Method, access network node and user equipment

By transmitting energy-saving instructions to user equipment in the 5G wireless communication system, allowing access network nodes to apply energy-saving operations within the time period, the problem of difficult to achieve dynamic sleep mode and fine-grained energy-saving in the prior art is solved, and more efficient Network energy saving.

CN119072965APending Publication Date: 2024-12-03NEC CORP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202380036041.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-04-26
Filing Date
2023-04-10
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The prior art is difficult to realize dynamic sleep mode and fine-grained energy-saving operations in 5G wireless communication systems, resulting in the base station being unable to flexibly shut down the cells when the load is insufficient, increasing network energy consumption.

Method used

By transmitting the first information to the user equipment, the access network node is instructed to apply energy-saving operations in continuous subframes within the time period, and includes energy-saving configuration parameters in the system information, allowing the user equipment to select resources according to needs, and realize dynamic and fine-grained Energy-saving adaptation.

Benefits of technology

It realizes energy-saving operations that adapt to the current load conditions without completely shutting down work and not unloading user equipment, reduces the energy consumption of the base station, and supports fine-grained dynamic energy-saving mode.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119072965A_ABST
    Figure CN119072965A_ABST
Patent Text Reader

Abstract

A system is disclosed in which a base station (5) transmits, to a user equipment (UE) (3), first information for indicating whether to apply a power saving operation for each of a plurality of blocks of consecutive subframes within a period of time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to wireless communication systems and devices thereof operating in accordance with the 3rd Generation Partnership Project (3GPP) standards or their equivalents or derivatives. The present disclosure particularly, but not exclusively, relates to energy saving techniques in so-called "5G" or "new air interface" systems (also referred to as "next generation" systems) and similar systems. Background Art

[0002] Under the 3GPP standard, a NodeB (or "eNB" in LTE, "gNB" in 5G) is a base station via which a communication device (user equipment or "UE") is connected to the core network and communicates with other communication devices or remote servers. The so-called Radio Resource Control (RRC) protocol is used to control the communication between the UE and the base station. The communication device may be, for example, a mobile communication device such as a mobile phone, a smart phone, a smart watch, a personal digital assistant, a laptop / tablet computer, a web browser, an e-book reader, and / or the like. Such mobile (or even generally stationary) devices are typically operated by a user (so they are often collectively referred to as user equipment "UE"), although Internet of Things (IoT) devices and similar machine type communication (MTC) devices may also be connected to the network. For simplicity, this application will use the term base station to refer to any such base station, and the term mobile device or UE to refer to any such communication device.

[0003] The latest developments in 3GPP standards are the so-called "5G" or "New Radio" (NR) standards, which refer to evolved communication technologies that are expected to support a variety of applications and services, such as MTC / IoT communications, vehicle communications and autonomous vehicles, high-resolution video streaming, smart city services, and / or the like. 3GPP intends to support 5G through the so-called 3GPP Next Generation (NextGen) Radio Access Network (RAN) and 3GPP NextGen Core (NGC) networks. Various details of 5G networks are described in, for example, the Next Generation Mobile Network (NGMN) Alliance's "NGMN 5G White Paper" V1.0 (the document is available at https: / / www.ngmn.org / 5g-white-paper.html).

[0004] An end-user communication device is typically referred to as a user equipment (UE), which may be operated by a person or include an automated (MTC / IoT) device. Although the base stations of a 5G / NR communication system are typically referred to as new radio base stations ("NR-BS") or as "gNBs", it will be understood that they may be referred to using the term "eNB" (or 5G / NR eNB) more typically associated with a Long Term Evolution (LTE) base station (also commonly referred to as a "4G" base station). 3GPP Technical Specification (TS) 38.300 V16.7.0 and 3GPP TS 37.340 V16.7.0 define the following nodes, among others:

[0005] gNB: A node that provides NR user plane and control plane protocol termination towards the UE and is connected to the 5G Core Network (5GC) via the NG interface.

[0006] ng-eNB: A node that provides Evolved Universal Terrestrial Radio Access (E-UTRA) user plane and control plane protocol termination towards the UE and is connected to the 5GC via the NG interface.

[0007] En-gNB: A node that provides NR user plane and control plane protocol termination towards the UE and acts as a secondary node in E-UTRA-NR Dual Connectivity (EN-DC).

[0008] NG-RAN node: gNB or ng-eNB.

[0009] The term base station or RAN node is used herein to refer to any such node.

[0010] The energy consumption of base stations and other similar access network nodes represents the main operating expenditure of network operators. There are various tools for saving energy on the network side. For example, capacity cells (i.e., cells deployed to assist certain areas during peak hours) can be turned off, and neighboring cells know whether the capacity cells are available. This function allows optimizing energy consumption, for example, in deployments where capacity enhancers can be distinguished from cells providing basic coverage, thereby making it possible to: when the capacity of an E-UTRA cell or an E-UTRA-new air interface dual connectivity (EN-DC) cell providing additional capacity via single connectivity or dual connectivity is no longer needed, the E-UTRA cell or the EN-DC cell is turned off, and the E-UTRA cell or the EN-DC cell is reactivated as needed. Consistent with the configured information, the decision is typically based on cell load information. The decision to turn off can also be made by operation and maintenance (O&M).

[0011] The base station may initiate a handover action to unload the cell being switched off, and may indicate the reason for the handover using an appropriate cause value, for example to support the target node in taking subsequent actions when selecting a target cell for a subsequent handover. The configured information typically includes the base station's ability to perform autonomous cell switch-off, and the base station's ability to request the reactivation of a configured list of dormant cells owned by a peer base station. The O&M may also configure the strategy used by the base station for cell switch-off decisions, and the strategy used by the peer base station to request the reactivation of dormant cells.

[0012] From a physical point of view, if at least one channel is active, the cell is on and consumes most of its power. Any additional channel represents a marginal increase in power consumption, so from a network energy saving point of view, it is preferable to have the cell fully on using about 100% of its capacity or to have the cell completely off. Summary of the invention

[0013] Problem that the invention aims to solve

[0014] Typically, the network may decide to switch off an entire cell if the load is insufficient and the UE can be offloaded to a neighboring cell. However, this may not always be feasible (e.g. for a covering cell) if no other cells are available (as the network still has to ensure service to the UE). Furthermore, in some cases, switching off an entire cell will result in neighboring cells using more power (to enhance their coverage) than would be saved for the cell being switched off. It will also result in some overhead signaling associated with the handover of the UE to a suitable neighboring cell.

[0015] There are other methods to save energy at the network (base station), such as:

[0016] - Save spectrum: do not transmit on the full bandwidth (the base station uses only a portion of its available spectrum by managing bandwidth portions);

[0017] - Save the covered space: do not transmit power in some areas covered by the cell;

[0018] - Save power: transmit at lower power (which effectively reduces cell coverage and / or throughput); and

[0019] - Save time: do not transmit during certain time periods (in this case, the network may configure long periodicity for signaling channels, e.g. up to every 160 ms for SSS / PSS, MIB and PRACH).

[0020] In more detail, certain features can be independently "turned off" for relatively short periods of time:

[0021] - Transmit synchronization signals (primary synchronization signal (PSS) and secondary synchronization signal (SSS)) and master information block (MIB) with a periodicity of 5ms, 10ms, 20ms, 40ms, 80ms or 160ms;

[0022] - Broadcasting of System Information Block Type 1 (SIB1) with a periodicity of 160 ms and a variable transmission repetition periodicity within 160 ms;

[0023] - Other SIBs may be broadcast every 8, 16, 32, 64, 128, 256 or 512 radio frames (1 radio frame = 10 ms) with a different periodicity indicated by SIB1;

[0024] - The Physical Random Access Channel (PRACH) can be configured from every 1 ms to every 160 ms; and

[0025] - The control channel and the data channel may be configured by the base station per UE, so depending on the UE traffic requirements, there may be time periods with no uplink (UL) or downlink (DL) transmission in the cell of the base station.

[0026] Therefore, in conventional systems, a cell can be virtually turned off for up to 160ms by limiting the broadcast of signaling channels and configuring data resources and transmitting the channels around the time when the cell is turned on. However, this method is not flexible because it is limited by the PSS / SSS periodicity used and the PRACH spanning 16 radio frames (160ms) and does not provide fine granularity.

[0027] The network can schedule UL resources and DL resources to be simultaneous and not transmit / receive data the rest of the time to achieve some energy savings. The network can also adjust the coverage of the cell by increasing / decreasing the transmission power. If appropriate, load balancing can be done between neighboring cells with handover or dual connectivity.

[0028] However, existing solutions do not provide a dynamic sleep mode (on / off mode) because cell shutdown is a one-time process. In addition, the network can only periodically shut down signaling, not data transmission.

[0029] Using these conventional methods, the cell is completely switched off, which means that the cell completely "disappears" (i.e. the cell becomes unavailable to all UEs), typically for very long periods of time (e.g., at night). The UEs must therefore be redirected to another cell, which is therefore only applicable to capacity cells, i.e., not possible for coverage cells. It is not possible to configure the UE to return to the cell automatically (or in a planned manner), since any redirected UE can only return to the cell via conventional cell reselection when the cell comes back up again.

[0030] From Release 18 onwards, new types of system information can be used for more flexible cell sleep modes (e.g., "micro-sleep"). It is also envisioned to allow UE-triggered base station wake-up and generally provide UE assistance for network energy saving. 3GPP intends to prioritize idle / empty and low / medium load scenarios (the exact definition of such load has not yet been agreed).

[0031] Therefore, it is necessary to utilize potential support / feedback from UE to achieve more efficient energy-saving operation through dynamic and / or semi-static and finer-grained adaptation of transmission and / or reception of base stations in one or more network energy-saving technologies in time domain, frequency domain, space domain and power domain.

[0032] Solutions for solving problems

[0033] The present disclosure therefore seeks to provide methods and associated apparatus for solving or at least alleviating (at least some of) the problems set out above.

[0034] In one aspect, the present disclosure provides a method performed by an access network node, the method comprising: transmitting first information to a user equipment, i.e., UE, wherein the first information is used to indicate, for each block of multiple blocks of consecutive subframes within a time period, whether the access network node applies an energy-saving operation to the one block of the multiple blocks of the consecutive subframes.

[0035] In one aspect, the present disclosure provides a method performed by a user equipment, i.e., UE, comprising: receiving first information from an access network node, the first information being used to indicate, for each block of multiple blocks of consecutive subframes within a time period, whether the access network node applies an energy-saving operation to the one block of the multiple blocks of the consecutive subframes.

[0036] In one aspect, the present disclosure provides an access network node, comprising: a component (e.g., a memory, a controller, and a transceiver) for transmitting first information to a user equipment (UE), wherein the first information is used to indicate, for each of a plurality of blocks of consecutive subframes within a time period, whether the access network node applies an energy-saving operation to the one of the plurality of blocks of the consecutive subframes.

[0037] In one aspect, the present disclosure provides a user equipment (UE), comprising: a component (e.g., a memory, a controller, and a transceiver) for receiving first information from an access network node, wherein the first information is used to indicate, for each block of multiple blocks of consecutive subframes within a time period, whether the access network node applies an energy-saving operation to the one block of the multiple blocks of the consecutive subframes.

[0038] Aspects of the present disclosure extend to corresponding systems, apparatus and computer program products such as computer-readable storage media storing instructions, which are operable to program a programmable processor to perform the methods as set out above or described in the aspects and possibilities recited in the claims and / or to program a suitably adapted computer to provide the apparatus recited in any of the claims.

[0039] Although the present disclosure will be described in detail in the context of a 3GPP system (5G network) for efficiency of understanding by those skilled in the art, the principles of the present disclosure may also be applied to other systems.

[0040] The present disclosure is defined by the accompanying claims. Aspects of the present disclosure are set out in the independent claims. Some optional features are set out in the dependent claims.

[0041] However, each feature disclosed in this specification (which term includes the claims) and / or shown in the drawings may be incorporated into the present disclosure independently of (or in combination with) any other disclosed and / or exemplified feature. In particular, but not limitingly, features of any claim in a claim dependent upon a particular independent claim may be introduced into that independent claim in any combination or alone. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] Embodiments of the present disclosure will now be described by way of example with reference to the accompanying drawings, in which:

[0043] Figure 1 Schematically illustrate a mobile (cellular or wireless) telecommunication system to which embodiments of the present disclosure may be applied;

[0044] Figure 2 is formed Figure 1 A schematic block diagram of a mobile device that is part of the system shown;

[0045] Figure 3 is formed Figure 1 A schematic block diagram of an access network node (e.g., a base station) that is part of the system shown;

[0046] Figure 4 is formed Figure 1 A schematic block diagram of a core network node that is part of the system shown;

[0047] Figure 5 is exemplified in Figure 1 A schematic signaling (timing) diagram of an exemplary manner in which network energy saving can be achieved in the system shown;

[0048] Figure 6 is exemplified in Figure 1A schematic signaling (timing) diagram of an exemplary manner in which network energy saving can be achieved in the system shown;

[0049] Figure 7 is exemplified in Figure 1 A schematic signaling (timing) diagram of an exemplary manner in which network energy saving can be achieved in the system shown; and

[0050] Figure 8 is exemplified in Figure 1 A schematic signaling (timing) diagram of an exemplary manner in which network energy saving can be achieved in the system shown. DETAILED DESCRIPTION

[0051] Overview

[0052] Figure 1 A mobile (cellular or wireless) telecommunication system 1 is schematically illustrated to which embodiments of the present disclosure may be applied.

[0053] In this system 1, users of mobile devices 3 (UE) can communicate with each other and other users via base stations 5 (and other access network nodes) and a core network 7 using appropriate 3GPP radio access technologies (RATs) (e.g., Evolved Universal Terrestrial Radio Access (E-UTRA) and / or 5G RAT). It will be appreciated that a plurality of base stations 5 form a (radio) access network or (R)AN. As will be appreciated by those skilled in the art, although for purposes of illustration only the base stations 5 are described in detail below. Figure 1 Two mobile devices 3A and 3B and one base station 5 are shown, but the system will typically include other base stations / (R)AN nodes and mobile devices (UEs) when implemented.

[0054] Each base station 5 controls (either directly or via other nodes such as home base stations, repeaters, remote radio heads, distributed units, and / or the like) one or more associated cells 6. Base stations 5 that support next generation / 5G protocols may be referred to as "gNBs." It will be understood that some base stations 5 may be configured to support both 4G and 5G, and / or any other 3GPP or non-3GPP communication protocols.

[0055] The mobile device 3 and its serving base station 5 are connected via a suitable air interface (e.g., a so-called "NR" air interface, a "Uu" interface, and / or the like). Neighboring base stations 5 are connected to each other via a suitable base station-to-base station interface (such as a so-called "Xn" interface, an "X2" interface, and / or the like). The base stations 5 are also connected to the core network nodes via a suitable interface (such as a so-called "NG-U" interface (for the user plane), a so-called "NG-C" interface (for the control plane), and / or the like).

[0056] The core network 7 (e.g., EPC in the case of LTE or NGC in the case of NR / 5G) typically includes logical nodes (or "functions") for supporting communications in the telecommunications system 1 and for subscriber management, mobility management, charging, security, call / session management (among others). For example, the core network 7 of a "next generation" / 5G system will include user plane entities and control plane entities, such as one or more control plane functions (CPFs) 10 and one or more user plane functions (UPFs) 11. For example, the so-called access and mobility management function (AMF) in 5G or the mobility management entity (MME) in 4G is responsible for handling connection and mobility management tasks for mobile devices 3, and the session management function (SMF) is responsible for handling communication sessions for mobile devices 3, such as session establishment, modification and release. The core network 7 is coupled (via the UPF 11) to a data network 20, such as the Internet or a similar Internet Protocol (IP) based network.

[0057] In the system 1, UE-assisted network energy saving is achieved based on one or more of the following features:

[0058] - Parameters indicating the Energy Saving (ES) configuration used by the base station 5. The ES configuration includes at least one of the following:

[0059] -- A mapping at a certain on / off time granularity within a certain time period (e.g., 32 bits may be used for a granularity of five subframes over a 160 ms period); and

[0060] --Indication of the affected functionality to be turned on / off (including, for example, synchronization signals, MIB, SIB, PRACH, configured grants, retransmissions, scheduled PUSCH / PDSCH transmissions).

[0061] - The ES configuration is transmitted to the UE 3 in an RRC message (eg, RRC Reconfiguration / RRC Connection Reconfiguration message) or in system information.

[0062] - The UE 3 selects available resources according to the ES configuration signaled by the base station 5 .

[0063] - An optional parameter in system information (eg, minimum system information, such as MIB or SIB1, etc.) indicates whether the UE 3 should inform the base station 5 whether the UE 3 supports network energy saving.

[0064] - The UE 3 reports its energy saving capabilities (if requested via system information).

[0065] - System information is updated by the base station 5 following an ES configuration update (including potential offloading of non-ES capable UEs 3 and indication of the ES configuration for the remaining UEs 3).

[0066] In practice, the mapping information or parameters transmitted to the UE 3 may be referred to as first information for identifying the energy saving configuration applied by the access network node (in this case, the base station 5). The mapping for the energy saving configuration indicates, for each of a plurality of blocks of consecutive subframes within a period (e.g., using 1 bit for every five subframes in a 160ms period), whether an energy saving operation is applied by the access network node for the block of consecutive subframes. The indication of the affected functionality may be referred to as second information for identifying at least one functionality affected by the energy saving operation. The energy saving capability of the UE may be referred to as third information for identifying the capability of the UE to support the energy saving configuration.

[0067] Advantageously, using the above method, a dynamic energy saving mode with fine granularity can be provided, wherein the network (base station 5) can adapt its operation to the current load conditions without necessarily having to shut down completely and without having to offload the UE 3 to a neighboring cell. This is possible because the ES configuration includes information for identifying the on / off mode of the cell 6 (i.e., the "first information").

[0068] The above approach enables non-dedicated resources (such as broadcast and PRACH etc.) to be configured only when dedicated resources are also being configured, this pattern is load and latency dependent, and the cell 6 can be switched off the rest of the time.

[0069] The energy saving method is backward compatible and legacy UEs can still access the cell 6 or they can be redirected using legacy procedures if necessary.

[0070] User Equipment (UE)

[0071] Figure 2 is an example Figure 1 3 is a block diagram of the main components of a mobile device (UE) 3. As shown, the UE 3 includes a transceiver circuit 31 that is operable to transmit signals to and receive signals from a connected node (or nodes) via one or more antennas 33. Although not necessarily Figure 2 3, but of course the UE 3 will have all the common functionality of a conventional mobile device (such as a user interface 35 etc.), and this may be provided by any one or any combination of hardware, software and firmware as appropriate. The controller 37 controls the operation of the UE 3 according to the software stored in the memory 39. For example, the software may be pre-installed in the memory 39 and / or may be downloaded via the telecommunications network 1 or from a removable data storage device (RMD). The software includes an operating system 41, a communication control module 43 and an energy saving module 45, among others.

[0072] The communication control module 43 is responsible for handling (generating / sending / receiving) signaling messages and uplink / downlink data packets between the UE 3 and other nodes (including the (R)AN node 5 and the core network node). The signaling may include control signaling related to energy-saving operations (e.g., via system information or RRC). It will be understood that the communication control module 43 may include multiple submodules ("layers" or "entities") to support specific functionality. For example, the communication control module 43 may include a PHY submodule, a MAC submodule, an RLC submodule, a PDCP submodule, a SDAP submodule, an IP submodule, an RRC submodule, etc.

[0073] The energy saving module 45 is responsible for energy saving related operations (of the UE 3 itself and / or of a network node such as an access network node / base station 5). Energy saving is usually achieved by shutting down certain components (eg, the transceiver circuit 31) during certain periods.

[0074] Access network node (base station)

[0075] Figure 3 is an example Figure 1 5 is a block diagram of the main components of the base station 5 (or similar access network node) shown. As shown, the base station 5 includes a transceiver circuit 51, which is operable to transmit signals to and receive signals from the connected (one or more) UE 3 via one or more antennas 53, and to transmit signals to and receive signals from other network nodes via a network interface 55 (directly or indirectly). The network interface 55 typically includes an appropriate base station-base station interface (such as X2 / Xn, etc.) and an appropriate base station-core network interface (such as S1 / N1 / N2 / N3, etc.). The controller 57 controls the operation of the base station 5 according to the software stored in the memory 59. For example, the software can be pre-installed in the memory 59 and / or can be downloaded via the telecommunications network 1 or from a removable data storage device (RMD). The software includes an operating system 61, a communication control module 63 and an energy saving module 65, among others.

[0076] The communication control module 63 is responsible for handling (generating / sending / receiving) signaling between the base station 5 and other nodes (such as UE 3 and core network nodes, etc.). The signaling may include control signaling related to energy-saving operations (e.g., via system information or RRC). It will be understood that the communication control module 63 may include multiple submodules ("layers" or "entities") to support specific functionality. For example, the communication control module 63 may include a PHY submodule, a MAC submodule, an RLC submodule, a PDCP submodule, an SDAP submodule, an IP submodule, an RRC submodule, etc.

[0077] The energy saving module 65 is responsible for operations related to energy saving (of the UE 3 and / or the access network node / base station 5 itself). Energy saving is usually achieved by shutting down certain components (e.g., the transceiver circuit 51) during certain periods of time. For example, the energy saving module 65 can obtain information related to the energy saving capability of the UE from other nodes.

[0078] Core network functions

[0079] Figure 4 is an example of a common core network function (such as Figure 1 10 or UPF 11, etc. shown in the figure). As shown, the core network function includes a transceiver circuit 71, which is operable to transmit signals to other nodes (including UE 3, base station 5 and other core network nodes) via a network interface 75 and receive signals from these other nodes. The controller 77 controls the operation of the core network function according to the software stored in the memory 79. For example, the software can be pre-installed in the memory 79 and / or can be downloaded via the telecommunications network 1 or from a removable data storage device (RMD). The software includes an operating system 81, a communication control module 83 and an energy saving module 85 (the energy saving module 85 may be optional) and others.

[0080] The communication control module 83 is responsible for handling (generating / sending / receiving) signaling between the core network functions and other nodes (such as UE 3, base station 5 and other core network nodes, etc.). The signaling may include, for example, UE context / UE capability indication of UE 3 related to energy saving.

[0081] If present, the energy saving module 85 is responsible for energy saving related operations (eg, of the UE 3 and / or of the access network node / base station 5). For example, the energy saving module 85 may provide information related to the energy saving capabilities of the UE to the base station 5.

[0082] Detailed description

[0083] The following are references Figures 5 to 8 Yes Figure 1 An illustration of how UE-assisted network energy saving can be achieved in the system 1 shown.

[0084] The following exemplary categories may be used to define network load (base station / cell load):

[0085] Case 1: No active UEs (0% load) - In this case, the cell may be completely switched off, but some UEs 3 may be camping on the cell and relying on it for future DL / UL data.

[0086] Case 2: Few active UEs (5-20% load) - In this case, the cell can be switched off and the UEs 3 can be offloaded to a neighbouring cell, but some UEs 3 may require high QoS which is only achievable in this cell.

[0087] Case 3: Medium load (20-50%) - In this case, cells are switched off (if possible), which will result in handover overhead and may not be energy efficient for the UE 3 and the network in general. In this case, other approaches such as smart scheduling may be more efficient.

[0088] Case 4: High but not full load (50-80%) - In this case, cell switching off should not be considered. However, the cell is not being utilized to its maximum potential and at least some network energy savings should be achieved.

[0089] It will be appreciated that, using the above definition, a cell may be considered to have a "full load" above 80% (or any ratio between 80% and 100%).

[0090] As described above, using the conventional approach, cell 6 is completely switched off, which means that cell 6 completely "disappears" (e.g., at night). Therefore, UE 3 must be redirected to another cell 6, and when that cell 6 appears again, UE 3 can only return to that cell 6 via conventional cell reselection. The conventional approach provides six different configurations for SSS / PSS / MIB. Of these six possible configurations, one configuration is "always on". Thus, there are only five configurations in which, if PRACH and other channels are configured accordingly, cell 6 can be effectively switched off and not consume power, or be in standby and consume only a relatively low amount of power.

[0091] In all cases, it may be beneficial to avoid completely switching off cells 6 for long periods of time and to use a relatively finer granularity for cell switching. Energy saving should also take into account the load level of the cells 6 / base stations 5 .

[0092] Thus, in this system 1, a dynamic cell shut-down method is used.

[0093] In more detail, the base station 5 is "switched off", or in other words, is unavailable for reception and transmission only for a short period of time, which can be dynamically planned and notified to the UE 3. The UE 3 may not need to leave the cell 6 during the period when the cell 6 is "switched off", and once the cell 6 is available again, the UE 3 can continue to use the cell 6 without any specific procedures.

[0094] Furthermore, the base station 5 may decide to put only certain functionalities to sleep while keeping other functionalities (ie no complete shutdown is required).The approach may be dynamically adapted depending on traffic load and UE requirements.

[0095] Indeed, since it is preferred to have the entire cell 6 (all relevant functionality) switched off simultaneously, it is proposed to have a "mask" that can be applied on top of the configured resources to indicate whether the cell 6 will receive / transmit during a specified time period. Figure 5 Some examples of these masks are illustrated in .

[0096] However, the mask (or on / off mode) can be adapted to be valid only for certain functions. For example, the on / off mode can be applied to one or more of the following items: synchronization signals, MIB, SIB, PRACH, configured physical uplink control channel (PUCCH) resources / physical downlink control channel (PDCCH) resources, configured grants and retransmissions, and other configured physical downlink shared channel (PDSCH) transmissions / physical uplink shared channel (PUSCH) transmissions.

[0097] Therefore, depending on the load conditions and UE requirements, the base station 5 may skip some traditionally configured SIBs or PRACHs (to achieve some energy saving) or even cancel some data transmissions to achieve more energy saving (ie, the cell decides to shut down and UL or DL ​​data is placed in a buffer).

[0098] To determine the appropriate granularity for energy saving configuration (on / off mode), the following issues are considered.

[0099] - Regarding the lower bound of applicable granularity:

[0100] --PSS / SSS and MIB can be scheduled up to every 5ms, and other channels can be scheduled with 1ms granularity.

[0101] - From a physical point of view, power amplifier ramp-up and ramp-down may be a limitation, ie the cell 6 cannot be switched on / off with too small a periodicity.

[0102] -- A minimum lower bound of 5 ms seems to be sufficient (ie, half a radio frame).

[0103] -About the upper limit of applicable granularity:

[0104] - PSS / SSS is scheduled at least every 160ms, if cell 6 is switched off for a longer period, a legacy neighbouring UE 3 close to cell 6 may not be able to detect cell 6 if it cannot detect PSS / SSS in this 160ms interval.

[0105] -- An upper bound of maximum 160ms (i.e. 16 radio frames) seems to be needed for backward compatibility (if backward compatibility is required).

[0106] However, it will be appreciated that future applications may also be lower than the proposed 5 ms granularity (eg, for short transmission time interval applications and / or in frequency range 2 applications) or higher than 160 ms.

[0107] Figure 5 Some exemplary options for achieving energy saving by the base station 5 are schematically illustrated. In this example, the base station 5 is active only in some time periods with a granularity of five subframes over a 160ms period, depending on the applicable configuration. Figure 5 In the example used in , each rectangle represents a group of five subframes.

[0108] The striped subframe (group) indicates that resources are available if configured by conventional means, and the black subframe (group) indicates that no resources are available even if otherwise configured by conventional techniques. When resources are available, the cell / base station is "ON", and when no resources are available, the cell / base station (at least the components related to transmission and UE control) is effectively "OFF".

[0109] Figure 5 Example 1 of corresponds to a 20ms periodicity. However, in this solution, varying loads can be considered with a granularity of about 3% (e.g. about 30% load in Example 2). As can be seen, the period of activity can be flexible, as in Example 3, to avoid frequent startups and shutdowns. The solution can also be adapted to network energy saving in the case of higher loads (e.g. 75% load) as shown in Example 4.

[0110] Rationale

[0111] The base station 5 decides to use an energy saving configuration that includes a mapping of on / off times over a repetitive time period (e.g., a 160 ms period in this example). For example, the mapping may be for each subframe group (e.g., Figure 5 The group of five subframes in the subframe group includes 1-bit information for indicating whether the cell is turned on or off during the subframe group. The 1-bit information can be set to a first value (e.g., "1") for these subframe groups for network energy saving on (i.e., cell off), and set to a second value (e.g., "0") for these subframe groups for network energy saving off (i.e., cell on), or vice versa. It will be understood that any other suitable mapping granularity and / or mapping value can be used.

[0112] The base station 5 may also provide an indication of which functionality (eg PRACH, SIB and retransmission) is switched off when network energy saving is on. The base station 5 broadcasts the current energy saving configuration to the UEs 3 in its cell 6 .

[0113] The UEs 3 may be configured to combine their legacy configuration (eg discontinuous reception / transmission and / or configured grants) with the energy saving configuration of the cell 6 to determine the timing of the next available resource in the cell 6 .

[0114] In this example with a fully flexible 5 ms granularity over 160 ms, 32 bits of signaling are required. However, since most power saving configurations may not be practical, and since there are many similar possible modes, it will be appreciated that fewer bits may be sufficient (e.g., 16 bits).

[0115] The legacy resource configuration is applicable only during the "on" times, so the low periodicity of system information may be applied during these times (e.g., high PRACH configuration, but only every fifth set of five subframes). Furthermore, the "on" times are only determined as resources may be available, and resources will actually be available only if they would have been available using the legacy configuration (the mapping acts as an "AND" function).

[0116] However, this solution may not be backward compatible. A legacy UE 3 (in this case, a UE supporting an earlier version) will be able to decode the normal SI and:

[0117] - These UEs 3 may not find the PSS / SSS not transmitted during the off time and think the cell is lost; and / or

[0118] - These UEs 3 may use RACH during the off-time and "fail" (the base station 5 is not listening, so there is no random access response), which results in unnecessary and potentially interfering power ramping.

[0119] To make this solution backwards compatible, two options are proposed:

[0120] - Apply the energy saving configuration only in specific bandwidth parts where the network knows that the UE 3 supports network energy saving. This option has the advantage of being easy to implement, but the energy saving gains may be limited because the initial bandwidth parts that are backward compatible will not implement more sophisticated network energy saving techniques.

[0121] - Put the cell into legacy sleep and apply handover to legacy UEs 3 while keeping energy saving capable UEs 3 in the cell. This option will allow the full potential of network energy saving, but there may be interference issues for UEs 3 close to (still partially switched on) cells that are handed over to neighbour cells.

[0122] Solution 1

[0123] This solution is a practical implementation of the above-mentioned advanced solution. The base station 5 is active only during the time period (applicable to each BWP in the cell 6) and the energy saving configuration is signaled in the system information. However, since the base station 5 may act as a conventional base station or the base station 5 may not be in energy saving mode in some scenarios (in which case no energy saving related information needs to be transmitted), the energy saving configuration may be an optional parameter.

[0124] UE 3 obtains information identifying the on / off times (power saving configuration) before they make initial access so that UE 3 knows where system information and RACH resources are available. Preferably, this information is provided as part of the minimum system information (MIB or SIB1) in the cell 6. UE 3 behavior for system information monitoring and RACH resource selection is based on this information.

[0125] After initial access, the UE 3 may be made aware of any energy saving configuration updates by updating system information or by transmitting the updated energy saving configuration to the UE 3 using higher layer signaling (eg, RRC).

[0126] Note that this method may also be implemented for legacy UEs 3 if cell 6 uses conventional switching techniques (including handover) for legacy UEs 3 while being in the above-described pattern-based energy saving mode for compatible UEs 3 (eg, Release 18 and higher UEs).

[0127] Figure 6 The overall process for network energy saving according to Solution 1 is illustrated. As generally shown in step S101, an applicable network energy saving configuration (ES configuration) is indicated via system information (eg, minimum system information).

[0128] In step S102, UE 3 (in this case, a UE compatible with the ES configuration) selects available PRACH resources based on the energy saving configuration, and proceeds to initial access / RRC setup in step S103. In step S104, the network / base station 5 confirms that the RRC setup is complete. From this point on, UE 3 and base station 5 use the energy saving configuration indicated in step S101.

[0129] As generally shown in steps S106 and S107, the base station 5 may update the energy saving configuration applied in its cell 6 to indicate the updated energy saving configuration to the UE 3 using an appropriately formatted RRC message (e.g., an RRC reconfiguration or RRC connection reconfiguration message). The updated energy saving configuration may, for example, be included in an RRC message that allocates a bandwidth portion (e.g., a first bandwidth portion) to the UE 3. It will be appreciated that such an update of the energy saving configuration may be triggered by the arrival / initial access of the UE 3 in the cell 6 (or a subsequent arrival of another UE). The update may involve at least one of the mapping / granularity used in the cell 6 and the functionality affected.

[0130] Despite Figure 6 Not shown, but the updated energy saving configuration may also be broadcast via system information so that new UEs may arrive at cell 6 based on the updated configuration (and existing UEs may update their operations accordingly).

[0131] Solution 2

[0132] This is effectively the same as solution 1, but is implemented per bandwidth portion to improve backward compatibility and allow for potentially longer off periods than 160ms. Figure 7 and Figure 8 Two exemplary implementations of this solution are illustrated in .

[0133] An initial bandwidth portion is used for each UE 3, where conventional energy saving tools (except complete shutdown) are typically implemented on this bandwidth portion. Thus, the UE 3 can be configured to perform a conventional initial access procedure (i.e., in this initial bandwidth portion, all resources are available, so the UE 3 does not have to apply a mask / mode at this stage). In this solution, information identifying the applicable energy saving configuration is provided by the base station 5 during RRC reconfiguration when the first bandwidth portion is allocated to the UE 3.

[0134] In this case, the network needs to know whether the UE 3 has energy saving capability to avoid allocating the UE 3 to a bandwidth portion with an incompatible energy saving configuration.

[0135] exist Figure 7 A first variant of Solution 2 is shown in FIG.

[0136] As can be seen, in step S201, the base station 5 broadcasts conventional system information, i.e., the system information does not include any information related to network energy saving (or such information can be ignored by the UE 3). Therefore, the UE 3 uses a conventional method to select a random access channel resource (step S202), and continues with the conventional initial access and RRC setup process (step S203), and then receives confirmation from the network that the RRC setup is complete (step S204).

[0137] Advantageously, the base station 5 may determine whether the UE 3 supports network energy saving from a UE context associated with the UE 3. Note: The energy saving capability of the UE forms part of the UE context.

[0138] For example, the base station 5 may be configured to perform any of the following processes (as generally illustrated in step S205):

[0139] 1) Obtain the UE's energy saving capabilities from a core network node (e.g., AMF) using the "UE Context Request" procedure (3GPP TS 38.413);

[0140] 2) Obtain the UE's energy saving capabilities from the neighboring base station 5 using the "Retrieve UE Context" procedure (3GPP TS 38.423);

[0141] 3) Obtain the UE's energy saving capability from the UE 3 itself using the "UECapabilityEnquiry" procedure (3GPP TS 38.331).

[0142] It will be appreciated that in the case of option 2), since the "UE Radio Capability ID" field is optional in the Retrieve UE Context Response, the base station 5 may be configured to explicitly query the UE for the energy saving capabilities.

[0143] Based on the capabilities of the UE (i.e., whether the UE 3 supports the energy saving adopted by the base station 5), in step S206, the base station 5 proceeds to allocate an appropriate bandwidth part (BWP) to the UE 3. It will be appreciated that step S206 may also involve updating the energy saving configuration applied in the cell 6 of the base station 5 as described above with reference to steps S106 and S107.

[0144] Once the appropriate bandwidth portion has been allocated, the base station 5 indicates the energy saving configuration to the UE 3 using an appropriately formatted RRC message (e.g., an RRC reconfiguration or RRC connection reconfiguration message) that allocates the bandwidth portion to the UE 3. It will be appreciated that the base station 5 may indicate a new energy saving configuration to the UE 3 whenever there is a need to update the configuration used in the cell 6 or the bandwidth portion used by the UE 3 (e.g., by repeating steps S206 and S207).

[0145] exist Figure 8 A second variation of solution 2 is shown in . In this case, UE 3 informs the network (base station 5) before the allocation of the first bandwidth portion.

[0146] As generally shown in step S301, the base station 5 broadcasts system information, which may include information (eg, a flag) indicating that the UEs 3 need to provide information about themselves related to supporting network energy saving.

[0147] In this example, UE 3 performs a conventional RACH procedure (step S302) and indicates its energy saving capability during initial access / RRC setup (step S303). It will be appreciated that if the system information does not request UE 3 to indicate its energy saving capability (or if UE 3 does not indicate its capability in response to the system information), the base station 5 may use the UECapabilityEnquiry procedure to obtain energy saving capability information from UE 3 (during or after initial access).

[0148] Steps S306 and S307 are the same as steps S206 and S207, respectively.

[0149] It will be appreciated that Solution 2 is compatible with the scenario where the base station 5 chooses to offload non-energy saving capable UEs 3 and retain cells for energy saving capable UEs 3 (similar to Solution 1).

[0150] Beneficially, the method is backward compatible.The method also provides finer granularity than existing energy saving methods, and the method can be adapted to any UE 3 during the connected phase (eg, still serving power users in a dedicated BWP).

[0151] Modifications and Replacements

[0152] Detailed embodiments have been described above. As will be appreciated by those skilled in the art, many modifications and substitutions may be made to the above embodiments while still benefiting from the disclosures embodied in these embodiments. Many of these substitutions and modifications will now be described only by way of example.

[0153] It will be understood that the above embodiments can be applied to both 5G new air interface and LTE system (E-UTRAN).The above embodiments can also be applied to future systems (beyond 5G, 6G, etc.).

[0154] Next generation mobile networks support diverse service requirements, which have been classified by the International Telecommunication Union (ITU) into three categories: enhanced mobile broadband (eMBB); ultra-reliable low latency communications (URLLC); and massive machine type communications (mMTC). eMBB aims to provide enhanced support for conventional mobile broadband, focusing on services that require large and guaranteed bandwidth, such as high-definition (HD) video, virtual reality (VR), and augmented reality (AR). URLLC is a requirement for key applications such as autonomous driving and factory automation, which require guaranteed access in a very short time. mMTC needs to support a large number of networked devices such as smart metering and environmental monitoring, but can usually tolerate a certain access delay. It will be understood that some of these applications may have relatively relaxed quality of service / quality of experience (QoS / QoE) requirements, while some applications may have relatively strict QoS / QoE requirements (e.g., high bandwidth and / or low latency). It will be understood that the energy saving methods described herein may be applicable to at least one category of UEs and / or at least one type of service in the above categories. Different energy saving methods (if any) may be applicable to different categories of UEs and / or different services.

[0155] In the above description, for ease of understanding, the UE, access network node (base station) and core network node are described as having multiple discrete modules (such as communication control modules, etc.). Although these modules may be provided in this way for certain applications, for example, in the case where an existing system has been modified to implement the present disclosure, in other applications, such as in a system designed from the outset to utilize the inventive features, these modules may be built into the entire operating system or code, and therefore these modules may not be discernible as discrete entities. These modules may also be implemented in software, hardware, firmware, or a mixture of these.

[0156] Each controller may include any suitable form of processing circuitry, including (but not limited to) for example: one or more hardware-implemented computer processors; microprocessors; central processing units (CPUs); arithmetic logic units (ALUs); input / output (IO) circuits; internal memory / cache (program and / or data); processing registers; communications buses (e.g., control, data and / or address buses); direct memory access (DMA) functionality; hardware or software-implemented counters, pointers and / or timers; and / or the like.

[0157] In the above embodiments, multiple software modules are described. As will be appreciated by those skilled in the art, the software modules may be provided in compiled or uncompiled form and may be supplied to the UE, access network node (base station) and core network node as a signal via a computer network or on a recording medium. In addition, one or more dedicated hardware circuits may be used to perform the functionality performed by part or all of the software. However, the use of software modules is preferred because software modules facilitate updating the UE, access network node and core network node to update their functionality.

[0158] It will be appreciated that the functionality of a base station (referred to as a "distributed" base station or gNB) may be split between one or more distributed units (DUs), where the CU typically performs higher level functions and communications with the Next Generation Core, and a central unit (CU), where the DU performs lower level functions and communications over the air interface with UEs in the vicinity (i.e., in the cell in which the gNB operates). A distributed gNB includes the following functional units:

[0159] gNB Central Unit (gNB-CU): A logical node hosting the Radio Resource Control (RRC), Service Data Adaptation Protocol (SDAP) and Packet Data Convergence Protocol (PDCP) layers of a gNB (or the RRC and PDCP layers of an en-gNB) that controls the operation of one or more gNB-DUs. The gNB-CU terminates the so-called F1 interface with the gNB-DUs.

[0160] gNB Distributed Unit (gNB-DU): A logical node that hosts the Radio Link Control (RLC), Medium Access Control (MAC) and Physical (PHY) layers of a gNB or en-gNB, and whose operation is partially controlled by the gNB-CU. One gNB-DU supports one or more cells. One cell is supported by only one gNB-DU. The gNB-DU terminates the F1 interface with the gNB-CU.

[0161] gNB-CU-Control Plane (gNB-CU-CP): The logical node hosting the RRC and control plane parts of the PDCP protocol for an en-gNB or a gNB-CU of a gNB. The gNB-CU-CP terminates the so-called E1 interface with the gNB-CU-UP and the F1-C (F1 control plane) interface with the gNB-DU.

[0162] gNB-CU-User Plane (gNB-CU-UP): The logical node that hosts the user plane part of the PDCP protocol for the gNB-CU of the en-gNB and the user plane part of the PDCP protocol and SDAP protocol for the gNB-CU of the gNB. The gNB-CU-UP terminates the E1 interface with the gNB-CU-CP and the F1-U (F1 User Plane) interface with the gNB-DU.

[0163] It will be appreciated that when a distributed base station or similar control plane-user plane (CP-UP) separation is employed, the base station may be separated into separate control plane entities and user plane entities, each entity may include associated transceiver circuits, antennas, network interfaces, controllers, memories, operating systems, and communication control modules. When the base station comprises a distributed base station, the network interface ( Figure 3 The reference numeral 55 in the figure also includes an E1 interface and an F1 interface (F1-C for the control plane and F1-U for the user plane) to communicate signals between the various functions of the distributed base station. In this case, the communication control module is also responsible for the communication between the control plane part and the user plane part of the base station (generating, sending and receiving signaling messages). It will also be understood that when using a distributed base station, it is not necessary to involve both the control plane part and the user plane part to seize communication resources as described in the above exemplary embodiments. It will be understood that the seizure can be handled by the user plane part of the base station without involving the control plane part (or vice versa).

[0164] The above embodiments may also be applied to "non-mobile" or generally stationary user equipment. The above mobile devices may include MTC / IoT devices and / or the like.

[0165] A user equipment (or "UE," "mobile station," "mobile device," or "wireless device") in the present disclosure is an entity connected to a network via a wireless interface.

[0166] It should be noted that the present disclosure is not limited to dedicated communication devices, and as explained in the following paragraphs, can be applied to any device having a communication function.

[0167] The terms "user equipment" or "UE" (as that term is used by 3GPP), "mobile station", "mobile device" and "wireless device" are generally intended to be synonymous with each other, and include standalone mobile stations, such as terminals, mobile phones, smartphones, tablets, cellular IoT devices, IoT devices and machines, etc. It will be understood that the terms "mobile station" and "mobile device" also cover devices that remain stationary for long periods of time.

[0168] UE can be, for example, a device for production or manufacturing and / or an energy-related machine (for example, equipment or machinery such as: boilers; engines; turbines; solar panels; wind turbines; hydroelectric generators; thermal generators; nuclear power generators; batteries; nuclear systems and / or related equipment; heavy electrical machinery; pumps including vacuum pumps; compressors; fans; blowers; oil pressure equipment; pneumatic equipment; metal processing machinery; manipulators; robots and / or their application systems; tools; injection molding molds or die-casting molds; reels; conveying equipment; lifting equipment; material handling equipment; textile machinery; sewing machines; printing and / or related machinery; paper processing machinery; chemical machinery; mining and / or construction machinery and / or related equipment; machinery and / or tools for agriculture, forestry and / or fisheries; safety and / or environmental protection equipment; tractors; precision bearings; chains; gears; power transmission equipment; lubrication equipment; valves; pipe fittings; and / or application systems of any of the aforementioned equipment or machinery; etc.).

[0169] A UE may be, for example, a transportation device (e.g., a transportation device such as a rolling stock; a motor vehicle; a motorcycle; a bicycle; a train; a bus; a cart; a rickshaw; ships and other watercraft; an airplane; a rocket; a satellite; a drone; a balloon; etc.).

[0170] UE may be, for example, an information and communication device (eg, information and communication devices such as: electronic computers and related devices; communication and related devices; electronic components; etc.).

[0171] UE can be, for example, a refrigerator, a product using a refrigerator, a trade and / or service industry equipment, a vending machine, an automatic service machine, an office machine or equipment, consumer electronics and electronic equipment (for example, consumer electronic devices such as: audio equipment; video equipment; speakers; radios; televisions; microwave ovens; rice cookers; coffee machines; dishwashers; washing machines; dryers; electric fans or related equipment; vacuum cleaners; etc.).

[0172] The UE may be, for example, an electrical application system or device (eg, an electrical application system or device such as: x-ray system; particle accelerator; radioisotope device; sonic wave device; electromagnetic application device; electronic power application device; etc.).

[0173] A UE may be, for example, an electronic lamp, a luminaire, a measuring instrument, an analyzer, a tester, or a mapping or sensing instrument (e.g., a mapping or sensing instrument such as: a smoke alarm; a human alarm sensor; a motion sensor; a wireless tag; etc.), a watch or clock, a laboratory instrument, an optical device, a medical device and / or system, a weapon, a piece of cutlery, a hand tool, or the like.

[0174] A UE may be, for example, a wirelessly equipped personal digital assistant or related equipment such as a wireless card or module designed to be attached to or inserted into another electronic device (eg, a personal computer, an electrical measuring machine, etc.).

[0175] A UE may be a part of or a device that provides applications, services, and solutions related to the "Internet of Things" (IoT) described below using various wired and / or wireless communication technologies.

[0176] IoT devices (or "things") may be equipped with appropriate electronics, software, sensors, network connectivity, and / or the like that make it possible for these devices to collect and exchange data with each other and with other communication devices. IoT devices may include automated devices that follow software instructions stored in internal memory. IoT devices may operate without the need for human supervision or interaction. IoT devices may also remain stationary and / or inactive for long periods of time. IoT devices may be implemented as part of (usually) stationary equipment. IoT devices may also be embedded in non-stationary equipment (e.g., vehicles), or attached to animals or people to be monitored / tracked.

[0177] It will be appreciated that IoT technology may be implemented on any communication device that can connect to a communication network for sending / receiving data, regardless of whether such communication device is controlled by human input or by software instructions stored in memory.

[0178] It will be understood that IoT devices are sometimes also referred to as machine type communication (MTC) devices or machine to machine (M2M) communication devices. It will be understood that a UE may support one or more than one IoT or MTC applications. Some examples of MTC applications are listed in the following table (source: 3GPP TS 22.368 V13.1.0, Appendix B, the contents of which are incorporated herein by reference). This list is not exhaustive and is intended to indicate some examples of machine type communication applications.

[0179]

[0180]

[0181] The applications, services and solutions may be mobile virtual network operator (MVNO) services, emergency radio communication systems, private branch exchange (PBX) systems, PHS / digital cordless telecommunication systems, point of sale (POS) systems, advertising calling systems, multimedia broadcast and multicast services (MBMS), vehicle to everything (V2X) systems, train radio systems, location-related services, disaster / emergency wireless communication services, community services, video streaming services, femtocell application services, voice over LTE (VoLTE) services, billing services, radio on demand services, roaming services, activity monitoring services, telecommunications carrier / communication NW selection services, feature restriction services, proof of concept (PoC) services, personal information management services, ad-hoc network / delay tolerant network (DTN) services, etc.

[0182] In addition, the above UE categories are merely examples of applications of the technical ideas and exemplary embodiments described herein. Needless to say, these technical ideas and embodiments are not limited to the above UE, and various modifications may be made to the UE.

[0183] The method performed by the access network node may also include: transmitting second information for identifying at least one functionality affected by the energy saving operation. The at least one functionality may include at least one of the following: transmission of a synchronization signal; transmission of a master information block; transmission of at least one system information block; configured grant functionality; scheduled physical downlink shared channel (PDSCH) transmission / scheduled physical uplink shared channel (PUSCH) transmission; physical random access channel (PRACH) functionality; and retransmission functionality.

[0184] At least one of the first information and the second information may be transmitted via system information.

[0185] At least one of the first information and the second information may be transmitted using Radio Resource Control (RRC) signaling.

[0186] At least one of the first information and the second information may be transmitted using an RRC message for allocating a bandwidth portion to the UE.

[0187] The method performed by the access network node may further include: obtaining third information for identifying the capability of the UE to support energy saving configuration. The third information may be included in a UE context associated with the UE.

[0188] The third information may be obtained from a core network node (eg, AMF) for mobility management. For example, obtaining the third information may include: obtaining the third information during a UE context request process.

[0189] The third information may be obtained from another access network node. For example, obtaining the third information may include: obtaining the third information during a UE context transfer procedure.

[0190] The third information may be obtained from the UE. For example, obtaining the third information may include: obtaining the third information during initial access / RRC setup.

[0191] The method performed by the access network node may further include: allocating a bandwidth portion to the UE in a case where, based on the third information, the UE supports the energy saving configuration.

[0192] The method performed by the access network node may further include: initiating a handover process for the UE when the UE does not support the energy-saving configuration.

[0193] The energy saving configuration may be applied by the access network node for each cell or for each bandwidth portion.

[0194] The method performed by the UE may further include: configuring the UE to communicate with the access network node according to the UE specific configuration; and communicating with the access network node according to the UE specific configuration by taking into account the energy saving configuration applied by the access network node.

[0195] The method performed by the UE may further include: determining at least one subframe in which the access network node does not apply the energy saving operation.

[0196] Various other modifications will be apparent to those skilled in the art and will not be described in further detail here.

[0197] For example, all or part of the exemplary embodiments disclosed above may be described as, but not limited to, the following supplementary notes.

[0198] (Supplementary Note 1)

[0199] A method performed by an access network node, the method comprising:

[0200] First information is transmitted to a user equipment (UE), wherein the first information is used to indicate, for each block of multiple blocks of consecutive subframes in a time period, whether the access network node applies an energy saving operation to the one block of the multiple blocks of the consecutive subframes.

[0201] (Supplementary Note 2)

[0202] The method according to Supplementary Note 1, further comprising: transmitting second information for identifying at least one functionality affected by the energy saving operation.

[0203] (Supplementary Note 3)

[0204] The method according to Supplementary Note 2, wherein the at least one functionality includes at least one of the following items:

[0205] Transmission of synchronization signals;

[0206] Transmission of master information blocks;

[0207] transmission of at least one system information block;

[0208] Configured authorization functionality;

[0209] Scheduled physical downlink shared channel transmission, i.e., PDSCH transmission / physical uplink shared channel transmission, i.e., PUSCH transmission;

[0210] Physical Random Access Channel functionality, or PRACH functionality; and

[0211] Retransmission functionality.

[0212] (Supplementary Note 4)

[0213] The method according to Supplementary Note 2 or 3, wherein at least one of the first information and the second information is transmitted via system information.

[0214] (Supplementary Note 5)

[0215] The method according to any one of Supplementary Notes 2 to 4, wherein at least one of the first information and the second information is transmitted using radio resource control signaling (RRC signaling).

[0216] (Supplementary Note 6)

[0217] The method according to any one of Supplementary Notes 2 to 5, wherein at least one of the first information and the second information is transmitted using an RRC message for allocating a bandwidth portion to the UE.

[0218] (Supplementary Note 7)

[0219] The method according to any one of Supplementary Notes 1 to 6 further includes: obtaining third information for identifying the capability of the UE to support energy saving configuration.

[0220] (Supplementary Note 8)

[0221] The method according to Supplementary Note 7, wherein the third information is included in a UE context associated with the UE.

[0222] (Supplementary Note 9)

[0223] The method according to Supplementary Note 7 or 8, wherein the third information is obtained from a core network node for mobility management.

[0224] (Supplementary Note 10)

[0225] The method according to Supplementary Note 9, wherein the third information is obtained during a UE context request procedure.

[0226] (Supplementary Note 11)

[0227] The method according to Supplementary Note 7 or 8, wherein the third information is obtained from another access network node.

[0228] (Supplementary Note 12)

[0229] The method according to Supplementary Note 11, wherein the third information is obtained during a UE context transfer procedure.

[0230] (Supplementary Note 13)

[0231] The method according to Supplementary Note 7 or 8, wherein the third information is obtained from the UE.

[0232] (Supplementary Note 14)

[0233] The method according to Supplementary Note 13, wherein the third information is obtained during initial access / RRC setup.

[0234] (Supplementary Note 15)

[0235] The method according to any one of Supplementary Notes 7 to 14 further includes: allocating a bandwidth portion to the UE if, based on the third information, the UE supports the energy saving configuration.

[0236] (Supplementary Note 16)

[0237] The method according to any one of Supplementary Notes 1 to 15 further includes: initiating a handover process for the UE when the UE does not support energy saving configuration.

[0238] (Supplementary Note 17)

[0239] According to the method described in any one of Supplementary Notes 1 to 16, the energy saving configuration applied by the access network node is applied to each cell or to each bandwidth part.

[0240] (Supplementary Note 18)

[0241] A method performed by a user equipment (UE), the method comprising:

[0242] First information is received from an access network node, the first information being used to indicate, for each of a plurality of blocks of consecutive subframes within a time period, whether a power saving operation is applied by the access network node to the one of the plurality of blocks of consecutive subframes.

[0243] (Supplementary Note 19)

[0244] The method according to Supplementary Note 18, further comprising:

[0245] configuring the UE to communicate with the access network node according to the UE specific configuration; and

[0246] Communicating with the access network node according to the UE specific configuration by taking into account the power saving configuration applied by the access network node.

[0247] (Supplementary Note 20)

[0248] The method according to Supplementary Note 18 or 19 further includes: determining at least one subframe in which the access network node does not apply the energy saving operation.

[0249] (Supplementary Note 21)

[0250] An access network node, comprising:

[0251] A component for transmitting first information to a user equipment (UE), wherein the first information is used to indicate whether the access network node applies an energy saving operation to the one block in the multiple blocks of the consecutive subframes within a time period.

[0252] (Supplementary Note 22)

[0253] A user equipment, namely, UE, includes:

[0254] A component for receiving first information from an access network node, the first information being used to indicate, for each of a plurality of blocks of consecutive subframes within a time period, whether a power saving operation is applied by the access network node for the one of the plurality of blocks of consecutive subframes.

[0255] This application is based upon and claims the benefit of priority from UK patent application 2206088.3 filed on April 26, 2022, the disclosure of which is incorporated herein in its entirety by reference.

[0256] Reference numerals list

[0257] 1Telecommunications System

[0258] 3 Mobile Devices

[0259] 5 Base Stations

[0260] 7Core Network

[0261] 10Control Panel Functions

[0262] 11 User plane functions

[0263] 20Data Network

[0264] 31 Transceiver Circuit

[0265] 33 Antenna

[0266] 35 User Interface

[0267] 37 Controller

[0268] 39 Memory

[0269] 41 Operating Systems

[0270] 43 Communication control module

[0271] 45 Energy saving modules

[0272] 51 transceiver circuit

[0273] 53 Antenna

[0274] 55 Network Interface

[0275] 57 Controller

[0276] 59 Memory

[0277] 61 Operating System

[0278] 63 Communication control module

[0279] 65 Energy saving modules

[0280] 71 Transceiver Circuit

[0281] 75 Network Interface

[0282] 77 Controller

[0283] 79 Memory

[0284] 81 Operating System

[0285] 83 Communication control module

[0286] 85 Energy saving module

Claims

1. A method performed by an access network node, the method include: First information is transmitted to a user equipment (UE), where the first information is used to indicate whether to apply the energy saving operation at the access network node for each of a plurality of blocks of consecutive subframes within a time period.

2. The method according to claim 1, further comprising: include: Second information identifying at least one functionality affected by the energy saving operation is transmitted.

3. The method according to claim 2, in, The at least one functionality includes functionality that uses non-dedicated resources.

4. The method according to claim 2 or 3, in, The at least one functionality comprises at least one of the following: Transmission of synchronization signals; Transmission of master information blocks; transmission of at least one system information block; Configured authorization functionality; Scheduled physical downlink shared channel transmission, i.e., PDSCH transmission / physical uplink shared channel transmission, i.e., PUSCH transmission; Physical Random Access Channel functionality, or PRACH functionality; and Retransmission functionality.

5. The method according to any one of claims 2 to 4, in, At least one of the first information and the second information is transmitted via minimum system information (minimum SI) before initial access of the UE.

6. The method according to any one of claims 2 to 5, in, At least one of the first information and the second information is transmitted using a radio resource control message (RRC message) after initial access of the UE.

7. The method according to any one of claims 2 to 6, in, At least one of the first information and the second information is transmitted using an RRC message for allocating an initial bandwidth portion to the UE.

8. The method according to any one of claims 1 to 7, in, The energy saving operation at the access network node is applied to each cell or each bandwidth part.

9. The method according to any one of claims 1 to 8, further comprising: include: receiving third information for identifying a capability of the UE to support energy-saving operations at the access network node; as well as Based on the capability of the UE to support energy-efficient operation at the access network node, it is determined whether the UE should be handed over to another access network node.

10. The method according to claim 9, further comprising: include: In case the UE supports energy-saving operation at the access network node, a bandwidth portion is allocated to the UE.

11. The method according to claim 9 or 10, further comprising: include: In case the UE does not support energy-saving operation at the access network node, a handover procedure is initiated for the UE.

12. The method according to any one of claims 9 to 11, in, The third information is included in the UE context of the UE.

13. The method according to any one of claims 9 to 12, in, The third information is received from a core network node for mobility management.

14. The method according to claim 13, in, The third information is received during the UE context request procedure.

15. The method according to any one of claims 9 to 12, in, The third information is received from another access network node.

16. The method according to claim 15, in, The third information is received during a UE context transfer procedure.

17. The method according to any one of claims 9 to 12, in, The third information is received from the UE.

18. The method according to claim 17, in, The third information is received during at least one of an initial access procedure and an RRC setup procedure.

19. The method according to any one of claims 1 to 18, in, The first information is determined based on at least one of the following: The load at the access network node; and The latency of each service served by the access network node.

20. The method according to any one of claims 1 to 19, in, The first information includes mode information applied to each time period.

21. The method according to any one of claims 1 to 20, in, The first information is in units of 5 milliseconds.

22. The method according to any one of claims 1 to 21, in, The period is 160 milliseconds.

23. A method performed by a user equipment (UE), the method include: First information is received from an access network node, the first information being used to indicate whether a power saving operation at the access network node is applied for each of a plurality of blocks of consecutive subframes within a time period.

24. The method according to claim 23, further comprising: include: configuring the UE to communicate with the access network node using the first information based on UE capabilities for energy-efficient operation at the access network node; as well as Communicating with the access network node based on the UE capabilities.

25. The method according to claim 23 or 24, further comprising: include: At least one subframe in which a power saving operation at the access network node is not applied is determined to communicate with the access network node.

26. The method according to any one of claims 23 to 25, further comprising: include: Second information identifying at least one functionality affected by the energy conservation operation is received.

27. The method according to claim 26, in, The at least one functionality includes functionality that uses non-dedicated resources.

28. The method according to claim 26 or 27, in, The at least one functionality comprises at least one of the following: Transmission of synchronization signals; Transmission of master information blocks; transmission of at least one system information block; Configured authorization functionality; Scheduled physical downlink shared channel transmission, i.e., PDSCH transmission / physical uplink shared channel transmission, i.e., PUSCH transmission; Physical Random Access Channel functionality, or PRACH functionality; and Retransmission functionality.

29. The method according to any one of claims 26 to 28, in, At least one of the first information and the second information is received via minimum system information (minimum SI) before initial access of the UE.

30. The method according to any one of claims 26 to 29, in, At least one of the first information and the second information is received using a radio resource control message (RRC message) after initial access of the UE.

31. The method according to any one of claims 26 to 30, in, At least one of the first information and the second information is transmitted using an RRC message for allocating an initial bandwidth portion to the UE.

32. The method according to any one of claims 23 to 31, in, The energy saving operation at the access network node is applied to each cell or each bandwidth part.

33. The method according to any one of claims 23 to 32, further comprising: include: Third information identifying the capability of the UE to support energy-saving operation at the access network node is transmitted for use by the access network node to determine whether the UE should be handed over to another access network node based on the capability of the UE to support energy-saving operation at the access network node.

34. The method according to claim 33, in, In case the UE supports energy-saving operation at the access network node, a bandwidth portion is allocated to the UE by the access network node.

35. The method according to claim 33 or 34, further comprising: include: In case the UE does not support energy-saving operation at the access network node, a handover procedure is initiated for the UE.

36. A method according to any one of claims 33 to 35, in, The third information is transmitted during at least one of an initial access procedure and an RRC setup procedure.

37. The method according to any one of claims 23 to 36, in, The first information is determined based on at least one of the following: The load at the access network node; and The latency of each service served by the access network node.

38. The method according to any one of claims 23 to 37, in, The first information includes mode information applied to each time period.

39. The method according to any one of claims 23 to 38, in, The first information is in units of 5 milliseconds.

40. The method according to any one of claims 23 to 39, in, The period is 160 milliseconds.

41. An access network node, include: A component for transmitting first information to a user equipment (UE), wherein the first information is used to indicate whether to apply energy saving operation at the access network node for each of a plurality of blocks of consecutive subframes within a time period.

42. A user equipment, namely, UE, include: Means for receiving first information from an access network node, the first information being for indicating, for each of a plurality of blocks of consecutive subframes within a time period, whether a power saving operation at the access network node is to be applied.

Citation Information

Cited By

  • Enhanced user equipment collaboration and random access channel adaptation operations

    WO2026128108A1