Super high-rise steel-concrete structure truss layer and construction method
The super high-rise steel-concrete structure truss layer addresses construction challenges through a truss layer design with adjustable connections and V-shaped supports, enabling synchronized pouring and reducing construction time and safety risks.
Patent Information
- Application Number
- CN202411175543.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-26
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-08-26
AI Technical Summary
The construction of super high-rise steel-concrete composite structures faces challenges such as differing construction processes, quality control issues due to large welding work, high tower crane hoisting pressure, manual transportation dangers, and difficulties in adjusting dimensional deviations during on-site construction.
A super high-rise steel-concrete structure truss layer with a core tube supported between truss layers, using adjustable connection assemblies, V-shaped support components, and cantilever beams to facilitate precise installation and integration of steel and concrete elements, along with optimized formwork systems.
Enables synchronized layer pouring, reduces construction time, ensures high-quality connections, and enhances safety by minimizing manual handling and crane dependency.
Smart Images

Figure CN119083577A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, and in particular to a super-high-rise steel-concrete structure truss layer and a construction method. Background Art
[0002] With the rapid economic development and the accelerated urban construction process, super high-rise office buildings are increasingly widely used. In structural design, the core tube-steel frame is favored due to its good lateral force resistance performance. However, for economic considerations and to improve the comfort of subsequent small owners, full concrete structure super high-rise buildings still have market demand.
[0003] In order to ensure the overall rigidity of the all-concrete super-high-rise, a steel-concrete composite truss reinforcement layer is designed. However, the combination of steel structure and concrete leads to many problems in the actual construction process: (1) The construction process of the steel-concrete structure is different from that of the all-concrete structure floor, and the whole floor flow operation cannot be connected; (2) Due to the large amount of welding work, the construction quality is difficult to control; (3) The number of on-site steel beams, steel columns and cantilever beam components is large, the tower crane hoisting pressure is high, and the construction progress is difficult to advance; (4) The V-shaped support components need to be installed after the structure is capped. At this time, large vertical transportation machinery cannot be used on the floor, and manual transportation is required, which is very dangerous; (5) The formwork and steel structure are both rigid materials. The dimensional deviation of the on-site construction of both is difficult to adjust, and the connection is difficult.
[0004] In response to the above-mentioned difficult and key issues, technical personnel carried out scientific and technological research, and proposed an ultra-high-rise steel-concrete structure truss layer and construction method for the construction process of the truss layer and the full concrete structure floor. Summary of the invention
[0005] The purpose of the present invention is to provide a super high-rise steel-concrete structure truss layer and a construction method, which solves the above-mentioned problems existing in the steel-concrete composite truss reinforcement layer in the actual engineering construction process.
[0006] To achieve the above object, the present invention adopts the following technical solutions: A super high-rise steel-concrete structure truss layer, comprising multiple truss layers, a core tube is supported between the middle parts of adjacent truss layers, and a concrete pouring layer is arranged above the truss layers; The core tube comprises a core tube steel frame, a steel beam supporting tire frame is arranged in the core tube steel frame, and the steel beam supporting tire frame is supported in the core tube steel frame; The truss layer includes a truss layer steel frame, which is a hollow frame structure, and a reinforced concrete pouring layer is arranged on the top of the truss layer steel frame; The truss layer steel frame includes steel beams and steel columns. The steel columns are supported on the reinforced concrete casting layer. The steel beams are connected between two adjacent steel columns through an adjustable connection assembly. Two steel beams are connected between the two adjacent steel columns at the upper and lower parts. A V-shaped support assembly is supported between the two steel beams arranged upper and lower, and the V-shaped support assembly is connected to the steel beam arranged above through two hangers.
[0007] Preferably, the adjustable connecting assembly includes a mounting seat and a connecting bridge, the mounting seat is installed on the side of the steel column, and the mounting seat and the end of the steel beam are adjustably connected through the connecting bridge; the connecting bridge is arched and consists of a crossbeam and two connecting columns, and the two connecting columns are detachably installed at both ends of the crossbeam through fasteners.
[0008] Preferably, the V-shaped support assembly includes a first support beam, a second support beam, a top connecting seat, a connecting piece and a connecting seat, the connecting seat is arranged on the steel beam arranged below, and has inclined ends at both ends of the connecting seat, and the first support beam and the second support beam are connected to the two inclined ends respectively through connecting pieces, and a top connecting seat is provided on the lower side of the steel beam arranged above, and the top ends of the first support beam and the second support beam are both connected to the top connecting seat through connecting pieces, and the first support beam and the second support beam are distributed in a V shape.
[0009] Preferably, the connecting member includes a plug plate and a wing plate, and the wing plates are vertically arranged on both sides of the plug plate. The plug plate is provided with a slot, and the slot is plugged into the connecting seat. The wing plate is temporarily connected to the first support beam and the second support beam through the connecting bridge and then welded and fixed.
[0010] Preferably, the steel beam supporting tire frame is a disc-type tire frame supporting system, including a plurality of vertical poles, and an elevation adjustment assembly is arranged on the top of the vertical poles; the elevation adjustment assembly includes a plurality of columns, and the columns are telescopically installed on the top of the columns, and a U-shaped groove is installed on the top of the column, and the U-shaped groove is supported on the bottom of the crossbeam of the core tube steel frame.
[0011] Preferably, a plurality of cantilevered beams are cantilevered and connected in the middle of the truss layer, one end of the cantilevered beam is connected to the steel beam or the steel column through the adjustable connection assembly, and the other end is connected to the core tube steel frame through an embedded plate.
[0012] Preferably, the embedded plate includes a steel plate and a plurality of connecting ribs arranged on one side of the steel plate, the steel plate is installed at the end of the cantilever steel beam, and the end of the connecting rib is connected to the core tube steel frame.
[0013] A construction method for a super high-rise steel-concrete structure truss layer comprises the following steps: Step 1: Construction simulation: Establish a three-dimensional model of the steel-concrete structure truss layer, add a steel bar model for collision analysis, and optimize the connection nodes; Step 2: Binding of steel bars for the first layer of core tube shear wall: Step 3: Installation of the first-layer core tube steel frame: Build the first-layer steel beam support frame, and build the first-layer core tube steel frame based on the first-layer steel beam support frame; Step 4: Installation of the first layer of steel columns; Step 5: hoist and adjust the elevation of the first layer of steel beams in sequence: first, weld the mounting seat at the designed position on the side of the steel column, then hoist the steel beam horizontally to the mounting seat, connect the end of the steel beam to the mounting seat through the connecting bridge, and adjust the connection position of the cross beam and the connecting column through fasteners to achieve horizontal adjustment of the steel beam. After the elevation and horizontality of the steel beam are tested to be qualified, weld the end of the steel beam to the mounting seat; Step 6, installation of the V-shaped support assembly: welding a connection seat on the steel beam arranged at the bottom, installing connecting pieces at both ends of the first support beam and the second support beam respectively, lifting the first support beam and the second support beam to the designed positions in turn, plugging the connecting pieces into the connection seat and temporarily fixing them with fasteners, and after the first support beam and the second support beam pass the support strength test, welding the connecting pieces to the connection seat, welding the connecting pieces to the first support beam, and welding the connecting pieces to the second support beam in turn; Step 7, cantilever beam installation: first install the embedded plate at one end of the cantilever beam, then hoist the cantilever beam horizontally to the designed elevation, and install the other end on the steel beam or the steel column through the adjustable connection assembly, and the connection rib is connected to the first-layer core tube steel frame; Step 8: Tie the steel bars between the first layer of steel columns: Arrange the steel bars on the upper and lower sides of the steel beams and the upper and lower sides of the cantilevered beams, tie the ends of the steel bars to the steel columns, and then remove the first layer of steel beam support frames; Step 9, assembling and sealing the first layer of formwork: Use BIM software to deepen the formwork, reserve space between the formwork and the steel beam and the cantilever beam, install a U-shaped opening at the reserved space, plug the formwork into the U-shaped opening to form the first layer of casting formwork, and reserve gaps between the formwork and the steel beam and between the formwork and the cantilever beam and seal the gaps with foam glue; Step 10, pouring the first layer of concrete: pouring concrete in the first layer of pouring formwork to form a reinforced concrete pouring layer; Step 11, construction of upper steel-concrete structure truss layer: repeat steps 2 to 10 until the construction of multiple truss layers is completed.
[0014] Preferably, in step six, a lifting frame is used to lift the first support beam or the second support beam to the designed position; the lifting frame includes a ballast platform, a rectangular mounting frame, an electric hoist, a wire rope and a walking roller, a walking roller is installed at each of the four corners of the bottom of the ballast platform, a rectangular mounting frame is vertically installed on one side of the top of the ballast platform, an electric hoist is retractably installed at both corners of the top of the rectangular mounting frame through a chain, a grab hook is hung on the electric hoist, and the rectangular mounting frame and the other side of the top of the ballast platform are tied together by multiple wire ropes.
[0015] In the present invention, the construction process of synchronous pouring of the entire layer is realized by deduction, the template system is optimized, the various processes are reasonably connected, and the construction period is shortened.
[0016] The core tube has only completed the steel bar binding and cannot form a rigid connection with the core tube steel frame. A steel beam support cradle is used to support the core tube steel frame. After the core tube steel frame and the cantilevered beam are connected through embedded plates, the steel beam support cradle is removed. The steel beam support cradle can realize high-precision installation of the core tube steel frame.
[0017] The adjustable connection assembly can adjustably connect the steel beam between two adjacent steel columns. After adjusting the elevation and levelness of the steel beam, the end of the steel beam is welded and fixed. Therefore, the adjustable connection assembly not only has a temporary fixing function, but also can adjust the height and levelness. It is suitable for construction projects with large welding workloads, ensuring construction quality.
[0018] The cantilever beam connects the core tube steel frame with the truss layer steel frame and is a key component for overall stability. The truss layer steel frame is supported by V-shaped support components and reinforced by hangers, so the truss layer steel frame structure is stable. One end of the cantilever beam is connected to the truss layer steel frame through an adjustable connection component, and the other end is connected to the core tube steel frame through an embedded plate. After the steel bars are tied and the concrete is poured, a stable super-high-rise steel-concrete structure is formed.
[0019] BIM software is used to deepen the template and reserve space, a U-shaped opening is set at the reserved space, and the template is inserted into the U-shaped opening to form a casting template, and the casting template does not need to be disassembled.
[0020] Because both the formwork and the truss layer steel frame are made of rigid materials, if the size deviation between the two is large during on-site construction, there will be difficulties in connection. Gaps are reserved between the formwork and the steel beams, as well as between the formwork and the cantilevered steel beams to absorb the size deviations. After the formwork is installed, the gaps are finally sealed with foam glue. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a partial structural schematic diagram of the present invention; Figure 3 It is another structural schematic diagram of the present invention; Figure 4 It is a schematic diagram of the structure of the connecting piece of the present invention; Figure 5 It is a schematic diagram of the structure of the lifting frame of the present invention; In the figure: 1. truss layer; 2. core tube; 3. steel beam supporting frame; 4. lifting frame; 10. truss layer steel frame; 20. core tube steel frame; 21. embedded plate; 30. vertical pole; 31. elevation adjustment component; 40. weight platform; 41. rectangular mounting frame; 42. electric hoist; 43. wire rope; 44. walking roller; 45. grab hook; 100. steel beam; 101. steel column; 102. adjustable connection component; 103. V-shaped support component; 104. suspension rod; 105. cantilever beam; 311. vertical column; 312. U-shaped groove; 1020. mounting seat; 1021. connecting bridge; 1030. first supporting beam; 1031. second supporting beam; 1032. top connecting seat; 1033. connecting piece; 1034. connecting seat. DETAILED DESCRIPTION
[0022] The present invention will be further described below in conjunction with the accompanying drawings: like Figure 1 to Figure 5 A super high-rise steel-concrete structure truss layer shown includes multiple truss layers 1, a core tube 2 is supported and arranged between the middle parts of adjacent truss layers 1, and a concrete pouring layer is arranged above the truss layer 1.
[0023] The core tube 2 includes a core tube steel frame 20, in which a steel beam support frame 3 is arranged, and the steel beam support frame 3 is supported in the core tube steel frame 20. The steel beam support frame 3 is a disc buckle frame support system, including a plurality of vertical poles 30, and a height adjustment component 31 is arranged on the top of the vertical pole 30. The height adjustment component 31 includes a plurality of columns 311, and the columns 311 are telescopically installed on the top of the columns 30, and a U-shaped groove 312 is installed on the top of the column 311, and the U-shaped groove 312 is supported on the bottom of the crossbeam of the core tube steel frame 20.
[0024] The truss layer 1 includes a truss layer steel frame 10, which is a hollow frame structure, and a reinforced concrete casting layer is arranged on the top of the truss layer steel frame 10. The truss layer steel frame 10 includes a steel beam 100 and a steel column 101, and the steel column 101 is supported on the reinforced concrete casting layer. The steel beam 100 is connected between two adjacent steel columns 101 through an adjustable connection component 102, and two steel beams 100 are connected between the two adjacent steel columns 101. A V-shaped support component 103 is supported between the two steel beams 100 arranged in an upper and lower manner, and the V-shaped support component 103 is connected to the steel beam 100 arranged above through two suspension rods 104.
[0025] The adjustable connection assembly 102 includes a mounting seat 1020 and a connecting bridge 1021. The mounting seat 1020 is mounted on the side of the steel column 101, and the mounting seat 1020 is adjustably connected to the end of the steel beam 100 through the connecting bridge 1021. The connecting bridge 1021 is arched and consists of a crossbeam and two connecting columns. The two connecting columns are detachably mounted on both ends of the crossbeam through fasteners.
[0026] The V-shaped support assembly 103 includes a first support beam 1030, a second support beam 1031, a top connection seat 1032, a connector 1033 and a connection seat 1034. The connection seat 1034 is arranged on the steel beam 100 arranged below, and there are inclined ends at both ends of the connection seat 1034, and the first support beam 1030 and the second support beam 1031 are connected to the two inclined ends through connectors 1033 respectively, and a top connection seat 1032 is arranged on the lower side of the steel beam 100 arranged above, and the top ends of the first support beam 1030 and the second support beam 1031 are both connected to the top connection seat 1032 through connectors 1033, and the first support beam 1030 and the second support beam 1031 are distributed in a V shape.
[0027] The connecting member 1033 includes a plug plate and a wing plate. The wing plates are vertically arranged on both sides of the plug plate. The plug plate is provided with a slot, which is plugged into the connecting seat 1034. The wing plate is temporarily connected to the first support beam 1030 and the second support beam 1031 through the connecting bridge 1021 and then welded and fixed.
[0028] A plurality of cantilever beams 105 are cantilevered and connected in the middle of the truss layer 1. One end of the cantilever beam 105 is connected to the steel beam 100 or the steel column 101 through an adjustable connection assembly 102, and the other end is connected to the core tube steel frame 20 through an embedded plate 21. The embedded plate 21 includes a steel plate and a plurality of connecting ribs arranged on one side of the steel plate. The steel plate is installed at the end of the cantilever steel beam 105, and the end of the connecting rib is connected to the core tube steel frame 20.
[0029] A construction method for a super high-rise steel-concrete structure truss layer comprises the following steps: Step 1: Construction simulation: Use Tekla Structures software to build a three-dimensional model of the steel-concrete structure truss layer, add a steel bar model for collision analysis, and optimize the connection nodes; Step 2: Binding of steel bars for shear wall of first-layer core tube 2: Step 3, installation of the first layer core tube steel frame 20: constructing the first layer steel beam support frame 3, and constructing the first layer core tube steel frame 20 based on the first layer steel beam support frame 3; Step 4: installing the first layer of steel columns 101; Step 5: The first layer of steel beams 100 are hoisted and adjusted in elevation in sequence: first, a mounting seat 1020 is welded at the designed position on the side of the steel column 101, and then the steel beam 100 is hoisted horizontally to the mounting seat 1020, and the end of the steel beam 100 is connected to the mounting seat 1020 through the connecting bridge 1021, and the connection position between the cross beam and the connecting column is adjusted by fasteners to adjust the horizontality of the steel beam 100, and after the elevation and horizontality of the steel beam 100 are tested to be qualified, the end of the steel beam 100 is welded to the mounting seat 1020; Step 6, installation of the V-shaped support assembly 103: welding a connection seat 1034 on the steel beam 100 arranged at the bottom, installing connectors 1033 at both ends of the first support beam 1030 and at both ends of the second support beam 1031 respectively, lifting the first support beam 1030 and the second support beam 1031 to the designed positions in turn, plugging the connector 1033 into the connection seat 1034 and temporarily fixing them with fasteners, and after the first support beam 1030 and the second support beam 1031 pass the support strength test, welding the connector 1033 to the connection seat 1034, welding the connector 1033 to the first support beam 1030, and welding the connector 1033 to the second support beam 1031 in turn; After the first layer of steel beams are hoisted, the V-shaped support assembly will be limited in space during hoisting, and large vertical transportation machinery cannot be used. Therefore, the hoisting frame 4 is used to hoist the first support beam 1030 or the second support beam 1031 to the designed position; The lifting frame 4 includes a weight platform 40, a rectangular mounting frame 41, an electric hoist 42, a wire rope 43 and a travel roller 44. A travel roller 44 is installed at each of the four corners of the bottom of the weight platform 40 to facilitate the movement of the lifting frame 4. When the lifting frame 4 is in operation, the travel roller 44 needs to be locked to prevent the lifting frame 4 from moving during the operation. A rectangular mounting frame 41 is vertically mounted on one side of the top of the weight platform 40, and an electric hoist 42 is retractably mounted on the two corners of the top of the rectangular mounting frame 41 through a chain, and a grab hook 45 is hung on the electric hoist 42. The lifting position height of the two electric hoists 42 is adjusted by the extension and retraction of the chain, so that the inclination angle of the connection line of the two grab hooks 45 is consistent with the installation angle of the first support beam 1030 or the second support beam 1031, thereby improving the flexibility and accuracy of lifting; The rectangular mounting frame 41 is connected to the other side of the top of the ballast platform 40 by a plurality of steel wire ropes 43, thereby reducing the overall weight of the lifting frame 4; Step 7, cantilever beam installation: first install the embedded plate 21 at one end of the cantilever beam, then hoist the cantilever beam horizontally to the designed elevation, and install the other end on the steel beam 100 or the steel column 101 through the adjustable connection assembly 102, and the connection rib is connected to the first-layer core tube steel frame 20; In the construction project, due to the large number of steel beams, steel columns and cantilever beam components on site, the tower crane hoisting pressure is high and the construction progress is difficult to advance, so it is necessary to use the hoisting frame 4 to cooperate with the component hoisting; Step 8: Tie the steel bars between the first-layer steel columns 101: Arrange steel bars on the upper and lower sides of the steel beam 100 and the upper and lower sides of the cantilevered cross beam, tie the ends of the steel bars to the steel columns 101, and then remove the first-layer steel beam support frame; Step 9, assembling and sealing the first layer of formwork: using BIM software to deepen the formwork, reserve space between the formwork and the steel beam 100 and the cantilever beam, install a U-shaped opening at the reserved space, plug the formwork into the U-shaped opening to form the first layer of casting formwork, and reserve gaps between the formwork and the steel beam 100 and between the formwork and the cantilever beam and seal the gaps with foam glue; Step 10, pouring the first layer of concrete: pouring concrete in the first layer of pouring formwork to form a reinforced concrete pouring layer; Step 11, construction of the upper steel-concrete structure truss layer: repeat steps 2 to 10 until the construction of the multi-layer truss layer 1 is completed.
[0030] The above embodiments are only some illustrations of the concept and implementation of the present invention, and are not intended to limit the same. Under the concept of the present invention, technical solutions that have not been substantially changed are still within the scope of protection.
Claims
1. A super high-rise steel-concrete structure truss layer, characterized by: It comprises a plurality of truss layers (1), a core tube (2) is provided between the middle parts of adjacent truss layers (1) for support, and a concrete pouring layer is provided above the truss layers (1); The core tube (2) comprises a core tube steel frame (20), a steel beam supporting frame (3) is arranged inside the core tube steel frame (20), and the steel beam supporting frame (3) is supported inside the core tube steel frame (20); The truss layer (1) comprises a truss layer steel frame (10), the truss layer steel frame (10) is a hollow frame structure, and a reinforced concrete casting layer is arranged on the top of the truss layer steel frame (10); The truss layer steel frame (10) comprises a steel beam (100) and a steel column (101), wherein the steel column (101) is supported on a reinforced concrete pouring layer, the steel beam (100) is connected between two adjacent steel columns (101) via an adjustable connection assembly (102), and two steel beams (100) are connected between the two adjacent steel columns (101) at the upper and lower ends, a V-shaped support assembly (103) is supported between the two steel beams (100) arranged at the upper and lower ends, and the V-shaped support assembly (103) is connected to the steel beam (100) arranged at the upper end via two suspension rods (104).
2. The super high-rise steel-concrete structure truss layer according to claim 1 is characterized in that: The adjustable connection assembly (102) comprises a mounting seat (1020) and a connecting bridge (1021); the mounting seat (1020) is mounted on the side of the steel column (101); the mounting seat (1020) and the end of the steel beam (100) are adjustably connected via the connecting bridge (1021); the connecting bridge (1021) is arched and consists of a crossbeam and two connecting columns; the two connecting columns are detachably mounted at both ends of the crossbeam via fasteners.
3. The super high-rise steel-concrete structure truss layer according to claim 1 is characterized in that: The V-shaped support assembly (103) comprises a first support beam (1030), a second support beam (1031), a top connection seat (1032), a connection piece (1033) and a connection seat (1034); the connection seat (1034) is arranged on the steel beam (100) arranged below; both ends of the connection seat (1034) are inclined ends; the first support beam (1030) and the second support beam (1031) are connected to the two inclined ends respectively via the connection piece (1033); a top connection seat (1032) is arranged on the lower side of the steel beam (100) arranged above; the top end of the first support beam (1030) and the top end of the second support beam (1031) are both connected to the top connection seat (1032) via the connection piece (1033); the first support beam (1030) and the second support beam (1031) are distributed in a V shape.
4. The super high-rise steel-concrete structure truss layer according to claim 3 is characterized in that: The connecting member (1033) comprises a plug plate and a wing plate, with wing plates being vertically arranged on both sides of the plug plate, and a slot being arranged on the plug plate, which is plugged into the connecting seat (1034), and the wing plate is temporarily connected to the first support beam (1030) and the second support beam (1031) via the connecting bridge (1021) and then fixed by welding.
5. The super high-rise steel-concrete structure truss layer according to claim 1 is characterized in that: The steel beam support frame (3) is a disc-type frame support system, comprising a plurality of vertical poles (30), with a height adjustment assembly (31) being arranged on the top of the vertical poles (30); the height adjustment assembly (31) comprising a plurality of vertical columns (311), the vertical columns (311) being telescopically mounted on the top of the vertical poles (30), with a U-shaped groove (312) being mounted on the top of the vertical column (311), and the U-shaped groove (312) being supported on the bottom of the crossbeam of the core tube steel frame (20).
6. The super high-rise steel-concrete structure truss layer according to claim 1 or 2, characterized in that: A plurality of cantilevered cross beams (105) are cantilevered and connected in the middle of the truss layer (1); one end of the cantilevered cross beam (105) is connected to the steel beam (100) or the steel column (101) via the adjustable connection assembly (102), and the other end is connected to the core tube steel frame (20) via an embedded plate (21).
7. The super high-rise steel-concrete structure truss layer according to claim 6 is characterized by: The embedded plate (21) comprises a steel plate and a plurality of connecting ribs arranged on one side of the steel plate; the steel plate is mounted on the end of the cantilever steel beam (105); and the end of the connecting rib is connected to the core tube steel frame (20).
8. A construction method for a super high-rise steel-concrete structure truss layer according to any one of claims 1 to 7, characterized in that: The following steps are involved: Step 1: Construction simulation: Establish a three-dimensional model of the steel-concrete structure truss layer, add a steel bar model for collision analysis, and optimize the connection nodes; Step 2: Binding of shear wall reinforcements for the first core tube (2): Step 3, installation of the first layer core tube steel frame (20): constructing the first layer steel beam support frame (3), and constructing the first layer core tube steel frame (20) based on the first layer steel beam support frame (3); Step 4: installing the first layer of steel columns (101); Step 5, the first layer of steel beams (100) are hoisted and adjusted in elevation in sequence: first, a mounting seat (1020) is welded at a designed position on the side of the steel column (101), and then the steel beam (100) is hoisted horizontally to the mounting seat (1020), and the end of the steel beam (100) is connected to the mounting seat (1020) via a connecting bridge (1021), and the connection position between the cross beam and the connecting column is adjusted by fasteners to achieve horizontal adjustment of the steel beam (100), and after the elevation and horizontality of the steel beam (100) are tested and qualified, the end of the steel beam (100) is welded to the mounting seat (1020); Step 6, installing the V-shaped support assembly (103): welding a connection seat (1034) on the steel beam (100) arranged at the bottom, installing connecting pieces (1033) at both ends of the first support beam (1030) and at both ends of the second support beam (1031), respectively, lifting the first support beam (1030) and the second support beam (1031) to the designed positions in sequence, plugging the connecting piece (1033) into the connection seat (1034) and temporarily fixing it with fasteners, and after the first support beam (1030) and the second support beam (1031) pass the support strength test, welding the connecting piece (1033) to the connection seat (1034), welding the connecting piece (1033) to the first support beam (1030), and welding the connecting piece (1033) to the second support beam (1031) in sequence; Step 7, cantilever beam installation: first install an embedded plate (21) at one end of the cantilever beam, then hoist the cantilever beam horizontally to the designed elevation, and install the other end on the steel beam (100) or the steel column (101) through the adjustable connection component (102), and the connection rib is connected to the first-layer core tube steel frame (20); Step 8, tying the steel bars between the first layer of steel columns (101): arranging steel bars on the upper and lower sides of the steel beam (100) and the upper and lower sides of the cantilevered cross beam, tying the ends of the steel bars to the steel columns (101), and then removing the first layer of steel beam support frame; Step 9, assembling and sealing the first layer of formwork: using BIM software to deepen the formwork, leaving space between the formwork and the steel beam (100) and the cantilever beam, installing a U-shaped opening at the reserved space, plugging the formwork into the U-shaped opening to form the first layer of casting formwork, and leaving gaps between the formwork and the steel beam (100) and between the formwork and the cantilever beam and sealing the gaps with foam glue; Step 10, pouring the first layer of concrete: pouring concrete in the first layer of pouring formwork to form a reinforced concrete pouring layer; Step 11: Construction of the upper steel-concrete structure truss layer: Repeat steps 2 to 10 until the construction of the multi-layer truss layer (1) is completed.
9. The construction method according to claim 8, characterized in that: In step six, a lifting frame (4) is used to lift the first support beam (1030) or the second support beam (1031) to the designed position; the lifting frame (4) comprises a ballast platform (40), a rectangular mounting frame (41), an electric hoist (42), a steel wire rope (43) and a walking roller (44); a walking roller (44) is installed at each of the four corners of the bottom of the ballast platform (40); a rectangular mounting frame (41) is vertically installed on one side of the top of the ballast platform (40); an electric hoist (42) is retractably installed at each of the two corners of the top of the rectangular mounting frame (41) via a chain; a grab hook (45) is hung on the electric hoist (42); and a plurality of steel wire ropes (43) are connected between the rectangular mounting frame (41) and the other side of the top of the ballast platform (40).
Citation Information
Patent Citations
Steel pipe concrete column and steel reinforced column concrete core wall mixed structure and mounting method
CN107795005A
Pre-assembling method for steel structure truss of reinforced layer of super high-rise building
CN108678398A
Frame-core tube construction method
CN113982115A
Synchronous construction method for steel structure frame and reinforced concrete core tube
CN116220384A
Giant frame and partition filling module combined high-rise modular building and construction method
CN118309177A
Cited By
Construction method of combined steel structure building
CN121273102A