Construction method of waterproof curtain between support piles penetrating through water-rich gravel layer

Through the combination of high-pressure rotary spray grouting and hole induction machine, the problem of difficult construction of water stop curtains in the rich gravel layer in the groundwater is solved, and the effective water stop curtain formation between reinforced concrete support piles is achieved, reducing the groundwater compensation speed , provide favorable conditions for foundation pits.

CN119083473AInactive Publication Date: 2024-12-06CHINA CONSTRUCTION SIXTH ENGINEERING DIVISION CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202411585555.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2024-12-06
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the gravel layer with abundant groundwater, it is difficult for the prior art to effectively apply a water-stop curtain, resulting in the restriction of the inlet of the high-pressure rotary spray pile, and the depth and quality of the curtain cannot be guaranteed, especially in areas where single-axis or three-axis mixing pile machinery is lacking. .

Method used

The high-pressure rotary spray grouting point determination is adopted, and the hole guide drives the drilling rod and the steel casing guide hole, combining the hydraulic power impact hammer and high-pressure water flow to clean the slag, and then the PVC guard pipe is lowered and high-pressure rotary spraying is carried out. The slurry forms a water-stopping curtain.

Benefits of technology

The water stop curtain was successfully formed between the reinforced concrete support piles, which reduced the groundwater compensation speed, provided effective precipitation conditions for the foundation pit, and solved the problem of water stop curtain construction during the water-rich gravel layer.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119083473A_ABST
    Figure CN119083473A_ABST
Patent Text Reader

Abstract

The invention relates to a construction method of a waterproof curtain between support piles penetrating through a water-rich gravel layer. The construction method comprises the specific steps that S1, a high-pressure rotary jet grouting point position is determined; s2, a hole guiding machine drives a hole guiding drill rod and a steel sleeve to guide a hole to the designed bottom elevation of the curtain; s3, a PVC protection pipe is put down; and S4, the high-pressure jet grouting drill rod is lowered to the designed bottom elevation of the curtain, and the waterproof curtain is formed through jet grouting from bottom to top. According to the construction method, in countries or regions with outdated waterproof curtain construction equipment, the method that holes are firstly guided, then the PVC protection pipe is used for protecting the wall, and finally, the high-pressure rotary jet grouting drill rod is used for conducting rotary jet grouting in the PVC protection pipe is adopted, so that the problem that construction of the waterproof curtain in a water-rich gravel layer is difficult is solved, rotary jet grouting is conducted between the reinforced concrete support piles to form the waterproof curtain, and the construction efficiency is improved. The compensation speed of underground water outside the pit into the pit is reduced, and favorable conditions are provided for precipitation in the pit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit support, and in particular to a method for constructing a water-stop curtain between support piles that passes through a water-rich gravel layer. Background Art

[0002] In the strata with abundant groundwater, especially those with water supply, water-stop curtains are of vital importance, and the quality of water-stop curtains directly determines the success or failure of foundation pit support. In some countries and regions where mechanical equipment is relatively backward, the design and construction of water-stop curtains are greatly restricted, resulting in many water-stop curtain construction methods being unable to be implemented. For example, in some areas of Ulaanbaatar, Mongolia, there are thick gravel-sand layers with high permeability and abundant groundwater, especially in some areas close to rivers. There is a certain hydraulic connection between groundwater and river water, and there are almost no single-axis or three-axis mixing pile machines in Mongolia. The method of using cement-soil mixing piles to form a water-stop curtain after rotary drilling and drilling is impossible to implement, and other water-stop curtain construction methods can only be used. The gravel-sand layer is thick and very dense, and it is difficult for general high-pressure rotary jet piles to be driven directly. It is only possible to drill holes first and then apply high-pressure rotary jet piles to form a water-stop curtain. However, it is very easy to collapse the hole during the drilling process, resulting in limited footage, and the depth, diameter and curtain quality of the high-pressure rotary jet piles cannot be guaranteed. Summary of the invention

[0003] The present invention aims to solve the deficiencies of the prior art and provides a method for constructing a water-stop curtain between support piles that penetrates a water-rich gravel layer.

[0004] In order to achieve the above object, the present invention adopts the following technical solutions:

[0005] A method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer, the specific steps are:

[0006] S1. Determination of high pressure jet grouting points:

[0007] High-pressure jet grouting pile position marks are made at the midpoint of the line connecting the centers of each two adjacent reinforced concrete support piles to ensure that the jet grouting diffusion range and the intersection range of the reinforced concrete support piles are maximized;

[0008] S2. The drilling machine drives the drilling rod and steel casing to the designed bottom elevation of the curtain:

[0009] The boring machine drives the boring rod and steel casing to the designed bottom elevation of the curtain. The boring machine is equipped with a hydraulic power impact hammer. The drill bit of the boring rod impacts and rotates while drilling, and continuously sprays high-pressure water to bring the broken gravel out of the ground from the gap between the boring rod and the steel casing. In the process of connecting the boring rod and the steel casing, the slag is first cleared with high-pressure water, and then the boring rod and the steel casing are connected again, and the cycle is repeated until the designed bottom elevation of the curtain is reached;

[0010] S3. Lower the PVC protective pipe:

[0011] After the hole is drilled to the designed bottom elevation of the curtain, first remove the drilling rod, then lower the PVC protective pipe into the steel casing. A number of 1cm diameter holes are drilled in a plum blossom shape at intervals of 15cm on the wall of the PVC protective pipe. After the PVC protective pipe is lowered to the designed elevation, pull out the steel casing and remove the drilling machine.

[0012] S4. Lower the high-pressure jet grouting drill rod to the designed bottom elevation of the curtain, and perform jet grouting from bottom to top to form a water-stop curtain:

[0013] Lower the high-pressure jet grouting drill rod into the PVC protective pipe to the designed bottom elevation of the curtain, spray cement slurry, and jet grout from bottom to top, spreading through the holes reserved on the PVC protective pipe to eventually form a water-stop curtain between piles.

[0014] In step S1, reinforced concrete support piles are first constructed using a long casing rotary drilling rig. After the reinforced concrete support piles are cured to the designed strength, high-pressure rotary jet grouting points are marked.

[0015] In step S1, when the high-pressure rotary jet pile water-stop curtain is installed, it is necessary to install it at intervals.

[0016] In step S2, when the boring machine is boring, slag is removed before the boring drill rod and steel casing are extended. During the slag removal process, the pressure and flow rate of the jet water flow must be guaranteed to ensure that the gravel can be brought to the surface.

[0017] In step S2, the boring machine presses the first section of boring rod and the first section of steel casing into the soil layer, and uses the hydraulic power impact hammer at the end to continuously hammer and press the first section of boring rod and the first section of steel casing into the soil layer; after the first section of boring rod and the first section of steel casing enter the soil, first disconnect the first section of steel casing and the boring machine, and lift the first section of boring rod, and press the high-pressure water flow into the first section of boring rod to clean the gravel at the bottom of the first section of steel casing, the high-pressure water flow brings the gravel and sand particles out from the gap between the first section of boring rod and the first section of steel casing, and sprays them directly from the pipe mouth of the first section of steel casing, and when the first section of steel casing sprays clean water, the second section of boring rod and the second section of steel casing are connected in turn, and then the footage is continuously advanced according to the above process until the curtain bottom design elevation is reached.

[0018] In step S3, the PVC protective pipe needs to be connected and lowered in sections, and the connection between each section needs to be reliable to avoid the pipe falling.

[0019] In step S4, when the high-pressure jet grouting drill pipe is jetted and lifted, the cement slurry needs to have sufficient pressure to ensure the effect of breaking the wall of the PVC protective pipe and the grouting diffusion range.

[0020] In step S4, the high-pressure rotary jet drill rod is lowered from the PVC protective pipe to the designed bottom elevation of the curtain, and the high-pressure rotary jet drill rod is lifted at a speed of 15-20cm / min. The water-cement ratio is 1, the cement slurry pressure is 25-30MPa, and the cement slurry diffuses to the reinforced concrete support piles to achieve the water-stopping effect of the water-stop curtain.

[0021] The beneficial effects of the present invention are as follows: in countries or regions where the equipment for constructing water-stop curtains is backward, the present invention solves the difficult problem of constructing water-stop curtains in water-rich gravel layers by using a method of first drilling holes, then PVC protective pipes and walls, and finally rotary jet grouting with a high-pressure rotary jet drill rod in the PVC protective pipe. The water-stop curtain is formed by rotary jet grouting between reinforced concrete supporting piles, thereby reducing the compensation speed of groundwater outside the pit into the pit and providing favorable conditions for precipitation in the pit. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a schematic diagram of a hole-guiding machine driving a hole-guiding drill rod and a steel casing to guide a hole in a specific embodiment of the present invention;

[0023] Figure 2 It is a schematic diagram of high-pressure water flow slag removal when the hole-guiding machine drives the hole-guiding drill rod and steel casing to guide the hole in a specific embodiment of the present invention;

[0024] Figure 3 It is a schematic diagram of the drilling rod and steel casing being connected and then drilling in a specific embodiment of the present invention;

[0025] Figure 4 It is a schematic diagram of the drill rod for guiding a hole and the removal of the drill rod for guiding a hole after the steel casing is guided in a specific embodiment of the present invention;

[0026] Figure 5 This is a schematic diagram of lowering a PVC protective pipe into a steel casing in a specific embodiment of the present invention;

[0027] Figure 6 It is a schematic diagram of high-pressure rotary jet grouting of a drill pipe after the steel casing is removed in a specific embodiment of the present invention;

[0028] Figure 7 Schematic diagram of holes on the PVC protective tube of the present invention;

[0029] In the figure: 1-reinforced concrete support pile; 2-drill rod; 3-steel casing; 4-hydraulic power impact hammer; 5-high-pressure water flow; 6-PVC protective pipe; 7-hole; 8-high-pressure jet jet drill rod; 9-surface clay layer; 10-gravel layer; 11-gravel and clay layer;

[0030] 21-the first section of the drilling rod for guiding the hole; 22-the second section of the drilling rod for guiding the hole;

[0031] 31-the first section of steel casing; 32-the second section of steel casing;

[0032] The following is a detailed description of the embodiments of the present invention with reference to the accompanying drawings. DETAILED DESCRIPTION

[0033] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The embodiments are only used to explain the present invention and are not used to limit the scope of the present invention. The present invention is described in more detail by way of example with reference to the accompanying drawings in the following paragraphs. The advantages and features of the present invention will become clearer according to the following description. It should be noted that the accompanying drawings are all in a very simplified form and are not in precise proportions, and are only used to facilitate and clearly assist in explaining the purpose of the embodiments of the present invention.

[0034] It should be noted that when a component is referred to as being "fixed to" another component, it may be directly on the other component or there may also be a component centered. When a component is considered to be "connected to" another component, it may be directly connected to the other component or there may also be a component centered. When a component is considered to be "set on" another component, it may be directly set on the other component or there may also be a component centered. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0035] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention belongs. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.

[0036] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0037] The geology treated in this embodiment is, from top to bottom, a surface clay layer 9 , a gravel layer 10 , and a gravel-clay layer 11 .

[0038] A method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer, the specific steps are:

[0039] S1. Determination of high pressure jet grouting points:

[0040] First, use a long casing rotary drilling rig to construct reinforced concrete support piles 1. After the reinforced concrete support piles 1 are cured to the designed strength, mark the high-pressure rotary jet grouting points; mark the high-pressure rotary jet pile points at the midpoint of the line connecting the centers of each two adjacent reinforced concrete support piles 1 to ensure that the diffusion range of the rotary jet grouting and the intersection range of the reinforced concrete support piles 1 are maximized; when setting up the high-pressure rotary jet pile water-stop curtain, it is necessary to set up the water-stopping curtain at intervals to avoid damage to the curtain formed by the high-pressure rotary jet grouting that has just been completed due to too close distance, thereby affecting the water-stopping effect of the water-stop curtain.

[0041] S2, the drilling machine drives the drilling rod 2 and the steel casing 3 to drill the hole to the designed bottom elevation of the curtain, such as Figure 1 , Figure 2 , Figure 3 As shown:

[0042] Since the gravel and clay layer 11 is relatively tight, the conventional high-pressure jet grouting drill rod 8 cannot advance normally, so it is necessary to first lead the hole to the designed bottom elevation of the water-stop curtain;

[0043] The boring machine drives the boring rod 2 and the steel casing 3 to the designed bottom elevation of the curtain. The boring machine is equipped with a hydraulic power impact hammer 4. The drill bit of the boring rod 2 impacts and rotates while drilling, and continuously sprays high-pressure water flow 5 to bring the broken gravel out of the ground from the gap between the boring rod 2 and the steel casing 3. In the process of connecting the boring rod 2 and the steel casing 3, the high-pressure water flow 5 is used to clean the slag first. During the cleaning process, the pressure and flow of the sprayed water flow must be guaranteed to ensure that the gravel can be brought to the ground surface. Then the boring rod 2 and the steel casing 3 are connected again, and the cycle is repeated until the designed bottom elevation of the curtain is reached. The specific operation is as follows:

[0044] The boring machine presses the first boring drill rod 21 and the first steel casing 31 into the soil layer, and uses the hydraulic power impact hammer 4 at the end to continuously hammer and press the first boring drill rod 21 and the first steel casing 31 into the soil layer; after the first boring drill rod 21 and the first steel casing 31 enter the soil, first disconnect the first steel casing 31 and the boring machine, and lift the first boring drill rod 21, and press the high-pressure water flow 5 through the first boring drill rod 21 to clean the gravel at the bottom of the first steel casing 31. The high-pressure water flow 5 brings the gravel and sand particles out from the gap between the first boring drill rod 21 and the first steel casing 31, and directly sprays them out from the pipe mouth of the first steel casing 31. When the first steel casing 31 sprays clean water, the second boring drill rod 22 and the second steel casing 32 are connected in turn, and then the footage is continuously advanced according to the above process until the curtain bottom design elevation is reached.

[0045] S3, lower the PVC protective tube 6, such as Figure 4 , Figure 5 As shown:

[0046] After the hole is drawn to the designed bottom elevation of the curtain, the drilling rod 2 is first removed, and then the PVC protective pipe 6 is lowered into the steel casing 3 to prevent the hole from collapsing. A number of holes 7 with a diameter of 1 cm are punched in a plum blossom shape at intervals of 15 cm on the wall of the PVC protective pipe 6. Figure 7 As shown, after the PVC protective pipe 6 is lowered to the designed elevation, the steel casing 3 is pulled out and the boring machine is removed;

[0047] The PVC protective pipe 6 needs to be connected and lowered in sections, and the connections between each section must be reliable to avoid the pipe falling.

[0048] S4. Lower the high-pressure jet grouting drill rod 8 to the designed bottom elevation of the curtain, and jet grout from bottom to top to form a water-stop curtain. Figure 6 As shown:

[0049] Lower the high-pressure jetting drill rod 8 into the PVC protective pipe 6 to the designed bottom elevation of the curtain, spray cement slurry, and jet grout from bottom to top, spreading through the holes 7 reserved on the PVC protective pipe 6, and finally forming a water-stop curtain between piles;

[0050] When the high-pressure jet grouting drill rod 8 is jetted and lifted, the cement slurry must have sufficient pressure to ensure the effect of breaking the wall of the PVC protective pipe 6 and the grouting diffusion range; most of the cement slurry is ejected from the holes 7 on the wall of the PVC protective pipe 6, and part of the wall of the PVC protective pipe 6 can also be broken, and both processes exist;

[0051] The high-pressure rotary jet drill rod 8 is lowered from the PVC protective pipe 6 to the designed bottom elevation of the curtain, and the high-pressure rotary jet drill rod 8 is lifted at a speed of 15-20cm / min. The water-cement ratio is 1, the cement slurry pressure is 25-30MPa, and the cement slurry diffuses to the reinforced concrete support piles 1 to achieve the water-stopping effect of the water-stopping curtain.

[0052] In countries or regions where the equipment for constructing water-stop curtains is backward, the present invention solves the difficult problem of constructing water-stop curtains in water-rich gravel layers by first drilling holes, then protecting the walls with PVC protective pipes 6, and finally performing rotary jet grouting with high-pressure rotary jet drill rods 8 in the PVC protective pipes 6. The water-stop curtain is formed by rotary jet grouting between the reinforced concrete supporting piles 1, thereby reducing the compensation speed of groundwater outside the pit into the pit and providing favorable conditions for precipitation in the pit.

[0053] The present invention is described above by way of example in conjunction with the accompanying drawings. It is obvious that the specific implementation of the present invention is not limited to the above-mentioned method. As long as various improvements are made using the method concept and technical solution of the present invention, or are directly applied to other occasions without improvement, they are all within the protection scope of the present invention.

Claims

1. A method for constructing a water-stop curtain between support piles that passes through a water-rich gravel layer, characterized in that: The specific steps are: S1. Determination of high pressure jet grouting points: A high-pressure jet grouting pile position mark is made at the midpoint of the line connecting the centers of each two adjacent reinforced concrete support piles (1) to ensure that the jet grouting diffusion range and the intersection range of the reinforced concrete support piles (1) are maximized; S2. The drilling machine drives the drilling rod (2) and the steel casing (3) to drill the hole to the designed bottom elevation of the curtain: The boring machine drives the boring rod (2) and the steel casing (3) to be driven into the curtain design bottom elevation. The boring machine is equipped with a hydraulic power impact hammer (4). The drill bit of the boring rod (2) impacts and rotates while drilling and continuously sprays high-pressure water flow (5) to bring the broken gravel out of the ground from the gap between the boring rod (2) and the steel casing (3). In the process of connecting the boring rod (2) and the steel casing (3), the high-pressure water flow (5) is first used to clean the slag, and then the boring rod (2) and the steel casing (3) are connected again, and the cycle is repeated until the curtain design bottom elevation is reached; S3. Lower the PVC protective pipe (6): After the hole is drilled to the designed bottom elevation of the curtain, the drilling rod (2) is first removed, and then the PVC protective pipe (6) is lowered into the steel casing (3). A plurality of holes (7) with a diameter of 1 cm are punched in a plum blossom shape at intervals of 15 cm on the wall of the PVC protective pipe (6). After the PVC protective pipe (6) is lowered to the designed elevation, the steel casing (3) is pulled out and the drilling machine is removed; S4. Lower the high-pressure jet grouting drill rod (8) to the designed bottom elevation of the curtain, and perform jet grouting from bottom to top to form a water-stop curtain: A high-pressure jet grouting drill rod (8) is lowered into the PVC protective pipe (6) to the designed bottom elevation of the curtain, and cement slurry is sprayed and jetted from bottom to top, and spreads through the holes (7) reserved on the PVC protective pipe (6), finally forming a water-stop curtain between piles.

2. A method for constructing a water-stop curtain between support piles that passes through a water-rich gravel layer according to claim 1, characterized in that: In step S1, a long casing rotary drilling rig is used to construct reinforced concrete support piles (1). After the reinforced concrete support piles (1) are cured to a designed strength, high-pressure rotary jet grouting points are marked.

3. The method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer according to claim 2, characterized in that: In step S1, when the high-pressure rotary jet pile water-stop curtain is installed, it is necessary to install it at intervals.

4. The method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer according to claim 1, characterized in that: In step S2, when the boring machine is boring, slag is removed before the boring drill rod (2) and the steel casing (3) are extended. During the slag removal process, the pressure and flow rate of the jet water flow must be ensured to ensure that gravel can be brought to the surface.

5. The method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer according to claim 4, characterized in that: In step S2, the boring machine presses the first section of boring rod (21) and the first section of steel casing (31) into the soil layer, and uses the hydraulic power impact hammer (4) at the end to continuously hammer and press the first section of boring rod (21) and the first section of steel casing (31) into the soil layer; after the first section of boring rod (21) and the first section of steel casing (31) enter the soil, the connection between the first section of steel casing (31) and the boring machine is first disconnected, and the first section of boring rod (21) is lifted, and the first section of boring rod (21) is passed through the first section of boring rod (21) ) is pressed into a high-pressure water flow (5) to clean the gravel at the bottom of the first section of the steel casing (31). The high-pressure water flow (5) brings the gravel and sand particles out from the gap between the first section of the guide hole drill rod (21) and the first section of the steel casing (31) and sprays them directly from the pipe mouth of the first section of the steel casing (31). When the first section of the steel casing (31) sprays clean water, the second section of the guide hole drill rod (22) and the second section of the steel casing (32) are connected in turn, and then the above process is followed to continuously advance the footage until the curtain bottom design elevation is reached.

6. The method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer according to claim 1, characterized in that: In step S3, the PVC protective pipe (6) needs to be connected and lowered in sections, and the connection between each section needs to be reliable to prevent the pipe from falling.

7. The method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer according to claim 1, characterized in that: In step S4, when the high-pressure jet grouting drill rod (8) is jetted and lifted, the cement slurry must be sprayed with sufficient pressure to ensure the effect of breaking the wall of the PVC protective pipe (6) and the grouting diffusion range.

8. The method for constructing a water-stop curtain between support piles passing through a water-rich gravel layer according to claim 7, characterized in that: In step S4, the high-pressure jet grouting drill rod (8) is lowered from the PVC protective pipe (6) to the designed bottom elevation of the curtain, and the high-pressure jet grouting drill rod (8) is lifted at a speed of 15-20 cm / min. The water-cement ratio is 1, the cement slurry pressure is 25-30 MPa, and the cement slurry diffuses to the reinforced concrete support piles (1), thereby achieving the water-stopping effect of the water-stopping curtain.

Citation Information

Patent Citations

  • Construction method for composite grouting waterproof curtain

    CN105064385A

  • PBA engineering method tunnel water-stop curtain construction method based on hole guiding technology

    CN111155542A

  • Deep thick hard rock underground continuous wall grooving construction method and structure

    CN111364446A

  • Construction method of spiral jet grouting waterproof curtain in water-enriched sandy gravel geological condition

    CN111733851A

  • Construction method of foundation pit waterproof curtain in strong permeable stratum area

    CN113006109A