Storage production management method and system, electronic equipment and storage medium
By determining preset operating modes and task strategies in the warehousing management system and automatically calculating the production plan, the problem of low production efficiency caused by the existing warehousing management system relying on manual work is solved, digital automation of warehousing production management is realized, and efficiency and tasks are improved. quality.
Patent Information
- Application Number
- CN202410495335.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-12-13
AI Technical Summary
When the existing warehousing management system handles the surge in electronic orders, it has a high reliance on labor, resulting in low production efficiency.
By determining the preset operation mode and task strategy, automatically calculate the production plan based on the preset rules, generate job management tasks, and realize digital automation of warehousing production management.
Reliance on labor is reduced, production efficiency and task quality is improved, and the efficiency and accuracy of warehousing production management is improved through automated processing.
Smart Images

Figure CN119130314A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of warehouse management, and in particular to a warehouse production management method and system, electronic equipment and storage medium. Background Art
[0002] With the development of Internet technology, online shopping based on e-commerce platforms has entered people's daily lives. For example, one community group buying operation model is: the e-commerce platform configures one or more central warehouses offline, and the central warehouse is configured with multiple regional grid warehouses facing different regions, and each warehouse is linked to one or more offline service sites.
[0003] At present, warehouses are generally managed through WMS (Warehouse Management System). However, the inventors of this application found that the current WMS outbound plan relies more on "waves" (i.e. matching orders and inventory to generate work tasks) to generate tasks, and the quality and depth of tasks rely more on the control of waves by production managers. With the surge in the number of electronic orders, the current warehouse production management method will have the problem of high dependence on manual labor and low production efficiency. Summary of the invention
[0004] The present application provides a warehouse production management method and system, an electronic device and a storage medium, which are used to solve the problems of high reliance on manual labor and low production efficiency in current warehouse management plans.
[0005] According to one aspect of the present application, the warehouse production management method includes: determining a preset operation mode and a preset task strategy corresponding to the preset operation mode; determining a production plan corresponding to the preset task strategy based on preset rules; preprocessing the demand within a preset period to obtain a preprocessing result; precalculating the preprocessing result based on the production plan to generate an operation management task.
[0006] According to some embodiments of the present application, determining a production plan corresponding to a preset task strategy based on preset rules includes: determining production strategies for different job partitions according to the preset rules; and generating a production plan based on the production strategies.
[0007] According to some embodiments of the present application, the preset rules include at least a preset work group of the job partition, a preset job time, a preset priority, and a decomposition rule for decomposing a preset task strategy.
[0008] According to some embodiments of the present application, preprocessing the demand order within a preset period to obtain a preprocessing result includes: screening target information that meets the requirements according to the production plan.
[0009] According to some embodiments of the present application, precalculating the preprocessing results based on the production plan further includes: storing the precalculated results in a local task pool.
[0010] According to another aspect of the present application, the present application provides a warehouse production management system, which includes a production plan determination unit, a preprocessing unit and a task processing unit. The production plan determination unit determines a preset operation mode and a preset task strategy corresponding to the preset operation mode, and determines a production plan corresponding to the preset task strategy based on preset rules; the preprocessing unit preprocesses the demand within a preset period to obtain a preprocessing result; the task processing unit precalculates the preprocessing result based on the production plan to generate an operation management task.
[0011] According to some embodiments of the present application, the production plan determination unit determines the production strategies for different job partitions according to preset rules, and generates a production plan based on the production strategies.
[0012] According to some embodiments of the present application, the preset rules include at least a preset work group of the job partition, a preset job time, a preset priority, and a decomposition rule for decomposing a preset task strategy.
[0013] According to some embodiments of the present application, the preprocessing unit screens target information that meets the requirements according to the production plan.
[0014] According to some embodiments of the present application, the warehouse production management system further includes a task pool unit, and the task processing unit further stores the pre-calculated results in the task pool unit.
[0015] According to another aspect of the present application, an electronic device is also provided. The electronic device includes: one or more processors; a storage device for storing one or more programs, and when the one or more programs are executed by the one or more processors, the one or more processors can implement the warehouse production management method described above.
[0016] According to another aspect of the present application, a non-volatile computer-readable storage medium is provided, wherein a computer program is stored on the storage medium, and the computer program can implement the warehouse production management method as described above.
[0017] The warehouse production management system provided in this application can automatically calculate the production plan based on a preset rule engine, and realize the hosting of the production plan by automatically creating and allocating the production plan, so that the operation process of warehouse production management can be digitally automated. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0019] Figure 1 A flowchart showing the warehousing production management method according to an embodiment of the present application;
[0020] Figure 2 A schematic diagram showing a preset operation mode of an embodiment of the present application;
[0021] Figure 3 A schematic diagram showing a preset task strategy of an embodiment of the present application;
[0022] Figure 4 Another flow chart showing the storage production management method of the embodiment of the present application;
[0023] Figure 5 A schematic diagram showing a production strategy of an embodiment of the present application;
[0024] Figure 6 A schematic diagram showing a production plan of an embodiment of the present application;
[0025] Figure 7 A schematic diagram showing the preprocessing of an embodiment of the present application;
[0026] Figure 8 A schematic diagram showing pre-calculation of an embodiment of the present application;
[0027] Fig. 9 A schematic diagram showing a job management task according to an embodiment of the present application;
[0028] Fig.10 A schematic diagram showing a storage production management method according to an embodiment of the present application;
[0029] Fig.11 A schematic diagram showing a warehouse production management system according to an embodiment of the present application.
[0030] Description of reference numerals:
[0031] Warehouse production management system 1; production plan determination unit 10; pre-processing unit 20; task processing unit 30; task pool unit 40. DETAILED DESCRIPTION
[0032] The user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data used for analysis, stored data, displayed data, etc.) involved in this application are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with the relevant laws, regulations and standards of relevant countries and regions, and provide corresponding operation entrances for users to choose to authorize or refuse.
[0033] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in many forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this application will be comprehensive and complete and will fully convey the concepts of the example embodiments to those skilled in the art. The same reference numerals in the figures represent the same or similar parts, and thus their repeated description will be omitted.
[0034] The described features, structures or characteristics may be combined in one or more embodiments in any suitable manner. In the following description, many specific details are provided to provide a full understanding of the embodiments of the present disclosure. However, those skilled in the art will appreciate that the technical solutions of the present disclosure may be practiced without one or more of these specific details, or other modes, components, materials, devices, etc. may be adopted. In these cases, known structures, methods, devices, implementations, materials or operations will not be shown or described in detail.
[0035] In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but may optionally include steps or units that are not listed, or may optionally include other steps or units that are inherent to these processes, methods, products or devices.
[0036] The terms "first", "second" and the like in the specification and claims of this application and the above drawings are used to distinguish different objects rather than to describe a specific order.
[0037] The following is a clear and complete description of the technical solution of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.
[0038] According to one aspect of the present application, the present application provides a warehouse production management method, which can be executed by a warehouse production management system.
[0039] Figure 1 A flow chart showing the storage production management method of an embodiment of the present application is shown. Figure 1 As shown, the warehouse production management method includes steps S100-S400.
[0040] In step S100, the warehouse production management system determines a preset operation mode and a preset task strategy corresponding to the preset operation mode.
[0041] The preset operation mode can be an operation solution defined and designed by the warehouse management personnel according to the preset rules. Each preset operation mode corresponds to a detailed preset task strategy, and the preset task strategy can also be defined and designed by the warehouse management personnel according to the preset operation mode according to the preset rules.
[0042] Figure 2 A schematic diagram showing a preset operation mode of an embodiment of the present application. Figure 3 A schematic diagram showing a preset task strategy according to an embodiment of the present application.
[0043] Taking the warehousing of an e-commerce platform based on community group buying as an example, its preset operation mode can be the operation solution adopted by a specified warehouse partition. Figure 2 As shown, the operation solution of the warehouse or a certain warehouse partition can be customized by the user, such as "fruit and vegetable solution", "normal temperature fruit picking solution" or "cold chain solution". Figure 3 , Figure 3 The detailed task strategy corresponding to the "fruit and vegetable solution" is shown. Both the operation mode and the task strategy can be preset according to user needs.
[0044] In step S200, the warehouse production management system determines a production plan corresponding to a preset task strategy based on preset rules.
[0045] The warehouse production management system determines the production plan corresponding to the preset task strategy according to the preset rules customized by the user.
[0046] According to the example embodiment, the warehouse production management system can automatically calculate the production plan based on the preset rule engine. By automatically creating and allocating the production plan, the production plan can be managed, so that the operation process of warehouse production management can be digitally automated.
[0047] Figure 4 Another flow chart showing the storage production management method of the embodiment of the present application; Figure 5 A schematic diagram showing a production strategy of an embodiment of the present application; Figure 6 A schematic diagram showing a production plan according to an embodiment of the present application.
[0048] Alternatively, if Figure 4 As shown, step S200 may further include steps S210-S220.
[0049] In step S210, the warehouse production management system determines the production strategies for different operation zones according to preset rules.
[0050] Optionally, the preset rules include at least a preset work group of the job partition, a preset job time, a preset priority, and a decomposition rule for decomposing a preset task strategy.
[0051] According to an example embodiment, the warehouse production management system configures a work group of a certain job partition according to preset rules customized by the user, generates a production strategy for the job partition at a preset time according to a preset demand priority (referring to the priority level of the pre-calculated tasks) and a further refinement of the preset task strategy (i.e., decomposition rules).
[0052] For example, Figure 5 As shown, different working groups generate corresponding task strategies within the specified time period according to the preset production content / demand priorities and detailed selection of solutions.
[0053] In step S220, the warehouse production management system generates a production plan based on the production strategy.
[0054] For example, Figure 6 As shown, the warehouse production management system combines various production strategies to generate a production plan, and configures and selects production plan versions.
[0055] In step S300, the warehouse production management system preprocesses the demand within a preset period to obtain a preprocessing result.
[0056] Figure 7 A schematic diagram showing the preprocessing of an embodiment of the present application; Figure 8 A schematic diagram showing pre-calculation of an embodiment of the present application; Fig. 9 A schematic diagram showing a job management task according to an embodiment of the present application.
[0057] According to an exemplary embodiment, the demand can be customized according to the management purpose of the warehouse management personnel. For example, the demand can be order information from an e-commerce platform.
[0058] The warehouse production management system performs demand preprocessing on order information every 1 minute to obtain the preprocessing results. Figure 7 As shown, the preprocessing results include but are not limited to grid warehouses, categories, grid warehouse cold chain groups, grid warehouse container groups, grid warehouse SLA groups, product attributes, product labels, product sales and product sales rankings.
[0059] Alternatively, if Figure 7 As shown, the demand preprocessing results may also include abnormality inspection results, etc.
[0060] Optionally, step S300 may also include the warehouse production management system screening target information that meets the requirements according to the production plan.
[0061] Exemplarily, the target information may be order information.
[0062] For example, the warehouse production management system can query the corresponding production strategy based on the production plan, and then obtain the priority of the demand order or other preset rule information, and combine the information of the current demand order to be processed (such as the grid warehouse or order demand quantity, etc.) to filter out the order information that meets the rules.
[0063] In step S400, the warehouse production management system pre-calculates the pre-processing results based on the production plan and generates a job management task.
[0064] The warehouse production management system calculates the preprocessing results in combination with the inventory occupancy strategy and task generation strategy at a preset cycle time (e.g., every 5 minutes). Figure 8 As shown, the warehouse production management system matches inventory and demand according to the existing occupancy strategy to obtain occupancy results, and obtains operational task partitions based on the production plan and occupancy results.
[0065] like Fig. 9 As shown, the warehouse production management system generates job management tasks to automatically assign job management tasks to workers based on their task capabilities and portraits; and production management personnel can make corresponding adjustments to worker portraits based on job management tasks and production progress requirements.
[0066] Optionally, in step S400, the warehouse production management system may also save the pre-calculation result to a local task pool.
[0067] Exemplarily, the local task pool may be a virtual task pool based on a cache. Based on the pre-calculation method and the storage task pool method, the warehouse production management system can calculate and generate the job management tasks in a relatively fast time.
[0068] Fig.10 A schematic diagram of the storage production management method of the embodiment of the present application is shown. Fig.10 The warehouse production management method described above is introduced by way of example.
[0069] like Fig.10As shown in the figure, based on the warehouse production management system, logistics planners perform the design and definition of the operation mode, warehouse production personnel determine the task strategy and production strategy, and after the warehouse production management system generates the operation management task, the warehouse management personnel determine the labor profile according to the conditions to schedule and adjust the production partition of the work group. Fig.10 As shown, the warehouse production management system can automatically calculate and generate job management tasks, and can support the allocation, recalculation and structural optimization of job management tasks.
[0070] Through the above-mentioned example embodiments, the warehouse production management system provided by the present application can automatically realize the calculation of production plans based on a preset rule engine, and realize the hosting of production plans by automatically creating and allocating production plans, so that the operation process of warehouse production management can be digitally automated.
[0071] The warehouse production management system can avoid manual intervention in tasks based on waves through the automatic generation of production plans, reduce dependence on manual labor, and effectively improve operational efficiency. And by automatically allocating or recalculating operation management tasks, unassigned tasks can be continuously optimized, which can improve production efficiency and task quality.
[0072] The warehouse production management system can enable warehouse managers to perform warehouse production management according to the operation management tasks by issuing operation management tasks, so that operation tasks can be accurately allocated according to the ability characteristics of the labor force, thereby improving the efficiency of task execution.
[0073] According to another aspect of the present application, the present application also provides a warehouse production management system.
[0074] Fig.11 A schematic diagram of a warehouse production management system according to an embodiment of the present application is shown. Fig.11 As shown, the warehouse production management system 1 includes a production plan determination unit 10 , a preprocessing unit 20 , a task processing unit 30 and a task pool unit 40 .
[0075] According to an exemplary embodiment, the production plan determination unit 10 determines a preset operation mode and a preset task strategy corresponding to the preset operation mode.
[0076] The preset operation mode can be an operation solution defined and designed by the warehouse management personnel according to the preset rules. Each preset operation mode corresponds to a detailed preset task strategy, and the preset task strategy can also be defined and designed by the warehouse management personnel according to the preset operation mode according to the preset rules.
[0077] Taking the warehousing of an e-commerce platform based on community group buying as an example, its preset operation mode can be the operation solution adopted by a specified warehouse partition. For example, the operation solution of the warehouse or a certain warehouse partition can be a user-defined "fruit and vegetable solution", "normal temperature fruit picking solution" or "cold chain solution". Both the operation mode and task strategy can be preset according to user needs.
[0078] The production plan determination unit 10 determines a production plan corresponding to a preset task strategy based on preset rules.
[0079] The production plan determination unit 10 determines a production plan corresponding to a preset task strategy according to preset rules customized by a user.
[0080] According to the exemplary embodiment, the production plan determination unit 10 can automatically calculate the production plan based on a preset rule engine. By automatically creating and allocating the production plan, the production plan can be managed, so that the operation process of warehouse production management can be digitally automated.
[0081] Optionally, the production plan determination unit 10 determines the production strategies for different operation partitions according to preset rules.
[0082] Optionally, the preset rules include at least a preset work group of the job partition, a preset job time, a preset priority, and a decomposition rule for decomposing a preset task strategy.
[0083] The production plan determination unit 10 configures a work group of a certain job partition according to the preset rules customized by the user at the preset time, and generates the production strategy of the job partition according to the preset demand priority (referring to the priority of the pre-calculated tasks) and the further refinement of the preset task strategy (i.e., the decomposition rules).
[0084] For example, the production plan determination unit 10 generates corresponding task strategies according to different work groups within a specified time period, according to the preset production content / demand priorities, and detailed selection of solutions.
[0085] Optionally, the production plan determination unit 10 generates a production plan based on a production strategy.
[0086] For example, the production plan determination unit 10 combines various production strategies to generate a production plan, and configures and selects a production plan version.
[0087] According to an exemplary embodiment, the preprocessing unit 20 preprocesses the demand within a preset period to obtain a preprocessing result.
[0088] According to an exemplary embodiment, the demand can be customized according to the management purpose of the warehouse management personnel. For example, the demand can be order information from an e-commerce platform.
[0089] The preprocessing unit 20 performs demand preprocessing on the demand order once every 1 minute to obtain a preprocessing result. For example, the preprocessing result includes but is not limited to grid warehouse, category, grid warehouse cold chain group, grid warehouse container group, grid warehouse SLA group, product attribute, product label, product sales volume and product sales volume ranking, etc.
[0090] Optionally, the demand preprocessing result may also include anomaly detection results and the like.
[0091] Optionally, the preprocessing unit 20 filters target information that meets the requirements according to the production plan.
[0092] Exemplarily, the target information is order information.
[0093] For example, the preprocessing unit 20 can query the corresponding production strategy based on the production plan, and then obtain the priority of the demand order or other preset rule information, and combine the information of the current demand order to be processed (such as the grid warehouse or order demand quantity, etc.) to filter out the order information that meets the rules.
[0094] According to an exemplary embodiment, the task processing unit 30 pre-calculates the pre-processing result based on the production plan and generates a job management task.
[0095] The task processing unit 30 combines the preprocessing results with the inventory occupancy strategy and the task generation strategy for calculation at a preset cycle time (e.g., every 5 minutes). The task processing unit 30 matches the inventory and demand according to the existing occupancy strategy, obtains the occupancy result, and obtains the operable task partition according to the production plan and the occupancy result.
[0096] For example, the task processing unit 30 generates job management tasks to automatically assign job management tasks to workers based on their task capabilities and profiles; and production management personnel can make corresponding adjustments to worker profiles based on job management tasks and production progress requirements.
[0097] Alternatively, if Fig.11 As shown, the warehouse production management system 1 further includes a task pool unit 40. The task processing unit 30 also stores the pre-calculated result in the task pool unit 40.
[0098] Exemplarily, the task pool unit 40 may be a virtual task pool based on a cache. Based on the pre-calculation method and the method of storing the task pool, the task processing unit 30 may calculate and generate the job management task in a relatively fast time.
[0099] Through the above-mentioned example embodiments, the warehouse production management system provided by the present application can automatically realize the calculation of production plans based on a preset rule engine, and realize the hosting of production plans by automatically creating and allocating production plans, so that the operation process of warehouse production management can be digitally automated.
[0100] The warehouse production management system can avoid manual intervention in tasks based on waves through the automatic generation of production plans, reduce dependence on manual labor, and effectively improve operational efficiency. And by automatically allocating or recalculating operation management tasks, unassigned tasks can be continuously optimized, which can improve production efficiency and task quality.
[0101] The warehouse production management system can enable warehouse managers to perform warehouse production management according to the operation management tasks by issuing operation management tasks, so that operation tasks can be accurately allocated according to the ability characteristics of the labor force, thereby improving the efficiency of task execution.
[0102] According to another aspect of the present application, an electronic device is also provided. The electronic device includes: one or more processors; a storage device for storing one or more programs, and when the one or more programs are executed by the one or more processors, the one or more processors can implement the warehouse production management method described above.
[0103] According to another aspect of the present application, a non-volatile computer-readable storage medium is provided, wherein a computer program is stored on the storage medium, and the computer program can implement the warehouse production management method as described above.
[0104] Finally, it should be noted that the above is only a preferred embodiment of the present application and is not intended to limit the present application. Although the present application is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions of the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A warehouse production management method, characterized in that: include: Determine a preset operation mode and a preset task strategy corresponding to the preset operation mode; Determine a production plan corresponding to the preset task strategy based on preset rules; Preprocess the requirements within a preset period to obtain preprocessing results; The preprocessing result is pre-calculated based on the production plan to generate a job management task.
2. The warehousing production management method according to claim 1, characterized in that: Determining the production plan corresponding to the preset task strategy based on the preset rules includes: Determine production strategies for different operation partitions based on preset rules; The production plan is generated based on the production strategy.
3. The warehousing production management method according to claim 2, characterized in that: The preset rules at least include a preset work group, a preset work time, a preset priority, and a decomposition rule for decomposing a preset task strategy of the job partition.
4. The warehousing production management method according to claim 1, characterized in that: The preprocessing of the demand order within a preset period to obtain a preprocessing result includes: Filter target information that meets the requirements according to the production plan.
5. The warehousing production management method according to claim 1, characterized in that: The pre-calculating the pre-processing result based on the production plan further comprises: Store the precomputed results in the local task pool.
6. A warehouse production management system, characterized in that: include: A production plan determination unit, which determines a preset operation mode and a preset task strategy corresponding to the preset operation mode, and determines a production plan corresponding to the preset task strategy based on preset rules; A preprocessing unit preprocesses the demand within a preset period to obtain a preprocessing result; The task processing unit pre-calculates the pre-processing result based on the production plan to generate a job management task.
7. The warehouse production management system according to claim 6, characterized in that: The production plan determination unit determines production strategies for different operation zones according to preset rules, and generates the production plan based on the production strategies.
8. The warehouse production management system according to claim 7, characterized in that: The preset rules at least include a preset work group, a preset work time, a preset priority, and a decomposition rule for decomposing a preset task strategy of the job partition.
9. The warehouse production management system according to claim 6, characterized in that: The preprocessing unit screens target information that meets the requirements according to the production plan.
10. The warehouse production management system according to claim 6, characterized in that: Also includes: The task pool unit, the task processing unit also stores the pre-calculated results in the task pool unit.
11. An electronic device, characterized in that: include: one or more processors; A storage device for storing one or more programs; When the one or more programs are executed by the one or more processors, the one or more processors implement the warehouse production management method as described in any one of claims 1-5.
12. A non-volatile computer-readable storage medium having a computer program stored thereon, characterized in that: The computer program implements the warehouse production management method as described in any one of claims 1-5.
