Leakage nuclear fuel assembly identification model, construction method and device thereof, and nuclear reactor
By setting up a neutron detector in a nuclear reactor to measure the neutron injection rate density and establishing a relationship model, the problem that the existing technology cannot accurately locate the leaked nuclear fuel components in the core of the nuclear reactor is solved, and the effect of accurate positioning and cost saving is achieved.
Patent Information
- Application Number
- CN202310651357.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-06-02
- Publication Date
- 2024-12-03
AI Technical Summary
The prior art cannot accurately locate the leaky nuclear fuel assembly in the core of a nuclear reactor. It can only diagnose the fact that it exists or occurs, but cannot accurately position it.
By setting up multiple neutron detectors in the nuclear reactor, the neutron injection rate density is measured, the relationship model between the operating state of the nuclear reactor and the neutron injection rate density is established, and the leakage nuclear fuel assembly and the neutron injection rate density are combined. The relationship model between them is constructed to build a leaky nuclear fuel component identification model to achieve accurate positioning.
It shortens the time occupied by nuclear power units for inspection of leaked nuclear fuel components, saves inspection costs, improves power generation benefits, and reduces the annual collective dose level and design costs of nuclear power plants.
Smart Images

Figure CN119066830A_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of nuclear science and technology, and specifically relates to a leaking nuclear fuel assembly identification model, a construction method and device thereof, and a nuclear reactor. Background Art
[0002] With the development of nuclear science and technology and the increasing number of nuclear power units, the monitoring, analysis and diagnosis of the integrity of nuclear fuel assemblies in the core of nuclear reactors has become a research and development hotspot.
[0003] At present, the monitoring, analysis and diagnosis of the integrity of nuclear fuel assemblies in nuclear reactor cores are mostly carried out by detecting some special radionuclides in the nuclear reactor coolant system. However, this method can only diagnose the fact or phenomenon that nuclear fuel assembly leakage has occurred or exists in the nuclear reactor core, but cannot accurately locate the leaking nuclear fuel assembly in the nuclear reactor core. Summary of the invention
[0004] In view of this, the present application proposes a leaking nuclear fuel assembly identification model, a construction method and device thereof, and a nuclear reactor. By setting multiple neutron detectors in the core of the nuclear reactor, the leaking nuclear fuel assembly identification model is constructed using the neutron injection rate density measured by the multiple neutron detectors, thereby realizing the accurate positioning of the leaking nuclear fuel assembly in the core of the nuclear reactor using the leaking nuclear fuel assembly identification model.
[0005] In a first aspect, the present application provides a method for constructing a leaky nuclear fuel assembly identification model, the method comprising: establishing a first relationship model between process variables of a nuclear reactor operation state and neutron fluence rate density when a leaky nuclear fuel assembly is not included in a plurality of nuclear fuel assemblies; establishing a second relationship model between a leaky nuclear fuel assembly and neutron fluence rate density when a leaky nuclear fuel assembly is included in a plurality of nuclear fuel assemblies; and constructing a leaky nuclear fuel assembly identification model in combination with the first relationship model and the second relationship model. A nuclear reactor comprises a core and a coolant system. A plurality of nuclear fuel assemblies, a plurality of neutron detectors and a plurality of control rods are arranged in the core. The coolant system is configured to use a coolant to conduct heat in the core. The process variables include at least one of power in the core, temperature, pressure and flow of the coolant, position of the neutron detector and position of the control rod. The neutron fluence rate density is measured by the neutron detector.
[0006] In the above scheme, a leaking nuclear fuel assembly identification model is constructed by combining a first relationship model between the process variables of the nuclear reactor operating state and the neutron injection rate density and a second relationship model between the leaking nuclear fuel assembly and the neutron injection rate density. The leaking nuclear fuel assembly identification model can be used to accurately locate the position of the leaking nuclear fuel assembly, thereby shortening the time taken by the nuclear power unit for inspecting the leaking nuclear fuel assembly, saving the inspection cost of the leaking nuclear fuel assembly, and improving the power generation efficiency of the nuclear power unit.
[0007] In at least one embodiment of the present application, the above-mentioned establishment of a first relationship model between the process variables of the nuclear reactor operating state and the neutron fluence rate density includes: using multiple neutron detectors to obtain a first neutron noise signal in the core; based on the first neutron noise signal, establishing a first relationship model between the process variables of the nuclear reactor operating state and the neutron fluence rate density.
[0008] In at least one embodiment of the present application, the above-mentioned first relationship model between the process variables of the operating state of the nuclear reactor and the neutron fluence rate density is established based on the first neutron noise signal, including: establishing a first sub-relationship model between the first neutron noise signal and the power in the core; establishing a second sub-relationship model between the first neutron noise signal and the position of the neutron detector.
[0009] In at least one embodiment of the present application, the above-mentioned establishment of a second relationship model between the leaking nuclear fuel assembly and the neutron fluence rate density includes: using multiple neutron detectors to obtain a second neutron noise signal in the core; based on the second neutron noise signal, establishing a second relationship model between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal.
[0010] In at least one embodiment of the present application, the above-mentioned establishment of a second relationship model between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal includes: based on the neutron fluence rate density corresponding to the second neutron noise signal, using neutron perturbation theory and neutron transmission theory to determine the position of the leaking nuclear fuel assembly to determine the second relationship model.
[0011] In at least one embodiment of the present application, before establishing the first relationship model between the process variables of the nuclear reactor operating state and the neutron fluence rate density, the construction method also includes: establishing a third relationship model between the neutron noise driving source and the neutron noise signal source, the neutron noise signal source is an identifiable or distinguishable neutron noise driving source; and establishing a transfer characteristic model between the neutron detector and the neutron noise signal source.
[0012] In at least one embodiment of the present application, the above-mentioned construction of a leaking nuclear fuel assembly identification model by combining the first relationship model and the second relationship model includes: establishing a neutron noise spectrum library for monitoring and locating leaking nuclear fuel assemblies in the core by combining the first relationship model and the second relationship model; and constructing a leaking nuclear fuel assembly identification model based on the neutron noise spectrum library.
[0013] The second aspect of the present application provides a construction device for a leaky nuclear fuel assembly identification model, the construction device comprising a first establishment module, a second establishment module and a construction module. The first establishment module is used to establish a first relationship model between process variables of a nuclear reactor operating state and neutron fluence rate density when the leaky nuclear fuel assembly is not included in the multiple nuclear fuel assemblies. The nuclear reactor comprises a core and a coolant system. A plurality of nuclear fuel assemblies, a plurality of neutron detectors and a plurality of control rods are arranged in the core. The coolant system is configured to use the coolant to extract heat in the core. The process variables include at least one of the power in the core, the temperature, pressure and flow rate of the coolant, the position of the neutron detector and the position of the control rod. The neutron fluence rate density is measured by the neutron detector. The second establishment module is used to establish a second relationship model between the leaky nuclear fuel assembly and the neutron fluence rate density when the leaky nuclear fuel assembly is included in the multiple nuclear fuel assemblies. The construction module is used to construct a leaky nuclear fuel assembly identification model in combination with the first relationship model and the second relationship model.
[0014] A third aspect of the present application provides a leaking nuclear fuel assembly identification model, which is established by the method for constructing a leaking nuclear fuel assembly identification model in the above embodiment.
[0015] In a fourth aspect, the present application provides a nuclear reactor, which includes a core and a coolant system. A plurality of nuclear fuel assemblies, a plurality of neutron detectors, and a plurality of control rods are arranged in the core. The plurality of neutron detectors are configured to monitor the neutron injection rate density changes of the plurality of nuclear fuel assemblies. The coolant system is connected to the core, and the coolant system is configured to use the coolant to conduct heat in the core. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 The figure is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in one embodiment of the present application.
[0017] Figure 2 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in another embodiment of the present application.
[0018] Figure 3 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in yet another embodiment of the present application.
[0019] Figure 4 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in yet another embodiment of the present application.
[0020] Figure 5 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in yet another embodiment of the present application.
[0021] Figure 6 Shown is a schematic structural diagram of a device for constructing a leaking nuclear fuel assembly identification model provided in one embodiment of the present application.
[0022] Figure 7 Shown is a schematic structural diagram of a nuclear reactor provided in one embodiment of the present application.
[0023] Figure 8 Shown is a schematic structural diagram of a nuclear reactor provided in another embodiment of the present application. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0025] In a nuclear power plant, the nuclear reactor core is composed of multiple nuclear fuel assemblies. The performance of nuclear fuel assemblies, such as reliability and integrity, has been greatly improved with the development of nuclear power technology. However, since nuclear fuel assemblies operate under harsh conditions of thermal migration, thermal stress and strong radiation damage during the actual operation of nuclear reactors, there is still a more or less leakage of nuclear fuel assemblies during the operation of nuclear reactors.
[0026] However, existing monitoring, analysis and diagnosis of nuclear fuel assembly leakage are mostly carried out on the detection of some special radionuclides in the nuclear reactor coolant system, that is, detecting the changes of radionuclides in the reactor coolant system. This method can only diagnose the fact or phenomenon that nuclear fuel assembly leakage has occurred or exists in the nuclear reactor core, but cannot accurately locate the leaking nuclear fuel assembly in the nuclear reactor core.
[0027] After careful study, it is found that during the operation of a nuclear reactor, when a nuclear fuel assembly in the reactor core leaks or is damaged, some fission products and decay products of fission products originally stored in the nuclear fuel assembly will migrate to the reactor coolant system along the breach on the nuclear fuel assembly. In the process of migrating from the breach of the nuclear fuel assembly to the reactor coolant system, these fission products and decay products will also continuously undergo decay reactions and / or undergo new fission reactions and other nuclear reactions with neutrons, which will change the original neutron fluence rate density and distribution at the breach of the nuclear fuel assembly. In addition, the reactor coolant will more or less flow into the nuclear fuel assembly from the breach of the nuclear fuel assembly, which will also change the original reactor coolant flow field and temperature field at the breach of the nuclear fuel assembly. Therefore, the process variables of the reactor operation state at the core position and its vicinity where the breached nuclear fuel assembly (i.e., the leaking nuclear fuel assembly) is located will fluctuate randomly, thereby causing random fluctuations in the neutron fluence rate level at the core position and its vicinity where the breached nuclear fuel assembly is located.
[0028] During the operation of a nuclear reactor, random fluctuations in process variables used to describe the operating status of the nuclear reactor, such as power in the core, coolant temperature, coolant pressure, coolant flow, and the position of the control rods, will cause random fluctuations in the neutron fluence rate level in the core. The random fluctuations of these process variables are caused by some inherent random interference components associated with the nuclear reaction process during the operation of the nuclear reactor, which cannot be eliminated. For example, the random fluctuations caused by the deviation of the neutron fluence rate generated or caused by each nuclear fission nuclear reaction from the Poisson distribution, or the random fluctuations caused by some unknown reactive disturbances. In addition, during the circulation of the coolant system in the nuclear reactor, the neutron slowing down effect and the change of heat transfer performance caused by the change of coolant density or the change of coolant flow field due to the fluctuation of coolant temperature or local boiling of coolant will cause random fluctuations in the neutron fluence rate. Nuclear reactor neutron noise analysis technology is the technology and method for studying the random fluctuations of these process variables.
[0029] In a nuclear reactor, the power in the core is very low (e.g. less than 10 -10 The random fluctuation of the number of neutrons in the core is a kind of noise caused by the branching process of nuclear fission reaction, usually called nuclear noise. -10 A), the reactor power level still contains noise components, which are caused by the random interference components of process variables. In the nuclear reactor core, the power level in the nuclear reactor core is proportional to the neutron injection rate level in the core (that is, the number of neutrons in the core).
[0030] Therefore, in a nuclear reactor, the neutron noise signal can be expressed as the fluctuation of the neutron fluence rate density caused by the disturbance of the neutron noise signal source, refer to the following formula (1).
[0031]
[0032] In formula (1), is the neutron noise signal, which is a function of time; is the neutron fluence rate density at the disturbance location; is the average neutron fluence rate density where the disturbance occurs; r is the location where the disturbance occurs (that is, the location of the neutron noise signal source).
[0033] In fact, in a nuclear reactor, all disturbances to the neutron fluence rate density can be attributed to or are equivalent to disturbances to the neutron macroscopic cross section, see the following formula (2).
[0034]
[0035] Since the macroscopic cross section is the product of the microscopic cross section and the density of the material, the cause of neutron noise can always be traced back to density changes caused by some reason.
[0036] The fluctuation of neutron fluence rate density is described by differential equations. Since the disturbance causing neutron noise is always small enough, the stochastic differential equation used to describe neutron noise is always linear. The stochastic differential equation of neutron noise is expressed by the following formula (3).
[0037]
[0038] In formula (3), L(r, t) is the operator of the neutron transport process, and S(r, t) is the source of the neutron noise signal. Therefore, formula (3) can be solved by starting from the neutron transport equation, decomposing the neutron flux rate density and the macroscopic cross section into average values and fluctuation values, and performing series expansion, retaining the first-order terms, and eliminating the static (useless interference) terms. It refers to the neutron fluence rate density where the disturbance occurs.
[0039] By applying Fourier transform to formula (3), the time domain function of the above formula (3) can be converted into a frequency domain function, refer to the following formula (4).
[0040]
[0041] In formula (4), the operator Corresponding to the undisturbed state, it is in the form of a complex number. Its real part corresponds to the static neutron transport equation, and its imaginary part corresponds to the fluctuation part (neutron noise), which is a function of frequency. ω=2πf, where f is the frequency and ω is the angular frequency. Let G(r,r′,ω) be the Green function describing the dynamic transfer process of neutron fluence rate density in a nuclear reactor. Based on formula (4), the neutron noise signal can be expressed as the following formula (5).
[0042]
[0043] The purpose of reactor neutron noise analysis is to obtain information about the operating status of the nuclear reactor through analysis. r' refers to the position of the neutron detector.
[0044] Based on the above analysis and research, at least one embodiment of the present application provides a leaking nuclear fuel assembly identification model and its construction method and device, and a nuclear reactor. The technical scheme in the embodiment of the present application will be clearly and completely described below in conjunction with the drawings in the embodiment of the present application. Obviously, the described embodiment is only a part of the embodiment of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0045] Figure 1 The figure shows a flow chart of a method for constructing a leaky nuclear fuel assembly identification model provided in an embodiment of the present application. The method for constructing a leaky nuclear fuel assembly identification model includes the following steps.
[0046] S100: In the case where the multiple nuclear fuel assemblies do not include a leaking nuclear fuel assembly, a first relationship model between the process variables of the nuclear reactor operating state and the neutron fluence rate density is established. The nuclear reactor includes a core and a coolant system. A plurality of nuclear fuel assemblies, a plurality of neutron detectors, and a plurality of control rods are arranged in the core. The coolant system is configured to use the coolant to conduct heat in the core. The process variables include at least one of the power in the core, the temperature, pressure, and flow rate of the coolant, the position of the neutron detector, and the position of the control rod. The neutron fluence rate density is measured by the neutron detector.
[0047] Specifically, the neutron fluence rate density can be measured using a neutron detector. By controlling at least one of the process variables to change while keeping the other process variables unchanged, the relationship between the process variables of the nuclear reactor operating state and the neutron fluence rate density can be determined. Furthermore, a first relationship model can be established based on the relationship between the process variables of the nuclear reactor operating state and the neutron fluence rate density.
[0048] In some embodiments, one neutron detector may correspond to multiple nuclear fuel assemblies (e.g., 2, 3, or 5, etc.), thus reducing the overall cost of the neutron detector and the space occupied by the neutron detector in the core. In other embodiments, multiple nuclear fuel assemblies and multiple neutron detectors may be arranged one-to-one, thus improving the accuracy of determining the leaking nuclear fuel assembly based on the neutron flux rate density detected by the neutron detector, and reducing the difficulty of constructing a leaking nuclear fuel assembly identification model.
[0049] S200: When the plurality of nuclear fuel assemblies include a leaking nuclear fuel assembly, a second relationship model between the leaking nuclear fuel assembly and the neutron fluence rate density is established.
[0050] Specifically, the process monitoring data of existing nuclear power units with leaking nuclear fuel assemblies and the detection results of checking leaking nuclear fuel assemblies during core unloading can be used as sample data to establish a second relationship model between leaking nuclear fuel assemblies and neutron injection rate density.
[0051] It should be noted that each nuclear fuel assembly may include multiple nuclear fuel rods (for example, more than 200). If there is a leak in a nuclear fuel rod in a nuclear fuel assembly, the nuclear fuel assembly can be determined as a leaking nuclear fuel assembly. The more nuclear fuel rods there are in a nuclear fuel assembly, the greater the neutron fluence rate density, and the greater the change in the neutron fluence rate density.
[0052] S300: Constructing a leaking nuclear fuel assembly identification model by combining the first relationship model and the second relationship model.
[0053] Specifically, by comparing the first relationship model and the second relationship model, the change in the neutron injection rate density of the leaking nuclear fuel assembly when leakage occurs can be determined. Based on this, the position of the leaking nuclear fuel assembly can be determined according to the change in the neutron injection rate density at a certain position, and then a leaking nuclear fuel assembly identification model can be constructed.
[0054] According to the technical solution provided by the embodiment of the present application, a leaking nuclear fuel assembly identification model is constructed through the above steps S100 to S300, so that the leaking nuclear fuel assembly identification model can accurately locate the position of the leaking nuclear fuel assembly, which can shorten the time that the nuclear power unit occupies the overhaul key path due to the inspection of the leaking nuclear fuel assembly during the core unloading process, and strive for more power generation time for the nuclear power unit, which is conducive to improving the power generation efficiency of the nuclear power unit. For example, the power generation efficiency of a million-kilowatt nuclear power unit is about 10 million yuan / day. Every extra day of time gained will increase the profit by 10 million yuan. In addition, using the leaking nuclear fuel assembly identification model to accurately locate the position of the leaking nuclear fuel assembly can reduce the number of nuclear power units that check the leaking nuclear fuel assembly during the core unloading process, reduce the exposure dose and number of power station staff and equipment due to the inspection of the leaking nuclear fuel assembly, thereby reducing the overhaul collective dose level of the nuclear power unit and the annual collective dose level of the nuclear power plant, and also save the inspection cost of the leaking nuclear fuel assembly, for example, about 8.6 million yuan. In addition, using the leaky nuclear fuel assembly identification model to accurately locate the position of the leaky nuclear fuel assembly can also provide accurate information about the nuclear fuel assembly that can be used again for normal core refueling design, which can reduce the steps of emergency core refueling design that is restarted after the leaky nuclear fuel assembly is confirmed by offline poolside sipping inspection, which can directly save design costs, such as about 1 million yuan, and can also reduce the time for safety review of refueling core design. The embodiment of the present application can completely solve the world-class problem of locating the leaky nuclear fuel assembly in the core, and improve and enhance the monitoring, analysis and diagnosis technology and method of nuclear fuel assembly integrity in the world.
[0055] Figure 2 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in another embodiment of the present application. Figure 2 The embodiment shown is Figure 1 A variation of the embodiment shown. Figure 2 As shown, Figure 1 The difference of the illustrated embodiment is that, before step S100, the construction method further includes steps S102 and S104.
[0056] S102: Establishing a third relationship model between a neutron noise driving source and a neutron noise signal source. The neutron noise signal source is an identifiable or discernible neutron noise driving source.
[0057] For example, by studying the statistical characteristics of the neutron noise stochastic differential equation, the law between the neutron noise signal and the neutron noise driving source is found, and the neutron noise driving source that can be identified or distinguished is determined as the neutron noise signal source, thereby establishing a third relationship model between the neutron noise driving source and the neutron noise signal source.
[0058] In some embodiments, the neutron noise signal extraction technology and processing method of the neutron detector are studied by using the existing process monitoring signal of the nuclear power unit, so as to establish a third relationship model between the neutron noise driving source and the neutron noise signal source. In other embodiments, for the neutron noise driving source that cannot be identified or distinguished, or the neutron noise driving source whose relationship with the neutron noise signal source cannot be determined by using the existing process monitoring signal of the nuclear power unit, new neutron noise signal extraction technology and processing method can be studied, for example, more advanced neutron detectors or neutron detectors of different models can be used, or improvements can be made to the neutron detectors, etc.
[0059] It should be noted that the neutron detector can collect signals from neutron noise driving sources, and the neutron noise driving sources whose signals can be collected are neutron noise signal sources. Neutron noise driving sources can include process variables and nuclear fuel components, etc.
[0060] S104: Establishing a transfer characteristic model between the neutron detector and the neutron noise signal source.
[0061] Specifically, the transfer characteristics between the neutron detector and the neutron noise signal source can be studied based on the above formula (5), and then a transfer characteristic model between the neutron detector and the neutron noise signal source can be established based on the research results.
[0062] In some embodiments, if the neutron noise signal source is a normal nuclear fuel assembly, the transmission relationship between the neutron detector and the normal nuclear fuel assembly can be determined. In other embodiments, if the neutron noise signal source is a leaking nuclear fuel assembly, the transmission relationship between the neutron detector and the leaking nuclear fuel assembly can be determined.
[0063] According to the technical solution provided by the embodiment of the present application, by establishing a third relationship model between the neutron noise driving source and the neutron noise signal source, the neutron noise driving source that can be identified or distinguished can be determined according to the neutron noise signal source. By establishing a transfer characteristic model between the neutron detector and the neutron noise signal source, it is helpful to determine the position of the neutron noise signal source according to the position of the neutron detector and the neutron noise signal detected by it, and then determine the neutron noise driving source according to the position of the neutron noise signal source.
[0064] In at least one embodiment of the present application, steps S310 and S320 are Figure 1 A specific implementation of step S300 in the illustrated embodiment.
[0065] S310: Combining the first relationship model and the second relationship model, a neutron noise spectrum library for monitoring and locating a leaking nuclear fuel assembly in a core is established.
[0066] For example, based on the spectrum analysis technology and method, the relationship map between the process variables of the nuclear reactor operating state and the neutron injection rate density can be spectrally analyzed to form a first relationship model (corresponding to S100), and the relationship map between the leaking nuclear fuel assembly and the neutron injection rate density can be spectrally analyzed to form a second relationship model (corresponding to S200), and then the neutron noise spectrum used for monitoring and locating the leaking nuclear fuel assembly in the core is determined by comparing the spectrum results of the first relationship model and the second relationship model, and then a neutron noise spectrum library for monitoring and locating the leaking nuclear fuel assembly in the core is established.
[0067] It should be noted that the neutron noise spectrum library is a representation of the Green's function in the above formula (5). The neutron noise spectrum can be a spectrum related to the neutron noise signal. The neutron noise spectrum library used for monitoring and locating the leaking nuclear fuel assembly in the core can include a spectrum related to the position of each leaking nuclear fuel assembly and the neutron noise signal.
[0068] S320: Construct a leaky nuclear fuel assembly identification model based on the neutron noise spectrum library.
[0069] In some embodiments, the neutron noise spectrum library used for monitoring and locating the leaking nuclear fuel assembly in the core can be directly used to form a leaking nuclear fuel assembly identification model. When the leaking nuclear fuel assembly is identified using the leaking nuclear fuel assembly identification model, the measured neutron noise spectrum and the neutron noise spectrum library can be compared, so that the location of the leaking nuclear fuel assembly can be determined based on the comparison result. In other embodiments, program software can be developed based on the neutron noise spectrum library used for monitoring and locating the leaking nuclear fuel assembly in the core, so that the program software can be used as a leaking nuclear fuel assembly identification model. When the leaking nuclear fuel assembly is identified using the leaking nuclear fuel assembly identification model, the program software can give the location of the leaking nuclear fuel assembly based on the measured neutron noise spectrum.
[0070] In an embodiment of the present application, a leaking nuclear fuel assembly identification model is constructed based on a neutron noise spectrum library used for in-core monitoring and positioning of leaking nuclear fuel assemblies, so that the leaking nuclear fuel assembly identification model can more accurately locate the position of the leaking nuclear fuel assembly.
[0071] Figure 3 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in yet another embodiment of the present application. Figure 3 The embodiment shown is Figure 1 A variation of the embodiment shown. Figure 3 As shown, Figure 1 The difference of the embodiment shown is that steps S110 and S120 are Figure 1 A specific implementation of step S100 in the illustrated embodiment.
[0072] S110: When the plurality of nuclear fuel assemblies do not include a leaking nuclear fuel assembly, a first neutron noise signal in the core is acquired using a plurality of neutron detectors.
[0073] S120: Based on the first neutron noise signal, a first relationship model between the process variable of the nuclear reactor operation state and the neutron fluence rate density is established.
[0074] According to the technical solution provided in the embodiment of the present application, a first relationship model is established by utilizing the first neutron noise signal monitored by multiple neutron detectors, so that the first relationship model can more accurately reflect the relationship between the process variables of the operating state of the nuclear reactor and the neutron injection rate density.
[0075] In at least one embodiment of the present application, steps S210 and S220 are Figure 1 A specific implementation of step S200 in the illustrated embodiment.
[0076] S210: In the case where the multiple nuclear fuel assemblies include a leaking nuclear fuel assembly, a second neutron noise signal in the core is acquired using multiple neutron detectors.
[0077] S220: Based on the second neutron noise signal, a second relationship model between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal is established.
[0078] For example, by utilizing the existing process monitoring data of nuclear power units (including the second neutron noise signal), the neutron perturbation theory and neutron transport theory can be used to solve the location of the leaking nuclear fuel assembly, and further engineering verification of the in-core monitoring and positioning method of the leaking nuclear fuel assembly based on the neutron noise analysis technology can be carried out to establish the second relationship model.
[0079] In an embodiment of the present application, a second relationship model is established by utilizing the second neutron noise signal monitored by multiple neutron detectors, so that the second relationship model can more accurately reflect the relationship between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal.
[0080] Figure 4 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in yet another embodiment of the present application. Figure 4 The embodiment shown is Figure 3 A variation of the embodiment shown. Figure 4 As shown, Figure 3 The difference of the embodiment shown is that steps S122 and S124 are Figure 3 A specific implementation of step S120 in the illustrated embodiment.
[0081] S122: Establishing a first sub-relationship model between the first neutron noise signal and the power in the core.
[0082] For example, based on the neutron transport theory and applying reactor physics numerical calculations, the three-dimensional power distribution in the core of a nuclear reactor and the neutron fluence rate density distribution corresponding to the first neutron noise signal under the three-dimensional power distribution can be determined, so that a first sub-relationship model (also called a three-dimensional core power distribution theoretical model) can be constructed based on the three-dimensional power distribution and the neutron fluence rate density distribution.
[0083] S124: Establishing a second sub-relationship model between the first neutron noise signal and the position of the neutron detector.
[0084] For example, based on neutron transport theory and combined with the Monte Carlo calculation method, the neutron flux rate density distribution of each neutron detector and its vicinity can be refined (corresponding to the time t and neutron noise signal in the above formula (3) Furthermore, the convergence criterion of iterative calculation can be formulated based on the uncertainty research (based on the neutron noise signal obtained above). Given formula (5) The initial value of is determined by the reverse method using the convergence criterion of iterative calculation The final value of ), thereby constructing a second sub-relationship model based on the position of each neutron detector and the neutron fluence rate density distribution in its vicinity.
[0085] It should be noted that the positions of the multiple neutron detectors and the positions of the multiple nuclear fuel assemblies can be determined during the engineering design of the core, and the positions of the multiple neutron detectors and the positions of the multiple nuclear fuel assemblies can be determined based on the position coordinates on the coordinate system.
[0086] According to the technical solution provided in the embodiment of the present application, by selecting the power in the core and the position of the neutron detector as representative process variables, and establishing a relationship model between the neutron noise signal and the power in the core and a relationship model between the neutron noise signal and the position of the neutron detector as the first relationship model, the method of establishing the first relationship model is simplified.
[0087] Figure 5 Shown is a flow chart of a method for constructing a leaking nuclear fuel assembly identification model provided in yet another embodiment of the present application. Figure 5 The embodiment shown is Figure 4 A variation of the embodiment shown. Figure 5 As shown, Figure 4 The difference of the embodiment shown is that step S124a is Figure 4 A specific implementation of step S124 in the illustrated embodiment.
[0088] S124a: Based on the neutron fluence rate density corresponding to the second neutron noise signal, the position of the leaking nuclear fuel assembly is determined using neutron perturbation theory and neutron transmission theory to determine the second relationship model.
[0089] For example, the location of the leaking nuclear fuel assembly can be assumed, and the neutron injection rate density distribution at the location of the leaking nuclear fuel assembly and its vicinity can be refined, and further, the convergence criterion of the calculation can be formulated based on the uncertainty study, so as to forward solve the above formula (5) and determine the formula (5). The final value of .
[0090] In the embodiment of the present application, the position of the leaking nuclear fuel assembly is determined by using the neutron perturbation theory and the neutron transport theory, so that the relationship between the leaking nuclear fuel assembly and the neutron injection rate density is more accurate.
[0091] At least one embodiment of the present application further provides a leaking nuclear fuel assembly identification model, and the leaking nuclear fuel assembly identification model is established by the method for constructing a leaking nuclear fuel assembly identification model in any of the above embodiments.
[0092] It should be noted that the leaking nuclear fuel assembly identification model can be applied to all types of pressurized light water nuclear reactors (PWRs) nuclear power units, for example, the nuclear power units include but are not limited to M310 nuclear power units, VVER nuclear power units, CAP1400 nuclear power units, Hualong One nuclear power units, AP1000 nuclear power units and EPR nuclear power units.
[0093] Figure 6 FIG. 1 is a schematic diagram of a structure of a device for constructing a leaky nuclear fuel assembly identification model provided by an embodiment of the present application. Figure 6 As shown, the construction device 100 includes a first establishment module 110, a second establishment module 120 and a construction module 130. The first establishment module 110 is used to establish a first relationship model between the process variables of the operation state of the nuclear reactor and the neutron injection rate density when the multiple nuclear fuel assemblies do not include the leaking nuclear fuel assembly. The nuclear reactor includes a core and a coolant system. A plurality of nuclear fuel assemblies, a plurality of neutron detectors and a plurality of control rods are arranged in the core. The coolant system is configured to use the coolant to extract the heat in the core. The process variables include at least one of the power in the core, the temperature, pressure and flow of the coolant, the position of the neutron detector and the position of the control rod. The neutron injection rate density is measured by the neutron detector. The second establishment module 120 is used to establish a second relationship model between the leaking nuclear fuel assembly and the neutron injection rate density when the multiple nuclear fuel assemblies include the leaking nuclear fuel assembly. The construction module 130 is used to construct a leaking nuclear fuel assembly identification model in combination with the first relationship model and the second relationship model.
[0094] In at least one embodiment of the present application, the first establishment module 110 is also used to use multiple neutron detectors to obtain a first neutron noise signal in the core; based on the first neutron noise signal, a first relationship model between the process variables of the nuclear reactor operating state and the neutron injection rate density is established.
[0095] In at least one embodiment of the present application, the first establishing module 110 is also used to establish a first sub-relationship model between the first neutron noise signal and the power in the core; and to establish a second sub-relationship model between the first neutron noise signal and the position of the neutron detector.
[0096] In at least one embodiment of the present application, the second establishment module 120 is also used to use multiple neutron detectors to obtain a second neutron noise signal in the core; based on the second neutron noise signal, a second relationship model between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal is established.
[0097] In at least one embodiment of the present application, the second establishment module 120 is also used to determine the location of the leaking nuclear fuel assembly based on the neutron fluence rate density corresponding to the second neutron noise signal using neutron perturbation theory and neutron transport theory to determine the second relationship model.
[0098] In at least one embodiment of the present application, the first establishing module 110 or the second establishing module 120 is also used to establish a third relationship model between the neutron noise driving source and the neutron noise signal source; and to establish a transfer characteristic model between the neutron detector and the neutron noise signal source.
[0099] In at least one embodiment of the present application, the construction module 130 is also used to combine the first relationship model and the second relationship model to establish a neutron noise spectrum library for monitoring and locating leaking nuclear fuel assemblies in the core; and to construct a leaking nuclear fuel assembly identification model based on the neutron noise spectrum library.
[0100] Since the leaking nuclear fuel assembly identification model and the construction device of the leaking nuclear fuel assembly identification model include all the technical features of the construction method provided in the embodiment of the present application, the technical effects of the technical features in the leaking nuclear fuel assembly identification model and the construction device of the leaking nuclear fuel assembly identification model can be referred to the description of the construction method in the embodiment of the present application and will not be repeated here.
[0101] Figure 7 FIG. 1 is a schematic diagram of the structure of a nuclear reactor provided by an embodiment of the present application. Figure 7As shown, the nuclear reactor 200 includes a core 210 and a coolant system 220. A plurality of nuclear fuel assemblies 211, a plurality of neutron detectors 212 and a plurality of control rods 213 are arranged in the core 210. The plurality of neutron detectors 212 are configured to monitor the neutron injection rate density changes of the plurality of nuclear fuel assemblies 211. The coolant system 220 is connected to the core 210, and the coolant system 220 is configured to use the coolant to conduct heat in the core 210. Part of the neutron detectors 212 in the nuclear reactor 200 is located in the core 210, and the plurality of neutron detectors 212 can be regularly or fixedly deep into the core 210 for measurement according to actual needs. In this way, the multiple neutron detectors 212 arranged in the core 210 of the nuclear reactor 200 can be used to monitor the changes in the neutron injection rate density in the core 210, and then the nuclear reactor 200 can be used to establish a leaking nuclear fuel assembly identification model. The nuclear reactor 200 can also be used to monitor in real time whether there is a leaking nuclear fuel assembly, and the location of the leaking nuclear fuel assembly can be determined in combination with the leaking nuclear fuel assembly identification model.
[0102] It should be noted that the coolant system 220 may be filled with coolant. In addition to the core 210 and the coolant system 220, the nuclear reactor 200 may also include a control rod drive mechanism, a ventilation hood, and a pressure vessel. During the operation of the nuclear reactor 200, the plurality of control rods 213 may all be located in the core 210, and when the nuclear reactor 200 stops operating, the plurality of control rods 213 may be withdrawn from the core 210.
[0103] Figure 8 Shown is a schematic structural diagram of a nuclear reactor provided in another embodiment of the present application. Figure 8 The embodiment shown is Figure 7 A variation of the embodiment shown. Figure 8 As shown, Figure 7 The difference of the illustrated embodiment is that all of the neutron detectors 212 in the nuclear reactor 300 are located in corresponding nuclear fuel assemblies 211 in the core 210 .
[0104] Those skilled in the art can clearly understand that, for the convenience and simplicity of description, the specific working process of the leaking nuclear fuel assembly identification model, construction device and nuclear reactor described above can refer to the corresponding process in the above method embodiment, and will not be repeated here.
[0105] It should be noted that the combination of the various technical features in the embodiments of the present application is not limited to the combination described in the embodiments of the present application or the combination described in the specific embodiments, and all technical features described in the present application can be freely combined or combined in any way unless there is a contradiction between them.
[0106] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A method for constructing a leaky nuclear fuel assembly identification model, characterized in that: include: In the case that the multiple nuclear fuel assemblies do not include the leaking nuclear fuel assembly, a first relationship model between the process variables of the nuclear reactor operation state and the neutron fluence rate density is established, wherein the nuclear reactor comprises a core and a coolant system, the core is provided with multiple nuclear fuel assemblies, multiple neutron detectors and multiple control rods, the coolant system is configured to use the coolant to conduct heat in the core, the process variables include at least one of the power in the core, the temperature, pressure and flow rate of the coolant, the position of the neutron detector and the position of the control rod, and the neutron fluence rate density is measured by the neutron detector; In the case where the plurality of nuclear fuel assemblies include the leaking nuclear fuel assembly, establishing a second relationship model between the leaking nuclear fuel assembly and the neutron fluence rate density; The leaking nuclear fuel assembly identification model is constructed by combining the first relationship model and the second relationship model.
2. The construction method according to claim 1, characterized in that: The step of establishing a first relationship model between a process variable of a nuclear reactor operation state and a neutron fluence rate density comprises: Acquiring a first neutron noise signal in the core using a plurality of the neutron detectors; Based on the first neutron noise signal, a first relationship model between the process variable of the nuclear reactor operation state and the neutron fluence rate density is established.
3. The construction method according to claim 2, characterized in that: The step of establishing a first relationship model between a process variable of a nuclear reactor operation state and a neutron fluence rate density based on the first neutron noise signal comprises: Establishing a first sub-relationship model between the first neutron noise signal and the power in the core; A second sub-relationship model between the first neutron noise signal and the position of the neutron detector is established.
4. The construction method according to claim 1, characterized in that: The establishing of a second relationship model between the leaking nuclear fuel assembly and the neutron fluence rate density comprises: Acquiring a second neutron noise signal in the core using a plurality of the neutron detectors; Based on the second neutron noise signal, a second relationship model between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal is established.
5. The construction method according to claim 4, characterized in that: The step of establishing a second relationship model between the position of the leaking nuclear fuel assembly and the neutron fluence rate density corresponding to the second neutron noise signal comprises: Based on the neutron fluence rate density corresponding to the second neutron noise signal, the position of the leaking nuclear fuel assembly is determined using neutron perturbation theory and neutron transmission theory to determine the second relationship model.
6. The construction method according to any one of claims 1 to 5, characterized in that: Before establishing the first relationship model between the process variables of the nuclear reactor operation state and the neutron fluence rate density, the construction method further includes: Establishing a third relationship model between a neutron noise driving source and a neutron noise signal source, wherein the neutron noise signal source is an identifiable or discernible neutron noise driving source; A transfer characteristic model between the neutron detector and the neutron noise signal source is established.
7. The construction method according to any one of claims 1 to 5, characterized in that: The step of combining the first relationship model and the second relationship model to construct the leaking nuclear fuel assembly identification model includes: Combining the first relationship model and the second relationship model to establish a neutron noise spectrum library for monitoring and locating a leaking fuel assembly in a pile; A leaky nuclear fuel assembly identification model is constructed based on the neutron noise spectrum library.
8. A device for constructing a leaky nuclear fuel assembly identification model, characterized in that: include: A first establishing module is used to establish a first relationship model between a process variable of a nuclear reactor operation state and a neutron fluence rate density when a plurality of nuclear fuel assemblies do not include a leaking nuclear fuel assembly, wherein the nuclear reactor comprises a core and a coolant system, a plurality of nuclear fuel assemblies, a plurality of neutron detectors and a plurality of control rods are arranged in the core, the coolant system is configured to use a coolant to conduct heat in the core, the process variable comprises at least one of the power in the core, the temperature, pressure and flow rate of the coolant, the position of the neutron detector and the position of the control rod, and the neutron fluence rate density is measured by the neutron detector; A second establishing module is used to establish a second relationship model between the leaking nuclear fuel assembly and the neutron fluence rate density when the plurality of nuclear fuel assemblies include a leaking nuclear fuel assembly; and A construction module is used to construct the leaking nuclear fuel assembly identification model by combining the first relationship model and the second relationship model.
9. A leaky nuclear fuel assembly identification model, characterized in that: The leaky nuclear fuel assembly identification model is established by the method for constructing a leaky nuclear fuel assembly identification model according to any one of claims 1 to 7.
10. A nuclear reactor, characterized in that: include: A core, provided with a plurality of nuclear fuel assemblies, a plurality of neutron detectors and a plurality of control rods, wherein the plurality of neutron detectors are configured to monitor the neutron fluence rate density variation of the plurality of nuclear fuel assemblies; and A coolant system is connected to the core and is configured to use a coolant to remove heat from the core.