Loading control method and device for port and wharf liquid chemicals
By analyzing the loading demand of liquid chemicals at port terminals, determining the quantitative loading curve and iteratively optimizing the valve position of the pneumatic piston valve, the problem of insufficient accuracy of loading control of liquid chemicals in the existing technology is solved, and intelligence is achieved Control and efficient measurement.
Patent Information
- Application Number
- CN202410983528.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-12-06
AI Technical Summary
The prior art is difficult to achieve precise control in the loading control of liquid chemicals at port terminals and terminals, and the lack of designs for synchronization, feedback and adjustment of loading data, which makes it difficult to accurately control the loading capacity.
By analyzing the loading demand, determining the quantitative loading curve, and combining the characteristics of the pneumatic piston valve, the initial valve position and flow rate are given, and the valve position is iteratively optimized to achieve precise loading control of liquid chemicals.
Intelligent loading control is realized, metering accuracy and efficiency are improved, manual intervention is reduced, and the consistency between loading volume and demand is ensured.
Smart Images

Figure CN119079922A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of chemical transportation, and in particular relates to a loading control method and device for liquid chemicals at a port terminal. Background Art
[0002] There are many types of liquid chemicals shipped at ports and terminals, such as petroleum products, chemical raw materials, solvents, acids and alkalis, liquid gases or other types of specialty chemicals. Since liquid chemicals are flammable, explosive, toxic, corrosive and other properties, their safe loading, unloading, storage and transportation at ports and terminals are basic requirements for cargo terminals. Port terminals are usually equipped with special storage tanks and loading and unloading facilities for the safe storage and loading and unloading of liquid chemicals.
[0003] With the development of information technology, ports and terminals have also begun to use digital means to manage and control the storage and transportation of liquid chemicals, so as to improve efficiency and safety. For example, patent CN117585630A provides a butyl acrylate storage and transportation system and method, the system includes: butyl acrylate storage tank, shell and tube heat exchanger, exhaust gas treatment device, loading platform and pipeline assembly, butyl acrylate storage tank and loading platform are connected to the exhaust gas treatment device through pipeline assembly respectively; butyl acrylate storage tank is provided with air pressure control assembly, air pressure control assembly controls the gas phase pressure in butyl acrylate storage tank to be not less than 1.5Kpa, gas phase includes nitrogen and oxygen, oxygen volume percentage is 5-8%; shell and tube heat exchanger includes multiple groups of heat exchange plates and positioning mechanism for fastening each group of heat exchange plates, butyl acrylate circulates from butyl acrylate storage tank to heat exchange plate, and completes heat exchange with cooling water in heat exchange plate. The butyl acrylate storage and transportation system of this solution is designed for the transportation, warehousing and loading of butyl acrylate in an integrated manner, especially realizing the safety, efficiency and automation of the storage and transportation of butyl acrylate in the terminal environment.
[0004] For another example, patent CN220745380U provides a filling pump and crane position batch control device, including: a first conveying unit, the first conveying unit includes a first filling pump, a second filling pump and a plurality of crane pipe devices distributed on the crane position unit, and a first pipeline system is provided between the first filling pump and the second filling pump and the crane pipe device; a second conveying unit, the second conveying unit includes a third filling pump, a fourth filling pump, a fifth filling pump and a plurality of crane pipe devices on the crane position unit, and a second pipeline system is provided between the third filling pump, the fourth filling pump, the fifth filling pump and the crane pipe device; the scheme utilizes the first pipeline system and the second pipeline system to coordinate the pipelines to realize the oil transportation between different finished oil tanks and the crane positions, and realizes a one-to-one, one-to-many or many-to-many oil transportation mode through control coordination between pipelines, thereby improving the oil transportation efficiency between the finished oil tanks and the tank trucks parked at the crane positions.
[0005] However, the current research focus is still on improving the hardware and structure of the control system. There is relatively little research on the control process. Only improvements in hardware and structure, without designing data synchronization, feedback, and adjustment during loading, make it difficult to accurately control the loading volume of liquid chemicals.
[0006] Therefore, based on the current liquid chemical storage tanks and loading and unloading equipment at port terminals, exploring loading control methods to achieve precise control of the loading amount of liquid chemicals is an urgent problem to be solved by technical personnel in this field. Summary of the invention
[0007] In view of the defects existing in the above-mentioned prior art, the present invention provides a method and device for controlling the loading of liquid chemicals at a port terminal. Based on the analysis of the loading demand of liquid chemicals, the quantitative loading curve of the loading platform in the port terminal is determined; combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given, and the initial valve position of the pneumatic piston valve is given; combined with the real-time loading volume of liquid chemicals, the valve position of the pneumatic piston valve at each level is iteratively optimized to complete the loading control of liquid chemicals at the port terminal. The loading control method provided by the present invention not only realizes intelligent loading control, but also meets the measurement accuracy requirements of transshipment and handover, and greatly improves the efficiency of loading and metering work.
[0008] In a first aspect, the present invention provides a method for controlling the loading of liquid chemicals at a port terminal, which specifically comprises the following steps:
[0009] Based on the analysis of the loading demand of liquid chemicals, determine the quantitative loading curve of the loading platform in the port terminal;
[0010] Combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given, and the initial valve position of the pneumatic piston valve is given;
[0011] Combined with the real-time loading volume of liquid chemicals, the valve positions of pneumatic piston valves at each level are iteratively optimized to complete the loading control of liquid chemicals at the port terminal.
[0012] Furthermore, based on the analysis of the loading demand of liquid chemicals, a quantitative loading curve of the loading platform in the port terminal is determined, which specifically includes the following steps:
[0013] Determine the target type of the quantitative loading curve of the loading platform and the flow threshold of the pneumatic piston valve;
[0014] According to the loading demand of liquid chemicals, an initial quantitative loading curve is given;
[0015] The initial quantitative loading curve is optimized in combination with the disturbance objective function to determine the quantitative loading curve of the loading platform in the port terminal.
[0016] Furthermore, the quantitative loading curve is a trend curve of the loading flow rate of liquid chemicals and the loading time, and the loading flow rate of liquid chemicals is distributed in a step-like manner along with the loading time.
[0017] Furthermore, the initial quantitative loading curve is optimized in combination with the disturbance objective function, which specifically includes the following steps:
[0018] The initial error value for the initial quantitative loading curve is given by perturbing the objective function;
[0019] Determine a flow disturbance value, a flow disturbance amplitude, a flow disturbance threshold, a time disturbance value, a time disturbance amplitude, and a time disturbance threshold for optimizing an initial quantitative loading curve;
[0020] Combined with the flow disturbance value, time disturbance value, flow disturbance amplitude and time disturbance amplitude, the initial quantitative loading curve is iteratively disturbed and optimized until the flow disturbance threshold or the time disturbance threshold is exceeded respectively, and the corresponding disturbed quantitative loading curve is given, and the disturbance error value for the disturbed quantitative loading curve is given through the disturbance objective function;
[0021] Based on the comparison of each disturbance error value, the optimized quantitative loading curve is determined.
[0022] Furthermore, the perturbation objective function is specifically expressed as:
[0023]
[0024] Among them, J1 is the perturbation objective function, ω1 is the first weight, ω2 is the second weight, ω3 is the third weight, n is the total number of time periods, q i is the flow rate in time period i, q i+1 is the flow rate in time period i+1, Q total is the total flow.
[0025] Furthermore, the initial valve position of the pneumatic piston valve is given, which specifically includes the following steps:
[0026] Based on the analysis of the quantitative loading curve, each time frame of the pneumatic piston valve at each level and the initial flow rate of liquid chemical loading at each time frame are obtained;
[0027] According to the characteristic relationship of the pneumatic piston valve, various time points for opening and controlling, the corresponding initial valve positions and various time points for closing and controlling are given.
[0028] Furthermore, according to the characteristic relationship of the pneumatic piston valve, various time points for opening the control, the corresponding initial valve position and various time points for closing the control are given, which are specifically expressed as follows:
[0029]
[0030] Among them, Δε i is the valve position change in the i-th time period, ΔQ i is the flow change in the i-th time period, Δt i,1 is the time point of opening regulation corresponding to the i-th time period, Δt i,2 is the time point of closing control corresponding to the i-th time period, Q0 is the flow corresponding to the maximum valve position, ε0 is the maximum valve position, V0 is the volume of liquid chemical flowing through per unit time at the maximum valve position, μ is the cross-sectional coefficient of the pneumatic piston valve, A1 is the cross-sectional area of the pipe connecting the pneumatic piston valve, A2 is the piston area in the pneumatic piston valve, ρ is the density of the liquid chemical, x0 is the elongation of the piston in the pneumatic piston valve, P0 is the inlet and outlet pressure difference of the pneumatic piston valve, and K is the proportional constant.
[0031] Furthermore, combined with the real-time loading volume of liquid chemicals, the valve positions of pneumatic piston valves at each level are iteratively optimized, specifically including the following steps:
[0032] According to the initial flow rate of liquid chemical loading in each time frame, the initial increment in the corresponding time frame is given;
[0033] The real-time loading volume of liquid chemicals in each time frame is obtained, and each initial increment is iteratively optimized. The valve position of each level of pneumatic piston valve is adjusted in combination with each initial increment to complete the loading of liquid chemicals at the port terminal.
[0034] Furthermore, each initial increment is iteratively optimized, which is specifically expressed as follows:
[0035]
[0036] Among them, E i+1 is the flow error value in the i+1th time period, D i is the initial flow rate in the i-th time period, C i is the initial increment of the i-th time period, R i is the real-time loading quantity in the i-th time period, R i+1 is the real-time loading volume in the i+1th time period, J2 is the incremental objective function, α is the adjustment coefficient, and min is the minimum value function.
[0037] In a second aspect, the present invention further provides a loading control device for liquid chemicals at a port, which adopts the loading control method for liquid chemicals at a port, specifically comprising:
[0038] The flow analysis module is used to determine the quantitative loading curve of the loading platform in the port terminal based on the analysis of the loading demand of liquid chemicals; combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given;
[0039] The valve position control module is used to give the initial valve position of the pneumatic piston valve; combined with the real-time loading volume of liquid chemicals, the valve position of the pneumatic piston valves at each level is iteratively optimized to complete the loading control of liquid chemicals at the port terminal.
[0040] The present invention provides a method and device for controlling loading of liquid chemicals at a port terminal, which has at least the following beneficial effects:
[0041] (1) The loading control method provided by the present invention obtains the initial valve position of the pneumatic piston valves at each level through the quantitative loading curve, and then optimizes the initial valve position of the pneumatic piston valve according to the real-time loading volume, thereby realizing intelligent loading control, meeting the metering accuracy requirements of transfer and handover, and greatly improving the efficiency of loading and metering work.
[0042] (2) By optimizing the initial quantitative loading curve according to the perturbation objective function, the error between the quantitative loading curve and the loading demand can be gradually reduced, thus improving the measurement accuracy of loading. At the same time, the perturbation objective function can also achieve the autonomy of adjustment and optimization, thus reducing manual intervention.
[0043] (3) The initial increment in each time frame is set as an estimate. As the liquid chemical loading operation progresses, based on the real-time loading volume monitored in each time frame and time period, the initial increment estimated in the subsequent time frame and time period is iterated by calculating the error value through the incremental objective function, so as to realize dynamic correction of the loading volume to ensure that the loading volume is consistent with the loading demand. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Figure 1 A schematic diagram of the structure of a port terminal liquid chemical loading system provided by the present invention;
[0045] Figure 2 A schematic flow chart of a method for controlling the loading of liquid chemicals at a port terminal provided by the present invention;
[0046] Figure 3 A schematic diagram of a process for optimizing an initial quantitative loading curve in combination with an objective function provided by the present invention;
[0047] Figure 4 A schematic diagram of a process for iteratively optimizing the valve positions of pneumatic piston valves at each level provided by the present invention;
[0048] Figure 5This is a structural schematic diagram of a loading control device for liquid chemicals at a port terminal provided by the present invention. DETAILED DESCRIPTION
[0049] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0050] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings, and "multiple" generally includes at least two.
[0051] It should also be noted that the term "includes", "comprising" or any other variation thereof is intended to cover non-exclusive inclusion, so that a commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprising a ..." do not exclude the existence of other identical elements in the commodity or device including the elements.
[0052] For the loading, unloading, storage and transshipment of liquid chemicals at port terminals, the current research focus is still on the improvement of the hardware and structure of the liquid chemical shipping system, while the research on the control process is relatively small. However, it is difficult to accurately control the loading volume of liquid chemicals by only improving the shipping hardware and structure without designing data synchronization, feedback, and adjustment during loading.
[0053] The present invention sets a loading control scheme for liquid chemicals at port terminals based on adjusting the liquid chemical loading system. Figure 1 As shown, the quantitative loading system for liquid chemicals at the port terminal includes: a loading platform, an upper loading crane pipe, a flow meter, a pneumatic piston valve and a batch control device. The batch control device is connected to the upper loading crane pipe, the flow meter, and the pneumatic piston valve signal to control the real-time loading amount of the liquid chemicals.
[0054] The loading platform is connected to the liquid chemical storage tanks in the port terminal storage area, and the liquid chemicals enter the loading platform from the storage tanks. The liquid chemicals stored and transferred at the port terminal are usually connected to the transport vehicle at the loading platform, and the liquid chemicals are accurately and quantitatively transported to the transport vehicle (tank truck) through the upper loading crane pipe and under the control of the batch control device, flow meter, and pneumatic piston valve, so as to realize the transmission and transfer of liquid chemicals from the port terminal.
[0055] Specifically, when the tank truck arrives at the designated location in the port terminal storage area, the operator will roughly align and finely align the upper crane pipe, and then the upper crane pipe will enter the tank truck port, press and seal it, and control the liquid chemicals to enter the tank truck through the batch control device. Among them, the real-time flow control of liquid chemicals entering the tank truck is mainly through the batch control device.
[0056] like Figure 2 As shown, the present invention provides a method for controlling the loading of liquid chemicals at a port terminal, which specifically includes the following steps:
[0057] Based on the analysis of the loading demand of liquid chemicals, determine the quantitative loading curve of the loading platform in the port terminal;
[0058] Combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given, and the initial valve position of the pneumatic piston valve is given;
[0059] Combined with the real-time loading volume of liquid chemicals, the valve positions of pneumatic piston valves at each level are iteratively optimized to complete the loading control of liquid chemicals at the port terminal.
[0060] The loading requirements of liquid chemicals can be obtained in advance based on specific application scenarios. The loading requirements are related to the volume of the tank truck, shipping requirements, etc., and are not specifically limited here.
[0061] The quantitative loading curve applied to the batch control device can be obtained by the pre-acquired loading demand of liquid chemicals. The batch control device analyzes the quantitative loading curve and gives a valve position control signal applied to the pneumatic piston valve. Each pneumatic piston valve can be set in different levels, and the valve position control signal controls the valve position of the pneumatic piston valves at different levels. After the valve positions of the pneumatic piston valves at different levels are given, the liquid chemical loading volume is monitored in real time through the flow meter, and the valve position of the pneumatic piston valve is optimized in combination with the analysis of the real-time liquid chemical loading volume.
[0062] The loading control method provided by the present invention obtains the initial valve position of the pneumatic piston valves at each level through a quantitative loading curve, and then optimizes the initial valve position of the pneumatic piston valve according to the real-time loading volume, thereby realizing intelligent loading control, meeting the metering accuracy requirements of transfer and handover, and greatly improving the efficiency of loading and metering work.
[0063] Among them, based on the analysis of the loading demand of liquid chemicals, the quantitative loading curve of the loading platform in the port terminal is determined, which specifically includes the following steps:
[0064] Determine the target type of the quantitative loading curve of the loading platform and the flow threshold of the pneumatic piston valve;
[0065] According to the loading demand of liquid chemicals, an initial quantitative loading curve is given;
[0066] The initial quantitative loading curve is optimized in combination with the disturbance objective function to determine the quantitative loading curve of the loading platform in the port terminal.
[0067] The quantitative loading curve is a trend curve of the loading flow rate of liquid chemicals and the loading time, and the loading flow rate of liquid chemicals is distributed in a step-like manner along with the loading time.
[0068] According to the loading demand of liquid chemicals, the quantitative loading curve of the loading platform in the port terminal is given. The main considerations include: the target type of the quantitative loading curve, the flow threshold of the pneumatic piston valve at each level, etc. Generally speaking, the target types of quantitative loading curves include linear, exponential, logarithmic, wave, step, etc. For the quantitative loading curve of liquid chemicals, a step type is used. The step type quantitative loading curve is a curve in which the loading flow of liquid chemicals is distributed in a step-like manner with the loading time.
[0069] The quantitative loading curve is determined through the process of initial design and optimization. The loading control of liquid chemicals according to the quantitative loading curve can not only achieve precise metering control, but also improve loading efficiency.
[0070] like Figure 3 As shown in the figure, the initial quantitative loading curve is optimized in combination with the perturbation objective function, which specifically includes the following steps:
[0071] The initial error value for the initial quantitative loading curve is given by perturbing the objective function;
[0072] Determine a flow disturbance value, a flow disturbance amplitude, a flow disturbance threshold, a time disturbance value, a time disturbance amplitude, and a time disturbance threshold for optimizing an initial quantitative loading curve;
[0073] Combined with the flow disturbance value, time disturbance value, flow disturbance amplitude and time disturbance amplitude, the initial quantitative loading curve is iteratively disturbed and optimized until the flow disturbance threshold or the time disturbance threshold is exceeded respectively, and the corresponding disturbed quantitative loading curve is given, and the disturbance error value for the disturbed quantitative loading curve is given through the disturbance objective function;
[0074] Based on the comparison of each disturbance error value, the optimized quantitative loading curve is determined.
[0075] For the perturbation objective function, it is specifically expressed as:
[0076]
[0077] Among them, J1 is the perturbation objective function, ω1 is the first weight, ω2 is the second weight, ω3 is the third weight, n is the total number of time periods, q i is the flow rate in time period i, q i+1 is the flow rate in time period i+1, Q total is the total flow.
[0078] By optimizing the initial quantitative loading curve according to the perturbation objective function, the error between the quantitative loading curve and the loading demand can be gradually reduced, and the measurement accuracy of loading can be improved. At the same time, the perturbation objective function method can also achieve the autonomy of adjustment and optimization and reduce manual intervention.
[0079] In the quantitative loading curve, the disturbance and optimization parameters are the flow rate of liquid chemicals and the time periods of each step of the step curve. Therefore, the flow disturbance value, flow disturbance amplitude, flow disturbance threshold, time disturbance value, time disturbance amplitude, and time disturbance threshold are the key parameter values for optimizing the quantitative loading curve.
[0080] Taking the flow of liquid chemicals as an example, the flow disturbance amplitude and flow disturbance threshold in each time period can be preset. A certain value is selected as the flow disturbance value within the preset range. Combined with the flow disturbance values of other time periods, the disturbance error value is given through the disturbance objective function. Finally, the optimal flow disturbance value and the optimal quantitative loading curve are determined based on the comparison of the disturbance error values. The process of time disturbance and flow disturbance in each time period is consistent.
[0081] The quantitative loading curve can be used to give the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame, and then determine the initial valve position of the pneumatic piston valve corresponding to the initial flow rate of liquid chemical loading.
[0082] Multiple pneumatic piston valves can be connected in series or in parallel to create a cascade control system. In a cascade control system, the output of one valve can be used as the input of the next valve, thus achieving more complex flow control strategies.
[0083] The initial valve position of the pneumatic piston valve is given by the initial flow rate of liquid chemical loading, which specifically includes the following steps:
[0084] Based on the analysis of the quantitative loading curve, each time frame of the pneumatic piston valve at each level and the initial flow rate of liquid chemical loading at each time frame are obtained;
[0085] According to the characteristic relationship of the pneumatic piston valve, various time points for opening and controlling, the corresponding initial valve positions and various time points for closing and controlling are given.
[0086] The characteristic relationship of the pneumatic piston valve includes the relative flow relationship and the relative opening relationship. The relative flow relationship and the relative opening relationship are determined by factors such as the structure of the electro-hydraulic valve.
[0087] According to the characteristic relationship of the pneumatic piston valve, the various time points of opening control, the corresponding initial valve position and the various time points of closing control are given, which are specifically expressed as:
[0088]
[0089] Among them, Δε i is the valve position change in the i-th time period, ΔQ i is the flow change in the i-th time period, Δt i,1 is the time point of opening regulation corresponding to the i-th time period, Δt i,2 is the time point of closing control corresponding to the i-th time period, Q0 is the flow corresponding to the maximum valve position, ε0 is the maximum valve position, V0 is the volume of liquid chemical flowing through per unit time at the maximum valve position, μ is the cross-sectional coefficient of the pneumatic piston valve, A1 is the cross-sectional area of the pipe connecting the pneumatic piston valve, A2 is the piston area in the pneumatic piston valve, ρ is the density of the liquid chemical, x0 is the elongation of the piston in the pneumatic piston valve, P0 is the inlet and outlet pressure difference of the pneumatic piston valve, and K is the proportional constant.
[0090] In addition, due to the common monitoring limits (accuracy, responsiveness) of flow meters, the pneumatic piston valve will have an "overcharge" phenomenon. That is, due to the hysteresis of the response of the pneumatic piston valve, the pneumatic piston valve cannot be closed immediately after the batch control device issues a closing command, resulting in some excess loading or missing loading. The correction of excess loading or missing loading can be achieved by adding additional increments to each time frame. The increment is determined by determining the error value of the incremental objective function, and then the optimization iteration method is used to improve the accuracy.
[0091] like Figure 4 As shown, combined with the real-time loading volume of liquid chemicals, the valve positions of pneumatic piston valves at each level are iteratively optimized, specifically including the following steps:
[0092] According to the initial flow rate of liquid chemical loading in each time frame, the initial increment in the corresponding time frame is given;
[0093] The real-time loading volume of liquid chemicals in each time frame is obtained, and each initial increment is iteratively optimized. The valve position of each level of pneumatic piston valve is adjusted in combination with each initial increment to complete the loading of liquid chemicals at the port terminal.
[0094] The initial increment in each time frame is set as an estimate. As the liquid chemical loading operation progresses, based on the real-time loading volume monitored in each time frame and time period, the error value is calculated through the incremental objective function to iterate the initial increment estimated in the subsequent time frame and time period, so as to realize dynamic correction of the loading volume to ensure that the loading volume is consistent with the loading demand.
[0095] Each initial increment is iteratively optimized, which is specifically expressed as:
[0096]
[0097] Among them, E i+1 is the flow error value in the i+1th time period, D i is the initial flow rate in the i-th time period, C i is the initial increment of the i-th time period, R i is the real-time loading quantity in the i-th time period, R i+1 is the real-time loading volume in the i+1th time period, J2 is the incremental objective function, α is the adjustment coefficient, and min is the minimum value function.
[0098] The dynamically corrected data in each time frame and time period achieved in the above manner can also be used as estimated reference data for the initial increments in each time frame and time period in the next loading operation.
[0099] like Figure 5 As shown, in a second aspect, the present invention further provides a loading control device for liquid chemicals at a wharf or port, which adopts the loading control method for liquid chemicals at a wharf or port as described above, specifically comprising:
[0100] The flow analysis module is used to determine the quantitative loading curve of the loading platform in the port terminal based on the analysis of the loading demand of liquid chemicals; combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given;
[0101] The valve position control module is used to give the initial valve position of the pneumatic piston valve; combined with the real-time loading volume of liquid chemicals, the valve position of the pneumatic piston valves at each level is iteratively optimized to complete the loading control of liquid chemicals at the port terminal.
[0102] The present invention provides a method and device for controlling loading of liquid chemicals at a port terminal, which has at least the following beneficial effects:
[0103] (1) The loading control method provided by the present invention obtains the initial valve position of the pneumatic piston valves at each level through the quantitative loading curve, and then optimizes the initial valve position of the pneumatic piston valve according to the real-time loading volume, thereby realizing intelligent loading control, meeting the metering accuracy requirements of transfer and handover, and greatly improving the efficiency of loading and metering work.
[0104] (2) By optimizing the initial quantitative loading curve according to the perturbation objective function, the error between the quantitative loading curve and the loading demand can be gradually reduced, thus improving the measurement accuracy of loading. At the same time, the perturbation objective function can also achieve the autonomy of adjustment and optimization, thus reducing manual intervention.
[0105] (3) The initial increment in each time frame is set as an estimate. As the liquid chemical loading operation progresses, based on the real-time loading volume monitored in each time frame and time period, the initial increment estimated in the subsequent time frame and time period is iterated by calculating the error value through the incremental objective function, so as to realize dynamic correction of the loading volume to ensure that the loading volume is consistent with the loading demand.
[0106] Although preferred embodiments of the present invention have been described, additional changes and modifications may be made to these embodiments by those skilled in the art once the basic inventive concepts are known. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. Obviously, those skilled in the art may make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for controlling the loading of liquid chemicals at a port terminal, characterized in that: The specific steps include: Based on the analysis of the loading demand of liquid chemicals, determine the quantitative loading curve of the loading platform in the port terminal; Combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given, and the initial valve position of the pneumatic piston valve is given; Combined with the real-time loading volume of liquid chemicals, the valve positions of pneumatic piston valves at each level are iteratively optimized to complete the loading control of liquid chemicals at the port terminal.
2. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 1, characterized in that: Based on the analysis of the loading demand of liquid chemicals, the quantitative loading curve of the loading platform in the port terminal is determined, which specifically includes the following steps: Determine the target type of the quantitative loading curve of the loading platform and the flow threshold of the pneumatic piston valve; According to the loading demand of liquid chemicals, an initial quantitative loading curve is given; The initial quantitative loading curve is optimized in combination with the disturbance objective function to determine the quantitative loading curve of the loading platform in the port terminal.
3. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 1 or 2, characterized in that: The quantitative loading curve is a trend curve of the loading flow rate of liquid chemicals and the loading time, and the loading flow rate of liquid chemicals is distributed in a step-like manner along with the loading time.
4. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 3, characterized in that: The initial quantitative loading curve is optimized in combination with the disturbance objective function, which specifically includes the following steps: The initial error value for the initial quantitative loading curve is given by perturbing the objective function; Determine a flow disturbance value, a flow disturbance amplitude, a flow disturbance threshold, a time disturbance value, a time disturbance amplitude, and a time disturbance threshold for optimizing an initial quantitative loading curve; Combined with the flow disturbance value, time disturbance value, flow disturbance amplitude and time disturbance amplitude, the initial quantitative loading curve is iteratively disturbed and optimized until the flow disturbance threshold or the time disturbance threshold is exceeded respectively, and the corresponding disturbed quantitative loading curve is given, and the disturbance error value for the disturbed quantitative loading curve is given through the disturbance objective function; Based on the comparison of each disturbance error value, the optimized quantitative loading curve is determined.
5. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 4, characterized in that: The perturbation objective function is specifically expressed as: Among them, J1 is the perturbation objective function, ω1 is the first weight, ω2 is the second weight, ω3 is the third weight, n is the total number of time periods, q i is the flow rate in time period i, q i+1 is the flow rate in time period i+1, Q total is the total flow.
6. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 1, characterized in that: Providing the initial valve position of the pneumatic piston valve includes the following steps: Based on the analysis of the quantitative loading curve, each time frame of the pneumatic piston valve at each level and the initial flow rate of liquid chemical loading at each time frame are obtained; According to the characteristic relationship of the pneumatic piston valve, various time points for opening and controlling, the corresponding initial valve positions and various time points for closing and controlling are given.
7. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 6, characterized in that: According to the characteristic relationship of the pneumatic piston valve, the various time points of opening control, the corresponding initial valve position and the various time points of closing control are given, which are specifically expressed as: Among them, Δε i is the valve position change in the i-th time period, ΔQ i is the flow change in the i-th time period, Δt i,1 is the time point of opening regulation corresponding to the i-th time period, Δt i,2 is the time point of closing control corresponding to the i-th time period, Q0 is the flow corresponding to the maximum valve position, ε0 is the maximum valve position, V0 is the volume of liquid chemical flowing through per unit time at the maximum valve position, μ is the cross-sectional coefficient of the pneumatic piston valve, A1 is the cross-sectional area of the pipe connecting the pneumatic piston valve, A2 is the piston area in the pneumatic piston valve, ρ is the density of the liquid chemical, x0 is the elongation of the piston in the pneumatic piston valve, P0 is the inlet and outlet pressure difference of the pneumatic piston valve, and K is the proportional constant.
8. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 1, characterized in that: Combined with the real-time loading volume of liquid chemicals, the valve positions of pneumatic piston valves at each level are iteratively optimized, including the following steps: According to the initial flow rate of liquid chemical loading in each time frame, the initial increment in the corresponding time frame is given; The real-time loading volume of liquid chemicals in each time frame is obtained, and each initial increment is iteratively optimized. The valve position of each level of pneumatic piston valve is adjusted in combination with each initial increment to complete the loading of liquid chemicals at the port terminal.
9. The method for controlling loading of liquid chemicals at a port terminal as claimed in claim 8, characterized in that: Each initial increment is iteratively optimized, which is specifically expressed as: Among them, E i+1 is the flow error value in the i+1th time period, D i is the initial flow rate in the i-th time period, C i is the initial increment of the i-th time period, R i is the real-time loading quantity in the i-th time period, R i+1 is the real-time loading volume in the i+1th time period, J2 is the incremental objective function, α is the adjustment coefficient, and min is the minimum value function.
10. A loading control device for liquid chemicals at a port, characterized in that: The method for controlling loading of liquid chemicals at a terminal port as claimed in any one of claims 1 to 9 specifically comprises: The flow analysis module is used to determine the quantitative loading curve of the loading platform in the port terminal based on the analysis of the loading demand of liquid chemicals; combined with the analysis of the quantitative loading curve, the initial flow rate of liquid chemical loading of each level of pneumatic piston valve in each time frame is given; The valve position control module is used to give the initial valve position of the pneumatic piston valve; combined with the real-time loading volume of liquid chemicals, the valve position of the pneumatic piston valves at each level is iteratively optimized to complete the loading control of liquid chemicals at the port terminal.
Citation Information
Patent Citations
Quantitative car loading numeral control method
CN101231514A
Distributed quantitative loading control system
CN102070116A
Intelligent loading system
CN117657824A
LNG (liquefied natural gas) tank car loading system
CN202274286U
Crude oil automatic control ration loading device
CN204714507U