Section steel stand column and steel bar installation and construction method thereof
By setting reinforcement ribs and sleeves in the steel columns, the absolute position of the steel bars is ensured, and the problem of mutual influence during cross-construction of the steel columns is solved, the construction efficiency and safety are improved, the position conflict of stirrups is avoided, and high efficiency is achieved construction of beam and column nodes.
Patent Information
- Application Number
- CN202411408439.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-10
- Publication Date
- 2024-12-03
AI Technical Summary
The problem of interfering with each other during cross-construction of part steel bars in the prior art has led to low construction quality and efficiency, and traditional processes cannot guarantee the construction quality of the beam and column node core area.
H-shaped steel columns are used, reinforcement ribs are set between the wing plates, reinforcement ribs are connected vertically on the outer side, column sleeves and beam sleeves are set, reinforcement holes are opened on the web, and main ribs are connected through column sleeves and beam sleeves to ensure the stirrups are Absolute position, reduce on-site welding operations, and adopt prefabricated processing methods.
It effectively solves the problem of mutual influence during cross-construction of steel columns, ensures the absolute position of the main ribs of each component in the core area of the beam and column nodes, avoids conflicts between stirrups and H-shaped steel shear nails, and improves construction efficiency and safety. Save labor and cost.
Smart Images

Figure CN119062059A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of building construction, and in particular relates to a steel column and a steel bar installation and construction method thereof. Background Art
[0002] Steel-concrete composite structure technology is one of the top ten new technologies in the construction industry. The composite structure makes full use of the tensile strength of steel and the compressive strength of concrete. It has greater bearing capacity, greater rigidity, better seismic resistance, and better fire resistance than traditional reinforced concrete structures. It also reduces the cross-sectional size of components and meets the functional requirements of large bays and spaces in buildings. It is a commonly used structural form in modern frame structures, frame-shear structures, frame-tube structures, etc.
[0003] The project undertaken by the company has two underground floors as an integrated underground space, and the ground is divided into hotel guest rooms, east office building, west office building and hotel lobby building. The structural form is a frame-shear structure, and the steel-concrete structural columns are widely distributed and scattered. The anchorage between the steel column and the reinforced concrete beam and the arrangement of the column reinforcement are deepened. If the traditional construction technology is used, the column main reinforcement, column stirrups, and beam main reinforcement will not be able to guarantee the construction quality of the core area of the beam-column node and the impact on the construction period caused by the conflict of the reinforcement position.
[0004] The Chinese patent with the publication number CN112359970A discloses a beam-column connection node structure in a steel-concrete structure and its construction method, which solves the problem of how to ensure the overall penetration of the longitudinal steel bars and take into account the strength of the steel beam when the longitudinal steel bars interfere with the flange plate of the steel beam in the existing steel-concrete composite structure. A groove is pre-opened on the upper and lower flange plates of the steel beam for the longitudinal steel bars in the steel-concrete composite structure to pass through, so that the longitudinal steel bars that interfere with the upper and lower flange plates of the steel beam can vertically pass through the upper and lower flange plates of the steel beam, ensuring the overall pressure bearing capacity of the longitudinal steel bars in the vertical direction; between the upper and lower flange plates of the steel beam at the groove, a semi-cylindrical support sleeve is fixedly welded to compensate for the reduction in the strength of the steel beam caused by the groove, ensuring the overall strength of the steel beam; ensuring the strength of the beam-column node, improving the construction efficiency, and saving construction materials. However, the document has the problem that the opening of the steel flange causes the stress state of the steel to change, and does not solve the problem of mutual influence when the cross-construction of some steel bars of the steel column. Summary of the invention
[0005] The invention provides a steel column and a steel bar installation and construction method thereof, aiming to overcome the problem of mutual influence during the cross construction of some steel bars of a medium-sized steel column in the prior art.
[0006] To this end, the present invention provides a steel column, which is an H-shaped steel column, a reinforcing rib one is arranged and connected between two wing plates of the H-shaped steel, the outer sides of the two wing plates are vertically connected with reinforcing ribs two, the number of reinforcing ribs one and two is multiple, the multiple reinforcing ribs one and two are spaced and distributed from top to bottom, a plurality of column sleeves are arranged and connected above or below the reinforcing rib two, a plurality of beam sleeves are arranged and connected on the outer sides of the wing plates, a plurality of steel bar holes are opened on the web of the H-shaped steel, and a plurality of shear nails are arranged and connected on the outer sides of the two wing plates of the H-shaped steel.
[0007] Preferably, the column sleeve is used to vertically connect the column main reinforcement 1, the beam sleeve is used to horizontally connect the beam main reinforcement 1, and the steel bar hole is used to horizontally pass through the beam main reinforcement 2 or the U-shaped hoop.
[0008] Preferably, the first reinforcing rib and the second reinforcing rib are both located at elevated positions.
[0009] A steel bar installation and construction method based on the steel column comprises the following steps:
[0010] 1) Install the steel column to the target position;
[0011] 2) Prepare the required steel bars, which include at least beam main bar 1, beam main bar 2, column main bar 1, U-shaped stirrups, and single-limb stirrups;
[0012] 3) Install column main reinforcement and beam main reinforcement on and around the steel column as required. The beam main reinforcement and column main reinforcement are installed on the steel column as follows: vertically connect the column main reinforcement in the column sleeve, horizontally connect the beam main reinforcement in the beam sleeve, and vertically connect the beam main reinforcement in the steel bar hole;
[0013] 4) Tie two-legged hoops, U-shaped hoops and one-legged hoops to the outermost column main reinforcement of the steel column;
[0014] 5) Complete the binding of all steel bars as required;
[0015] 6) Assemble and reinforce the template to complete the template installation;
[0016] 7) Pour concrete on the formwork to complete the construction.
[0017] Preferably, in the step 4), when inserting the U-shaped hoop, the open end of the U-shaped hoop is required to insert the steel bar hole.
[0018] Preferably, when the U-shaped stirrup is inserted in step 4), the two relatively connected U-shaped stirrups are connected into one closed stirrup with the H-shaped steel web as the center.
[0019] Preferably, the height of the reinforcing rib 1 and the reinforcing rib 2 is lower than the height of the main reinforcement of the beam at the same elevation.
[0020] Preferably, the template is a disc-type template.
[0021] Preferably, when pouring concrete, wire mesh is set at the positions of concrete of different grades at the beam-column joints to intercept.
[0022] Preferably, when pouring concrete, the long-span beam is poured gradually from the middle of the span to both ends.
[0023] Beneficial effects of the present invention:
[0024] 1. The steel column and steel bar installation and construction method provided by the present invention is that a reinforcing rib 1 is arranged between the two wing plates of the H-shaped steel, and the outer sides of the two wing plates are vertically connected with reinforcing rib 2. A plurality of column sleeves are arranged above or below the reinforcing rib 2, and a plurality of beam sleeves are arranged on the outer sides of the wing plates. A plurality of steel bar holes are opened on the web of the H-shaped steel, and a plurality of shear nails are arranged on the outer sides of the two wing plates of the H-shaped steel; the column main reinforcement is connected to the column sleeve, and the beam main reinforcement passes through the steel bar hole or connects to the beam sleeve, and is transmitted upward through the column sleeve. The column stirrups are adjusted to be made into two open U-shaped stirrups on the premise of ensuring the lap length, and the two open U-shaped stirrups are overlapped through the steel bar holes reserved on the steel column to form a complete closed stirrup; part of the beam main reinforcement can be inserted through the steel bar holes reserved on the steel web. The smooth implementation of this construction method effectively solves the problem of mutual influence during the cross-construction of some steel bars of the steel column, and at the same time ensures the absolute position of the main reinforcement of each component in the core area of the beam-column node. The problem of construction difficulties caused by the conflict between the stirrups and the shear nails of the H-shaped steel is avoided. The traditional composite hoop construction process is optimized to prevent the change in the stress state of the H-shaped steel caused by the openings in the web and flange of the H-shaped steel, saving labor, improving construction efficiency and saving construction costs.
[0025] 2. The steel column and the steel bar installation and construction method provided by the present invention adopt the prefabricated processing method for H-shaped steel. Under the premise of meeting the lifting capacity of the lifting machinery, the on-site welding operation steps are reduced as much as possible, thereby minimizing the safety hazards such as object impact and electric shock. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] The present invention will be further described in detail below with reference to the accompanying drawings.
[0027] Figure 1 This is the main structural view of the H-beam;
[0028] Figure 2 This is the top view of the H-beam structure;
[0029] Figure 3 It is a schematic diagram of a one-limb hoop tightening structure;
[0030] Figure 4 It is a schematic diagram of the clamping structure of a U-shaped hoop and a single-limb hoop.
[0031] Explanation of the accompanying drawings: 1. Reinforcing rib one; 2. Reinforcing rib two; 3. Column sleeve; 4. Beam sleeve; 5. Steel bar hole; 6. Shear nail; 7. U-shaped hoop; 8. Single-limb hoop. DETAILED DESCRIPTION
[0032] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.
[0033] Embodiment 1:
[0034] like Figure 1-Figure 4 As shown, a steel column is an H-shaped steel column, and a reinforcing rib 1 is arranged and connected between two wing plates of the H-shaped steel, and the outer sides of the two wing plates are vertically connected with reinforcing ribs 2, and the number of reinforcing ribs 1 and reinforcing ribs 2 is multiple, and the multiple reinforcing ribs 1 and reinforcing ribs 2 are spaced and distributed from top to bottom, and multiple column sleeves 3 are arranged and connected above or below the reinforcing ribs 2, and multiple beam sleeves 4 are arranged and connected on the outer sides of the wing plates, a plurality of steel bar holes 5 are opened on the web of the H-shaped steel, and a plurality of shear nails 6 are arranged and connected on the outer sides of the two wing plates of the H-shaped steel.
[0035] Specifically, the number of column sleeves 3 and beam sleeves 4 is selected according to the actual situation. The column sleeve 3 is vertically connected to the reinforcing rib 2, and the beam sleeve 4 is vertically connected to the outer side of the wing plate. Multiple shear nails 6 are evenly spaced from top to bottom. After the installation of the steel column is completed, if the traditional construction process is used, the column main reinforcement, column stirrups, and beam main reinforcement will not be able to be constructed. This method proposes that when the column main reinforcement is constructed and the column elevation is extended upward, the column main reinforcement is connected to the column sleeve 3 and transmitted upward through the column sleeve 3. The column stirrups are adjusted to be made into two open U-shaped stirrups on the premise of ensuring the lap length. The two open U-shaped stirrups are overlapped into a complete closed stirrup through the steel bar hole 5 reserved on the steel column; the beam main reinforcement passes through the steel bar hole 5 or connects the beam sleeve 4, and part of the beam main reinforcement can be inserted through the steel bar hole 5 reserved on the steel web. The smooth implementation of this method effectively solves the problem of mutual influence during the cross-construction of some steel bars in the steel column, and at the same time ensures the absolute position of the main reinforcement of each component in the core area of the beam-column node. The problem of construction difficulties caused by the conflict between the stirrups and the H-steel shear nails is avoided. It is of reference value in the construction of similar steel-concrete structure columns. The H-steel is prefabricated. On the premise of meeting the lifting capacity of the lifting machinery, the on-site welding operation steps are minimized to minimize safety hazards such as object impact and electric shock.
[0036] Preferably, the column sleeve 3 is welded with the reinforcing rib 2, and the beam sleeve 4 is welded on the outer side of the wing plate.
[0037] Specifically, the welding connection does not require drilling holes, will not damage the reinforcing rib 2 and the H-shaped structure, optimizes the traditional composite hoop construction process, prevents the change in the stress state of the H-shaped steel caused by the holes in the web and flange of the H-shaped steel, saves labor, improves construction efficiency, and saves construction costs.
[0038] Preferably, the column sleeve 3 is used to vertically connect the column main reinforcement 1, the beam sleeve 4 is used to horizontally connect the beam main reinforcement 1, and the steel bar hole 5 is used to horizontally pass through the beam main reinforcement 2 or the U-shaped hoop 7. The structure is simple and convenient for construction. It effectively solves the problem of mutual influence during the cross construction of some steel bars in the steel column, and at the same time ensures the absolute position of the main reinforcement of each component in the core area of the beam-column node.
[0039] Preferably, the reinforcing rib 1 and the reinforcing rib 2 are both located at the elevation position. Specifically, this arrangement ensures the absolute position of the main reinforcement of each component in the core area of the beam-column node.
[0040] Embodiment 2:
[0041] On the basis of Example 1, a steel bar installation and construction method based on the steel column comprises the following steps:
[0042] 1) Install the steel column to the target position;
[0043] The specific installation operations are:
[0044] 1.1) The raw materials of the required prefabricated steel columns are transported to the site and welded into shape;
[0045] 1.2) Install anchor bolts at the target location. The process of installing anchor bolts is: enter the site and assemble together with the sleeve frame → measure and lay out according to the size of the drawing → install embedded parts → measure and calibrate → fix → re-inspect and accept → monitor the concrete pouring process → re-inspect → enter the next process;
[0046] 1.3) Lift the welded steel column to the installed anchor bolt and connect it. The steel column is hoisted by 4 points, with the temporary connection ear plate as the lifting lug. One end of the sling is firmly connected to the temporary connection ear plate, and the other end is directly hung in the tower crane hook, and the "rotation method" is used for hoisting.
[0047] 2) Prepare the required steel bars, which at least include beam main bar 1, beam main bar 2, column main bar 1, U-shaped stirrup 7, and one-limb stirrup 8;
[0048] Specifically, the longitudinal reinforcement of the column (including the main reinforcement of the column and the main reinforcement of the column) should be prepared and processed according to the length from the steel column sleeve 3 to the layer position. After being fastened and installed by the flange beam sleeve 4, a lap connection is formed at the middle position where the shear force is relatively small. The U-shaped hoop 7 and the one-limb hoop 8 are processed on site. In order to facilitate the installation of the longitudinal reinforcement, the reinforcement processing and production should be based on the actual conditions of the construction site to control the length of the longitudinal reinforcement. The reinforcement joints can be mechanically connected or welded. The U-shaped hoop 7 is determined according to the size of the hoop diameter, the amount of longitudinal reinforcement and the absolute position of the column main reinforcement. The spacing of the U-shaped hoop 7 is the same as that of the composite hoop.
[0049] 3) Install column main reinforcement and beam main reinforcement on and around the steel column as required, wherein the beam main reinforcement and column main reinforcement are installed on the steel column as follows: vertically connect column main reinforcement 1 in column sleeve 3, horizontally connect beam main reinforcement 1 in beam sleeve 4, and vertically connect beam main reinforcement 2 in steel bar hole 5;
[0050] Specifically, the column main reinforcement and beam main reinforcement are installed on the steel column and its surroundings as required. The operation is carried out in accordance with the on-site construction requirements. The column main reinforcement and column main reinforcement 1 are the same or different, and the beam main reinforcement 1, beam main reinforcement 2 and beam main reinforcement are the same or different. They can be selected according to needs to meet the requirements.
[0051] 4) Tie two-legged hoops, U-shaped hoops 7 and one-legged hoops 8 to the outermost column main bars of the steel column;
[0052] Specifically, after the hoisting and welding of the steel column is completed, start to install the two outermost hoops of the steel column, and the number is based on the floor height / spacing + 1. According to the construction plan, first connect the main reinforcement of the column with straight threads, and then tie and fix it firmly in the overlap area. Pass the main reinforcement of the beam through the reserved holes in the web of the steel column, and connect and tighten it with straight threads on the outside of the steel column. Arrange the composite hoops and U-shaped hoops 7 and one-leg hoops 8 according to the spacing, and tie and tie with the main reinforcement of the column. One of the hoops 8 can also be inserted into the steel bar hole 5 (such as Figure 3 It is practical.
[0053] 5) Complete the binding of all steel bars as required;
[0054] 6) Assemble and reinforce the template to complete the template installation;
[0055] 7) Pour concrete on the formwork to complete the construction.
[0056] This method is used to optimize the structural design and construction, which has no effect on the mechanical properties of the original structure and meets the stress state, durability and fire resistance requirements of the components. It creates good conditions for smooth construction, and the acceptance rate of components is 100%, which has good social benefits. It saves construction time, improves quality and efficiency, and reduces cost expenditure. This method is used to avoid the unreasonable arrangement of the original beam and column composite hoops, the position conflict that leads to the defect that the position of the main reinforcement cannot be guaranteed, speeds up the on-site binding progress, simplifies the operation, and ensures the position of the main reinforcement of the beam and column. According to calculations, the cumulative saving of key progress lines is 15 days.
[0057] The structural components made of steel-concrete have no appearance defects, and the construction quality meets the design requirements. The effect is good and the project quality is good.
[0058] Preferably, in the step 4), when the U-shaped hoop 7 is inserted, the open end of the U-shaped hoop 7 is required to be inserted into the steel bar hole 5 .
[0059] Preferably, when the U-shaped stirrup 7 is inserted in step 4), the two relatively connected U-shaped stirrups 7 are connected into one closed stirrup with the H-shaped steel web as the center.
[0060] Specifically, two U-shaped hoops 7 are overlapped through the steel bar holes reserved on the steel column to form a complete closed hoop, which effectively solves the problem of mutual influence during the cross construction of some steel bars of the steel column.
[0061] Preferably, the height of the reinforcing rib 1 and the reinforcing rib 2 is lower than the height of the main reinforcement of the beam at the same elevation.
[0062] Specifically, the stiffening ribs are 2.5 cm lower than the main reinforcement of the reinforced concrete beam at the floor elevation, meeting the requirements of the main reinforcement protection layer.
[0063] Preferably, the template is a disc-type template.
[0064] Specifically, the disc-type formwork has high safety, high construction efficiency, material saving, long service life, strong versatility and large space.
[0065] Preferably, when pouring concrete, a wire mesh is arranged at the position of concrete with different grades at the beam-column joint to intercept, so as to ensure that the column concrete can be smoothly poured to the top of the slab.
[0066] Preferably, when pouring concrete, the column and wall concrete are poured in three cycles.
[0067] Specifically, the concrete of columns and walls must be poured in three cycles and must not be formed in one go to prevent deformation due to excessive stress on the column molds.
[0068] Preferably, when pouring concrete, the long-span beam is gradually poured from the middle of the span to both ends to ensure the construction quality and structural safety.
[0069] In the description of the present invention, it should be understood that the orientation or positional relationship indicated by terms such as "front", "inside", "right", etc. is based on the orientation or positional relationship shown in the drawings, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the positional relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on the present invention.
[0070] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. All designs that are the same or similar to the present invention fall within the protection scope of the present invention.
Claims
1. A steel column, characterized in that: The steel column is an H-shaped steel, and a reinforcing rib (1) is arranged between two wing plates of the H-shaped steel, and the outer sides of the two wing plates are vertically connected with reinforcing ribs (2). The number of reinforcing ribs (1) and reinforcing ribs (2) is multiple, and the multiple reinforcing ribs (1) and reinforcing ribs (2) are distributed at intervals from top to bottom. A plurality of column sleeves (3) are arranged above or below the reinforcing ribs (2), and a plurality of beam sleeves (4) are arranged on the outer side of the wing plates. A plurality of steel bar holes (5) are opened on the web of the H-shaped steel, and a plurality of shear nails (6) are arranged on the outer sides of the two wing plates of the H-shaped steel.
2. The steel column according to claim 1, characterized in that: The column sleeve (3) is used to vertically connect the column main reinforcement 1, the beam sleeve (4) is used to horizontally connect the beam main reinforcement 1, and the steel bar hole (5) is used to horizontally pass through the beam main reinforcement 2 or the U-shaped hoop (7).
3. The steel column according to claim 2, characterized in that: The reinforcing rib one (1) and the reinforcing rib two (2) are both located at elevated positions.
4. A method for installing and constructing steel bars of a steel column according to claim 3, characterized in that: The steps include: 1) Install the steel column to the target position; 2) preparing the required steel bars, which at least include beam main bar 1, beam main bar 2, column main bar 1, U-shaped hoop (7), and single-limb hoop (8); 3) Install column main reinforcement and beam main reinforcement on and around the steel column as required, wherein the beam main reinforcement and column main reinforcement are installed on the steel column as follows: vertically connect the column main reinforcement 1 in the column sleeve (3), horizontally connect the beam main reinforcement 1 in the beam sleeve (4), and longitudinally connect the beam main reinforcement 2 in the steel bar hole (5); 4) Tie two-legged hoops, U-shaped hoops (7) and one-legged hoops (8) to the outermost column main reinforcement of the steel column; 5) Complete the binding of all steel bars as required; 6) Assemble and reinforce the template to complete the template installation; 7) Pour concrete on the formwork to complete the construction.
5. The steel bar installation and construction method of the steel column according to claim 4, characterized in that: When the U-shaped hoop (7) is inserted in step 4), the open end of the U-shaped hoop (7) is required to be inserted into the steel bar hole (5).
6. The reinforcement installation and construction method of the steel column according to claim 5, characterized in that: When the U-shaped stirrup (7) is inserted in step 4), the two relatively connected U-shaped stirrups (7) are connected to form a closed stirrup with the H-shaped steel web as the center.
7. The reinforcement installation and construction method of the steel column according to claim 4, characterized in that: The heights of the reinforcing rib one (1) and the reinforcing rib two (2) are lower than the heights of the main reinforcements of the beam at their respective elevations.
8. The steel bar installation and construction method of the steel column according to claim 4, characterized in that: The template adopts a disk-type template.
9. The steel bar installation and construction method of the steel column according to claim 4, characterized in that: When pouring concrete, steel wire mesh is arranged at the positions of concrete with different grades at the beam-column joints to intercept.
10. The steel bar installation and construction method of the steel column according to claim 4, characterized in that: When pouring concrete, the long-span beam is poured gradually from the middle of the span to both ends.