Experimental device and method for comprehensively simulating advanced tunnel detection and sudden water gushing monitoring
Through the experimental device that comprehensively simulates the advance detection and water surge monitoring of tunnels, the rock mass and seepage conditions in front of the tunnel palm are simulated, mechanics, thermal and displacement parameters are monitored, visual images are constructed, inversion imaging and early warning are performed, and the existing technology is solved. The problem of unpredictable geological response cannot be accurately predicted, which improves the safety and accuracy of tunnel construction.
Patent Information
- Application Number
- CN202411564278.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2024-12-03
AI Technical Summary
The existing tunnel advance geological forecast geophysical detection technology cannot accurately reveal the geophysical response of poor geology, and it is difficult to implement accurate quantitative predictions, resulting in high disaster risks still facing tunnel construction, especially during the gradual destruction of water-blocking rock mass There are shortcomings in the study of the fracture stress and seepage evolution laws of rock mass in the middle.
Provide an experimental device for comprehensively simulated tunnel advance detection and water surge monitoring, including anomaly structure area, monitoring and detection system, seepage simulation device and data processing and early warning center, which is used to simulate the rock mass and seepage situation in front of the tunnel palm. and mechanical, thermal and displacement parameters, visual water-containing structure images are constructed and inverted imaging and early warning.
The research on the rupture stress and seepage evolution laws of the rock mass in the water-incidence water barrier has been realized, and the poor geological effect of geophysical instruments has been improved, and the risk of water-incidence accidents during construction has been reduced, so it can be flexible under different geological conditions. Adjustment, suitable for tunnel projects of different sizes.
Smart Images

Figure CN119064557A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel model experiments, and in particular relates to an experimental device and method for comprehensively simulating tunnel advance detection and sudden water inrush monitoring. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] Tunnel projects usually have great burial depths, long tunnels and complex hydrogeological conditions. During the geological survey stage, it is usually difficult to accurately explore the geological conditions along the tunnel, which increases the risk of major disasters such as water and mud bursts during construction. These factors are key factors affecting project safety, progress and cost. Disturbance during tunnel excavation and damage and seepage disasters of surrounding rocks under high seepage pressure are the main triggering factors of water burst accidents. Using geophysical advance prediction technology to predict adverse geological conditions in front of the heading, so as to formulate reasonable response measures and construction plans, is an effective way to reduce these risks.
[0004] The main challenges facing tunnel construction technology at present are to explore the evolution law of rock mass fracture stress and seepage during the gradual destruction of water-inrush-proof rock mass during tunnel construction, as well as to clarify the adverse geological conditions in front of the face. The mechanical influence of seepage on soil is very significant. The current research methods mainly include analytical solutions, numerical simulations and model tests of theoretical analysis. Analytical solutions usually require certain assumptions for calculation, which may lead to deviations in the results. Numerical simulations also have approximations when dealing with the mechanical and physical parameters of soil, so the calculation results may be quite different from the actual situation. In contrast, model tests can more realistically reflect the stress distribution of soil and are an irreplaceable research method. Although important progress has been made in the development of theories, technologies and instruments for tunnel advanced geological prediction and good application results, the existing geophysical detection technology for advanced geological prediction still cannot accurately reveal the geophysical response of adverse geology, making it difficult to implement accurate quantitative predictions, so there is still a high risk of disasters during construction. In order to improve the effectiveness of geophysical instruments in detecting adverse geology, the commonly used research methods currently include field detection, numerical simulation and model tests. Field detection is a direct method of arranging survey lines in tunnels, but the detection effect is not ideal due to the uncertainty of the location and scale of the adverse geological body in front and the susceptibility to the complexity of the target body. The numerical simulation method studies the actual object from the abstract numerical model. Although it is low-cost and fast, the model is usually simplified and difficult to simulate accurately. The existing model test is only suitable for the study of the single characteristics of a specific adverse geological disaster body, and cannot meet the requirements of the study of the evolution law of rock mass fracture stress and seepage during the gradual destruction of the water-insulating rock mass and the detection requirements of the electrical method. Summary of the invention
[0005] In order to solve the technical problems existing in the above-mentioned background technology, the present invention provides an experimental device and method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring, which can meet the research on rock mass fracture stress and seepage evolution law in the process of gradual destruction of water-insulating rock mass and the detection requirements of electrical methods.
[0006] In order to achieve the above object, the present invention adopts the following technical solution: A first aspect of the present invention provides an experimental device for comprehensively simulating tunnel advance detection and sudden water inrush monitoring.
[0007] An experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring, comprising: an abnormal body structure area, a monitoring and detection system, a seepage simulation device, an excavation tunnel simulation area, and a data processing and early warning center; The abnormal body structural area is used to simulate the rock mass conditions in front of the tunnel face; The tunnel excavation simulation area is connected to the abnormal body structure area; a tunnel excavation machine model is arranged in the tunnel excavation simulation area; the tunnel excavation machine model is used to simulate the tunnel excavation situation; The seepage simulation device is used to simulate tunnel seepage conditions; The monitoring and detection system is arranged in the tunnel excavation simulation area, and is used to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the tunnel excavation simulation area under the set working conditions and transmit them to the data processing and early warning center; The data processing and early warning center is used to: regularly detect geophysical advance forecast related parameters, construct a visualized image of water-bearing structures that changes over time; and perform inversion imaging and early warning of sudden water inrush accidents based on mechanics, thermodynamics and displacement in the excavation tunnel simulation area under set working conditions.
[0008] As an implementation mode, the shells of the abnormal body structure area and the tunnel excavation simulation area are both cast by concrete.
[0009] As an implementation mode, the rock and soil materials of the abnormal structural area are simulated by sand, calcium carbonate, white cement, vaseline, silicone oil and iron powder in mass ratios of 46%, 6%, 8%, 4%, 4% and 32% respectively.
[0010] As an implementation mode, when the abnormal structural area is Grade VI surrounding rock, the rock and soil materials are: sand, white cement, barite powder, talcum powder, silicone oil, vaseline and water, with the mass ratios of 71%, 7.1%, 3.0%, 4.9%, 2.8%, 5.1% and 6.1% respectively.
[0011] As an implementation mode, when the abnormal body structural area is limestone, the rock and soil materials are: barite powder, barite sand, rosin and alcohol, with the mass ratios of 70%, 30%, 0.6% and 6% respectively.
[0012] As an implementation mode, the monitoring and detection system includes a detection system and a monitoring system; the detection system includes at least two geophysical advance prediction systems for detecting geophysical advance prediction related parameters; the monitoring system is used to monitor the mechanics, thermals and displacements in the excavation tunnel simulation area under set working conditions.
[0013] As an implementation mode, the seepage simulation device is used to simulate the seepage conditions in a seabed environment and a non-seabed water-containing environment.
[0014] As an implementation mode, the seepage simulation device includes a vehicle, a pressurized closed system and a liftable intelligent water tank; the pressurized closed system is carried on the vehicle, and the pressurized closed system is used to seal and pressurize the entire abnormal body structure area; the liftable intelligent water tank is connected to the data processing and early warning center, and is used to control the water pressure of the water body below the pressurized closed system.
[0015] The second aspect of the present invention provides an experimental method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring.
[0016] An experimental method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring, comprising: Construct an abnormal structural area to simulate the rock mass conditions in front of the tunnel face; Construct a tunnel excavation simulation area to connect it with the abnormal body structure area; and deploy a tunnel excavation machine model and a monitoring and detection system in the tunnel excavation simulation area; Construct a seepage simulation device to simulate the seepage conditions of a submarine environment or a non-submarine water-bearing environment tunnel; The monitoring and detection system is used to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the tunnel excavation simulation area under the set working conditions and transmit them to the data processing and early warning center; The data processing and early warning center regularly detects geophysical advance forecast-related parameters to construct a visual image of water-bearing structures that changes over time; and performs inversion imaging and early warning of sudden water inrush accidents based on the mechanics, thermal and displacement of the excavation tunnel simulation area under set working conditions.
[0017] The beneficial effects of the present invention are: (1) The present invention utilizes the abnormal body structural area to simulate the rock mass condition in front of the tunnel face, utilizes the seepage simulation device to simulate the tunnel seepage condition, utilizes the monitoring and detection system to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the excavation tunnel simulation area under the set working conditions, and finally utilizes the data processing and early warning center to regularly detect the geophysical advance prediction related parameters, constructs a visual water-bearing structure image that changes with time, and performs inversion imaging and early warning of sudden water inrush accidents based on the mechanics, thermal and displacement in the excavation tunnel simulation area under the set working conditions. It can comprehensively simulate tunnel advance detection and sudden water inrush monitoring, and meet the research on the rock mass fracture stress and seepage evolution law in the process of gradual destruction of the water-insulating rock mass and the detection requirements of the electrical method.
[0018] (2) The present invention utilizes the seepage simulation device to simulate the seepage conditions in a non-seabed water-containing environment, realizing simulations under hydrostatic hydrogeological conditions from mild to extreme, which can better study the impact of seepage on soil stability.
[0019] (3) The present invention utilizes a detection system and a monitoring system composed of at least two geophysical advance prediction systems to realize a variety of tests such as stress-seepage monitoring, stress-temperature monitoring, induced electric field monitoring of resistivity changes, induced electric field monitoring of relaxation time changes, and induced electric field monitoring of seepage channel changes.
[0020] (4) The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring provided by the present invention is highly configurable and adaptable, and can adjust the design of the anomaly, the configuration of the detection system and the setting of the hydrological simulation according to different experimental requirements. This flexibility enables the device to be widely used in tunnel engineering experiments of different scales and different geological conditions.
[0021] (5) The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring provided by the present invention can realize accurate physical experimental simulation of various geophysical advance prediction methods such as hole-tunnel induced polarization, long power supply induced polarization test, steel arch ring electrode induced polarization, resistivity advance detection, as well as simulated metal body interference related experiments.
[0022] (6) The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring provided by the present invention can realize real-time monitoring of detection data and monitoring data through the dispatching control of the data processing and early warning center, thereby making regular early warnings, thus realizing the integration of detection, monitoring and early warning.
[0023] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0025] Figure 1 A schematic diagram of the composition of an experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention; FIG. 2 (a) is a schematic diagram of the layout of unexcavated detection and monitoring in an excavated tunnel simulation area of an experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention; FIG2( b ) is a schematic diagram of the layout of excavation detection and monitoring in the excavation tunnel simulation area of the experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention; FIG3 (a) is a schematic diagram of a pressurized and sealed experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring in an embodiment of the present invention, showing a general water-containing condition without excavation; FIG3( b ) is a schematic diagram of the buried general water content monitoring device of the experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring in the embodiment of the present invention under the condition of no excavation; FIG4 (a) is a schematic diagram of the pressurized and sealed seabed conditions of the experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring in an embodiment of the present invention without excavation; FIG4( b ) is a schematic diagram of burying a seabed monitoring device in an unexcavated state of an experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention; FIG5 (a) is a schematic diagram of pressurized sealing of a general water content condition under excavation of an experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention; FIG5( b ) is a schematic diagram of the buried arrangement of a general water content monitoring device under excavation conditions of an experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention; Figure 6 The data processing flow chart of the experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention.
[0026] Among them, 1. Small pressurized closed system, 2. Water supply device, 3. Water supply pipeline, 4. Water tank, 5. Pressurizing device, 6. Water injection pipeline, 7. Lifting device, 8. Aerial vehicle group, 9. Large pressurized closed system, 10. Aerial vehicle group driving track, 11. Cutter head, 12. Excavation control device, 13. Tunnel excavation simulation area, 14. Detection system, 15. Monitoring system, 16. Abnormal body structure area, 17. Data transmission line, 18. Aerial vehicle driving track, 19. Aerial vehicle, 20. Data processing and early warning center, 21. Hydraulic retractable measuring electrode, 22. Hydraulic retractable power supply electrode, 23. Measuring electrode layout point, 24. Power supply electrode layout point, 25. Power supply device, 26. Transient electromagnetic coil layout frame, 27. Face monitoring system, 28. Data acquisition device. DETAILED DESCRIPTION
[0027] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0028] It should be noted that the following detailed descriptions are all illustrative and intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present invention belongs.
[0029] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit exemplary embodiments according to the present invention. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprising" and / or "including" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0030] according to Figure 1 , an experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring according to an embodiment of the present invention comprises: an abnormal body structure area 16, a monitoring and detection system, a seepage simulation device, an excavation tunnel simulation area 13 and a data processing and early warning center 20; wherein the monitoring and detection system comprises a detection system 14 and a monitoring system 15; The abnormal body structural area 16 is used to simulate the rock mass conditions in front of the tunnel face; The tunnel excavation simulation area 13 is connected to the abnormal body structure area 16; a tunnel excavation machine model is arranged in the tunnel excavation simulation area 13; the tunnel excavation machine model is used to simulate the tunnel excavation situation; The seepage simulation device is used to simulate tunnel seepage conditions; The monitoring and detection system is arranged in the tunnel excavation simulation area 13, and is used to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the tunnel excavation simulation area 13 under the set working conditions and transmit them to the data processing and early warning center 20; The data processing and early warning center 20 is used to: regularly detect geophysical advance prediction related parameters to construct a visualized water-bearing structure image that changes over time; and perform inversion imaging and early warning of sudden water inrush accidents based on the mechanics, thermals and displacements in the excavation tunnel simulation area 13 under set working conditions.
[0031] This embodiment utilizes the abnormal body structural area to simulate the rock mass condition in front of the tunnel face, utilizes the seepage simulation device to simulate the tunnel seepage condition, utilizes the monitoring and detection system to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the excavation tunnel simulation area under the set working conditions, and finally utilizes the data processing and early warning center to regularly detect the geophysical advance prediction related parameters, construct a visual water-bearing structure image that changes with time, and performs inversion imaging and early warning of sudden water inrush accidents based on the mechanics, thermal and displacement in the excavation tunnel simulation area under the set working conditions. It can comprehensively simulate tunnel advance detection and sudden water inrush monitoring, and meet the research on the rock mass rupture stress and seepage evolution law in the process of gradual destruction of the water-insulating rock mass and the detection requirements of the electrical method.
[0032] In the specific implementation process, the shells of the abnormal body structure area 16 and the excavation tunnel simulation area 13 are both cast by concrete.
[0033] In some optional embodiments, the abnormal body structure area 16 is located underground, and has an overall shape of a 5m*5m*8m cuboid, wherein a hole with a diameter of 2m is left in the center of one side of the 5m*5m area, which is connected to the excavation tunnel simulation area 13 .
[0034] In order to meet the requirements of studying the evolution law of rock mass fracture stress and seepage during the gradual destruction of water-inrushing impermeable rock mass and detecting by electrical methods, there are special requirements for the proportion of rock and soil materials used to simulate the rock mass in the abnormal body structural area 16.
[0035] For example, in order to achieve the requirements of research and detection, the rock and soil materials used for simulation need to have stable strength and permeability and a large softening coefficient. Sand, calcium carbonate, white cement, iron powder, vaseline and silicone oil can be used to configure the rock and soil materials used for simulation. The specific ratio is shown in Table 1: Table 1 Example 1 of material ratio for simulated rock and soil
[0036] In order to realize the rock and soil environment (surrounding rock, fault, cave filling, etc.) required by other studies, the proportion of simulation materials can be carried out according to the actual situation. Several reference proportions of surrounding rock and soil materials are given as shown in Table 2: Table 2 Reference rock and soil material ratios
[0037] When simulating seepage under general conditions, it is necessary to reserve a water-bearing structure area when filling the rock and soil materials used for simulation. No rock and soil filling is performed above this area to facilitate the subsequent pressurization of the water body to simulate seepage.
[0038] The tunnel excavation simulation area 13 is located underground and is connected to the abnormal body structure area 16. The overall shape is a cylinder with a diameter of 2m and a length of 5m.
[0039] In this embodiment, the tunnel excavator model is composed of an excavation control device 12 and a cutter head 11, and the advance, retreat and drilling footage are fully controlled by the central control device. The tunnel excavator model is equipped with a hydraulic retractable measuring electrode 21 and a hydraulic retractable power supply electrode 22, which can realize the function of exploring while excavating and transmitting data to the data processing and early warning center through the excavation control device. Among them, the hydraulic retractable measuring electrode 21 is arranged at the measuring electrode arrangement point 23, and the hydraulic retractable power supply electrode 22 is arranged at the power supply electrode arrangement point 24. The hydraulic retractable measuring electrode 21 and the hydraulic retractable power supply electrode 22 are both connected to the power supply device 25.
[0040] Sufficient space is reserved in the tunnel excavation simulation area 13 for the arrangement of detection and monitoring equipment. The monitoring detection system includes a detection system and a monitoring system; the detection system includes at least two geophysical advance prediction systems for detecting geophysical advance prediction related parameters; the monitoring system is used to monitor the mechanics, thermals and displacement in the tunnel excavation simulation area 13 under set working conditions.
[0041] Specifically, fixing devices for placing electrodes or metal bodies are specially provided around the excavation tunnel simulation area 13 and at the face. The installation position of the electrodes or metal bodies can also be adjusted according to the detection requirements, so as to realize the adaptability test of different geological anomaly detection technologies. These electrodes or metal bodies are used to implement geophysical detection technologies related to electrical methods.
[0042] When excavation is not carried out, the resistivity detection system and the induced polarization detection system are equipped with twelve measuring electrodes on the tunnel face. In some optional embodiments, power supply electrodes are arranged on the side walls of the excavation tunnel simulation area 13; in other embodiments, drilling operations can also be carried out on the tunnel face, and power supply electrodes are arranged in the boreholes to achieve detection.
[0043] During excavation, the measuring electrodes and the power supply electrodes of the resistivity detection system and the induced polarization detection system are arranged in the excavation tunnel simulation area 13 to monitor and detect the situation in front of the tunnel face during excavation.
[0044] In this embodiment, the monitoring system is composed of a plurality of sensors. The monitoring system includes but is not limited to mechanical measurement sensors, temperature measurement sensors, humidity measurement sensors, pore water pressure sensors, flow meters, strain gauges, seepage meters, soil pressure gauges, displacement meters, and temperature sensors. The strain gauges can be attached to the face of the tunnel for monitoring. Other integrated monitoring sensors are arranged at designated locations when the rock and soil materials used for simulation are filled.
[0045] The detection system is used to collect relevant parameters of the changes in the structural position of the water-bearing body, and the multi-parameter inversion imaging method is used to visualize the changes in the structural position of the water-bearing body and the evolution of the seepage process. The monitoring system monitors the changes in stress, strain, temperature, etc. during the seepage process and transmits them in real time to the data processing and early warning center for data processing (multi-parameter inversion imaging), monitoring of rock and soil changes, and early warning simulation, realizing the integration of detection, monitoring and early warning.
[0046] In this embodiment, the seepage simulation device is used to simulate the seepage conditions in a seabed environment and a non-seabed water-containing environment.
[0047] Among them, the seepage simulation device includes a vehicle 19, a pressurized closed system and a liftable intelligent water tank; the pressurized closed system is carried on the vehicle 19, and the pressurized closed system is used to seal and pressurize the entire abnormal body structure area 16; the liftable intelligent water tank is connected to the data processing and early warning center, and is used to control the water pressure of the water body below the pressurized closed system.
[0048] When simulating the seabed environment, the large pressurized closed system carried by the vehicle group 8 is used to pressurize the entire abnormal body structure area 16. The vehicle group 8 is composed of two vehicles 19, and the two vehicles 19 jointly hang the large pressurized closed system 9, and the position of the large pressurized closed system is adjusted on the vehicle group travel track 10 to perform pressurization.
[0049] Among them, the large pressurized closed system 9 is composed of a reaction beam, a hydraulic unit and a pressure plate. The pressure plate is 5m*8m in size and made of high-density steel. There are holes on the pressure plate, so that the water injection pipe of the liftable intelligent water tank can be connected to the water body under the pressure plate, thereby adjusting the water pressure by controlling the height of the water tank and the pressure of the pressurizing equipment. The hydraulic unit is composed of thirty-six hydraulic presses, which are connected to the pressure plate in six rows at a certain interval, and a reaction beam is connected to every six hydraulic presses. The pressurized closed system is pressurized and sealed by the hydraulic press.
[0050] When simulating the situation in a general water-containing environment, the small pressurized closed system 1 carried by the vehicle 19 is used to seal and pressurize the water-containing area.
[0051] The trolley 19 adjusts the longitudinal position of the small pressurized closed system 1 through the trolley track 18. The small pressurized closed system 1 carried by the trolley 19 is equipped with a lateral displacement system. Through the longitudinal displacement adjustment of the trolley 19 and the lateral displacement adjustment of the displacement system, the full position coverage of the small pressurized closed system 1 on the abnormal body structure area 16 can be achieved.
[0052] The liftable intelligent water tank is composed of a lifting device 7, a water tank 4, a water injection pipe 6 and a pressurizing device 5. The liftable intelligent water tank is controlled by the data processing and early warning center to lift and lower, and the pressurizing system pressure controls the water pressure. The water injection pipe 6 is connected to the water supply pipe 3 of the tap water system for water source replenishment. The water injection pipe 6 is connected to the water body below through the holes of the pressurizing plate in the pressurized closed system, thereby realizing the water pressure control of the water body below.
[0053] The small pressurized closed system 1 consists of a reaction beam, a hydraulic unit and a pressure plate. The pressure plate has a size of 1.5m*1m and is made of high-density steel. There are holes on the pressure plate, so that the water injection pipe of the liftable intelligent water tank can be connected to the water body under the pressure plate, thereby adjusting the water pressure by controlling the height of the water tank and the pressure of the pressurizing equipment. The hydraulic unit consists of twelve hydraulic presses, which are connected to the pressure plate in two rows at a certain interval, and a reaction beam is connected to every six hydraulic presses. The pressurized closed system is pressurized and sealed by the hydraulic press.
[0054] In one or more embodiments, an experimental method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring is provided, comprising: Construct an abnormal structural area to simulate the rock mass conditions in front of the tunnel face; Constructing a tunnel excavation simulation area 13 to connect it with the abnormal body structure area; and arranging a tunnel excavation machine model and a monitoring and detection system in the tunnel excavation simulation area 13; Construct a seepage simulation device to simulate the seepage conditions of a submarine environment or a non-submarine water-bearing environment tunnel; Using the monitoring and detection system to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the excavation tunnel simulation area 13 under the set working conditions and transmit them to the data processing and early warning center; The data processing and early warning center regularly detects geophysical advance forecast related parameters to construct a visual image of water-bearing structures that changes over time; and performs inversion imaging and early warning of sudden water inrush accidents based on the mechanics, thermal and displacement in the excavation tunnel simulation area 13 under set working conditions.
[0055] In general water-containing environment (without excavation): Combination Figure 1 , Figure 2 (a), Figure 2 (b), Figure 3 (a), Figure 3 (b) and Figure 6As shown in the figure, the experimental method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring under general water-bearing environment (without excavation) includes the following steps: Step 1: Select appropriate geotechnical materials for simulation according to research needs, design the scale and layout of the abnormal body, and cast the abnormal body prefabricated model. Here, sand, calcium carbonate, white cement, iron powder, vaseline and silicone oil are selected to configure the geotechnical materials for simulation. The specific proportions are shown in Table 3. The scale of the abnormal body is designed to be 2m*2m*2m, located 4m in front of the 13th face of the excavation tunnel simulation area.
[0056] Table 3 Example 2 of material proportions for simulated rock and soil
[0057] Step 2: Fill the simulated rock and soil materials and reserve the abnormal body space. During the filling process of the simulated rock and soil materials, the monitoring system 15 is deployed to the designed position to monitor the changes in mechanical parameters, displacement parameters and temperature field of the rock and soil during the seepage process, and the monitoring device is connected to the data processing and early warning center 20 via the data transmission line 17 to realize real-time monitoring of stress, strain, temperature and other parameters.
[0058] Step 3: After the model material is filled, inject the abnormal body simulation material (water). In addition, the influence of high temperature water on seepage can be studied by selecting water bodies of different temperatures.
[0059] Step 4: Use the trolley 19 to move the small pressurized closed system 1 to the top of the abnormal body, perform hydraulic pressurization and sealing treatment on the abnormal body after fine adjustment, and connect the water injection pipe 6 to the water body through the hole in the pressurized plate in the small pressurized closed system 1 in advance.
[0060] Step 5: Pressurize and seal, the data processing and early warning center 20 controls the water tank 4 to rise and fall, so that the water tank 4 and the pressurizing device 5 cooperate to increase the water pressure through the water injection pipe 6 until the pressure is increased to the set pressure value. In addition, the influence of high temperature water on seepage can be studied by increasing the water temperature of the water supply device 2 connected to the water injection pipe.
[0061] Step 6: Lay out measuring electrodes at the face of the tunnel simulation area 13, and use a handheld drill to lay out two holes on the face, in which power supply electrodes are buried. In addition to burying power supply electrodes, drilling holes can also be used to lay out other geophysical detection devices, such as GPR. In addition, other geophysical detection methods are selected for deployment according to the research objectives to complete the deployment of the detection system 14. A face monitoring system 27 is laid out on the face, which includes a stress and strain monitoring instrument, and a transient electromagnetic coil deployment rack 26 is reserved. The data acquisition device 28 can transmit the collected data to the data processing and early warning center 20 in real time.
[0062] Step 7: The data processing and early warning center 20 performs detection at regular intervals and performs multi-parameter inversion imaging on the detection information to visualize the change information of the rock and soil mass ahead. Combined with real-time monitoring information, relevant research on the change of rock and soil mass under seepage conditions is completed. When a parameter of the monitoring value and the detection value exceeds the warning value, the system automatically issues an early warning, realizing the integration of detection, monitoring and early warning.
[0063] Simulating seabed conditions (without excavation): Combination Figure 1 , Figure 2(a), Figure 2(b), Figure 4(a), Figure 4(b) and Figure 6 As shown in the figure, the experimental method for comprehensive simulated tunnel advance detection and sudden water inrush monitoring under simulated seabed conditions (without excavation) includes the following steps: Step 1: Select appropriate rock and soil materials for simulation according to research needs and cast the abnormal body prefabricated model. Here, sand, calcium carbonate, white cement, iron powder, vaseline and silicone oil are selected to configure the rock and soil materials for simulation. The specific proportions are shown in Table 4. The overall rock mass scale is set to 3.5m*5m*8m (that is, 1.5m*5m*8m of water injection space is left above) Table 4 Example 3 of simulated rock and soil materials
[0064] Step 2: Filling of rock and soil materials for simulation is performed. During the filling of rock and soil materials for simulation, the monitoring system 15 is deployed at the designed position to monitor the changes in mechanical parameters, displacement parameters and temperature field of the rock and soil during the seepage process, and the monitoring device is connected to the data processing and early warning center 20 via the data transmission line 17 to realize real-time monitoring of parameters such as stress, strain and temperature.
[0065] Step 3: After the model material is completely filled, inject the abnormal body simulation material (water).
[0066] Step 4: Use the vehicle group 8 to move the large pressurized closed system 9 to the top of the abnormal body, perform hydraulic pressurization and sealing treatment on the abnormal body after fine adjustment, and connect the water injection pipeline 6 to the water body through the holes in the pressurized plate in the large pressurized closed system 9 in advance.
[0067] Step 5: Pressurize and seal. The data processing and early warning center 20 controls the lifting and lowering of the water tank 4 so that the water tank 4 and the pressurizing device 5 cooperate with each other through the water injection pipe 6 to increase the water pressure until the pressure reaches the set pressure value.
[0068] Step 6: Lay out measuring electrodes at the face of the tunnel simulation area 13, and use a handheld drill to lay out two holes on the face, in which power supply electrodes are buried. In addition to burying power supply electrodes, drilling holes can also be used to lay out other geophysical detection devices, such as GPR. In addition, other geophysical detection methods are selected for deployment according to the research objectives to complete the deployment of the detection system 14. Some stress and strain monitoring instruments are laid out on the face, and a transient electromagnetic coil deployment rack 26 is reserved. The data acquisition device 28 can transmit the collected data to the data processing and early warning center 20 in real time.
[0069] Step 7: The data processing and early warning center 20 performs detection at regular intervals and performs multi-parameter inversion imaging on the detection information to visualize the change information of the rock and soil mass ahead. Combined with real-time monitoring information, relevant research on the change of rock and soil mass under seepage conditions is completed. When a parameter of the monitoring value and the detection value exceeds the warning value, the system automatically issues an early warning, realizing the integration of detection, monitoring and early warning.
[0070] General water content (excavation): like Figure 1 , Figure 2(a), Figure 2(b), Figure 5(a), Figure 5(b) and Figure 6 As shown in the figure, the experimental method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring under simulating general water-bearing conditions (excavation) includes the following steps: Step 1: Select appropriate geotechnical materials for simulation according to research needs, design the scale and layout of the abnormal body, and cast the abnormal body prefabricated model. Here, barite powder, barite sand, rosin and alcohol are selected to configure the geotechnical materials for simulation, and the specific proportions are shown in Table 5. The scale of the abnormal body is designed to be 2m*2m*2m, located 4m in front of the 13th face of the excavation tunnel simulation area.
[0071] Table 5 Example 4 of simulated rock and soil materials
[0072] Step 2: Fill the simulated rock and soil materials and reserve the abnormal body space. During the filling process of the simulated rock and soil materials, the monitoring system 15 is deployed to the designed position to monitor the changes in mechanical parameters, displacement parameters and temperature field of the rock and soil during the seepage process, and the monitoring device is connected to the data processing and early warning center 20 via the data transmission line 17 to realize real-time monitoring of stress, strain, temperature and other parameters.
[0073] Step 3: Use the trolley 19 to move the small pressurized closed system 1 to the top of the abnormal body, perform hydraulic pressurization and sealing treatment on the abnormal body after fine adjustment, and connect the water injection pipe 6 to the water body through the hole in the pressurized plate in the small pressurized closed system 1 in advance.
[0074] Step 4: Pressurize and seal, the data processing and early warning center 20 controls the water tank 4 to rise and fall, so that the water tank 4 and the pressurizing device 5 cooperate to increase the water pressure through the water injection pipe 6 until the pressure is increased to the set pressure value. In addition, the influence of high temperature water on seepage can be studied by increasing the water temperature of the water supply device 2 connected to the water injection pipe.
[0075] Step 5: Pressurize and seal. The data processing and early warning center 20 controls the lifting and lowering of the water tank 4 so that the water tank 4 and the pressurizing device 5 cooperate with each other through the water injection pipe 6 to increase the water pressure until the pressure reaches the set pressure value.
[0076] Step 6: Deploy measurement electrodes around the excavation tunnel simulation area 13, and bury power supply electrodes behind the peripheral wall. In addition, other geophysical detection methods can be selected according to the research objectives to complete the deployment of the detection system 14.
[0077] Step 7: Use the excavation control device 12 to push the cutter head 11 to advance. During the excavation process, after the excavation progress reaches the stage requirement, extend the hydraulic retractable measuring electrode 21 and the hydraulic retractable power supply electrode 22 for detection, and monitor in real time, and transmit the collected data to the data processing and early warning center 20 in real time.
[0078] Step 8: The data processing and early warning center 20 performs multi-parameter inversion imaging on the detection information to visualize the change information of the rock and soil in front. Combined with real-time monitoring information, the relevant research on the changes of the rock and soil under the conditions of excavation is completed. When a parameter of the monitoring value and the detection value exceeds the warning value, the system automatically issues an early warning to achieve the integration of detection, monitoring and early warning.
[0079] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. An experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring, characterized in that: include: Abnormal body structure area, monitoring and detection system, seepage simulation device, tunnel excavation simulation area and data processing and early warning center; The abnormal body structural area is used to simulate the rock mass conditions in front of the tunnel face; The tunnel excavation simulation area is connected to the abnormal body structure area; a tunnel excavation machine model is arranged in the tunnel excavation simulation area; the tunnel excavation machine model is used to simulate the tunnel excavation situation; The seepage simulation device is used to simulate tunnel seepage conditions; The monitoring and detection system is arranged in the tunnel excavation simulation area, and is used to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the tunnel excavation simulation area under the set working conditions and transmit them to the data processing and early warning center; The data processing and early warning center is used to: regularly detect geophysical advance forecast related parameters, construct a visualized image of water-bearing structures that changes over time; and perform inversion imaging and early warning of sudden water inrush accidents based on mechanics, thermodynamics and displacement in the excavation tunnel simulation area under set working conditions.
2. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1 is characterized in that: The shells of the abnormal body structure area and the tunnel excavation simulation area are both cast by concrete.
3. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1 is characterized in that: The rock and soil materials in the abnormal structural area are simulated by sand, calcium carbonate, white cement, vaseline, silicone oil and iron powder in mass ratios of 46%, 6%, 8%, 4%, 4% and 32% respectively.
4. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1, characterized in that: When the abnormal structural area is Grade VI surrounding rock, the rock and soil materials are: sand, white cement, barite powder, talcum powder, silicone oil, vaseline and water, with the mass proportions of 71%, 7.1%, 3.0%, 4.9%, 2.8%, 5.1% and 6.1% respectively.
5. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1, characterized in that: When the abnormal body structural area is limestone, the rock and soil materials are: barite powder, barite sand, rosin and alcohol, with the mass ratios being 70%, 30%, 0.6% and 6% respectively.
6. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1, characterized in that: The monitoring and detection system includes a detection system and a monitoring system; the detection system includes at least two geophysical advance prediction systems for detecting geophysical advance prediction related parameters; the monitoring system is used to monitor the mechanics, thermals and displacement in the excavation tunnel simulation area under set working conditions.
7. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1, characterized in that: The seepage simulation device is used to simulate the seepage situation in a water-containing environment of a seabed environment.
8. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1, characterized in that: The seepage simulation device is used to simulate the seepage situation in a non-seabed water-containing environment.
9. The experimental device for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring as claimed in claim 1, characterized in that: The seepage simulation device includes a vehicle, a pressurized closed system and a liftable intelligent water tank; the pressurized closed system is carried on the vehicle, and the pressurized closed system is used to seal and pressurize the entire abnormal body structure area; the liftable intelligent water tank is connected to the data processing and early warning center, and is used to control the water pressure of the water body below the pressurized closed system.
10. An experimental method for comprehensive simulation of tunnel advance detection and sudden water inrush monitoring, characterized in that: include: Construct an abnormal structural area to simulate the rock mass conditions in front of the tunnel face; Construct a tunnel excavation simulation area to connect it with the abnormal body structure area; A tunnel boring machine model and monitoring and detection system are deployed in the tunnel excavation simulation area; Construct a seepage simulation device to simulate the seepage conditions of a submarine environment or a non-submarine water-bearing environment tunnel; The monitoring and detection system is used to monitor the mechanical, thermal, displacement and geophysical advance prediction related parameters in the tunnel excavation simulation area under the set working conditions and transmit them to the data processing and early warning center; The data processing and early warning center regularly detects geophysical advance forecast-related parameters to construct a visual image of water-bearing structures that changes over time; and performs inversion imaging and early warning of sudden water inrush accidents based on the mechanics, thermal and displacement of the excavation tunnel simulation area under set working conditions.
Citation Information
Patent Citations
Tunnel construction large-scale integrated geophysics advanced detection model test device
CN103744129A
Testing system and method for seepage field model of tunnel in construction and operation periods
CN104880334A
Water-rich fault tunnel face water inrush evolution simulation test device and method
CN113030400A
Tunnel surrounding rock collapse disaster simulation test device and method
CN113310579A
Potential identification method for coal and rock mass water inrush dangerous area under action of stress and seepage
CN114088782A
Cited By
Tunnel water inrush monitoring and early warning method under water-rock coupling effect
CN120412207A