a card slot 22, and the dimension of the card slot 22 along the length direction of the water-permeable pipe 2 can be approximately equal to the wall thickness dimension of the pile structure 1. Part of the pile structure 1 can extend into the card slot 22, so that the water-permeable pipe 2 is fixedly connected to the pile structure 1 by means of a card connection through the card slot 22, so that the water-permeable pipe 2 and the pile structure 1 are stably and reliably fixedly connected, thereby improving the structural stability of the water-permeable pile structure 100.
[0063] As some embodiments of the present application, the dimension of the slot 22 along the length direction of the permeable pipe 2 can be slightly smaller than the wall thickness of the pile structure 1, so that the slot 22 can be connected with the pile structure 1 by interference fit, so as to further increase the connection stability between the slot 22 and the pile structure 1.
[0064] Reference below Fig. 9The construction method of the permeable pile structure for reinforcing the abutment according to the embodiment of the present invention is described. The permeable pile structure for reinforcing the abutment may be the permeable pile structure for reinforcing the abutment described above.
[0065] like Fig. 9 As shown, the construction method of the permeable pile structure for reinforcing the abutment includes the following steps:
[0066] S1, conduct drilling survey on the foundation around the existing abutment, determine the buried depth, thickness and liquefaction index of the liquefied layer, determine the underlying solid soil layer and use it as the bearing layer of the pile structure with permeable pipes. In addition, the length of the pile structure can be determined and prefabricated according to the actual situation of the survey, and the pile structure can be used to reinforce the existing abutment structure of liquefied soil, which can break through the site limitations of the existing abutment reinforcement construction.
[0067] S2, insert the pile structure with permeable pipes into the foundation one by one according to the sequence of the surrounding purlin pile insertion method, and insert the pile structure into the bearing layer. The surrounding purlin pile insertion method can effectively reduce the accumulation of tilt errors during pile insertion, and has the advantages of good construction quality, safety and reliability, and economic rationality.
[0068] In some embodiments of the present invention, multiple pile structures are constructed as three rows of piles, the first row of piles is arranged along a first direction, the second row and the third row of piles are arranged along a second direction, and the first direction is perpendicular to the second direction, that is, the first row of piles is perpendicular to the second row of piles, and the first row of piles is perpendicular to the third row of piles, so that the permeable pile structure defines a rectangular space that can accommodate the existing abutment to be reinforced.
[0069] The pile structure at the edge of the first row of piles can be connected to the pile structure at the edge of the second row of piles by a connecting piece, and the pile structure at the edge of the first row of piles can be connected to the pile structure at the edge of the third row of piles by a connecting piece. The connecting piece can connect the two rows of piles with an included angle into a whole, and then connect the first row of piles, the second row of piles and the third row of piles into a whole, so as to enhance the structural stability of the permeable pile structure.
[0070] Inserting the pile structures with permeable pipes into the foundation one by one according to the order of the purlin pile driving method includes: starting from the space between two adjacent rows, driving each side in turn, first driving some of the pile structures with permeable pipes into place one by one, then driving some of the pile structures with permeable pipes in a stepped manner, and then arranging a preset number of pile structures with permeable pipes by first inserting and closing them and then driving them.
[0071] Among them, the piles are arranged from between two adjacent rows, that is, the connector and the pile structure with a water-permeable pipe connected to the connector are first inserted into the foundation, and then two rows of piles are arranged with this base point as the pivot, and each side is hit in turn, and the pile structures with some water-permeable pipes are first inserted and hit in place, and then the pile structures with some water-permeable pipes are set in a stepped manner. When the pile structures with a preset number of water-permeable pipes are close to closing, the pile structures are inserted first and then hit, so that the pile positions can be adjusted at any time to ensure smooth closing. As some embodiments of the present application, the preset number can be but is not limited to ten.
[0072] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0073] In the description of the present invention, "first feature" or "second feature" may include one or more of the features.
[0074] In the description of the present invention, "plurality" means two or more.
[0075] In the description of the present invention, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.
[0076] In the description of the present invention, “on”, “over” and “above” a first feature from a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.
[0077] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0078] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A permeable pile structure (100) for reinforcing a bridge abutment (4), It is characterized in that include: A plurality of pile structures (1), wherein the plurality of pile structures (1) are suitable for being arranged around the abutment (4), and the plurality of pile structures (1) are arranged in series and connected; A plurality of water-permeable pipes (2), the plurality of water-permeable pipes (2) are respectively arranged in the plurality of pile structures (1), the pile structure (1) defines a first cavity (11), the water-permeable pipes (2) define a second cavity, the pipe wall of the water-permeable pipe (2) has a plurality of connecting holes (21), and some of the connecting holes (21) are located in the corresponding first cavity (11) to connect the corresponding first cavity (11) and the second cavity.
2. The permeable pile structure (100) for reinforcing abutments (4) according to claim 1, It is characterized in that The pile structure (1) is configured as a sheet pile.
3. The permeable pile structure (100) for reinforcing a bridge abutment (4) according to claim 1, It is characterized in that Both ends of the water-permeable pipe (2) are exposed outside the pile structure (1), and both ends of the water-permeable pipe (2) exposed outside the pile structure (1) have the communicating holes (21).
4. The permeable pile structure (100) for reinforcing a bridge abutment (4) according to claim 1, It is characterized in that Each of the pile structures (1) has connecting parts (12) on two opposite sides, and among the multiple pile structures (1) arranged in the same direction, two adjacent pile structures (1) are connected via the connecting parts (12).
5. The permeable pile structure (100) for reinforcing abutments (4) according to claim 4, It is characterized in that The connecting portion (12) comprises: a first sub-portion (121), a second sub-portion (122) and a third sub-portion (123); the second sub-portion (122) is connected between the first sub-portion (121) and the third sub-portion (123); the first sub-portion (121), the second sub-portion (122) and the third sub-portion (123) jointly define a snap-in space (13); of the two connected connecting portions (12), at least a portion of the third sub-portion (123) of one of the connecting portions (12) is snap-in engaged with the snap-in space (13) of the other connecting portion (12).
6. The permeable pile structure (100) for reinforcing abutments (4) according to claim 4, It is characterized in that Also includes: A connecting member (3), wherein the plurality of pile structures (1) are constructed into three rows of piles, wherein the plurality of pile structures (1) in the first row of piles are arranged along a first direction, and the plurality of pile structures (1) in the second and third rows of piles are arranged along a second direction, and the pile structures (1) at both ends of the first row of piles are respectively connected to the pile structures (1) at the end portions of the second and third rows of piles through the connecting member (3), and the first direction is perpendicular to the second direction.
7. The permeable pile structure (100) for reinforcing abutments (4) according to claim 6, It is characterized in that The connecting member (3) comprises two matching parts (31), and the two matching parts (31) are respectively engaged and matched with the connecting parts (12) of the two corresponding pile structures (1).
8. The permeable pile structure (100) for reinforcing abutments (4) according to claim 1, It is characterized in that The water-permeable pipe (2) has a clamping groove (22), and a portion of the pile structure (1) is located in the clamping groove (22) so that the water-permeable pipe (2) is clamped to the pile structure (1).
9. A construction method for reinforcing a permeable pile structure of a bridge abutment. It is characterized in that The permeable pile structure for reinforcing a bridge abutment is a permeable pile structure for reinforcing a bridge abutment according to any one of claims 1 to 8, and the construction method comprises: Conducting drilling survey on the foundation around the existing abutment to determine the buried depth, thickness and liquefaction index of the liquefied layer, and determining the underlying solid soil layer as the bearing layer of the pile structure with the permeable pipe; The pile structure with the permeable pipe is inserted into the foundation one by one according to the sequence of the surrounding purlin and pile insertion method, and the pile structure is inserted into the bearing layer.
10. The construction method of the permeable pile structure for reinforcing the bridge abutment according to claim 9, It is characterized in that The plurality of pile structures are configured as three rows of piles, and the step of inserting the pile structures with the permeable pipes into the foundation one by one in the order of the surrounding purlin pile insertion method comprises: Start laying out the piles between two adjacent rows, and then drive each side in turn. First, drive some of the pile structures with the permeable pipes into place one by one, then drive some of the pile structures with the permeable pipes in a stepped manner, and then arrange a preset number of pile structures with the permeable pipes by first inserting them together and then driving them.