Method for determining load sharing ratio of secondary lining after corrosion of tunnel primary support anchor rod

By calculating the anchor rod corrosion rate and interface bonding structure, a tunnel stratigraphic structure model was established, and the problem of stress transfer between surrounding rock-initial support-secondary lining after anchor rod corrosion was solved, and accurate load sharing ratio calculation was provided. Ensure the long-term operation of the tunnel.

CN119066872AInactive Publication Date: 2024-12-03CHINA RAILWAY ECONOMIC & PLANNING RES INST
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411201285.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In tunnel construction, after the anchor rod rust, the stress between surrounding rock-initial support-secondary lining is nonlinear, which increases the contact stress between initial support-secondary lining, affecting the safety of secondary lining during the operation period. There is a lack of effective method for determining load sharing ratios.

Method used

By calculating the corrosion rate of the anchor, the mechanical parameters of the corrosion anchor and the interface bonding structure of the combined structure are determined, and the surrounding rock-initial support-secondary lining structure model is established, and the contact stress of the anchor under different corrosion rates is extracted. , calculate the secondary lining load sharing ratio after anchor rod rust.

Benefits of technology

A set of precise and refined methods are provided to determine the load sharing ratio of secondary lining after anchor rod corrosion, ensure the long-term operation safety of tunnels, fill the gap in the bonding and slip theory of rust anchor rod-grouting body interface, and achieve accurate Simulation and safety evaluation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119066872A_ABST
    Figure CN119066872A_ABST
Patent Text Reader

Abstract

The invention provides a method for determining the load sharing ratio of a secondary lining after corrosion of a tunnel primary support anchor rod, and belongs to the technical field of tunnel engineering.The method comprises the following steps that S1, the corrosion rate of the anchor rod is calculated, and mechanical parameters of the corroded anchor rod are determined based on the corrosion rate; s2, determining a composite structure interface bonding constitutive structure of the rusted anchor rod; s3, building a surrounding rock-primary support-secondary lining stratum structure model considering the corrosion of the anchor rod; s4, extracting surrounding rock-primary support contact stress and primary support-secondary lining contact stress of the anchor rod under different corrosion rate conditions through the stratigraphic structure model established in the step S3; and S5, calculating the load sharing ratio of the secondary lining after the corrosion of the anchor rod. By the adoption of the method for determining the load sharing ratio of the secondary lining after corrosion of the tunnel primary support anchor rod, long-term operation safety of the tunnel can be guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering, and in particular to a method for determining a secondary lining load sharing ratio after initial tunnel support anchors are corroded. Background Art

[0002] At present, the active support design concept of tunnels emphasizes strengthening shotcrete, protecting surrounding rock, early deformation control, safety and efficiency, fully protecting surrounding rock, utilizing surrounding rock, reinforcing surrounding rock, and taking surrounding rock as the main bearing body. In order to protect the surrounding rock and maximize the self-bearing capacity of surrounding rock, prestressed anchor rods (anchor cables) and early high-strength fiber shotcrete are immediately applied after tunnel excavation. During the long-term operation of the tunnel, the prestressed anchor rods may rust and deteriorate under the influence of factors such as engineering environment and geological conditions. After deterioration, on the one hand, their own mechanical parameters are reduced; on the other hand, the bond between the corroded anchor rods and the grouting body is weakened. The combined effect of the two leads to nonlinear stress transfer between the tunnel surrounding rock-primary support-secondary lining, among which the contact stress between the primary support and the secondary lining will increase. The degree of increase (i.e., the change in the load sharing ratio of the secondary lining) is particularly important for the safety evaluation of the secondary lining during the operation period. Therefore, it is urgent to establish a method for determining the load sharing ratio of the secondary lining after the deterioration of the tunnel anchor rods.

[0003] At present, the research on anchor corrosion mainly uses micro-scale tests to obtain the products and corrosion mechanism of anchor corrosion; macro-scale tests are used to obtain the mechanical parameters of the corroded anchor and the bond strength and bond-slip constitutive structure of the anchor-grouting material interface. Summary of the invention

[0004] The purpose of the present invention is to provide a method for determining the secondary lining load sharing ratio after the initial support anchor of the tunnel is corroded, so as to ensure the long-term operation safety of the tunnel.

[0005] To achieve the above object, the present invention provides a method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is corroded, comprising the following steps:

[0006] S1. Calculate the corrosion rate of the anchor rod, and determine the mechanical parameters of the corroded anchor rod based on the corrosion rate;

[0007] S2. Determine the interface bonding constitutive property of the combined structure of the corroded anchor bolts;

[0008] S3. Establish a surrounding rock-primary support-secondary lining stratigraphic structure model considering anchor corrosion;

[0009] S4, extracting the surrounding rock-initial support contact stress and the initial support-secondary lining contact stress under different anchor corrosion rates using the stratum structure model established in step S3;

[0010] S5. Calculate the secondary lining load sharing ratio after anchor corrosion.

[0011] Preferably, in step S1, the corrosion rate of the anchor rod is calculated, and the specific operation is as follows:

[0012] Cut a section of corroded anchor rod in the tunnel, remove the rust products of the corroded anchor rod with hydrochloric acid solution, then neutralize it with 3% sodium carbonate solution, finally wash it with clean water and put it in an oven for drying;

[0013] Weigh the anchor rod after rust removal to obtain the mass of the anchor rod after rusting m c , compared with the mass m of the uncorroded anchor rod of the same specification and length, the actual mass loss due to corrosion Δm is further obtained;

[0014] Finally, the anchor corrosion rate is calculated. The calculation formula of the corrosion rate is as follows:

[0015]

[0016] Among them, ρ is the actual corrosion rate.

[0017] Preferably, in step S1, the mechanical parameters of the corroded anchor include yield strength, ultimate strength and ultimate strain, and the calculation formulas are as follows:

[0018]

[0019] ε suc =e -3.789ρ ε su0 (4)

[0020] Among them, f yc 、f uc , ε suc are the yield strength, ultimate strength and ultimate strain of the corroded anchor respectively; f y0 、f u0 , ε su0 are the yield strength, ultimate strength and ultimate strain of the corresponding non-corroded anchor rods, respectively.

[0021] Preferably, in step S2, the combined structural interface bonding constitutive property of the corroded anchor bolt is determined, and the specific operation is as follows:

[0022] S21. Determine the size of the surrounding rock-mortar-anchor rod combination structure, make the surrounding rock-mortar-anchor rod combination structure, and obtain the combination structure of anchor rods with different corrosion rates through electrical acceleration test;

[0023] S22, the bond strength-slip curve of the anchor-grouting interface with different corrosion rates is obtained through pull-out test;

[0024] S23. Based on the bond strength-slip curve, the bond-slip constitutive model between the anchor bolt and the grouting body interface under different corrosion rates was fitted by statistical theory. The calculation formula is as follows:

[0025]

[0026] Wherein, τ is the bond strength of the corroded anchor-grouting interface; S is the bond slip of the corroded anchor-grouting interface; It is a parameter to consider the effect of anchor corrosion on interface strength.

[0027] Preferably, in step S3, a surrounding rock-primary support-secondary lining stratum structure model considering anchor corrosion is established, and the calculation model is a stratum structure model, and the surrounding rock, grouting material, anchor, initial support concrete, and secondary lining are simulated with solid units;

[0028] Among them, nonlinear springs are used for anchor rods and grouting materials to realize the bond slip between the two; contact units are used to simulate the force transmission between surrounding rock-primary support and primary support-secondary lining; for the simulation of anchor rod corrosion, the first point is to modify the mechanical parameters of the anchor rod itself through the corrosion rate (Formula 2-4); the second point is to transform the force F-displacement D curve through the bond slip degradation constitutive formula (Formula 5), ​​and further define the nonlinear spring force properties between the interface of anchor rod and grouting body.

[0029] Preferably, in step S5, the secondary lining load sharing ratio after anchor rod corrosion is calculated as follows:

[0030] λ=q2(ρ) / q1(ρ) (6)

[0031] Among them, q2(ρ) is the contact stress between the initial support and the secondary lining after considering the corrosion of the anchor rod; q1(ρ) is the contact stress between the surrounding rock and the initial support after considering the corrosion of the anchor rod; λ is the load sharing ratio of the secondary lining that changes with the corrosion rate of the anchor rod.

[0032] Therefore, the present invention adopts the above-mentioned method for determining the secondary lining load sharing ratio after the initial tunnel support anchor is corroded, and the technical effects are as follows:

[0033] (1) The anchor corrosion rate determination method proposed in the present invention solves the problem of difficulty in obtaining the on-site corrosion rate;

[0034] (2) The present invention designs an experiment to obtain the bond-slip at the interface of anchor rods and grouting bodies with different corrosion rates, and based on this, establishes the bond-slip constitutive model of the interface of corroded anchor rods and grouting bodies, filling the gap in the bond-slip theory of the interface of corroded anchor rods and grouting bodies;

[0035] (3) The present invention mainly uses the spring unit in the formation model to realize the bond slip at the interface of the corroded anchor rod and the grouting body. Based on this, a surrounding rock-primary support-secondary lining formation structure model considering the corrosion of the anchor rod is established, realizing accurate and detailed simulation under the effect of anchor rod corrosion;

[0036] (4) The present invention extracts the contact stress between surrounding rock and primary support, and between primary support and secondary lining, and provides a load sharing ratio calculation formula based on the contact stress, which can provide a basis for the long-term safety evaluation of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 It is a flow chart of the method for determining the secondary lining load sharing ratio after the initial tunnel support anchor rod is corroded according to the present invention;

[0038] Figure 2 is the size of the surrounding rock-mortar-anchor combination structure;

[0039] Figure 3 This is the electrical accelerated corrosion test diagram;

[0040] Figure 4 is the bond-slip (τ-S) curve;

[0041] Figure 5 It is a stratigraphic structure model;

[0042] Figure 6 It is the bonding spring between the grouting body and the anchor rod;

[0043] Figure 7 is the contact unit;

[0044] Figure 8 is the surrounding rock-initial support contact stress;

[0045] Fig. 9 is the contact stress between initial support and secondary lining. DETAILED DESCRIPTION

[0046] The technical solution of the present invention is further described below through the accompanying drawings and embodiments.

[0047] Unless otherwise defined, technical or scientific terms used in the present invention shall have the common meanings understood by one having ordinary skills in the field to which the present invention belongs.

[0048] Embodiment 1

[0049] like Figure 1 As shown, it is a flow chart of the method for determining the secondary lining load sharing ratio after the initial support anchor of the tunnel is corroded according to the present invention, which specifically includes the following steps:

[0050] S1. Calculate the corrosion rate of the anchor rod, and determine the mechanical parameters of the corroded anchor rod based on the corrosion rate;

[0051] The calculation process of the corrosion rate is as follows:

[0052] Cut a section of corroded anchor rod in the tunnel, remove the rust products of the corroded anchor rod with hydrochloric acid solution, then neutralize it with 3% sodium carbonate solution, finally wash it with clean water and put it in an oven for drying;

[0053] Weigh the anchor rod after rust removal to obtain the mass of the anchor rod after rusting m c , compared with the mass m of the uncorroded anchor rod of the same specification and length, the actual mass loss due to corrosion Δm is further obtained;

[0054] Finally, the anchor corrosion rate is calculated. The calculation formula of the corrosion rate is as follows:

[0055]

[0056] Among them, ρ is the actual corrosion rate.

[0057] The mechanical parameters of the corroded anchor include yield strength, ultimate strength and ultimate strain, and the calculation formulas are as follows:

[0058]

[0059] ε suc =e -3.789ρ ε su0 (4)

[0060] Among them, f yc 、f uc , ε suc are the yield strength, ultimate strength and ultimate strain of the corroded anchor respectively; f y0 、f u0 , ε su0 are the yield strength, ultimate strength and ultimate strain of the corresponding non-corroded anchor rods, respectively.

[0061] S2. Determine the interface bonding constitutive property of the combined structure of the corroded anchor bolts;

[0062] S21. Determine the dimensions of the surrounding rock-mortar-anchor combination structure (e.g. Figure 2 As shown in the figure), a surrounding rock-mortar-anchor combination structure is made, and the combination structure of anchors with different corrosion rates is obtained through electrical acceleration test;

[0063] According to Faraday's law, the accelerated electrolytic test is used to control the constant current, and the anchors with different corrosion rates are obtained by the power-on time. The accelerated electrolytic corrosion test mainly uses an electrolytic cell composed of a DC power supply, an ammeter, a wire, a 5% NaCl solution, a copper sheet, a plastic water tank, and a wooden pad. Figure 3 shown.

[0064] S22. The anchor-grouting interface bond strength-slip (τ-S) curves with different corrosion rates were obtained through pull-out tests, such as Figure 4 As shown;

[0065] Figure 4 In the equation, τ0 is the maximum bonding strength in the linear elastic stage, S0 is the corresponding slip value when the bonding strength is the maximum in the linear elastic stage; τ u is the ultimate bonding strength, S u is the slip value corresponding to the ultimate bonding strength; τ r is the residual bond strength, S r is the slip value corresponding to the residual bonding strength. OA represents the τ-S straight rising section; AB represents the τ-S curve rising section; BC represents the τ-S steep falling section; CD represents the τ-S residual section.

[0066] S23. Based on the bond strength-slip curve, the bond-slip constitutive model between the anchor bolt and the grouting body interface under different corrosion rates was fitted by statistical theory. The calculation formula is as follows:

[0067]

[0068] Wherein, τ is the bond strength of the corroded anchor-grouting interface; S is the bond slip of the corroded anchor-grouting interface; It is a parameter to consider the effect of anchor corrosion on interface strength.

[0069] S3. Establish a surrounding rock-primary support-secondary lining stratigraphic structure model considering anchor corrosion;

[0070] The calculation model is the stratigraphic structure model (such as Figure 5 As shown in the figure), the surrounding rock, grouting material, anchor rods, initial support concrete and secondary lining are simulated with solid units;

[0071] Among them, the anchor rod and the grouting material use nonlinear springs to achieve the bond slip between the two (such as Figure 6 Contact units are used to simulate force transfer between surrounding rock and primary support, and between primary support and secondary lining (as shown in Figure 7 As shown in the figure, for the simulation of anchor corrosion, the first point is to modify the mechanical parameters of the anchor itself through the corrosion rate (Equations 2 to 4); the second point is to transform the force F-displacement D curve through the bond-slip degradation constitutive model (Equation 5) to further define the nonlinear spring force properties between the anchor and the grouting body interface.

[0072] S4. Through the stratum structure model established in step S3, the surrounding rock-initial support contact stress and the initial support-secondary lining contact stress under different anchor corrosion rates are extracted, respectively as follows: Figure 8 , Fig. 9 As shown;

[0073] S5. Calculate the secondary lining load sharing ratio after anchor corrosion. The calculation formula is as follows:

[0074] λ=q2(ρ) / q1(ρ) (6)

[0075] Among them, q2(ρ) is the contact stress between the initial support and the secondary lining after considering the corrosion of the anchor rod; q1(ρ) is the contact stress between the surrounding rock and the initial support after considering the corrosion of the anchor rod; λ is the load sharing ratio of the secondary lining that changes with the corrosion rate of the anchor rod.

[0076] It is worth noting that the contents not elaborated in detail in the present invention are all prior art and are well known to those skilled in the art.

[0077] Therefore, the present invention adopts the above-mentioned method for determining the secondary lining load sharing ratio after the initial tunnel support anchors are corroded, which can ensure the long-term operation safety of the tunnel.

[0078] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that they can still modify or replace the technical solution of the present invention with equivalents, and these modifications or equivalent replacements cannot cause the modified technical solution to deviate from the spirit and scope of the technical solution of the present invention.

Claims

1. A method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is corroded, characterized in that: The following steps are involved: S1. Calculate the corrosion rate of the anchor rod, and determine the mechanical parameters of the corroded anchor rod based on the corrosion rate; S2. Determine the interface bonding constitutive property of the combined structure of the corroded anchor bolts; S3. Establish a surrounding rock-primary support-secondary lining stratigraphic structure model considering anchor corrosion; S4, extracting the surrounding rock-initial support contact stress and the initial support-secondary lining contact stress under different anchor corrosion rates using the stratum structure model established in step S3; S5. Calculate the secondary lining load sharing ratio after anchor corrosion.

2. The method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is described in claim 1, characterized in that: In step S1, the corrosion rate of the anchor rod is calculated, and the specific operation is as follows: Cut a section of corroded anchor rod in the tunnel, remove the rust products of the corroded anchor rod with hydrochloric acid solution, then neutralize it with 3% sodium carbonate solution, finally wash it with clean water and put it in an oven for drying; Weigh the anchor rod after rust removal to obtain the mass of the anchor rod after rusting m c , compared with the mass m of the uncorroded anchor rod of the same specification and length, the actual mass loss due to corrosion Δm is further obtained; Finally, the anchor corrosion rate is calculated. The calculation formula of the corrosion rate is as follows: Among them, ρ is the actual corrosion rate.

3. The method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is described in claim 2, characterized in that: In step S1, the mechanical parameters of the corroded anchor include yield strength, ultimate strength and ultimate strain, and the calculation formulas are as follows: e suc =e -3.789ρ e su0 (4) Among them, f yc 、f uc , ε suc are the yield strength, ultimate strength and ultimate strain of the corroded anchor respectively; f y0 、f u0 , ε su0 are the yield strength, ultimate strength and ultimate strain of the corresponding non-corroded anchor rods, respectively.

4. The method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is described in claim 3, characterized in that: In step S2, the combined structural interface bonding constitutive model of the corroded anchor bolt is determined, and the specific operation is as follows: S21. Determine the size of the surrounding rock-mortar-anchor rod combination structure, make the surrounding rock-mortar-anchor rod combination structure, and obtain the combination structure of anchor rods with different corrosion rates through electrical acceleration test; S22, the bond strength-slip curve of the anchor-grouting interface with different corrosion rates is obtained through pull-out test; S23. Based on the bond strength-slip curve, the bond-slip constitutive model between the anchor bolt and the grouting body interface under different corrosion rates was fitted by statistical theory. The calculation formula is as follows: Wherein, τ is the bond strength of the corroded anchor-grouting interface; S is the bond slip of the corroded anchor-grouting interface; It is a parameter to consider the effect of anchor corrosion on interface strength.

5. The method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is described in claim 4, characterized in that: In step S3, a surrounding rock-primary support-secondary lining stratum structure model considering anchor corrosion is established, and the calculation model is a stratum structure model, and the surrounding rock, grouting material, anchor, initial support concrete, and secondary lining are simulated with solid units; Among them, nonlinear springs are used for anchor rods and grouting materials to achieve the bond slip between the two; contact units are used between surrounding rock-primary support and primary support-secondary lining to simulate the force transmission.

6. The method for determining the secondary lining load sharing ratio after the initial support anchor of a tunnel is described in claim 5, characterized in that: In step S5, the secondary lining load sharing ratio after anchor rod corrosion is calculated as follows: λ=q2(ρ) / q1(ρ) (6) Among them, q2(ρ) is the contact stress between the initial support and the secondary lining after considering the corrosion of the anchor rod; q1(ρ) is the contact stress between the surrounding rock and the initial support after considering the corrosion of the anchor rod; λ is the load sharing ratio of the secondary lining that changes with the corrosion rate of the anchor rod.

Citation Information

Patent Citations

  • Method for designing tunnel composite lining based on total safety factor process

    CN109667598A

  • Method and device for calculating load sharing ratio of tunnel composite lining and terminal equipment

    CN115935475A