Scaling rate monitoring method
The hanging plate test unit with plumb bobs in oilfield water systems addresses inaccuracies in scaling rate monitoring by accounting for water flow and sludge, ensuring accurate and flexible monitoring, thus guiding oil and gas field production.
Patent Information
- Application Number
- CN202310651216.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-02
- Publication Date
- 2024-12-03
AI Technical Summary
Existing methods for monitoring scaling rates in oilfield water systems are inaccurate due to interference from oil and mud, and simulation methods fail to reflect actual field conditions, leading to significant errors in predicting corrosion and scaling rates.
A method involving a hanging plate test unit with a plumb bob at its ends, placed vertically in oilfield water systems at specific depths and positions, using a cleaning solution and titration to calculate scaling rates, considering water flow and oil sludge impacts, ensuring accurate monitoring.
The method provides accurate scaling rate monitoring by minimizing interference from floating sludge and fluid flow, reflecting actual conditions, and facilitating flexible monitoring at various depths and positions, guiding oil and gas field production effectively.
Smart Images

Figure CN119064206A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of scaling monitoring of oil and gas field water systems, and in particular relates to a scaling rate monitoring method. Background Art
[0002] Oilfield water refers to groundwater in the oil and gas field area (oil-bearing structure), including oil layer water and non-oil layer water. There are many scaling ions in oilfield water. Since scaling ions are often in an oversaturated state, and the pressure of produced oilfield water is released from the formation to the ground, the temperature and pressure between different ground treatment systems also change from time to time. Therefore, oilfield water generally has calcium carbonate scaling problems, which will aggravate the corrosion of oil and gas field pipeline equipment and cause serious adverse effects. Oilfield water needs to be purified before being reinjected into the oilfield. Understanding the scaling condition of oilfield water is one of the indicators that need to be monitored during oilfield water purification. However, in addition to the deposited calcium carbonate scaling, the actual on-site scale samples sometimes also contain floating sludge formed by the deposition of formation clay minerals. The floating sludge will interfere with the monitoring of calcium carbonate scaling.
[0003] At present, there are limited methods for monitoring the actual scaling rate. The commonly used methods are the pressure difference method, the short-circuit method and the hanging plate method. Among them, most of the scaling monitoring equipment and monitoring methods of the pressure difference method make scaling monitoring very inaccurate due to the presence of oil and mud; the short-circuit method is difficult to obtain data in the pipeline because the pipe diameter cannot be restored after expansion and contraction due to the influence of temperature; and the hanging plate method is to suspend the hanging plate in the sample oil for scaling, and the scaling rate is indicated by the change in the size of the pore size on the hanging plate. This method only considers the blockage of the pore size. For most scaling sites, the scaling rate cannot be known in a short time, and there is no clear method to eliminate the interference of oil.
[0004] Chinese patent CN107966346A discloses a laboratory hanging sheet rapid scaling method, wherein a rotor is installed at the bottom of the reactor, a calcium and magnesium ion solution of a certain initial concentration is prepared, a hanging sheet with a surface roughness greater than 6.3 after grinding is placed therein, the distance between the hanging sheet and the rotor and the rotor speed are set, and the temperature is repeatedly increased and decreased, and the pressure is increased and decreased. Before the temperature is increased, the carbon dioxide partial pressure is increased to 6MPa, and then the solution is quickly heated to 100°C, and then quickly cooled to 60°C. After every two coolings, the pressure is reduced to atmospheric pressure at 60°C. After each pressure drop, calcium chloride and magnesium chloride are added to increase the calcium ion concentration in the solution by 0.4% and the magnesium ion concentration by 0.05%. The best effect is achieved after 5 pressure drops. This patent takes into account that temperature and pressure have a great influence on the scaling of calcium and magnesium salts. Through repeated rapid pressure drops and temperature changes, calcium and magnesium salt scaling can be quickly generated. However, the method of this patent only simulates scaling in an indoor laboratory. The actual pressure in the indoor simulation test is significantly different from the pressure of the oil and gas field water system. In addition, the carbon dioxide partial pressure value existing in the method device of this patent is significantly different from the carbon dioxide partial pressure value in dynamic equilibrium in the actual formation. The experimental simulation results have large errors and cannot truly reflect the actual scaling rate of the oil and gas field water system, let alone accurately guide oil and gas field production.
[0005] Chinese patent CN113806964A discloses a method for predicting corrosion and scaling rates considering the coupling of multiple factors. First, the collected corrosion and scaling parameters of the work area are analyzed for correlation and the main controlling factors are determined. The metal corrosion and scaling experiments are simulated by orthogonal design, and the regression equation of the corrosion and scaling rate is obtained by combining the multivariate regression analysis method. Finally, the regression equation and the regression coefficient are tested, and the sample can be expanded by reducing the level interval of the main controlling factor to increase the experiment and improve the prediction accuracy. The method of the patent is based on the experiment of the influence of the main controlling factors on the corrosion and scaling rate, combined with the multivariate regression analysis method, and can predict the corrosion and scaling rate under a wider range of working conditions. However, the method of the patent is a theoretical analysis plus experimental simulation, which also has the problem that the simulation equipment and its parameters such as temperature and pressure are quite different from the actual working conditions, and the simulation results have large errors. At the same time, the method of the patent has the problems of difficult data processing, difficult analysis and extraction of the main controlling factors of scaling, and complex calculation process, and needs to design multiple groups of experiments for combined analysis, and the whole operation process is cumbersome. Summary of the invention
[0006] The present invention aims to solve at least one technical problem existing in the background technology, and provides a scaling rate monitoring method, which can fully take into account the influence of water flow, oil sludge, etc. on calcium carbonate type scaling, and realize the placement and monitoring of the hanging plate test unit in the oilfield water system at different depths and different positions in the engineering field. The monitoring result can more truly reflect the scaling situation and scaling rate of the oilfield water in the actual working environment, which has important guiding significance for oil and gas field production.
[0007] In order to achieve the above technical objectives, the present invention adopts the following technical solutions:
[0008] A method for monitoring scaling rate, comprising the following steps:
[0009] Step S1. Pretreatment of the hanging piece: drilling a circular hole on the hanging piece, cleaning and grinding the hanging piece;
[0010] Step S2. Hanging the hanging piece: vertical hanging wires of a certain length are fixedly installed through the circular holes at the upper and lower ends of the hanging piece, and a plumb bob with a sharp corner at the bottom is installed on the upper and lower hanging wires of each hanging piece to form a hanging piece test unit;
[0011] Step S3. Place the coupon: place the coupon test unit at a predetermined position and predetermined depth of the oilfield water to be monitored in the project site, and record the start time of placement; take it out after placing it for a period of time t;
[0012] Step S4. Cleaning the hanging sheet: placing the removed hanging sheet in a pre-configured cleaning solution for cleaning to obtain a scale-containing cleaning solution containing scaling substances;
[0013] Step S5. Titration to calculate the scaling rate:
[0014] Step S501: centrifuging and separating the scale-containing cleaning liquid to remove the organic phase therein to obtain an aqueous phase and a solid phase;
[0015] Step S502. After dripping triethanolamine masking agent into the aqueous phase, titration analysis is performed on the calcium ion content; the solid phase is dried and weighed;
[0016] Step S503. Calculate the scaling rate based on the calcium ion content and the solid phase dry weight:
[0017]
[0018] In the above formula, ω is the fouling rate; c(C a + ) Calcium ion concentration; V 酸 is the volume of acid solution; m is the dry weight of solid phase; S is the surface area of coupon; t is the placement time of coupon test unit.
[0019] Furthermore, when the coupon is pre-treated and cleaned in step S1, the coupon is cleaned in sequence using three solvents: acetone, ethanol and water.
[0020] Further, in steps S1 and S2, a horizontal circular hole is drilled through each of the upper and lower ends of the hanging piece, and a vertical hanging line is respectively tied through the horizontal circular hole at the upper and lower ends of the hanging piece; or,
[0021] A vertical circular hole is drilled on the hanging piece, which passes through the hanging wire. The inner diameter of the vertical circular hole is set to ensure that the hanging piece is fixed relative to the hanging wire.
[0022] Furthermore, the hanging wire is replaced by a flexible connecting rod.
[0023] Furthermore, when placing the coupons in step S3, a plurality of coupon test units are connected in series end to end to form a coupon test system to monitor the scaling rate of oilfield water at different depths at the same location.
[0024] Furthermore, when placing the coupons in step S3, a plurality of coupon test systems are placed at different locations of the oilfield water to be monitored, so as to monitor the scaling rate of the oilfield water at different locations.
[0025] Furthermore, in step S3, the oilfield water to be monitored in the engineering field is located in an oilfield water container tank and / or an oilfield water transportation pipeline for continuously storing the oilfield water.
[0026] Furthermore, in step S4, the pre-configured cleaning solution is a mixture of dilute hydrochloric acid and a cleaning agent, the concentration of the dilute hydrochloric acid is 2%-10%, and the cleaning agent is one or more combinations of petroleum ether, tetrachloroethylene or carbon tetrachloride.
[0027] Furthermore, when preparing the cleaning solution, the cleaning agents selected are petroleum ether and tetrachloroethylene, and the volume ratio of dilute hydrochloric acid, petroleum ether and tetrachloroethylene used is: 10:1:1-1:1:1.
[0028] Furthermore, when cleaning the hanging piece in step S4, the hanging piece is cleaned by oscillating with the heated cleaning liquid, and then the surface of the hanging piece is cleaned with a brush, so that the scale on the surface of the hanging piece is fully dissolved in the cleaning liquid.
[0029] Furthermore, in step S4, the cleaning liquid is heated to a temperature of 25°C-40°C.
[0030] Furthermore, the step S501 specifically includes:
[0031] Step S501: first centrifuge the scale-containing cleaning liquid, and then separate and remove the organic phase in the scale-containing cleaning liquid with a separatory funnel to obtain an aqueous phase and a solid phase.
[0032] Furthermore, the step S502 specifically includes:
[0033] Step S502: drip triethanolamine masking agent into the separated aqueous phase, shake well, let stand, and then use EDTA titration method to titrate and analyze the calcium ion content; dry and weigh the solid phase.
[0034] Compared with the prior art, the beneficial effects of the present invention are:
[0035] (1) The scaling rate monitoring method provided by the present invention fully considers the influence of water flow, oil sludge, etc. on scaling. A hanging plate test unit is formed by fixing a plumb bob with a sharp bottom on the upper and lower parts of the hanging plate through a hanging line (or a flexible connecting rod), and then the hanging plate test unit is placed at a predetermined position and a predetermined depth of the oilfield water to be monitored in the engineering field for monitoring. In actual engineering, the oilfield water to be tested is usually located in an oilfield water transportation pipeline or an oilfield water container tank for continuous storage of oilfield water, both of which are subject to oilfield water flow impact. During the placement process, the upper and lower plumb bobs of the hanging plate can not only ensure that the hanging plate test unit is placed vertically in the oilfield water, but also ensure that the hanging plate test unit can withstand the flow impact of the fluid without swinging randomly, thereby ensuring the vertical placement of the hanging plate test unit, and ensuring that the monitoring position of the hanging plate test unit is fixed and the monitoring result is accurate.
[0036] At the same time, when the hanger is placed into the oilfield water, the sharp corner of the lower plumb bob can pierce the hard floating sludge at the oil-water interface, avoiding the difficulty in placing the hanger due to the floating sludge in the oilfield water; when the hanger is taken out of the oilfield water, the upper plumb bob can stick to the floating sludge, thereby avoiding the floating sludge adhering to the hanger and interfering with the experimental test results, further ensuring the accuracy of the monitoring results.
[0037] (2) The scaling rate monitoring method provided by the present invention adopts a specially configured cleaning liquid composite dissolving hanging piece, then adopts a masking agent titration to analyze the calcium ion content, and dries and weighs the solid phase of other scaling substances that are insoluble in the cleaning liquid, and finally comprehensively calculates the scaling rate based on the calcium ion content and the solid phase dry weight. Not only is the operation method simple and easy to implement on the construction site, but the obtained test results can more truly reflect the scaling situation and scaling rate of the oilfield water system, which has important engineering practical significance for accurately guiding the production of oil and gas fields.
[0038] (3) When monitoring oilfield water, the hanging line length of the hanging test unit of the present invention can be flexibly adjusted, and a plurality of hanging test units can be connected in series end to end to form a hanging test system to monitor the scaling rate of oilfield water at different depths at the same position; at the same time, a plurality of hanging test systems can also be placed at different positions of the oilfield water to be monitored to monitor the scaling rate of the oilfield water at different positions; the monitoring method is flexible and changeable, which can meet the actual monitoring needs of the project, and it is easy to observe the change law of scaling in different treatment units, and further explore the scaling mechanism of oilfield water. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 This is a flow chart of a scaling rate monitoring method according to an embodiment of the present invention;
[0040] Figure 2It is a structural schematic diagram of a coupon test unit according to an embodiment of the present invention;
[0041] Marking instructions in the figure: 1-hanging wire or flexible connecting rod; 2-plumb bob; 3-hanging piece. DETAILED DESCRIPTION
[0042] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0043] Example 1
[0044] The present invention provides a method for monitoring scaling rate. Figure 1 As shown, the method comprises the following steps:
[0045] Step S1. Pretreatment of the hanging piece: drilling a circular hole on the hanging piece, cleaning and grinding the hanging piece;
[0046] Specifically, when drilling a circular hole on the hanging sheet, a horizontal circular hole can be drilled through each of the upper and lower ends of the hanging sheet, so that a vertical hanging line can be tied through the horizontal circular hole at the upper and lower ends of the hanging sheet; or a vertical circular hole can be drilled through the hanging sheet, so that the hanging line can be passed through the vertical circular hole. At the same time, the inner diameter of the vertical circular hole is equivalent to the outer diameter of the hanging line, so that after the hanging line passes through the hanging sheet, the hanging sheet can be fixed relative to the hanging line and will not slide down. When threading the hanging line, a tool such as a thimble can be used for threading. In some other embodiments, a flexible connecting rod can also be used instead of the hanging line.
[0047] When the coupons are pre-treated and cleaned, the coupons are cleaned in sequence using three solvents: acetone, ethanol and water.
[0048] Step S2. Hanging the hanging plate: vertical hanging wires of a certain length are fixedly installed through the circular holes at the upper and lower ends of the hanging plate, and the length of the hanging wire is determined according to the depth of the oil field water position to be tested; and a plumb bob with a sharp corner at the bottom is installed on the upper and lower hanging wires of each hanging plate to form a hanging plate test unit;
[0049] like Figure 2 As shown, 1 is a hanging wire or a flexible connecting rod; 2 is a plumb bob; and 3 is a hanging piece.
[0050] Step S3. Place the coupon: place the coupon test unit at a predetermined position and predetermined depth of the oilfield water to be monitored in the project site, and record the start time of placement; take it out after placing it for a period of time t;
[0051] The oilfield water to be monitored in the engineering field is usually located in an oilfield water container tank for continuous storage of the oilfield water and / or an oilfield water transportation pipeline.
[0052] During the placement process, the upper and lower plumb bobs of the hanging piece can ensure that the hanging piece test unit is placed vertically in the oilfield water. In the oilfield water container tank that continuously stores flowing oilfield water or in the oilfield water pipeline where oilfield water continuously flows, it can ensure that the hanging piece test unit can withstand the flow impact of the fluid without swinging at will, ensure the vertical placement of the hanging piece test unit, and ensure that the monitoring position of the hanging piece test unit is fixed and the accuracy of the monitoring results.
[0053] It should be additionally explained that when the coupon test unit monitors an oilfield water container tank that continuously stores flowing oilfield water, it can be placed and removed at any time; when the coupon test unit monitors an oilfield water pipeline in which oilfield water continuously flows, the coupon test unit needs to be placed when the oilfield water pipeline is connected and removed when the pipeline is disassembled and cleaned. Special pipeline connection equipment can also be used to achieve the purpose of placing and removing the coupon test unit at any time.
[0054] At the same time, when placing the hanging piece into the oil field water, the sharp corner of the lower plumb bob can pierce the hard floating sludge at the oil-water interface, avoiding the difficulty of placing the hanging piece due to the floating sludge in the oil field water; when the hanging piece is taken out of the oil field water, the upper plumb bob can stick to the floating sludge, thereby avoiding the floating sludge adhering to the hanging piece and interfering with the experimental test results; further ensuring the accuracy of the monitoring results.
[0055] In addition, in some other embodiments, the length of the hanging line can be flexibly adjusted to meet the needs of testing positions at different depths; a number of hanging test units can also be connected in series end to end to form a hanging test system to monitor the scaling rate of oilfield water at different depths at the same position; at the same time, a number of hanging test systems can also be placed at different positions of the oilfield water to be monitored to monitor the scaling rate of oilfield water at different positions; the monitoring method is flexible and changeable, which can meet the actual monitoring needs of the project, and it is easy to observe the changing law of scaling in different treatment units.
[0056] Step S4. Cleaning the hanging sheet: placing the removed hanging sheet in a pre-configured cleaning solution for cleaning to obtain a scale-containing cleaning solution containing scaling substances;
[0057] In this step, the pre-configured cleaning solution is a mixture of dilute hydrochloric acid and a cleaning agent, and the cleaning agent is a combination of one or more of petroleum ether, tetrachloroethylene or carbon tetrachloride.
[0058] When preparing the cleaning solution, the concentration of the dilute hydrochloric acid is 2%-10%. The required cleaning agent is selected according to the actual oilfield water conditions. In the embodiment of the present invention, the selected cleaning agents are petroleum ether and tetrachloroethylene, and the volume ratio of the dilute hydrochloric acid, petroleum ether and tetrachloroethylene is: 10:1:1-1:1:1.
[0059] Use a cleaning solution heated to 25℃-40℃ to vibrate and clean the coupon, and then use a brush to clean the surface of the coupon so that the scale on the surface of the coupon is fully dissolved in the cleaning solution.
[0060] Step S5. Titration to measure the scaling rate, specifically comprising the following steps:
[0061] Step S501. First, centrifuge the scale-containing cleaning liquid, and then separate and remove the organic phase therein with a separatory funnel to obtain an aqueous phase and a solid phase;
[0062] Step S502. dripping triethanolamine masking agent into the separated aqueous phase, shaking, standing, and then titrating and analyzing the calcium ion content by EDTA titration method; drying and weighing the solid phase;
[0063] Step S503. Calculate the scaling rate according to the calcium ion content and the solid phase dry weight. The calculation formula is as follows:
[0064] ω=[c(C a + )×V 酸 +m] / S / t (1)
[0065] In the above formula (1), ω is the fouling rate; c(C a + ) Calcium ion concentration; V 酸 is the volume of acid solution; m is the dry weight of solid phase; S is the surface area of coupon; t is the placement time of coupon test unit.
[0066] In some geological reservoirs, the scaling material in the oilfield water system is mainly calcium carbonate scaling. In this case, the mass of other solid phases in the scaling material except calcium carbonate measured by the hanging plate test unit may be negligible and account for a very small proportion. In this case, other solid phases can be ignored and only the scaling rate of calcium carbonate can be measured. In this way, m in the above formula (1) is equal to 0 or approximately equal to 0, and the scaling rate calculation formula can be simplified as follows:
[0067] ω(CaCO3)=c(Ca + )×V 酸 / S / t (2)
[0068] In the above formula (2), ω(CaCO3) is the scaling rate of calcium carbonate; c(C a + ) Calcium ion concentration; V 酸is the volume of acid solution; S is the surface area of the coupon; t is the placement time of the coupon test unit.
[0069] The above description is only an embodiment of the present invention and is not intended to limit the present invention. Any modification, equivalent replacement and improvement made within the application scope of the present invention shall be included in the protection scope of the present invention.
Claims
1. A scaling rate monitoring method, characterized in that: The method comprises the following steps: Step S1. Pretreatment of the hanging piece: drilling a circular hole on the hanging piece, cleaning and grinding the hanging piece; Step S2. Hanging the hanging piece: vertical hanging wires of a certain length are fixedly installed through the circular holes at the upper and lower ends of the hanging piece, and a plumb bob with a sharp corner at the bottom is installed on the upper and lower hanging wires of each hanging piece to form a hanging piece test unit; Step S3. Place the coupon: place the coupon test unit at a predetermined position and predetermined depth of the oilfield water to be monitored in the project site, and record the start time of placement; take it out after placing it for a period of time t; Step S4. Cleaning the hanging sheet: placing the removed hanging sheet in a pre-configured cleaning solution for cleaning to obtain a scale-containing cleaning solution containing scaling substances; Step S5. Titration to calculate the scaling rate: Step S501: centrifuging and separating the scale-containing cleaning liquid to remove the organic phase therein to obtain an aqueous phase and a solid phase; Step S502. After dripping triethanolamine masking agent into the aqueous phase, titration analysis is performed on the calcium ion content; the solid phase is dried and weighed; Step S503. Calculate the scaling rate based on the calcium ion content and the solid phase dry weight: ω=[c(C a + )×V 酸 +m] / S / t In the above formula, ω is the fouling rate; c(C a + ) Calcium ion concentration; V 酸 is the volume of acid solution; m is the dry weight of solid phase; S is the surface area of coupon; t is the placement time of coupon test unit.
2. The method according to claim 1, characterized in that: When the coupon is pre-treated and cleaned in step S1, the coupon is cleaned in sequence using three solvents: acetone, ethanol and water.
3. The method according to claim 1, characterized in that: In steps S1 and S2, a horizontal circular hole is drilled through each of the upper and lower ends of the hanging piece, and a vertical hanging line is respectively tied through the horizontal circular hole at the upper and lower ends of the hanging piece; or, A vertical circular hole is drilled on the hanging piece, which passes through the hanging wire. The inner diameter of the vertical circular hole is set to ensure that the hanging piece is fixed relative to the hanging wire.
4. The method according to claim 3, characterized in that The hanging wire is replaced by a flexible connecting rod.
5. The method according to claim 1, characterized in that When placing the coupons in step S3, a plurality of coupon test units are connected in series end to end to form a coupon test system, which is used to monitor the scaling rate of oilfield water at different depths at the same location.
6. The method according to claim 5, characterized in that When placing the coupons in step S3, a plurality of coupon test systems are placed at different locations of the oilfield water to be monitored, so as to monitor the scaling rate of the oilfield water at different locations.
7. The method according to claim 6, characterized in that In step S3, the oilfield water to be monitored in the engineering field is located in an oilfield water container tank and / or an oilfield water transportation pipeline for continuously storing the oilfield water.
8. The method according to claim 1, characterized in that In step S4, the pre-configured cleaning solution is a mixture of dilute hydrochloric acid and a cleaning agent, the concentration of the dilute hydrochloric acid is 2%-10%, and the cleaning agent is one or more combinations of petroleum ether, tetrachloroethylene or carbon tetrachloride.
9. The method according to claim 8, characterized in that When preparing the cleaning solution, the selected cleaning agents are petroleum ether and tetrachloroethylene, and the volume ratio of dilute hydrochloric acid, petroleum ether and tetrachloroethylene used is: 10:1:1-1:1:
1.
10. The method according to claim 8 or 9, characterized in that: When cleaning the hanging piece in step S4, the hanging piece is cleaned by oscillating with the heated cleaning liquid, and then the surface of the hanging piece is cleaned with a brush, so that the scale on the surface of the hanging piece is fully dissolved in the cleaning liquid.
11. The method according to claim 10, characterized in that In step S4, the cleaning liquid is heated to a temperature of 25°C-40°C.
12. The method according to claim 1, characterized in that The step S501 specifically includes: Step S501: first centrifuge the scale-containing cleaning liquid, and then separate and remove the organic phase in the scale-containing cleaning liquid with a separatory funnel to obtain an aqueous phase and a solid phase.
13. The method according to claim 12, characterized in that The step S502 specifically includes: Step S502: drip triethanolamine masking agent into the separated aqueous phase, shake well, let stand, and then use EDTA titration method to titrate and analyze the calcium ion content; dry and weigh the solid phase.