Subway direct-current fault judgment and rapid recovery method
Through the power dispatching system, the DC fault of the subway is monitored and determined in real time, and the DC switch of the faulty station is disconnected and jumped to the adjacent station switches in parallel, which realizes rapid failure recovery and power supply recovery of the subway contact network, and solves the upward and downward contact of the faulty station in the existing technology. The problem of power outage in the network has improved the fault handling efficiency and emergency response level.
Patent Information
- Application Number
- CN202411199914.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-29
- Publication Date
- 2024-12-06
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology cannot effectively warn upstream and downstream stations of subway DC faults, resulting in power outages of upstream and downstream contact networks of faulty stations, affecting train operations, and low fault recovery efficiency.
Through the power scheduling system, monitor the power supply status of each station in real time, determine the current-type frame protection fault, disconnect the DC switch of the faulty station, jump to the switch of the adjacent station in parallel, open first and then restore, ensure that the double-side power supply of the contact network is restored and the fault is carried out Handle and repair, monitor the power supply status after the failure is restored, and automatically notify the operation and maintenance personnel.
It realizes rapid fault determination and recovery of the subway contact network, ensures normal power supply at the up and down stations, improves fault handling efficiency and emergency response level, and avoids interruption of train operations.
Smart Images

Figure CN119093293A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of urban rail transit power supply fault determination and maintenance, and in particular to a subway direct current fault determination and rapid recovery method. Background Art
[0002] Rail transit generally uses DC1500V to power the subway overhead contact network. Failures in the DC overhead contact network system have the most serious impact on the operation and service of rail transit. The action of the DC frame protection will cause power outages in the overhead contact network power supply area and the upstream and downstream adjacent power supply areas, affecting the operation of the train. Therefore, the power supply must be restored as soon as possible to ensure the operation of the train. According to the type of protection action, DC frame protection can be divided into current type and voltage type. The current type is the main protection method, and the voltage type is the backup protection measure. The current type frame protection is to detect the leakage current and trigger the protection device to protect. The voltage type frame protection is to start the protection measure after detecting that the voltage between the negative pole of the equipment and the equipment frame exceeds a certain value.
[0003] The Chinese utility model patent with authorization announcement number CN213240411U discloses a rail transit train circuit fault monitoring device, including a communication circuit, a voltage acquisition circuit, a current acquisition circuit and a single-chip microcomputer. The voltage acquisition circuit is connected to the train circuit through an input interface, and the collected voltage signal is fed back to the single-chip microcomputer in real time. The current acquisition circuit is connected to the communication circuit through an input interface, and the collected current signal is fed back to the single-chip microcomputer in real time. The specific location of the fault is determined by the single-chip microcomputer.
[0004] Although the above patent can realize rapid monitoring of faults, this monitoring is often independent and has no relationship with the upstream station or downstream station where the fault occurs. However, in fact, when a fault occurs in a running station, the upstream station and downstream station of the faulty station also need to be warned at the same time. Summary of the invention
[0005] In order to overcome the deficiencies in the prior art, the present invention provides a subway DC fault determination and rapid recovery method.
[0006] To achieve the above-mentioned purpose, the present invention discloses a method for determining and quickly restoring a DC fault in a subway, comprising the following steps:
[0007] (S1) The power dispatching system monitors the operating status of the power supply system of each subway station in real time by collecting data;
[0008] (S2) When the power dispatching system detects the current action signal of the current type frame protection, the opening information of the two uplink DC switches and the two downlink DC switches of the station where the fault occurs, and the opening information of the uplink DC switches and the downlink DC switches of the previous station and the next station adjacent to the station where the fault occurs, it is determined that there is a DC fault of the current type frame protection of the subway overhead line;
[0009] (S3) When it is determined that the current-type frame protection DC fault occurs, all four DC switches of the faulty station are tripped and separated, and the uplink DC switches and downlink DC switches of the two adjacent stations are tripped together, resulting in power outages of the uplink and downlink contact networks of the station and the two adjacent stations; based on the principle of first opening and then restoring, the signal is restored first, the faulty station is shut down, the two stations adjacent to the faulty station resume operation, and then the contact switch of the faulty station is closed, and the contact network is powered on both sides to resume subway operation, and then the fault is handled and repaired;
[0010] (S4) Before fault recovery, it is necessary to check whether the switch blades of the two stations adjacent to the faulty station meet the remote control conditions. If the switch blades meet the remote control conditions, the fault recovery is allowed. If any of the remote control conditions are not met, it is necessary to notify the corresponding personnel to handle it;
[0011] (S5) Fault recovery: First, the switches connected to the DC switch of the faulty station are opened respectively; secondly, the contact switches between the faulty station and the adjacent station are allowed to be closed and the contact switch closing operation is performed; then, the DC switch tripping function of the uplink and downlink contact networks of the faulty station and the adjacent station is released; finally, the DC switches of the uplink and downlink contact networks of the two adjacent stations are closed, thereby realizing large bilateral power supply;
[0012] (S6) After the fault is restored, the power dispatching system continues to monitor whether the station has restored normal power supply. If the faulty station has restored normal power supply, the power dispatching system notifies the operation and maintenance personnel that the DC fault power restoration is successful; if the faulty station still has not restored power supply, repeat steps (S3) to (S5). If steps (S3) to (S5) are repeated three times in a row and the faulty station still has not restored normal power supply, an intelligent voice alarm is automatically generated, and a text message is sent to notify the operation and maintenance personnel that the DC fault power restoration has failed.
[0013] Preferably, in step (S1), the data collected by the electric power dispatching system include switch status, knife switch status, remote signaling status of primary equipment such as protection devices, and current of power supply lines.
[0014] The present invention has the following technical effects:
[0015] (1) The overhead contact network in existing subways is usually powered by DC switches at two stations, and the DC switches at the two stations are generally set with a joint trip function, that is, when one switch trips and disconnects, the other will also trip. Based on this, when it is determined that there is a DC fault in the current frame protection of the subway overhead contact network, the faulty station and the two adjacent stations will be powered off together to ensure that the overhead contact network is completely isolated;
[0016] (2) After the fault is confirmed, the power supply of the upstream and downstream stations of the faulty station shall be restored on the principle of first opening and then restoring, so that the overhead contact network of the upstream and downstream stations can resume normal operation without delaying the normal operation of trains at the upstream and downstream stations;
[0017] (3) This scheme can improve the execution efficiency and emergency response level of subway rail transit fault identification and fault handling. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A wiring diagram for a subway system with three consecutive stations. DETAILED DESCRIPTION
[0019] The following is combined with Figure 1 The principles and features of the present invention are described, and the examples given are only used to explain the present invention, rather than to limit the scope of the present invention.
[0020] The method for determining and quickly restoring a DC fault in a subway includes the following steps:
[0021] (S1) The power dispatching system collects data to monitor the operating status of the power supply system of each subway station in real time. The data collected by the power dispatching system includes but is not limited to the switch status, knife switch status, remote signal status of primary equipment such as protection devices, and current of power supply lines. Figure 1 , attached Figure 1 A system wiring diagram for three consecutive adjacent subway stations is shown.
[0022] (S2) When the electric power dispatching system detects the current action signal of the current type frame protection, the disconnection information of the uplink DC switch and the downlink DC switch of the station where the fault occurs, and the disconnection information of the uplink DC switch and the downlink DC switch of the previous station and the next station adjacent to the station where the fault occurs, it is determined to be a DC fault of the subway overhead contact network current type frame protection. The switch disconnection information here mainly refers to whether the status of the knife switch has changed and whether the current value has changed. If a fault occurs at station 2, switches 211, 212, 213, and 214 will trip, and switches 213 and 214 of station 1 and switches 211 and 212 of station 3 will trip; if the electric power dispatching system detects the above-mentioned development tripping action, it is determined that a DC switch fault occurs at station 2.
[0023] (S3) When it is determined that the current-type frame protection DC fault occurs, all four DC switches at the faulty station are tripped and separated, and the uplink DC switches and downlink DC switches of the two adjacent stations are tripped together, resulting in power outages in the uplink and downlink contact networks of the station and the two adjacent stations; based on the principle of first-on and then-off, the signal is restored first, the faulty station is shut down, the two stations adjacent to the faulty station resume operation, and then the contact switch of the faulty station is closed, and the contact network is powered on both sides to resume subway operation, and then the fault is handled and repaired.
[0024] (S4) Before fault recovery, it is necessary to check whether the switch blades of the two stations adjacent to the faulty station meet the remote control conditions. When the switch blades meet the remote control conditions, the fault recovery is allowed. When any of the remote control conditions are not met, it is necessary to notify the corresponding personnel to handle it. The remote control conditions here are defined according to the actual situation. For example, the remote control permission and whether to post a sign can be defined. Among them, the remote control permission means that the switch and other equipment can be remotely controlled when they are in the remote permission state, and can only be operated on the equipment body when they are in the local state, which is convenient for debugging the equipment; whether to post a sign means that the equipment will be posted in special circumstances such as when it needs maintenance, and the equipment cannot be remotely controlled at this time.
[0025] (S5) Fault recovery: First, the switches connected to the faulty station and the DC switches are opened respectively; secondly, the connecting switches between the faulty station and the adjacent station are allowed to be closed and the connecting switch closing operation is performed; then, the DC switch tripping function of the uplink and downlink contact networks of the faulty station and the adjacent station is released; finally, the DC switches of the uplink and downlink contact networks of the two adjacent stations are closed, thereby realizing large bilateral power supply.
[0026] (S6) After the fault is restored, the power dispatching system continues to monitor whether the station has restored normal power supply. If the faulty station has restored normal power supply, the power dispatching system notifies the operation and maintenance personnel that the DC fault power restoration is successful; if the faulty station still has not restored power supply, repeat steps (S3) to (S5). If steps (S3) to (S5) are repeated three times in a row and the faulty station still has not restored normal power supply, an intelligent voice alarm is automatically generated, and a text message is sent to notify the operation and maintenance personnel that the DC fault power restoration has failed.
Claims
1. Metro DC fault determination and rapid recovery method, It is characterized in that The following steps are involved: (S1) The power dispatching system monitors the operating status of the power supply system of each subway station in real time by collecting data; (S2) When the power dispatching system detects the current action signal of the current type frame protection, the tripping information of the uplink DC switch and the downlink DC switch of the station where the fault occurs, and the tripping information of the uplink DC switch and the downlink DC switch of the previous station and the next station adjacent to the station where the fault occurs, it is determined that there is a DC fault of the current type frame protection of the subway overhead line; (S3) When it is determined that the current-type frame protection DC fault occurs, all four DC switches of the faulty station are tripped and separated, and the uplink DC switches and downlink DC switches of the two adjacent stations are tripped together, resulting in power outages of the uplink and downlink contact networks of the station and the two adjacent stations; based on the principle of first opening and then restoring, the signal is restored first, the faulty station is shut down, the two stations adjacent to the faulty station resume operation, and then the contact switch of the faulty station is closed, and the contact network is powered on both sides to resume subway operation, and then the fault is handled and repaired; (S4) Before fault recovery, it is necessary to check whether the switch blades of the two stations adjacent to the faulty station meet the remote control conditions. If the switch blades meet the remote control conditions, the fault recovery is allowed. If any of the remote control conditions are not met, it is necessary to notify the corresponding personnel to handle it; (S5) Fault recovery: First, the switches connected to the DC switch of the faulty station are opened respectively; secondly, the contact switches between the faulty station and the adjacent station are allowed to be closed and the contact switch closing operation is performed; then, the DC switch tripping function of the uplink and downlink contact networks of the faulty station and the adjacent station is released; finally, the DC switches of the uplink and downlink contact networks of the two adjacent stations are closed, thereby realizing large bilateral power supply; (S6) After the fault is restored, the power dispatching system continues to monitor whether the station has restored normal power supply. If the faulty station has restored normal power supply, the power dispatching system notifies the operation and maintenance personnel that the DC fault power restoration is successful; if the faulty station still has not restored power supply, repeat steps (S3) to (S5). If steps (S3) to (S5) are repeated three times in a row and the faulty station still has not restored normal power supply, an intelligent voice alarm is automatically generated, and a text message is sent to notify the operation and maintenance personnel that the DC fault power restoration has failed.
2. The subway DC fault determination and rapid recovery method according to claim 1, It is characterized in that In step (S1), the data collected by the power dispatching system include switch status, knife switch status, remote signaling status of primary equipment such as protection devices, and current of power supply lines.
Citation Information
Patent Citations
Method for recovering power supply after stripping started by direct-current ground protection
CN105514926A
Self-healing power supply system for urban rail transit
CN112350309A
Current type frame protection method and device for direct current traction system
CN117039813A
Method for recovering power supply after tripping activated for direct-current ground protection
WO2017125011A1
